A photovoltaic carrying capacity assessment method and system based on communication-based reliable regulation
By acquiring basic data and communication parameters of the power distribution network, determining the reliable control coefficient of communication, and combining the losses and construction costs of photovoltaic control equipment, the problem of overly optimistic photovoltaic carrying capacity assessment results in existing technologies has been solved, achieving accurate photovoltaic carrying capacity assessment and economically reasonable improvement path selection.
Patent Information
- Application Number
- CN202611629240.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-21
- Publication Date
- 2026-11-17
AI Technical Summary
Existing photovoltaic carrying capacity assessment methods fail to accurately reflect the comprehensive benefits of communication control schemes, leading to overly optimistic assessment results and failing to provide a reasonable quantitative basis for decision-making on improving the photovoltaic carrying capacity of distribution networks.
By acquiring basic operational data, communication performance parameters, and historical control command execution records of the target distribution network, the reliable control coefficient of communication is determined. Based on this, the theoretical photovoltaic carrying capacity improvement is calculated. Combining the cumulative loss of photovoltaic control equipment and communication construction costs, the cost of improving the reliable photovoltaic carrying capacity is quantified, and the photovoltaic carrying capacity assessment results are output.
This approach enables a true reflection of the actual improvement effect of control measures on photovoltaic carrying capacity under different communication conditions, improves the accuracy of assessment results, and provides a quantitative basis for the economic rationality of photovoltaic carrying capacity improvement schemes for distribution networks.
Smart Images

Figure CN123117937A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of photovoltaic grid connection assessment technology, and in particular to a photovoltaic carrying capacity assessment method and system based on reliable communication control. Background Technology
[0002] As the penetration rate of distributed photovoltaic (PV) power in distribution networks continues to rise, the spatial and temporal mismatch between PV output and load is intensifying. Problems such as voltage exceeding limits, line overload, and reverse power flow are becoming increasingly prominent, severely restricting further PV integration. To improve the distribution network's capacity to accommodate PV, the industry typically relies on various control measures to implement real-time control of PV inverters, thereby releasing additional PV capacity while meeting safety constraints. Therefore, how to scientifically evaluate the actual improvement effect of control measures on PV carrying capacity has become a key technical issue in distribution network planning and operation.
[0003] However, existing photovoltaic carrying capacity assessment methods mostly focus on the grid topology and load characteristics themselves. When assessing the control gain, they often assume that the communication link is completely reliable and the control commands can be executed without loss. This leads to an overly optimistic assessment of the carrying capacity improvement, making it difficult for the assessment results to truly reflect the comprehensive benefits of the communication control scheme and failing to provide a reasonable quantitative basis for the decision-making on improving the photovoltaic carrying capacity of the distribution network. Summary of the Invention
[0004] This invention provides a photovoltaic carrying capacity assessment method and system based on reliable communication control, so as to provide a reasonable quantitative basis for decision-making on improving the photovoltaic carrying capacity of the distribution network.
[0005] To address the aforementioned technical problems, this invention provides, in one aspect, a photovoltaic load-bearing capacity assessment method based on reliable communication control, comprising: Acquire basic operating data, communication performance parameters, historical control command execution records, and communication construction cost parameters of the target distribution network, and determine at least one typical evaluation scenario based on the basic operating data; Based on the aforementioned communication performance parameters, determine the communication reliability control coefficient; Based on the basic operating data and the typical evaluation scenario, and under the premise of meeting the preset safe operation constraints, the theoretical photovoltaic carrying capacity improvement of the target distribution network is determined, and the theoretical photovoltaic carrying capacity improvement is converted based on the communication reliability control coefficient to obtain the photovoltaic reliability carrying capacity improvement. Based on the historical control command execution records, the cumulative loss of the photovoltaic control equipment is determined, and the cumulative loss is quantified as the command fatigue cost of the photovoltaic control equipment. Based on the photovoltaic reliable carrying capacity improvement amount, the instruction fatigue cost, and the communication construction cost parameters, the unit reliable carrying capacity improvement cost is determined, and the photovoltaic carrying capacity assessment result of the target distribution network is output based on the unit reliable carrying capacity improvement cost.
[0006] As one preferred embodiment, the communication performance parameters include communication latency, packet loss rate, link availability, and terminal coverage. The determination of the communication reliability control coefficient based on the communication performance parameters includes: Obtain the communication latency, packet loss rate, link availability, and terminal coverage corresponding to each candidate communication configuration scheme; The communication latency, packet loss rate, link availability and terminal coverage are respectively indexed and converted into communication quality index values. The weights corresponding to each of the communication quality index values are determined, and the corresponding communication reliability control coefficients are obtained based on each of the communication quality index values and the corresponding weights.
[0007] As one preferred embodiment, the historical control command execution record includes the frequency, amplitude, and duration of each command among the active power reduction command, reactive power adjustment command, and power factor adjustment command. The step of determining the cumulative loss of the photovoltaic control equipment based on the historical control command execution record includes: Based on the frequency of action corresponding to the active power reduction command, the switching losses of the switching devices in the photovoltaic control equipment are determined; Based on the action amplitude corresponding to the reactive power adjustment command, the conduction loss of the power devices in the photovoltaic control equipment is determined; The thermal stress accumulation level of the power devices in the photovoltaic control equipment is determined based on the duration corresponding to the power factor adjustment command. The cumulative loss is determined based on the switching loss, the conduction loss, and the thermal stress accumulation level.
[0008] As one preferred option, the communication construction cost parameter corresponds to at least two candidate communication configuration schemes; The process of determining the unit reliable carrying capacity improvement cost based on the photovoltaic reliable carrying capacity improvement amount, the command fatigue cost, and the communication construction cost parameters, and outputting the photovoltaic carrying capacity assessment result of the target distribution network based on the unit reliable carrying capacity improvement cost, includes: Obtain the network service costs and operation and maintenance costs corresponding to each of the candidate communication configuration schemes; The total control cost is obtained by summing the communication construction cost parameters, network service fees, operation and maintenance fees, and instruction fatigue costs corresponding to each candidate communication configuration scheme. The ratio of the total investment cost of regulation to the corresponding increase in photovoltaic credible carrying capacity is calculated, and the resulting ratio is determined as the corresponding unit cost of increasing credible carrying capacity. The candidate communication configuration schemes are sorted in ascending order according to their corresponding unit trusted carrying capacity improvement cost. The candidate communication configuration scheme with the lowest unit trusted carrying capacity improvement cost is determined as the photovoltaic carrying capacity improvement recommended scheme and output. Based on the recommended photovoltaic carrying capacity enhancement scheme and the corresponding unit credible carrying capacity enhancement cost, the photovoltaic carrying capacity assessment result of the target distribution network is output.
[0009] As one preferred embodiment, the preset safe operation constraints include power flow constraints of the distribution network, voltage over-limit constraints, line capacity constraints, and inverter regulation capability constraints. Determining the theoretical photovoltaic carrying capacity improvement of the target distribution network includes: Based on the aforementioned basic operational data, a power flow calculation model for the target distribution network is constructed. Without deploying control functions, taking the typical evaluation scenario as the operating condition, the power flow constraints of the distribution network, the voltage over-limit constraints, and the line capacity constraints are used as the constraints of the power flow calculation model. The photovoltaic access capacity is used as the optimization variable, and the optimization objective is to maximize the photovoltaic access capacity to obtain the maximum photovoltaic capacity that can be accessed without control. Under the condition of deploying control functions, taking the typical evaluation scenario as the operating condition, the power flow constraints of the distribution network, the voltage over-limit constraints, the line capacity constraints, and the inverter regulation capability constraints are used as the constraints of the power flow calculation model. The photovoltaic access capacity is used as the optimization variable and the optimization objective is to maximize the photovoltaic access capacity to obtain the maximum controllable photovoltaic capacity. The difference between the maximum accessible photovoltaic capacity with regulation and the maximum accessible photovoltaic capacity without regulation is determined as the theoretical photovoltaic carrying capacity improvement.
[0010] This invention provides a photovoltaic carrying capacity assessment system based on reliable communication control, comprising: The acquisition module is used to acquire basic operating data, communication performance parameters, historical control command execution records and communication construction cost parameters of the target distribution network, and determine at least one typical evaluation scenario based on the basic operating data; The first evaluation module is used to determine the communication reliability control coefficient based on the communication performance parameters. The first calculation module is used to determine the theoretical photovoltaic carrying capacity improvement of the target distribution network based on the basic operating data and the typical evaluation scenario, under the premise of meeting the preset safe operation constraints, and to perform conversion processing on the theoretical photovoltaic carrying capacity improvement based on the communication reliability control coefficient to obtain the photovoltaic reliability carrying capacity improvement. The second calculation module is used to determine the cumulative loss of the photovoltaic control equipment based on the historical control command execution records, and quantify the cumulative loss as the command fatigue cost of the photovoltaic control equipment. The second evaluation module is used to determine the unit reliable carrying capacity improvement cost based on the photovoltaic reliable carrying capacity improvement amount, the instruction fatigue cost, and the communication construction cost parameters, and output the photovoltaic carrying capacity evaluation result of the target distribution network based on the unit reliable carrying capacity improvement cost.
[0011] As one preferred embodiment, the communication performance parameters include communication latency, packet loss rate, link availability, and terminal coverage. The first evaluation module is specifically used for: Obtain the communication latency, packet loss rate, link availability, and terminal coverage corresponding to each candidate communication configuration scheme; The communication latency, packet loss rate, link availability and terminal coverage are respectively indexed and converted into communication quality index values. The weights corresponding to each of the communication quality index values are determined, and the corresponding communication reliability control coefficients are obtained based on each of the communication quality index values and the corresponding weights.
[0012] As one preferred embodiment, the historical control command execution record includes the frequency, amplitude, and duration of each command among the active power reduction command, reactive power adjustment command, and power factor adjustment command. The second calculation module is specifically used for: Based on the frequency of action corresponding to the active power reduction command, the switching losses of the switching devices in the photovoltaic control equipment are determined; Based on the action amplitude corresponding to the reactive power adjustment command, the conduction loss of the power devices in the photovoltaic control equipment is determined; The thermal stress accumulation level of the power devices in the photovoltaic control equipment is determined based on the duration corresponding to the power factor adjustment command. The cumulative loss is determined based on the switching loss, the conduction loss, and the thermal stress accumulation level.
[0013] As one preferred option, the communication construction cost parameter corresponds to at least two candidate communication configuration schemes; The second evaluation module is specifically used for: Obtain the network service costs and operation and maintenance costs corresponding to each of the candidate communication configuration schemes; The total control cost is obtained by summing the communication construction cost parameters, network service fees, operation and maintenance fees, and instruction fatigue costs corresponding to each candidate communication configuration scheme. The ratio of the total investment cost of regulation to the corresponding increase in photovoltaic credible carrying capacity is calculated, and the resulting ratio is determined as the corresponding unit cost of increasing credible carrying capacity. The candidate communication configuration schemes are sorted in ascending order according to their corresponding unit trusted carrying capacity improvement cost. The candidate communication configuration scheme with the lowest unit trusted carrying capacity improvement cost is determined as the photovoltaic carrying capacity improvement recommended scheme and output. Based on the recommended photovoltaic carrying capacity enhancement scheme and the corresponding unit credible carrying capacity enhancement cost, the photovoltaic carrying capacity assessment result of the target distribution network is output.
[0014] As one preferred embodiment, the preset safe operation constraints include power flow constraints of the distribution network, voltage over-limit constraints, line capacity constraints, and inverter regulation capability constraints. The first calculation module is specifically used for: Based on the aforementioned basic operational data, a power flow calculation model for the target distribution network is constructed. Without deploying control functions, taking the typical evaluation scenario as the operating condition, the power flow constraints of the distribution network, the voltage over-limit constraints, and the line capacity constraints are used as the constraints of the power flow calculation model. The photovoltaic access capacity is used as the optimization variable, and the optimization objective is to maximize the photovoltaic access capacity to obtain the maximum photovoltaic capacity that can be accessed without control. Under the condition of deploying control functions, taking the typical evaluation scenario as the operating condition, the power flow constraints of the distribution network, the voltage over-limit constraints, the line capacity constraints, and the inverter regulation capability constraints are used as the constraints of the power flow calculation model. The photovoltaic access capacity is used as the optimization variable and the optimization objective is to maximize the photovoltaic access capacity to obtain the maximum controllable photovoltaic capacity. The difference between the maximum accessible photovoltaic capacity with regulation and the maximum accessible photovoltaic capacity without regulation is determined as the theoretical photovoltaic carrying capacity improvement.
[0015] Compared with the prior art, the beneficial effects of the present invention are at least one of the following: 1) This invention determines the communication reliability control coefficient based on communication performance parameters such as communication delay, packet loss rate, link availability, and terminal coverage. Based on this coefficient, the theoretical photovoltaic carrying capacity improvement is calculated. This incorporates the actual loss to the execution effect of control commands due to unreliable communication links into the carrying capacity assessment process. This avoids the problem of overly optimistic carrying capacity improvement caused by the assumption of completely reliable communication in existing technologies, ensuring that the assessment results truly reflect the actual improvement effect of control methods on photovoltaic carrying capacity under different communication conditions. Simultaneously, by determining the cumulative loss of photovoltaic control equipment through historical control command execution records and quantifying it as command fatigue cost, the implicit losses caused by frequent control command issuance are made explicit, further improving the accuracy of the assessment results.
[0016] 2) This invention further correlates the parameters of photovoltaic reliable carrying capacity improvement, command fatigue cost and communication construction cost to determine the unit reliable carrying capacity improvement cost. This allows the technical gains of communication regulation to be combined with economic factors such as communication construction investment and equipment losses under the same quantitative index for comprehensive measurement. This provides a quantitative basis for the comparison and decision-making of photovoltaic carrying capacity improvement schemes in distribution networks that takes into account both technical feasibility and economic rationality, and helps to select the optimal photovoltaic carrying capacity improvement path under a limited communication construction budget. Attached Figure Description
[0017] Figure 1 This is a flowchart illustrating a photovoltaic load-bearing capacity assessment method based on reliable communication control in one embodiment of the present invention. Figure 2 This is a structural block diagram of a photovoltaic load-bearing capacity assessment system based on reliable communication control in one embodiment of the present invention; Figure label: Among them, 11 is the acquisition module; 12 is the first evaluation module; 13 is the first calculation module; 14 is the second calculation module; and 15 is the second evaluation module. Detailed Implementation
[0018] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. The purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.
[0019] In the description of this invention, the terms "first," "second," "third," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined with "first," "second," "third," etc., may explicitly or implicitly include one or more of that feature. In the description of this invention, unless otherwise stated, "a plurality of" means two or more.
[0020] In the description of this invention, it should be noted that, unless otherwise defined, all technical and scientific terms used in this invention have the same meaning as commonly understood by one of ordinary skill in the art. The terminology used in this specification is for the purpose of describing specific embodiments only and is not intended to limit the invention. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0021] One embodiment of the present invention provides a photovoltaic carrying capacity assessment method based on reliable communication control. For details, please refer to [link to relevant documentation]. Figure 1 , Figure 1 The diagram shown is a flowchart of a photovoltaic carrying capacity assessment method based on reliable communication control in one embodiment of the present invention, which includes steps S1-S5: S1: Obtain basic operation data, communication performance parameters, historical control command execution records, and communication construction cost parameters of the target distribution network, and determine at least one typical evaluation scenario based on the basic operation data.
[0022] With the large-scale integration of distributed photovoltaic (PV) power into the distribution network, there is a significant spatiotemporal mismatch between PV output and load demand. Load demand is low during the midday PV peak generation period, easily leading to problems such as node voltage exceeding limits and line power flow exceeding limits. Conversely, PV output drops sharply during the evening peak load period, potentially causing line overload. Therefore, before evaluating the effect of communication control measures on improving the PV carrying capacity of the distribution network, it is necessary to comprehensively acquire basic information on the target distribution network across multiple dimensions, including electrical operation, communication links, control execution, and economics, to construct a complete and accurate evaluation data foundation. In this embodiment, basic operational data, communication performance parameters, historical control command execution records, and communication construction cost parameters of the target distribution network are acquired. Specifically, this includes extracting corresponding data from the distribution network dispatch automation system, communication network management platform, PV inverter operation and maintenance records, and communication engineering investment ledgers. Based on the basic operational data, at least one typical evaluation scenario is determined, providing data support for subsequent determination of the reliable communication control coefficient, calculation of the theoretical PV carrying capacity improvement, and economic evaluation.
[0023] Specifically, basic operational data refers to a set of parameters describing the electrical topology and operating status of the target distribution network. Preferably, the basic operational data includes, but is not limited to: the node topology connections of the target distribution network, the impedance parameters (resistance and reactance values) of each line, the rated voltage and allowable voltage deviation range of each node, the thermal stability capacity limits of each line, the typical load curves of each load node (including active and reactive load changes over time), the photovoltaic installed capacity and typical daily power output curves of each photovoltaic grid-connected point, and the types and rated parameters of the photovoltaic control equipment deployed in the target distribution network. It should be noted that the time span for acquiring the above-mentioned basic operational data can be flexibly set according to actual assessment needs. For example, operational data from any continuous period within the past year can be selected, which is not limited in this invention. In addition, the basic operational data may also include auxiliary parameters such as transformer capacity and reactive power compensation device configuration information in the target distribution network to comprehensively characterize the safe operating boundaries of the target distribution network.
[0024] Communication performance parameters refer to key indicators characterizing the impact of communication links in the target distribution network on the transmission quality of photovoltaic control commands. In this embodiment, communication performance parameters preferably include at least one of the following: communication latency (i.e., the transmission delay time from the master station to the execution end of the photovoltaic control equipment), communication packet loss rate (i.e., the proportion of control commands that are lost or erroneous during transmission), communication link availability (i.e., the proportion of time the communication link is in a normal and available state within the statistical period), and communication terminal coverage of photovoltaic control equipment (i.e., the proportion of photovoltaic control equipment that has been connected to the communication network and has remote control capabilities to the total number of photovoltaic control equipment in the target distribution network).
[0025] It should be noted that communication performance parameters can be obtained from historical monitoring data of the communication network management platform, or determined through on-site testing or simulation modeling. This invention does not limit the specific method of obtaining communication performance parameters. Furthermore, when different regions in the target distribution network use different types of communication methods (such as fiber optic communication, wireless public network communication, power line carrier communication, etc.), communication performance parameters can be obtained separately according to the communication method or region to reflect the differentiated impact of different communication links on the reliability of regulation.
[0026] Historical control command execution records refer to detailed records of control commands issued by the target distribution network dispatching master station to each photovoltaic control device and their actual execution status within a preset statistical period. In this embodiment, the historical control command execution records preferably include: the issuance time of each control command, the command type (such as active power reduction command, reactive power adjustment command, or power factor correction command), the command target value, the actual execution value of the photovoltaic control device, the command response time, and the status indicator of whether the command execution was successful. Furthermore, the historical control command execution records may also include information such as the cumulative number of control operations of each photovoltaic control device within the statistical period, the power adjustment range of a single control operation, and the cumulative adjustment duration, so as to determine the cumulative loss of the photovoltaic control device and quantify the command fatigue cost in subsequent steps.
[0027] Communication construction cost parameters refer to economic parameters related to the construction and operation and maintenance of the target distribution network communication control system. Preferably, communication construction cost parameters include, but are not limited to: one-time construction investment costs of the communication network (including fiber optic laying, communication base station construction, terminal equipment installation, etc.), annual operation and maintenance costs of the communication network, service rental costs of communication links, and communication module modification costs of photovoltaic control equipment. It should be noted that communication construction cost parameters can be obtained according to the communication construction method (such as new construction, expansion, or leasing), and this invention does not limit this.
[0028] After obtaining the aforementioned basic operational data, at least one typical evaluation scenario is determined based on this data. In this embodiment, a typical evaluation scenario refers to a set of operating conditions that can represent the operational characteristics of the target distribution network under different combinations of photovoltaic output and load demand.
[0029] Specifically, photovoltaic (PV) output curves and load curves can be extracted from basic operational data. These curves are then combined according to PV output levels (e.g., high PV output, medium PV output, zero PV output) and load levels (e.g., peak load, flat load, low load) to generate multiple candidate operating conditions. The condition with the most stringent or representative constraints on PV carrying capacity is selected as the typical evaluation scenario. Preferably, the typical evaluation scenario includes at least a scenario of high PV output and low load (where the risk of voltage exceeding limits is most prominent) and a scenario of zero PV output and peak load (where the risk of line overload is most prominent).
[0030] It should be noted that the number and selection method of typical assessment scenarios can be flexibly determined according to the actual operating characteristics of the target distribution network and the assessment accuracy requirements. For example, seasonal factors (summer and winter) and day type factors (weekdays and holidays) can be further incorporated for further subdivision. This invention does not limit the specific number and granularity of typical assessment scenarios. In addition, when determining typical assessment scenarios, the allowable voltage deviation range and line thermal stability capacity limit in the basic operating data can be combined to pre-screen candidate operating conditions for safety constraints, eliminating extreme operating conditions that obviously do not meet the preset safety operating constraints, so as to improve the calculation efficiency and reasonableness of the subsequent carrying capacity assessment.
[0031] Specifically, in one embodiment of the present invention, for a certain communication configuration scheme m, its average communication latency, communication packet loss rate, link availability, and terminal coverage are determined by the following formulas: in, T m The average communication latency for this communication configuration scheme; N m The number of valid instructions included in the statistics; For the first i The timing of the transmission of the control command; For the first i The terminal feedback time of each control command; P m For communication packet loss rate; This is the number of instructions that were lost or timed out and were not responded to within the statistical period; This represents the total number of instructions sent within the statistical period. A m Link availability; This refers to the normal operating time of the link. This represents the total duration of the statistical period. C m For terminal coverage; The number of photovoltaic terminals that can access communication networks and have control and response capabilities; To assess the total number of photovoltaic terminals within the region that need to be included in the regulation scope.
[0032] To ensure the representativeness of the assessment results, the annual operating data was divided into three typical scenarios: the first scenario is a midday solar power surge with low load, mainly used to assess voltage exceedance and reverse power flow risks; the second scenario is an evening load peak with a rapid decline in solar power output, mainly used to assess the impact of insufficient control response on system safety margin; the third scenario is a cloud cover or rapid output fluctuation scenario, mainly used to assess the impact of communication latency and the executability of control commands on the carrying capacity improvement effect. The above scenario division results serve as the basis for subsequent calculation of the communication reliability control coefficient and solar power carrying capacity assessment. See Table 1, which provides examples of key performance parameters for different communication configuration schemes.
[0033] Table 1 S2: Determine the communication reliability control coefficient based on the communication performance parameters.
[0034] In the assessment of photovoltaic (PV) carrying capacity in distribution networks, the communication link is the only channel through which control commands are transmitted from the dispatch master station to the execution end of the PV control equipment. Its transmission quality directly determines whether the control commands can be executed in a timely, complete, and accurate manner. However, the actual distribution network communication environment is affected by multiple factors, including fiber optic cable laying distance, wireless channel fading, network congestion, and terminal deployment progress. The reliability of control command execution varies significantly under different communication configurations. Existing technologies, when assessing carrying capacity improvement, typically assume the communication link is completely reliable, ignoring the actual impact of communication performance on control effectiveness, leading to overly optimistic assessment results.
[0035] To overcome the aforementioned shortcomings, this embodiment introduces the concept of a communication reliability control coefficient, which comprehensively characterizes the overall reliability of the execution of control commands under a specific communication configuration scheme. This embeds the quantitative impact of communication performance into the subsequent calculation of carrying capacity enhancement. In this embodiment, the communication reliability control coefficient ranges from greater than zero to less than or equal to one. When the communication link is perfectly ideal, the coefficient approaches one; when the communication link is severely degraded, the coefficient approaches zero. This invention does not impose any limitations on this.
[0036] Specifically, the communication latency, packet loss rate, link availability, and terminal coverage corresponding to each candidate communication configuration scheme are first obtained. In this embodiment, the candidate communication configuration scheme refers to the communication construction and operation and maintenance schemes available in the target power distribution network, such as fiber optic private network schemes, wireless public network schemes, power line carrier schemes, and combinations thereof. This invention does not limit the specific type and number of candidate communication configuration schemes.
[0037] Among them, communication latency refers to the end-to-end transmission delay time from the dispatch master station to the photovoltaic control equipment execution terminal receiving and confirming the control command, usually measured in milliseconds; packet loss rate refers to the proportion of control commands that are lost, timed out, or have bit errors during transmission through the communication link within the statistical period, out of the total number of commands issued; link availability rate refers to the proportion of the cumulative time during which the communication link is in a normal and usable state (i.e., meets the minimum transmission quality requirements) within the statistical period, out of the total time of the statistical period; terminal coverage rate refers to the proportion of the number of photovoltaic control equipment in the target distribution network that has been connected to the communication network and has remote control capabilities, out of the total number of photovoltaic control equipment. The above four communication performance parameters can be obtained from the historical monitoring logs of the communication network management platform, on-site communication test reports, and photovoltaic control equipment ledgers, respectively. It should be noted that when there are multiple communication methods mixed in the target distribution network, the corresponding communication performance parameters should be obtained for each candidate communication configuration scheme to reflect the performance differences between different schemes.
[0038] After obtaining the communication performance parameters of each candidate communication configuration scheme, the communication latency, packet loss rate, link availability, and terminal coverage are indexed, converting each communication performance parameter into a communication quality index value. Since higher values for communication latency and packet loss rate indicate worse communication quality (i.e., inverse indicators), while higher values for link availability and terminal coverage indicate better communication quality (i.e., positive indicators), the dimensions, value ranges, and directions of advantage / disadvantage of each parameter are different, making direct weighted summation impossible. Therefore, in this embodiment, indexing refers to mapping each communication performance parameter to a dimensionless communication quality index value ranging from zero to one, according to its direction of advantage / disadvantage and a preset reasonable value range.
[0039] Preferably, for communication latency, it can be compared with preset upper and lower latency thresholds. When the latency is less than or equal to the lower latency threshold, the corresponding communication quality index value is one; when the latency is greater than or equal to the upper latency threshold, the corresponding communication quality index value is zero; when the latency is between the upper and lower thresholds, the corresponding communication quality index value is determined by linear interpolation. For packet loss rate, a similar inverse mapping method is used, i.e., the index value is one when the packet loss rate is zero, and the index value is zero when the packet loss rate reaches the preset upper limit. For link availability and terminal coverage, a forward mapping method is used, i.e., the larger the value, the higher the corresponding communication quality index value. It should be noted that the preset parameters such as the upper latency threshold, lower latency threshold, and upper packet loss rate threshold can be determined according to the control response time requirements of the target distribution network and the communication engineering design specifications. This invention does not limit their specific values. In addition, besides the above linear mapping, the index processing method can also use piecewise mapping, logarithmic mapping, or lookup table mapping, etc., which are not limited here.
[0040] After obtaining the values of each communication quality indicator, the weights corresponding to each communication quality indicator value are determined, and the corresponding communication reliability control coefficient is obtained based on each communication quality indicator value and its corresponding weight. In this embodiment, the preferred methods for determining the weights include the following: the first is the equal-weight method, where each of the four communication quality indicator values is assigned the same weight; the second is the expert scoring method, where technical personnel in the field of distribution network communication and control subjectively assign weights to each indicator based on their engineering experience; the third is the analytic hierarchy process (AHP), where a pairwise comparison judgment matrix is constructed between each communication quality indicator, and the relative weights of each indicator are calculated after consistency verification. It should be noted that in practical engineering applications, the impact of communication latency and packet loss rate on the execution effect of control commands is usually more direct than that of link availability and terminal coverage. Therefore, it is preferable to assign relatively high weights to communication latency and packet loss rate, but this invention does not limit the specific values and determination methods of each weight. After determining each weight, a weighted summation operation is performed based on each communication quality indicator value and its corresponding weight to obtain the communication reliability control coefficient corresponding to the candidate communication configuration scheme. Preferably, the sum of all weights is one, to ensure that the value of the communication reliability control coefficient remains between zero and one.
[0041] Furthermore, it should be noted that when multiple candidate communication configuration schemes exist in the target distribution network, the above-mentioned indexing and weighted calculation process should be performed for each candidate communication configuration scheme to obtain the communication reliability control coefficient corresponding to each candidate communication configuration scheme. This is to allow for the evaluation of the reliable improvement in photovoltaic carrying capacity and the unit reliable carrying capacity improvement cost under different communication schemes in subsequent steps, providing a quantitative basis for the comparison of communication construction schemes. In addition, the statistical period for communication performance parameters can be flexibly set according to the evaluation needs. For example, communication operation data from the past three months, the past six months, or the past year can be selected for statistics. This invention does not impose any limitations on this. Preferably, to eliminate the interference of short-term communication fluctuations on the evaluation results, the statistical period should not be shorter than one month.
[0042] Specifically, in one embodiment of the present invention, the communication reliability control coefficient is defined as: in, K m For the first m Communication reliability control coefficient of similar communication configuration scheme; T m This represents the average communication delay. T max To meet the maximum allowable delay requirements for photovoltaic regulation; P m For communication packet loss rate; A m Link availability; Cm For terminal coverage; , , , These are the weighting coefficients corresponding to latency, packet loss rate, availability, and coverage, respectively, and they satisfy the following conditions: .
[0043] In this embodiment, the weighting coefficients are determined based on the sensitivity of the evaluation scenario to communication performance indicators. Specifically, the evaluation scenarios are first divided into fast voltage regulation scenarios, conventional power control scenarios, and low-frequency monitoring scenarios, and then the weight values corresponding to latency, packet loss rate, availability, and coverage are given respectively.
[0044] For rapid voltage regulation scenarios, since the control commands need to arrive quickly and be executed reliably, [the following is taken]: =0.40, =0.30, =0.20, =0.10; For conventional power regulation scenarios, the impact of various communication performance indicators on the regulation effect is relatively balanced, so take... , , =0.25, =0.25; For low-frequency monitoring scenarios, the focus is on the long-term online capability of the communication link and the coverage of the terminal, taking... , , =0.30, =0.40.
[0045] S3: Based on basic operational data and typical evaluation scenarios, under the premise of meeting preset safe operation constraints, determine the theoretical photovoltaic carrying capacity improvement of the target distribution network, and convert the theoretical photovoltaic carrying capacity improvement based on the communication reliability control coefficient to obtain the photovoltaic reliability carrying capacity improvement.
[0046] In the planning and operation evaluation of distributed photovoltaic (PV) grid integration, PV carrying capacity refers to the maximum installed PV capacity that the target distribution network can accommodate under the premise of meeting the safety operation constraints of the distribution network. When PV control functions such as active power reduction and reactive power regulation are deployed in the distribution network, problems such as voltage exceeding limits and line overload can be mitigated through active management, thereby increasing the PV capacity that can be integrated without changing the grid structure. However, the actual effectiveness of the control function is highly dependent on the reliability of the communication link. If the control command cannot be effectively executed due to excessive communication delay, severe packet loss, or lack of terminal coverage, the theoretical increase in carrying capacity will not be fully realized. Therefore, this embodiment, based on calculating the maximum PV capacity that can be integrated under both control and uncontrolled conditions, further introduces a communication reliability control coefficient to recalculate the theoretical increase, thereby obtaining the actual reliable PV carrying capacity increase under given communication conditions. This overcomes the shortcomings of existing technologies that ignore the impact of communication reliability on the control effect.
[0047] In this embodiment, a power flow calculation model of the target distribution network is first constructed based on basic operational data. Specifically, the power flow calculation model is a mathematical model that describes the voltage amplitude, phase angle, and active and reactive power flow distribution of each node under steady-state operating conditions. It is based on the node topology of the target distribution network, uses the active and reactive power balance of each node as the fundamental equations, and the impedance parameters of each line as network parameters. When constructing the power flow calculation model, each load node in the target distribution network is considered a PQ node (i.e., a node with known active and reactive power), the photovoltaic grid connection point is considered a PQ node or a PV node (depending on whether the photovoltaic inverter has voltage regulation capability), and the upstream substation bus is considered a balancing node (i.e., a reference node with known voltage amplitude and phase angle).
[0048] It should be noted that the power flow calculation model can be constructed using any of the following methods: forward-backward substitution, Newton-Raphson method, or fast decoupling method. This invention does not limit the specific solution algorithm for power flow calculation. Furthermore, when the target distribution network is a weak-loop network or a radial network containing distributed generation sources, parameters such as line-to-ground capacitance and transformer turns ratio should also be included in the power flow calculation model to improve the calculation accuracy.
[0049] Without deploying control functions, taking a typical evaluation scenario as the operating condition, the power flow constraints, voltage over-limit constraints, and line capacity constraints of the distribution network are used as constraints of the power flow calculation model. The photovoltaic access capacity is used as the optimization variable and the optimization objective is to maximize the photovoltaic access capacity to obtain the maximum accessable photovoltaic capacity without control.
[0050] Among them, the power flow constraint of the distribution network refers to the balance constraint of active power and reactive power of each node, that is, the injected power of any node is equal to the sum of the power flow of each branch connected to that node; the voltage limit constraint means that the voltage amplitude of each node should be maintained within the preset allowable deviation range, for example, the per-unit voltage value of each node should be between 0.95 and 1.05; the line capacity constraint means that the apparent power transmitted by each line shall not exceed its thermal stability capacity limit.
[0051] In this embodiment, "not deploying control functions" means that the photovoltaic inverter operates only at unity power factor, without active power reduction or reactive power regulation. Photovoltaic output is entirely determined by sunlight conditions and it lacks the ability to actively participate in distribution network voltage and power flow management. During the solution process, the photovoltaic access capacity can be gradually increased. Power flow calculations are performed and the above three constraints are verified in each iteration until a certain constraint reaches a critical state. The corresponding photovoltaic access capacity at this point is the maximum uncontrolled access photovoltaic capacity. Preferably, when multiple typical evaluation scenarios exist, solutions should be obtained separately for each scenario, and the minimum value among the results for each scenario should be taken as the maximum uncontrolled access photovoltaic capacity to ensure the conservatism and security of the evaluation results. It should be noted that the above optimization solution can employ a stepwise incremental method, a binary search method, or a nonlinear programming solution method; this invention does not limit the method.
[0052] Under the condition of deploying control functions, taking typical evaluation scenarios as operating conditions, the power flow constraints of the distribution network, voltage over-limit constraints, line capacity constraints, and inverter regulation capability constraints are used as constraints of the power flow calculation model. The photovoltaic access capacity is used as the optimization variable and the optimization objective is to maximize the photovoltaic access capacity to obtain the maximum controllable photovoltaic capacity.
[0053] Compared to uncontrolled conditions, the newly added inverter regulation capability constraints under regulated conditions refer to the physical capability boundaries of photovoltaic inverters in terms of active power reduction and reactive power regulation. Specifically, these include: the active power output of the photovoltaic inverter can be continuously adjusted between zero and rated capacity, that is, it is allowed to reduce the actual photovoltaic output to below the maximum power that can be generated under the current irradiance conditions; the reactive power output of the photovoltaic inverter can be adjusted within the power circle determined by its rated apparent power and the current active power output; and the power factor of the photovoltaic inverter can be set within a preset adjustable range (e.g., leading 0.9 to lagging 0.9).
[0054] It should be noted that the specific parameters of the inverter regulation capability constraint can be determined based on the actual photovoltaic inverter model and rated parameters deployed in the target distribution network; this invention does not limit its specific values. Furthermore, under regulation conditions, the active power injection at the photovoltaic grid-connected point in the power flow calculation model is no longer entirely determined by illumination conditions, but rather participates in the solution as an optimizable variable, in order to fully utilize the inverter's regulation margin to alleviate voltage exceedance and line overload problems. The solution method is similar to that under unregulated conditions, and can employ a stepwise incremental method or a nonlinear programming method; this invention does not limit these methods.
[0055] After obtaining the maximum accessible photovoltaic (PV) capacity without regulation and the maximum accessible PV capacity with regulation, the difference between the two is determined as the theoretical PV carrying capacity improvement of the target distribution network under ideal communication conditions. This theoretical PV carrying capacity improvement represents the maximum carrying capacity gain that can be achieved by deploying PV regulation functions under the ideal assumption that the communication link is completely reliable and the regulation commands can be executed 100%. However, in actual engineering, due to factors such as communication delay, packet loss, link interruption, and lack of terminal coverage, some regulation commands may not be executed in a timely or correct manner, resulting in actual regulation effects lower than theoretical expectations. Therefore, in this embodiment, the theoretical PV carrying capacity improvement is converted based on the communication reliability regulation coefficient determined in step S2 above. Specifically, the product of the theoretical PV carrying capacity improvement and the communication reliability regulation coefficient is determined as the PV reliability carrying capacity improvement.
[0056] The physical meaning of this conversion process is as follows: the communication reliability control coefficient reflects the proportion or confidence level of reliable execution of control commands under a given communication configuration scheme. The converted photovoltaic reliable carrying capacity improvement is the actual reliable carrying capacity gain after considering the communication unreliability loss. It should be noted that when the communication reliability control coefficient is equal to one, the photovoltaic reliable carrying capacity improvement is equal to the theoretical photovoltaic carrying capacity improvement, corresponding to the extreme case of perfectly ideal communication; when the communication reliability control coefficient is less than one, the photovoltaic reliable carrying capacity improvement will be reduced accordingly, thus truly reflecting the constraint of communication conditions on the carrying capacity improvement effect. Preferably, when there are multiple candidate communication configuration schemes for the target distribution network, the conversion should be performed separately based on the communication reliability control coefficient corresponding to each scheme to obtain the photovoltaic reliable carrying capacity improvement of each scheme, so as to facilitate subsequent economic comparison and scheme selection.
[0057] Specifically, in one embodiment of the present invention, the improvement in photovoltaic reliable carrying capacity is calculated according to the following formula: in, For the first m The improvement in photovoltaic reliability under similar communication configuration schemes; Km For the first m Communication reliability control coefficient of similar communication configuration scheme; This represents the theoretical increase in photovoltaic carrying capacity calculated under ideal communication conditions.
[0058] S4: Based on historical control command execution records, determine the cumulative loss of photovoltaic control equipment and quantify the cumulative loss as the command fatigue cost of photovoltaic control equipment.
[0059] After deploying photovoltaic (PV) control functions in the distribution network, the dispatching master station needs to frequently issue active power reduction commands, reactive power adjustment commands, and power factor adjustment commands to the PV control equipment (mainly PV inverters and their internal power conversion devices) to maintain the distribution network voltage and power flow within a safe operating range. However, each execution of the above control commands will trigger additional electrical and thermal stresses on the power electronic devices inside the PV control equipment. Long-term accumulation will accelerate device aging, shorten equipment lifespan, and thus generate hidden equipment maintenance and replacement costs. Existing technologies, when assessing load-bearing capacity improvement, typically only focus on the mitigation effect of control functions on voltage exceedance and line overload problems, ignoring the wear and tear on equipment lifespan caused by frequent control commands. This results in assessments that fail to accurately reflect the full life-cycle cost of control measures. To overcome these shortcomings, this embodiment introduces the concepts of accumulated losses and command fatigue costs, making the hidden losses caused by the execution of control commands on PV control equipment explicit and quantifiable, thereby providing a complete cost input for subsequent economic assessments.
[0060] In this embodiment, the historical control command execution record includes the frequency, magnitude, and duration of each of the active power reduction, reactive power adjustment, and power factor adjustment commands. The frequency of action refers to the total number of times a certain type of control command is issued and executed within a preset statistical period; the magnitude of action refers to the amount of power change caused by each control command, such as the active power reduction amount (expressed in kilowatts or a percentage of rated capacity) corresponding to an active power reduction command, and the reactive power adjustment amount (expressed in kilovars or a percentage of rated capacity) corresponding to a reactive power adjustment command; the duration refers to the duration from the activation of each control command to its recovery.
[0061] It should be noted that the aforementioned historical control command execution records can be obtained from the operation logs of photovoltaic control equipment, the operation records of the dispatch automation system, and the operation data stored locally by the photovoltaic inverter. The statistical period can be set to the past three months, the past six months, or the past year, depending on the evaluation requirements; this invention does not impose any limitations on this. Furthermore, when there are multiple photovoltaic control devices in the target distribution network, the command execution records of each device can be obtained separately, or the command execution records of all devices can be summarized and statistically analyzed; this invention does not limit the statistical granularity.
[0062] Specifically, the switching losses of the switching devices in the photovoltaic control equipment are determined based on the frequency of action corresponding to the active power reduction command. In this embodiment, the switching device refers to the power semiconductor switching element (such as an insulated-gate bipolar transistor or a metal-oxide-semiconductor field-effect transistor) used to realize power conversion in the photovoltaic inverter. Each execution of the active power reduction command requires the switching device to perform an additional on / off switching operation, and each on / off switching will generate a switching loss inside the switching device (i.e., the instantaneous power loss caused by the overlap of voltage and current at the moment of switching). The higher the frequency of action, the greater the cumulative amount of switching loss borne by the switching device within the statistical period. Therefore, the total switching loss of the switching device within the statistical period can be determined based on the frequency of action of the active power reduction command and the average switching loss value of a single switching operation. It should be noted that the average switching loss value of a single switching operation can be determined based on the model specifications or measured data of the switching devices in the photovoltaic control equipment, and the present invention does not limit its specific value.
[0063] Based on the action amplitude corresponding to the reactive power regulation command, the conduction loss of power devices in the photovoltaic control equipment is determined. In this embodiment, power devices refer to power semiconductor elements and passive components such as power inductors and capacitors in the photovoltaic inverter that undertake the task of continuous current conduction. When the photovoltaic inverter executes the reactive power regulation command, a reactive current component needs to be superimposed on the original active current, resulting in an increase in the effective value of the current flowing through the power devices, which in turn increases the conduction loss of the power devices (i.e., the continuous heat loss generated when the current flows through the device's on-resistance or equivalent impedance). The larger the action amplitude, the larger the superimposed reactive current component, and the larger the increment of conduction loss. Therefore, the additional conduction loss of power devices due to reactive power regulation within the statistical period can be determined according to the action amplitude of the reactive power regulation command. Preferably, when the reactive power regulation command includes multiple regulation operations of different amplitudes, the conduction loss increment of each regulation operation can be calculated separately and then accumulated to obtain the total conduction loss within the statistical period.
[0064] The thermal stress accumulation level of power devices in photovoltaic control equipment is determined based on the duration corresponding to the power factor adjustment command. In this embodiment, the thermal stress accumulation level refers to the temperature rise caused by the power device operating under non-rated conditions for a long time and its cumulative impact on the device junction temperature, solder layer aging, and insulation performance. The power factor adjustment command usually requires the photovoltaic inverter to operate continuously in a non-unity power factor state for a long period of time. At this time, the effective value of the current and the internal heat generation of the power device are higher than the rated operating conditions, and the longer the duration, the more significant the thermal stress accumulation effect and the faster the aging rate of the device. Therefore, the thermal stress accumulation level of the power device within the statistical period can be determined based on the duration corresponding to the power factor adjustment command, combined with the thermal impedance parameters and allowable junction temperature range of the power device. It should be noted that the quantification method of thermal stress accumulation level can adopt the equivalent operating time method, rainflow counting method, or accelerated aging equivalent method based on the Arrhenius model. This invention does not limit the specific quantification method of thermal stress accumulation level.
[0065] After obtaining the switching loss, conduction loss, and thermal stress accumulation levels, the cumulative loss of the photovoltaic control equipment is determined based on these levels. In this embodiment, the cumulative loss is a quantitative indicator that comprehensively characterizes the overall loss level of the photovoltaic control equipment due to the execution of various control commands within a statistical period. Specifically, the switching loss, conduction loss, and thermal stress accumulation levels can be normalized separately and then weighted and summed to obtain the cumulative loss. Normalization involves dividing each loss by its corresponding allowable total loss within the rated lifespan to eliminate dimensional differences; the weighting coefficients can be determined based on the contribution of each loss type to the equipment's lifespan degradation. It should be noted that, in addition to weighted summation, the cumulative loss can also be synthesized using the maximum value method or the geometric mean method; this invention does not limit the specific method used.
[0066] Finally, the accumulated losses are quantified as the instruction fatigue cost of the photovoltaic control equipment. In this embodiment, instruction fatigue cost refers to the equivalent economic cost generated due to the accelerated aging of the photovoltaic control equipment caused by the frequent execution of control instructions. Its physical meaning is: if the photovoltaic control equipment operates under ideal conditions without control instructions, its expected service life is the design life; however, under the actual action of control instructions, the equipment ages prematurely due to the increase in accumulated losses, which is equivalent to a portion of the equipment's lifespan being consumed prematurely. The equipment replacement value or maintenance cost corresponding to this portion of the consumed lifespan is the instruction fatigue cost.
[0067] Specifically, the instruction fatigue cost can be obtained by multiplying the cumulative loss amount to the total allowable loss amount within the rated lifespan of the equipment by the replacement cost or annual depreciation cost of the photovoltaic control equipment. Preferably, the instruction fatigue cost can be calculated annually to allow for economic comparison with the annual operation and maintenance costs in the communication construction cost parameters on the same time benchmark. It should be noted that the replacement cost of the photovoltaic control equipment can be determined based on the equipment purchase price, installation and commissioning costs, and expected service life. This invention does not limit the specific calculation parameters for the instruction fatigue cost. Furthermore, when there are multiple photovoltaic control devices in the target distribution network, the instruction fatigue cost of each device can be calculated separately and then summed to obtain the overall instruction fatigue cost of the target distribution network.
[0068] Specifically, in a preferred embodiment of the present invention, the inverter command fatigue cost is quantified using a method of "loss calculation—temperature rise estimation—lifetime reduction—cost conversion". For the first... i The next adjustment action first calculates the inverter power device losses based on the adjusted current, voltage, switching frequency, and duration: In the formula, P loss,i For the first i Total power device losses corresponding to each adjustment action; P sw,i For switching losses; P cond,i For conduction loss; f sw This refers to the inverter switching frequency; E on,i and E off,i The first i The single turn-on energy and turn-off energy under each control action can be obtained from the device datasheet or experimental calibration curve. V 0 represents the device's equivalent on-state voltage drop; r on This is the equivalent on-resistance; I i To regulate the device current during operation.
[0069] Furthermore, the junction temperature fluctuation caused by the i-th control action is estimated based on the equivalent thermal resistance of the power device: in, For the first i The amount of junction temperature fluctuation corresponding to each adjustment action; R thThis is the equivalent thermal resistance of the power device. If a temperature sensor or inverter operation log is available, the measured junction temperature change value can also be used directly. Make corrections.
[0070] Subsequently, the cumulative damage method was used to calculate the inverter's lifespan reduction ratio: in, D m For the first m The cumulative lifespan loss ratio of inverters under similar communication configuration schemes; This represents the total number of regulatory actions taken within the statistical period. n i For the first i The number of actions corresponding to the junction temperature fluctuation; To accommodate junction temperature fluctuations The number of thermal cycles that the device can withstand; a and b These are fitting parameters determined from device lifetime curves or manufacturer test data.
[0071] Finally, the percentage of lifespan reduction is converted into economic costs: in, For the first m Inverter instruction fatigue cost under similar communication configuration schemes; C inv To assess the equivalent replacement cost of inverters involved in regulation within the region.
[0072] S5: Based on the parameters of photovoltaic reliable carrying capacity improvement, command fatigue cost and communication construction cost, determine the unit reliable carrying capacity improvement cost, and output the photovoltaic carrying capacity assessment result of the target distribution network based on the unit reliable carrying capacity improvement cost.
[0073] In the planning and decision-making process for enhancing the photovoltaic carrying capacity of distribution networks, the investment in communication infrastructure and the costs of regulation and operation are the core economic factors restricting the implementation of solutions. Existing technologies, when assessing carrying capacity enhancement, often only focus on the effect of regulation functions on the capacity of grid-connected photovoltaic systems, neglecting the costs of communication infrastructure construction, continuous operation of communication networks, and the implicit wear and tear on equipment lifespan caused by frequent regulation commands. This results in assessments that fail to provide a complete economic reference for investment decisions. Furthermore, when multiple communication configuration options exist, the cost-effectiveness of different options in terms of carrying capacity enhancement and investment costs varies significantly. The lack of a unified quantitative comparison index leads to a lack of objective basis for option selection. To overcome these shortcomings, this embodiment introduces a comprehensive economic index—the unit reliable carrying capacity enhancement cost—into a unified life-cycle cost framework, incorporating communication construction costs, network service fees, operation and maintenance costs, and command fatigue costs. Using the photovoltaic reliable carrying capacity enhancement as a normalized benchmark, it enables horizontal economic comparison and optimal recommendation among multiple candidate communication configuration options.
[0074] In this embodiment, the communication construction cost parameter corresponds to at least two candidate communication configuration schemes, meaning that there are two or more selectable communication construction and operation and maintenance schemes in the target distribution network, such as fiber optic private network schemes, wireless public network schemes, power line carrier schemes, and any combination thereof. This invention does not limit the specific type or number of candidate communication configuration schemes. First, the network service fees and operation and maintenance fees corresponding to each candidate communication configuration scheme are obtained. Network service fees refer to the communication service rental fees, bandwidth rental fees, or communication operator service fees that need to be continuously paid during the evaluation period to maintain the normal operation of the communication link. For example, when using a wireless public network scheme, the data package fee or private network service fee payable to the communication operator is included. Operation and maintenance fees refer to the costs incurred during the evaluation period for daily inspections, fault repairs, equipment replacements, and software upgrades of the communication network, including the cost of spare parts for communication equipment, labor costs for operation and maintenance personnel, and third-party operation and maintenance service outsourcing fees. It should be noted that both network service fees and operation and maintenance fees can be statistically calculated or converted on an annual basis so that they can be summed with the annually allocated costs in the communication construction cost on the same time benchmark. Preferably, when the communication construction cost parameters already include some operation and maintenance costs, duplicate inclusion should be avoided; however, this invention does not impose such limitations.
[0075] After obtaining the network service fees and operation and maintenance fees corresponding to each candidate communication configuration scheme, the communication construction cost parameters, network service fees, operation and maintenance fees, and command fatigue costs corresponding to each candidate communication configuration scheme are summed to obtain the corresponding total control investment cost. In this embodiment, the total control investment cost refers to a comprehensive measure of all economic costs required to realize the photovoltaic control function and ensure its reliable operation within the evaluation period. It covers the one-time construction investment of communication infrastructure, the continuous operation expenditure of communication links, the daily operation and maintenance expenditure of communication networks, and the implicit cost of accelerated equipment aging caused by frequent execution of control commands. It should be noted that when the one-time construction investment costs (such as fiber optic laying fees, communication base station construction fees, terminal equipment installation fees, etc.) in the communication construction cost parameters are included in the total control investment cost, it is preferable to amortize and calculate them annually according to the evaluation period to keep them consistent with the network service fees, operation and maintenance fees, and command fatigue costs in the time dimension. Command fatigue cost refers to the equivalent economic cost incurred by the photovoltaic control equipment in executing control commands, as determined in step S4 above. Including it in the total control investment cost is one of the key innovations of this embodiment. Its purpose is to transform the implicit consumption of equipment lifespan due to control behavior into an explicit economic cost, making the evaluation results more complete and realistic. Furthermore, when there are multiple photovoltaic control devices in the target distribution network, the command fatigue cost is the sum of the command fatigue costs of all devices.
[0076] After obtaining the total control investment cost corresponding to each candidate communication configuration scheme, the ratio of the total control investment cost to the corresponding photovoltaic reliable carrying capacity improvement is calculated, and the resulting ratio is determined as the corresponding unit reliable carrying capacity improvement cost. In this embodiment, the physical meaning of the unit reliable carrying capacity improvement cost is: under a given candidate communication configuration scheme, the comprehensive economic cost required to improve one unit of reliable photovoltaic carrying capacity, preferably in the form of RMB ten thousand per megawatt or RMB per kilowatt. This invention does not limit the specific unit of measurement. This indicator normalizes the correlation between the total control investment cost and the photovoltaic reliable carrying capacity improvement, making the carrying capacity improvement effects under different capacity scales and different communication schemes comparable. It should be noted that the photovoltaic reliable carrying capacity improvement is the reliable improvement obtained after conversion by the communication reliability control coefficient in the aforementioned step S3, rather than the theoretical improvement. Therefore, the unit reliable carrying capacity improvement cost already implies the detrimental effect of communication unreliability on the carrying capacity improvement effect, avoiding the problem of overestimating the cost-effectiveness of the scheme due to insufficient communication conditions. Preferably, when the photovoltaic reliability carrying capacity improvement corresponding to a candidate communication configuration scheme is zero or a very small value, the unit reliability carrying capacity improvement cost of the scheme will tend to infinity or a very large value, indicating that the scheme has no practical engineering application value and can be excluded in the subsequent ranking.
[0077] In a preferred embodiment of the present invention, the index is calculated according to the following formula: In the formula, For the first m The cost of increasing the unit trusted carrying capacity of similar communication configuration schemes; For the cost of building communication infrastructure; Costs of terminal installation and deployment; For network service fees; For operation and maintenance costs; Inverter instruction fatigue cost; This represents the increase in the reliable carrying capacity of photovoltaics under this scheme.
[0078] After determining the unit reliability carrying capacity improvement cost for each candidate communication configuration scheme, the candidate communication configuration schemes are ranked in ascending order according to their corresponding unit reliability carrying capacity improvement cost, that is, arranged from smallest to largest unit reliability carrying capacity improvement cost. The candidate communication configuration scheme with the smallest unit reliability carrying capacity improvement cost is determined as the recommended scheme for photovoltaic carrying capacity improvement and output. The physical meaning of this ranking and recommendation process is: the scheme with the smallest unit reliability carrying capacity improvement cost represents the lowest comprehensive economic cost over its entire life cycle, i.e., the best cost-effectiveness, under the premise of achieving the same reliability carrying capacity improvement effect. It should be noted that when there are two or more candidate communication configuration schemes with the same or very close unit reliability carrying capacity improvement costs, non-economic factors such as communication construction period, construction difficulty, and flexibility of later expansion can be further combined for comprehensive comparison and selection. This invention does not limit this. In addition, the result of the ascending ranking can also be output as part of the evaluation result so that decision-makers can intuitively understand the economic ranking of each scheme.
[0079] Finally, based on the recommended photovoltaic (PV) carrying capacity enhancement scheme and the corresponding unit reliable carrying capacity enhancement cost, the PV carrying capacity assessment result of the target distribution network is output. In this embodiment, the PV carrying capacity assessment result preferably includes the following: the name of the recommended PV carrying capacity enhancement scheme and the corresponding communication configuration parameters, the PV reliable carrying capacity enhancement amount under the scheme, the total control investment cost under the scheme and its components (communication construction cost, network service fee, operation and maintenance fee, and command fatigue cost), the unit reliable carrying capacity enhancement cost under the scheme, and a ranking table of the unit reliable carrying capacity enhancement costs of each candidate communication configuration scheme. Furthermore, the PV carrying capacity assessment result may also include the maximum regulated PV capacity, the maximum unregulated PV capacity, and the corresponding typical assessment scenario information of the target distribution network under the recommended scheme, so as to provide complete data support for distribution network planning and distributed PV access approval. It should be noted that the output form of the PV carrying capacity assessment result can be any form, such as a numerical report, data table, or visualization chart; this invention does not limit the output form. Preferably, while outputting the assessment result, suggestions for communication construction implementation and control strategy optimization for the recommended scheme can also be given to enhance the engineering guidance value of the assessment result.
[0080] For details, please refer to Table 2, which is an example table of comprehensive evaluation results for different secondary system configuration schemes.
[0081] Table 2 Another embodiment of the present invention provides a photovoltaic carrying capacity assessment system based on reliable communication control. For details, please refer to [link to relevant documentation]. Figure 2 , Figure 2 The diagram shown is a structural block diagram of a photovoltaic load-bearing capacity assessment system based on reliable communication control in one embodiment of the present invention, which includes: The acquisition module 11 is used to acquire the basic operation data, communication performance parameters, historical control command execution records and communication construction cost parameters of the target distribution network, and to determine at least one typical evaluation scenario based on the basic operation data; The first evaluation module 12 is used to determine the communication reliability control coefficient based on the communication performance parameters; The first calculation module 13 is used to determine the theoretical photovoltaic carrying capacity improvement of the target distribution network based on basic operating data and typical evaluation scenarios, under the premise of meeting preset safe operation constraints, and to convert the theoretical photovoltaic carrying capacity improvement based on the communication reliability control coefficient to obtain the photovoltaic reliability carrying capacity improvement. The second calculation module 14 is used to determine the cumulative loss of the photovoltaic control equipment based on the historical control command execution records, and to quantify the cumulative loss as the command fatigue cost of the photovoltaic control equipment. The second evaluation module 15 is used to determine the unit reliable carrying capacity improvement cost based on parameters such as photovoltaic reliable carrying capacity improvement amount, command fatigue cost and communication construction cost, and output the photovoltaic carrying capacity evaluation result of the target distribution network based on the unit reliable carrying capacity improvement cost.
[0082] Preferably, in one embodiment of the present invention, the communication performance parameters include communication latency, packet loss rate, link availability, and terminal coverage. The first evaluation module is specifically used for: Obtain the communication latency, packet loss rate, link availability, and terminal coverage corresponding to each candidate communication configuration scheme; Communication latency, packet loss rate, link availability and terminal coverage are indexed separately, and each communication performance parameter is converted into a communication quality index value; The weights corresponding to each communication quality index value are determined, and the corresponding communication reliability control coefficients are obtained based on each communication quality index value and its corresponding weight.
[0083] Preferably, in one embodiment of the present invention, the historical control command execution record includes the frequency, magnitude and duration of each of the active power reduction command, reactive power adjustment command and power factor adjustment command; The second calculation module is specifically used for: Based on the frequency of action corresponding to the active power reduction command, determine the switching losses of the switching devices in the photovoltaic control equipment; Based on the action amplitude corresponding to the reactive power regulation command, the conduction loss of power devices in photovoltaic control equipment is determined; The thermal stress accumulation level of power devices in photovoltaic control equipment is determined based on the duration corresponding to the power factor adjustment command. The cumulative loss is determined based on switching loss, conduction loss, and thermal stress accumulation level.
[0084] Preferably, in one embodiment of the present invention, the communication construction cost parameter corresponds to at least two candidate communication configuration schemes; The second evaluation module is specifically used for: Obtain the network service costs and operation and maintenance costs corresponding to each candidate communication configuration scheme; The total control cost is obtained by summing the communication construction cost parameters, network service fees, operation and maintenance costs, and command fatigue costs corresponding to each candidate communication configuration scheme. The ratio of the total investment cost of regulation to the corresponding increase in photovoltaic credible carrying capacity is calculated, and the resulting ratio is determined as the corresponding unit cost of increasing credible carrying capacity. The candidate communication configuration schemes are sorted in ascending order according to their corresponding unit trusted carrying capacity improvement cost. The candidate communication configuration scheme with the lowest unit trusted carrying capacity improvement cost is determined as the recommended scheme for improving photovoltaic carrying capacity and is output. Based on the recommended scheme for improving photovoltaic carrying capacity and the corresponding unit credible carrying capacity improvement cost, the photovoltaic carrying capacity assessment results of the target distribution network are output.
[0085] Preferably, in one embodiment of the present invention, the preset safe operation constraints include power flow constraints of the distribution network, voltage over-limit constraints, line capacity constraints, and inverter regulation capability constraints; The first calculation module is specifically used for: Based on basic operational data, a power flow calculation model for the target distribution network is constructed. Without deploying control functions, taking a typical evaluation scenario as the operating condition, the power flow constraints, voltage over-limit constraints, and line capacity constraints of the distribution network are used as constraints of the power flow calculation model. The photovoltaic access capacity is used as the optimization variable and the optimization objective is to maximize the photovoltaic access capacity to obtain the maximum photovoltaic capacity that can be accessed without control. Under the condition of deploying control functions, taking typical evaluation scenarios as operating conditions, the power flow constraints of the distribution network, voltage over-limit constraints, line capacity constraints, and inverter regulation capability constraints are used as constraints of the power flow calculation model. The photovoltaic access capacity is used as the optimization variable and the optimization objective is to maximize the photovoltaic access capacity to obtain the maximum controllable photovoltaic capacity. The difference between the maximum regulated photovoltaic capacity and the maximum unregulated photovoltaic capacity is determined as the theoretical increase in photovoltaic carrying capacity.
[0086] The above embodiments are preferred embodiments of the present invention. It should be noted that those skilled in the art can make several improvements and modifications without departing from the principle of the present invention, and these improvements and modifications are also considered to be within the scope of protection of the present invention.
Claims
1. A photovoltaic carrying capacity assessment method based on reliable communication control, characterized in that, include: Acquire basic operating data, communication performance parameters, historical control command execution records, and communication construction cost parameters of the target distribution network, and determine at least one typical evaluation scenario based on the basic operating data; Based on the aforementioned communication performance parameters, determine the communication reliability control coefficient; Based on the basic operating data and the typical evaluation scenario, and under the premise of meeting the preset safe operation constraints, the theoretical photovoltaic carrying capacity improvement of the target distribution network is determined, and the theoretical photovoltaic carrying capacity improvement is converted based on the communication reliability control coefficient to obtain the photovoltaic reliability carrying capacity improvement. Based on the historical control command execution records, the cumulative loss of the photovoltaic control equipment is determined, and the cumulative loss is quantified as the command fatigue cost of the photovoltaic control equipment. Based on the photovoltaic reliable carrying capacity improvement amount, the instruction fatigue cost, and the communication construction cost parameters, the unit reliable carrying capacity improvement cost is determined, and the photovoltaic carrying capacity assessment result of the target distribution network is output based on the unit reliable carrying capacity improvement cost.
2. The photovoltaic carrying capacity assessment method based on reliable communication control as described in claim 1, characterized in that, The communication performance parameters include communication latency, packet loss rate, link availability, and terminal coverage. The determination of the communication reliability control coefficient based on the communication performance parameters includes: Obtain the communication latency, packet loss rate, link availability, and terminal coverage corresponding to each candidate communication configuration scheme; The communication latency, packet loss rate, link availability and terminal coverage are respectively indexed and converted into communication quality index values. The weights corresponding to each of the communication quality index values are determined, and the corresponding communication reliability control coefficients are obtained based on each of the communication quality index values and the corresponding weights.
3. The photovoltaic carrying capacity assessment method based on reliable communication control according to claim 1, characterized in that, The historical control command execution record includes the frequency, amplitude, and duration of each command in the active power reduction command, reactive power adjustment command, and power factor adjustment command. The step of determining the cumulative loss of the photovoltaic control equipment based on the historical control command execution record includes: Based on the frequency of action corresponding to the active power reduction command, the switching losses of the switching devices in the photovoltaic control equipment are determined; Based on the action amplitude corresponding to the reactive power adjustment command, the conduction loss of the power devices in the photovoltaic control equipment is determined; The thermal stress accumulation level of the power devices in the photovoltaic control equipment is determined based on the duration corresponding to the power factor adjustment command. The cumulative loss is determined based on the switching loss, the conduction loss, and the thermal stress accumulation level.
4. The photovoltaic carrying capacity assessment method based on reliable communication control according to claim 1, characterized in that, The communication construction cost parameters correspond to at least two candidate communication configuration schemes; The process of determining the unit reliable carrying capacity improvement cost based on the photovoltaic reliable carrying capacity improvement amount, the command fatigue cost, and the communication construction cost parameters, and outputting the photovoltaic carrying capacity assessment result of the target distribution network based on the unit reliable carrying capacity improvement cost, includes: Obtain the network service costs and operation and maintenance costs corresponding to each of the candidate communication configuration schemes; The total control cost is obtained by summing the communication construction cost parameters, network service fees, operation and maintenance fees, and instruction fatigue costs corresponding to each candidate communication configuration scheme. The ratio of the total investment cost of regulation to the corresponding increase in photovoltaic credible carrying capacity is calculated, and the resulting ratio is determined as the corresponding unit cost of increasing credible carrying capacity. The candidate communication configuration schemes are sorted in ascending order according to their corresponding unit trusted carrying capacity improvement cost. The candidate communication configuration scheme with the lowest unit trusted carrying capacity improvement cost is determined as the photovoltaic carrying capacity improvement recommended scheme and output. Based on the recommended photovoltaic carrying capacity enhancement scheme and the corresponding unit credible carrying capacity enhancement cost, the photovoltaic carrying capacity assessment result of the target distribution network is output.
5. The photovoltaic carrying capacity assessment method based on reliable communication control according to claim 1, characterized in that, The preset safe operation constraints include power flow constraints, voltage over-limit constraints, line capacity constraints, and inverter regulation capability constraints. Determining the theoretical photovoltaic carrying capacity improvement of the target distribution network includes: Based on the aforementioned basic operational data, a power flow calculation model for the target distribution network is constructed. Without deploying control functions, taking the typical evaluation scenario as the operating condition, the power flow constraints of the distribution network, the voltage over-limit constraints, and the line capacity constraints are used as the constraints of the power flow calculation model. The photovoltaic access capacity is used as the optimization variable, and the optimization objective is to maximize the photovoltaic access capacity to obtain the maximum photovoltaic capacity that can be accessed without control. Under the condition of deploying control functions, taking the typical evaluation scenario as the operating condition, the power flow constraints of the distribution network, the voltage over-limit constraints, the line capacity constraints, and the inverter regulation capability constraints are used as the constraints of the power flow calculation model. The photovoltaic access capacity is used as the optimization variable and the optimization objective is to maximize the photovoltaic access capacity to obtain the maximum controllable photovoltaic capacity. The difference between the maximum accessible photovoltaic capacity with regulation and the maximum accessible photovoltaic capacity without regulation is determined as the theoretical photovoltaic carrying capacity improvement.
6. A photovoltaic carrying capacity assessment system based on reliable communication control, characterized in that, include: The acquisition module is used to acquire basic operating data, communication performance parameters, historical control command execution records and communication construction cost parameters of the target distribution network, and determine at least one typical evaluation scenario based on the basic operating data; The first evaluation module is used to determine the communication reliability control coefficient based on the communication performance parameters. The first calculation module is used to determine the theoretical photovoltaic carrying capacity improvement of the target distribution network based on the basic operating data and the typical evaluation scenario, under the premise of meeting the preset safe operation constraints, and to perform conversion processing on the theoretical photovoltaic carrying capacity improvement based on the communication reliability control coefficient to obtain the photovoltaic reliability carrying capacity improvement. The second calculation module is used to determine the cumulative loss of the photovoltaic control equipment based on the historical control command execution records, and quantify the cumulative loss as the command fatigue cost of the photovoltaic control equipment. The second evaluation module is used to determine the unit reliable carrying capacity improvement cost based on the photovoltaic reliable carrying capacity improvement amount, the instruction fatigue cost, and the communication construction cost parameters, and output the photovoltaic carrying capacity evaluation result of the target distribution network based on the unit reliable carrying capacity improvement cost.
7. The photovoltaic carrying capacity assessment system based on reliable communication control as described in claim 6, characterized in that, The communication performance parameters include communication latency, packet loss rate, link availability, and terminal coverage. The first evaluation module is specifically used for: Obtain the communication latency, packet loss rate, link availability, and terminal coverage corresponding to each candidate communication configuration scheme; The communication latency, packet loss rate, link availability and terminal coverage are respectively indexed and converted into communication quality index values. The weights corresponding to each of the communication quality index values are determined, and the corresponding communication reliability control coefficients are obtained based on each of the communication quality index values and the corresponding weights.
8. The photovoltaic carrying capacity assessment system based on reliable communication control according to claim 6, characterized in that, The historical control command execution record includes the frequency, amplitude, and duration of each command in the active power reduction command, reactive power adjustment command, and power factor adjustment command. The second calculation module is specifically used for: Based on the frequency of action corresponding to the active power reduction command, the switching losses of the switching devices in the photovoltaic control equipment are determined; Based on the action amplitude corresponding to the reactive power adjustment command, the conduction loss of the power devices in the photovoltaic control equipment is determined; The thermal stress accumulation level of the power devices in the photovoltaic control equipment is determined based on the duration corresponding to the power factor adjustment command. The cumulative loss is determined based on the switching loss, the conduction loss, and the thermal stress accumulation level.
9. The photovoltaic carrying capacity assessment system based on reliable communication control according to claim 6, characterized in that, The communication construction cost parameters correspond to at least two candidate communication configuration schemes; The second evaluation module is specifically used for: Obtain the network service costs and operation and maintenance costs corresponding to each of the candidate communication configuration schemes; The total control cost is obtained by summing the communication construction cost parameters, network service fees, operation and maintenance fees, and instruction fatigue costs corresponding to each candidate communication configuration scheme. The ratio of the total investment cost of regulation to the corresponding increase in photovoltaic credible carrying capacity is calculated, and the resulting ratio is determined as the corresponding unit cost of increasing credible carrying capacity. The candidate communication configuration schemes are sorted in ascending order according to their corresponding unit trusted carrying capacity improvement cost. The candidate communication configuration scheme with the lowest unit trusted carrying capacity improvement cost is determined as the photovoltaic carrying capacity improvement recommended scheme and output. Based on the recommended photovoltaic carrying capacity enhancement scheme and the corresponding unit credible carrying capacity enhancement cost, the photovoltaic carrying capacity assessment result of the target distribution network is output.
10. The photovoltaic carrying capacity assessment system based on reliable communication control according to claim 6, characterized in that, The preset safe operation constraints include power flow constraints, voltage over-limit constraints, line capacity constraints, and inverter regulation capability constraints. The first calculation module is specifically used for: Based on the aforementioned basic operational data, a power flow calculation model for the target distribution network is constructed. Without deploying control functions, taking the typical evaluation scenario as the operating condition, the power flow constraints of the distribution network, the voltage over-limit constraints, and the line capacity constraints are used as the constraints of the power flow calculation model. The photovoltaic access capacity is used as the optimization variable, and the optimization objective is to maximize the photovoltaic access capacity to obtain the maximum photovoltaic capacity that can be accessed without control. Under the condition of deploying control functions, taking the typical evaluation scenario as the operating condition, the power flow constraints of the distribution network, the voltage over-limit constraints, the line capacity constraints, and the inverter regulation capability constraints are used as the constraints of the power flow calculation model. The photovoltaic access capacity is used as the optimization variable and the optimization objective is to maximize the photovoltaic access capacity to obtain the maximum controllable photovoltaic capacity. The difference between the maximum accessible photovoltaic capacity with regulation and the maximum accessible photovoltaic capacity without regulation is determined as the theoretical photovoltaic carrying capacity improvement.