Intelligent Supply Management Methods Based on Big Data
By monitoring changes in demand for goods and suppliers' supply capacity during welfare redemption activities through big data, and dynamically adjusting supply arrangements, the problem of supply risk lag in existing technologies has been solved. This has enabled coordination between the supply process and changes in demand, and reduced the risk of performance delays.
Patent Information
- Application Number
- CN202611328806.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-31
- Publication Date
- 2026-11-17
AI Technical Summary
The existing welfare redemption supply management method is difficult to combine with the continuous changes in the demand for redeemed goods, the current supply quantity of suppliers, and the constraints of replenishment time, resulting in a lag in the assessment of supply risks and delays in fulfillment.
By using a big data-based intelligent supply management method, changes in commodity redemption demand are monitored in real time. Combined with the supplier's supply capacity and time constraints, the supply arrangements are dynamically adjusted, including obtaining real-time redemption data, identifying supply gaps, and selecting supply acceptance methods, forming a continuous closed-loop process for supply adjustment.
It improved the responsiveness of supply management to changes in demand during welfare activities, reduced the risk of performance delays, and ensured the coordination between commodity demand and the supply process.
Smart Images

Figure CN123117984A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the fields of supply chain management and computer data processing technology, and in particular to a big data-based intelligent supply management method. Background Technology
[0002] In the context of holiday welfare distribution in enterprises and institutions, companies typically provide employees with a certain welfare budget. Employees then independently select and redeem goods through an online platform within a specified activity period. The welfare service company organizes suppliers to prepare and fulfill the goods based on the actual redemption results. Unlike the supply model of traditional e-commerce orders that are formed instantly, the total participation scale of welfare activities is usually determined before the activity begins, while the demand for specific redeemed goods gradually forms during the activity as employees redeem them, and may exhibit different formation rates at different times.
[0003] Current welfare redemption supply management methods typically arrange supply based on current inventory or existing redemption orders. When judging based on current inventory, it mainly reflects the quantity of goods available from suppliers at the current point in time, making it difficult to assess subsequent supply pressure by considering the formation of redemption demand over a continuous period. On the other hand, when replenishing based on existing redemption orders, the replenishment process usually needs to be initiated only after demand is generated. When demand for goods continues to increase and the supplier's replenishment cycle is long, the current available quantity may not be able to cover the demand to be fulfilled.
[0004] Furthermore, existing methods often lack dynamic assessment of the relationship between supplier replenishment time and the latest available time for welfare activities after a supply gap occurs. When the remaining time from the current time to the latest available time of the goods is less than the supplier's replenishment cycle, even if the supply demand has been identified, it may not be possible to complete the supply within the latest available time using the original supplier's regular replenishment process. If the regular replenishment method is still followed, it can easily lead to delays in supply adjustments.
[0005] Therefore, the existing welfare redemption supply management method is difficult to combine the continuous changes in the demand for redeemed goods, the current supply quantity of suppliers, and the replenishment time constraints to dynamically assess the risk of goods supply and adjust the supply arrangements in a timely manner when it is determined that the regular replenishment process cannot meet the latest supply time. Summary of the Invention
[0006] To address this, the present invention provides a big data-based intelligent supply management method. This method dynamically assesses the supply status during welfare activities by combining continuous changes in commodity redemption demand, the current available quantity of suppliers, and replenishment time constraints. When it is determined that the regular replenishment process cannot make up for the supply gap within the latest available time, timely supply adjustments are made. This overcomes the problem in existing technologies where it is difficult to combine changes in commodity demand and supplier delivery timeliness to assess supply risks, leading to delayed supply adjustments and commodity fulfillment.
[0007] To achieve the above objectives, the present invention provides a supply intelligent management method based on big data, comprising: Obtain data on activity time constraints and commodity supply capacity related to welfare activities; During the welfare activities, real-time exchange data representing the demand for goods is periodically acquired, and the changing trend of the demand for goods is determined based on the real-time exchange data collected over a continuous period. Based on the real-time exchange data and the commodity supply capacity data, the total demand for commodities to be fulfilled is determined, and based on the relationship between the total demand for commodities to be fulfilled and the current available quantity corresponding to the commodity supply capacity data, it is determined whether there is a supply gap. When the supply gap is determined to exist, based on the activity time constraint data and the commodity supply capacity data, it is determined whether the supply gap can be made up before the latest available time of the corresponding commodity through the regular replenishment process; When it is determined that the supply gap cannot be made up within the latest available time through the regular replenishment process, a supply adjustment is triggered, and the supply acceptance method corresponding to the supply adjustment is determined according to the changing trend of the demand for the goods. After the supply adjustment is executed, the updated real-time exchange data is periodically obtained, and the determination of the supply gap and the fulfillment judgment of the regular replenishment process are re-executed based on the updated real-time exchange data until the welfare activity ends.
[0008] Furthermore, the periodic acquisition of real-time exchange data representing commodity demand includes: During the benefit redemption period, the system continuously acquires successfully confirmed employee benefit redemption records according to a preset collection cycle, and categorizes the benefit redemption records according to product identifiers to obtain the new redemption quantity corresponding to each product in the current collection cycle.
[0009] Furthermore, determining the trend of changes in commodity demand includes: Compare the number of new exchanges in the current collection period with the number of new exchanges in the previous collection period, and determine the trend of change in the demand for the corresponding products based on the comparison results. The trend of change in the demand for the commodity includes at least one of the following states: demand growth, demand stability, demand decline, and no new demand.
[0010] Furthermore, determining the total demand for goods currently pending fulfillment includes: The number of goods that have been successfully redeemed is determined based on the real-time redemption data, and the number of goods that have not yet entered the preset completion of supply status is determined from the number of goods that have been successfully redeemed. The number of goods that have not yet entered the preset completion of supply status is determined as the total demand for goods to be fulfilled at present.
[0011] Furthermore, determining whether a supply gap exists includes: Obtain the current available quantity of goods from one or more suppliers associated with the goods in the welfare activity, and determine the total available quantity of the goods currently available for the welfare activity based on the current available quantity of goods from the one or more suppliers; Compare the total demand for goods currently pending fulfillment with the current available quantity; When the total demand for goods to be fulfilled is greater than the current available quantity, a supply gap is determined, and the quantity of the supply gap is determined based on the quantity difference between the total demand for goods to be fulfilled and the current available quantity.
[0012] Furthermore, the determination of whether the supply gap can be made up within the latest available time through the conventional replenishment process includes: The latest delivery time for the product is determined based on the activity time constraint data. Determine the length of time between the current time and the latest available delivery time to obtain the remaining delivery preparation time; Obtain the supplier's replenishment cycle for the product; The remaining supply preparation time is compared with the replenishment cycle, and the results of the comparison are used to determine whether the regular replenishment process can make up for the supply gap before the latest delivery time.
[0013] Furthermore, determining whether the routine replenishment process can fill the supply gap before the latest available delivery time based on the comparison results includes: When the remaining supply preparation time is less than the replenishment cycle, it is determined that the regular replenishment process cannot make up the supply gap before the latest delivery time, and a supply adjustment request is generated.
[0014] Furthermore, the triggering of supply adjustments includes: Retrieve candidate suppliers associated with the goods for which the supply gap exists from a pre-established set of candidate suppliers; The supplier will be selected based on the supply capacity of each candidate supplier. Based on the quantity of the supply gap, determine the corresponding supply quantity of the supplier to accept the supply, and generate a supply adjustment task.
[0015] Furthermore, before determining the trend of changes in commodity demand, the process also includes: Set an initial observation phase, and continuously acquire the actual commodity redemption results for a continuous collection period during the initial observation phase; When the number of consecutive collection cycles corresponding to the actual commodity redemption results reaches the preset number of consecutive cycles, the initial observation phase ends, and the trend of commodity demand is determined based on the actual commodity redemption results of the consecutive collection cycles.
[0016] Furthermore, determining the supply acceptance method corresponding to the supply adjustment based on the changing trend of the commodity demand includes: When the demand for the commodity is trending towards growth, a single supplier that can currently supply enough goods to cover the supply gap should be selected from the suppliers. When there is no single supplier capable of covering the supply gap, the supply gap is allocated to the multiple suppliers based on the supply capacity of each supplier. When the demand for the commodity is stable, the supply gap is allocated according to the supply capacity of each supplier. When the demand for the commodity is trending downwards or there is no new demand, priority should be given to selecting suppliers whose current supply can cover the supply gap to fill the gap.
[0017] Compared with the prior art, the beneficial effects of the present invention are as follows: Specifically, the present invention, by associating changes in commodity demand with supply capacity and supply time limits, and dynamically determining the supply acceptance method based on the judgment results, can dynamically identify commodity supply risks in the context of the gradual formation of commodity demand and continuous changes in supply status during the welfare redemption process. Furthermore, it can promptly adjust supply arrangements when conventional supply methods are incompatible with the activity fulfillment requirements, ensuring that the formation of commodity demand and the actual supply process remain relatively coordinated. This improves the responsiveness of supply management to changes in demand during welfare activities and reduces the risk of fulfillment delays caused by concentrated demand formation and delayed supply adjustments. Attached Figure Description
[0018] Figure 1 This is a flowchart illustrating the overall process of the intelligent supply management method based on big data, as described in this invention. Figure 2 This is a flowchart illustrating the process of determining the trend of commodity demand changes in an embodiment of the present invention. Figure 3 This is a flowchart illustrating the process of determining supply gaps and judging delivery time limits in an embodiment of the present invention. Figure 4 This is a flowchart illustrating the process of determining the supplier and the method of supply in an embodiment of the present invention. Detailed Implementation
[0019] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be described in detail below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort are within the scope of protection of this invention.
[0020] The business scenario for which this invention is applied is employee welfare redemption activities in enterprises and institutions. In this scenario, welfare activities typically have preset start and end times for redemption. Within the redemption time frame, participating employees select and redeem goods from a preset range of products based on their welfare allowance. At the start of the welfare activity, the number of participating employees, the welfare allowance, and other activity scale information are usually already determined, while the actual redemption quantity for each product gradually forms within the redemption time frame as employees make their redemptions. Therefore, during the welfare activity, the actual demand quantity for each product is not determined at the start of the activity but changes dynamically as redemption records are continuously generated.
[0021] In the aforementioned welfare redemption process, the supply of goods is constrained by both the actual redemption demand and the supplier's supply capacity. The actual redemption demand increases continuously with each successfully confirmed redemption, while the supplier's supply capacity is affected by factors such as the current available quantity and replenishment cycle. When redemption demand for a particular product continues to build, even if the supplier currently has a certain quantity available, the current available quantity may be insufficient to cover the outstanding demand as the demand increases. Furthermore, if a supply gap occurs and the time required for the supplier to replenish the required goods through the regular replenishment process exceeds the remaining time between the current time and the latest available time for that product, then the original supplier's regular replenishment process cannot complete the corresponding supply within the latest available time.
[0022] Current welfare redemption supply management methods typically arrange supply based on current inventory or existing redemption orders. When using current inventory as the basis for supply judgment, it mainly reflects the supplier's current supply capacity at that point in time, making it difficult to assess subsequent supply pressure by considering the continuous formation of product demand during the welfare redemption process. When replenishing based on existing redemption orders, the replenishment process usually needs to be initiated only after demand has been generated. Given long supplier replenishment cycles and short remaining welfare redemption time, this can easily lead to replenishment completion times lagging behind the latest available product time. On the other hand, if only historical redemption data is used to predict product demand for current welfare activities, discrepancies may exist between historical data and actual redemption behavior due to variations in participants, redemption times, and product configurations across different welfare activities. This makes it difficult to directly use historical data as the basis for current supply adjustments.
[0023] Therefore, the existing supply management method lacks a dynamic judgment mechanism for the continuous formation of commodity demand in welfare redemption activities. It is difficult to judge whether the current demand for fulfillment can be completed within the latest supply time based on the formed commodity redemption demand, the current supply quantity of suppliers, and the time required for replenishment, even when there has been no actual interruption in the supply of commodities. It is also difficult to adjust the supply arrangement in a timely manner when the regular replenishment process cannot meet the time limit requirements.
[0024] Based on this, the technical problem to be solved by the present invention is: in welfare redemption activities with a specified redemption time range, how to dynamically judge whether the current unfulfilled demand for goods can be fulfilled within the latest available time based on the continuously generated demand for goods redemption during the welfare redemption process and the actual supply capacity of suppliers, and to promptly trigger supply adjustments when it is determined that the regular replenishment process cannot meet the supply time limit, so as to reduce the fulfillment delay caused by the mismatch between the formation of demand for goods and the replenishment time of suppliers.
[0025] To address the aforementioned technical problems, this invention proposes a big data-based intelligent supply management method. The method compares the newly added redemption quantities of each commodity within a continuous collection period based on real-time redemption data continuously generated during the welfare redemption process to determine the changing trend of commodity demand. This changing trend of commodity demand characterizes the changes in the newly added redemption demand for the corresponding commodity between continuous collection periods. Based on this, the total current pending commodity demand is determined according to the commodity demand that has been formed but not yet supplied, and this total pending commodity demand is compared with the supplier's current available quantity to determine if a supply gap exists. If a supply gap is determined, the latest available time for the commodity is further determined based on activity time constraint data, and the remaining supply preparation time between the current time and the latest available time is compared with the supplier's replenishment cycle to determine whether the supply gap can be filled within the latest available time through the regular replenishment process. When it is determined that the regular replenishment process cannot meet the latest available time, a supply adjustment is triggered, and the corresponding supply acceptance method is determined based on the changing trend of commodity demand.
[0026] After implementing supply adjustments, the system continues to acquire updated real-time redemption data and commodity supply capacity data, and reassesses the current unfulfilled demand for commodities, supply gaps, and the timeliness and feasibility of regular replenishment processes. This forms a closed-loop process of continuous monitoring, status assessment, and supply adjustment until the welfare activity ends. Thus, this invention links the continuous formation of commodity redemption demand with the supplier's quantity and time-based supply capacity. When current supply capacity is insufficient and regular replenishment cannot meet the remaining supply preparation time, it promptly identifies supply timeliness risks and initiates corresponding supply adjustments, thereby reducing fulfillment delays caused by the mismatch between commodity demand formation and supplier replenishment cycles.
[0027] Reference Figure 1 This invention provides an overall process for a big data-based intelligent supply management method. In this embodiment, the method is executed by a supply management system, which can be deployed in a server or cloud computing environment to continuously monitor and process the demand for goods redemption and the supply status during welfare activities.
[0028] First, the system executes step S100 to acquire activity time constraint data and commodity supply capacity data related to the welfare activity. The activity time constraint data characterizes the time range of the welfare activity and the corresponding time requirements for commodity supply. The commodity supply capacity data characterizes the supplier supply capacity for each commodity in the welfare activity. The commodity supply capacity data includes at least supplier identifier, commodity identifier, current available quantity, and replenishment cycle, and may further include inventory status, the supply quantity locked for the welfare activity, and the replenishment quantity, among other data.
[0029] Subsequently, during the welfare activity, the system executes step S200, acquiring real-time redemption data according to a preset collection cycle, and determining the changing trend of commodity demand based on the real-time redemption data acquired over consecutive collection cycles. The real-time redemption data includes successfully confirmed redemption records acquired during the welfare activity according to a preset collection cycle. Each successfully confirmed redemption record includes at least a commodity identifier, redemption time, and redemption quantity, used to determine the new redemption quantity of each commodity within the corresponding collection cycle and the commodity redemption demand quantity formed up to the current time. The system categorizes the acquired redemption data according to the commodity identifier and determines the changing trend of commodity demand for the corresponding commodity by the changes in the new redemption quantity between consecutive collection cycles.
[0030] In step S300, the system determines the total demand for goods to be fulfilled based on the real-time exchange data and the commodity supply capacity data, and compares the total demand for goods to be fulfilled with the current available quantity of the corresponding supplier to determine whether there is a supply gap. When the total demand for goods to be fulfilled is greater than the current available quantity, a supply gap is determined, and the amount of the supply gap is determined based on the difference between the two quantities.
[0031] When a supply gap is identified, the system executes step S400, determining the latest available time for the corresponding goods based on the activity time constraint data, and determining the remaining supply preparation time based on the time length between the current time and the latest available time. Subsequently, the remaining supply preparation time is compared with the corresponding supplier's replenishment cycle to determine whether the supply gap can be filled before the latest available time through the regular replenishment process.
[0032] When the remaining supply preparation time is less than the replenishment cycle, the system determines that the supply gap cannot be filled within the latest available time through the regular replenishment process, and executes step S500 to trigger supply adjustment. The supply adjustment includes determining the corresponding supply acceptance method based on the changing trend of the product demand, identifying a supplier capable of accepting the supply gap from candidate suppliers, and generating a corresponding supply adjustment task based on the quantity of the supply gap.
[0033] After completing the supply adjustment, the system does not end the judgment on the supply status of the corresponding product, but continues to execute step S200 to obtain the updated real-time exchange data according to the collection cycle, and re-determine the changing trend of product demand, the total demand of products to be fulfilled, and whether there is a supply gap based on the updated real-time exchange data; when it is re-determined that there is a supply gap, it is judged again whether the regular replenishment process can make up the supply gap within the latest delivery time, and determines whether it is necessary to perform supply adjustment again based on the judgment result.
[0034] After each round of judgment, the system executes step S600 to determine whether the welfare activity has ended. If the welfare activity has not ended, it returns to step S200 to continue obtaining updated real-time exchange data and performing subsequent judgments. When the welfare activity ends, the current supply risk identification and adjustment process concludes. This forms a cyclical processing procedure that uses real-time exchange data as input, bases judgments on demand and supply status, uses supply adjustment as a processing step, and continuously updates the judgments after adjustment, thereby achieving continuous identification and dynamic adjustment of commodity supply risks during welfare activities.
[0035] Specifically, this invention correlates changes in commodity demand with supply capacity and delivery time, and dynamically determines the supply acceptance method based on the judgment results. It can dynamically identify commodity supply risks in the context of the gradual formation of commodity demand and continuous changes in supply status during the welfare redemption process. When the conventional supply method is not compatible with the performance requirements of the activity, the supply arrangement is adjusted in a timely manner, so that the formation process of commodity demand and the actual supply process are relatively coordinated. This improves the responsiveness of supply management to changes in demand during welfare activities and reduces the risk of performance delays caused by concentrated demand formation and delayed supply adjustments.
[0036] To more clearly illustrate the technical solution of this invention, a specific employee welfare redemption activity is used as an example to explain the supply risk identification and adjustment process of this invention. Assume an enterprise or institution is conducting a Mid-Autumn Festival employee welfare redemption activity, with the redemption period from 00:00 on September 1st to 24:00 on September 20th. During this redemption period, employees select and redeem goods from a preset range of goods through the welfare platform. This embodiment uses a nut gift box as the target product, continuously judging and adjusting the supply status of the target product during the welfare redemption period.
[0037] Before the start of the promotional activity, the system acquires the activity time constraint data and product supply capacity data corresponding to the activity. The activity time constraint data includes the start and end times for redeeming benefits. In this embodiment, the start time for redeeming benefits is September 1st at 00:00, and the end time is September 20th at 24:00. The product supply capacity data includes supplier information associated with the nut gift box, current available quantity, and replenishment cycle.
[0038] For example, the system identifies Supplier A as the associated supplier of the nut gift boxes. Supplier A's initial available quantity for this promotional event is 1000 boxes, and the replenishment cycle for the nut gift boxes is 4 days. The current available quantity indicates the number of goods that can be supplied for this promotional event at the current time, and the replenishment cycle indicates the time required for Supplier A to complete the replenishment process according to the standard replenishment procedure, from initiating the replenishment process to the new goods reaching a state where they can be shipped for this promotional event.
[0039] After the welfare activity begins, the system acquires real-time redemption data according to a preset collection cycle. In this embodiment, the collection cycle is set to 2 hours. Every 2 hours, the system acquires employee welfare redemption records that have been successfully confirmed up to the current collection time, and categorizes the acquired redemption records according to product identifiers, thereby obtaining the new redemption quantity corresponding to each product within the current collection cycle.
[0040] While determining the changing trend of commodity demand, the system determines the total current demand for commodities to be fulfilled based on the real-time redemption data already acquired. Specifically, the system counts the number of nut gift boxes that have been successfully redeemed up to the current time, and determines the number of commodities that have not yet entered the preset completion of supply status from the number of commodities that have been successfully redeemed. The number of commodities that have not yet entered the preset completion of supply status is taken as the current total demand for commodities to be fulfilled.
[0041] Subsequently, the system retrieves the current available quantity of supplier A as of 12:00 on September 17th. For example, based on supplier A's current inventory, occupied inventory, and the supply quantity locked for this promotional event, the system determines that supplier A's current available quantity for this promotional event is 800 units. The system compares the total demand for goods currently pending fulfillment (1000 units) with the current available quantity of 800 units. Since the total demand for goods currently pending fulfillment is greater than the current available quantity, it determines that there is a supply gap for the nut gift boxes, and determines the supply gap to be 200 units based on the difference between the two.
[0042] After confirming the existence of the supply gap, the system determines the latest available time for the nut gift box based on the activity time constraint data. In this embodiment, the system determines the latest available time for the nut gift box according to the pre-configured product fulfillment lead time in the activity time constraint data. In this embodiment, the product fulfillment lead time is 2 days before the welfare redemption deadline, therefore September 18th at 24:00 is determined as the latest available time for the nut gift box. The product fulfillment lead time is used to characterize the fulfillment processing time reserved between the target product reaching the availability status and the welfare redemption deadline, and it can be pre-set according to the time requirements of product sorting, warehousing, delivery, and other fulfillment processing links. The system further determines the length of time between the current time September 17th at 12:00 and the latest available time, obtaining a remaining supply preparation time of 36 hours, or 1.5 days.
[0043] Subsequently, the system obtains the replenishment cycle for supplier A's nut gift boxes. In this embodiment, supplier A's replenishment cycle is 4 days. The system compares the remaining supply preparation time of 1.5 days with the replenishment cycle of 4 days. Since the remaining supply preparation time is less than the replenishment cycle, it determines that supplier A cannot replenish the 200 supply gap before the latest available time through the conventional replenishment process, and generates a corresponding supply adjustment request.
[0044] After generating the supply adjustment request, the system determines the supply acceptance method corresponding to the supply adjustment based on the changing trend of the demand for the corresponding nut gift box, and obtains candidate suppliers associated with the nut gift box from a pre-established set of candidate suppliers. The set of candidate suppliers records supply capacity data such as the product information that the candidate suppliers can provide, the current available quantity, and the replenishment cycle of the corresponding products.
[0045] After generating the supply adjustment request, the system determines the supply acceptance method corresponding to the supply adjustment based on the changing trend of the demand for the corresponding nut gift box, and obtains candidate suppliers associated with the nut gift box from a pre-established set of candidate suppliers. The set of candidate suppliers records supply capacity data such as the product information that the candidate suppliers can provide, the current available quantity, and the replenishment cycle of the corresponding products.
[0046] For example, the system selects Supplier B and Supplier C from the candidate supplier set as candidate suppliers for the nut gift boxes. Supplier B can provide nut gift boxes corresponding to this promotional activity, with a current supply of 300 boxes and a replenishment cycle of 1 day; Supplier C can also provide nut gift boxes, with a current supply of 300 boxes, but its replenishment cycle is 5 days.
[0047] The system determines the supplier based on the supply capacity of each candidate supplier. Specifically, the system first determines whether the candidate supplier can provide the target product, and then, based on the candidate supplier's current available quantity and replenishment cycle, determines whether it can form a supply capacity that meets the supply requirements within the remaining supply preparation time.
[0048] Since Supplier B's replenishment cycle is 1 day, which is less than the remaining 1.5 days of supply preparation time, and Supplier B has 300 units currently available for supply, Supplier B is selected as the supplier to accept the goods. Since Supplier C's replenishment cycle is 5 days, which is greater than the remaining 1.5 days of supply preparation time, Supplier C is not selected as the supplier to accept the goods corresponding to this supply adjustment.
[0049] Since the current demand trend for nut gift boxes is one of increasing demand, the system further determines the supply acceptance method based on this trend. If supplier B's current supply quantity can cover a supply gap of 200 units, it is determined that supplier B will solely accept the supply gap. The system then determines the corresponding supply quantity for supplier B based on the size of the supply gap, generating a supply adjustment task for supplier B. This task includes at least the product identifier and the quantity to be accepted, where the quantity is 200 units.
[0050] In another scenario, if supplier B currently has a supply of only 150 units, while supplier D has a supply of only 100 units, and both suppliers B and D can meet the supply requirements, then the system designates suppliers B and D as multiple supply recipients. The system then determines the corresponding supply quantity based on the supply gap and the supply capacity of each supplier. For example, 150 units might be allocated to supplier B, and 50 units to supplier D, with corresponding supply adjustment tasks generated for each.
[0051] After completing this round of supply adjustments, the system continues to acquire updated real-time exchange data according to the preset collection cycle, and re-determines the changing trend of the corresponding commodity demand and the total current demand for commodities to be fulfilled based on the updated real-time exchange data. When a supply gap is formed again between the updated total demand for commodities to be fulfilled and the current available quantity of the corresponding supplier, the system re-determines the amount of the supply gap, and re-determines the remaining supply preparation time based on the current time and the updated latest available time. Then, the remaining supply preparation time is compared with the replenishment cycle of the corresponding supplier to determine whether another supply adjustment needs to be triggered.
[0052] For example, after adjusting the aforementioned 200 supply gaps, if new nut gift box redemption records are generated during subsequent collection periods, causing the total demand for goods to be fulfilled to exceed the current supply quantity of the corresponding supplier, the system will re-execute the above-mentioned processes to determine the supply gap, the remaining supply preparation time, the replenishment cycle comparison, and the supplier to take over the supply, until the promotional activity reaches its deadline of 24:00 on September 20.
[0053] Reference Figure 2 This section explains the specific process for determining the changing trends in commodity demand.
[0054] In step S210, the system sets up an initial observation phase. During this initial observation phase, the system continuously acquires actual commodity redemption results according to a preset collection cycle and records the acquired results, but does not determine the trend of commodity demand based on the increase in redemption quantity between the current and previous collection cycles. In this embodiment, after the welfare redemption activity begins, the system sets three consecutive collection cycles as the initial observation phase, each cycle being 2 hours, therefore the initial observation phase lasts for 6 hours. In other embodiments, the number of collection cycles included in the initial observation phase can be set according to the duration of the welfare activity and the formation of commodity redemption records. The collection cycle is not limited to 2 hours and can be set according to the duration of the welfare activity, the frequency of redemption record generation, and the response time required for supply adjustments.
[0055] After the system obtains the actual commodity redemption results for three consecutive collection cycles, the third collection cycle is designated as the last observation cycle for establishing a trend judgment benchmark. Starting from the next collection cycle, the new redemption quantity in the current collection cycle is compared with the new redemption quantity in the previous collection cycle to determine the changing trend of commodity demand. In step S220, the system continuously obtains successfully confirmed employee welfare redemption records according to a preset collection cycle and determines the new redemption quantity corresponding to each commodity based on the obtained redemption records. Here, successfully confirmed employee welfare redemption records refer to records that have completed the welfare redemption confirmation process and formed valid redemption results.
[0056] In step S230, the system categorizes the redemption records obtained in the current collection period according to the product identifier, and counts the number of new redemptions for each product in the current collection period.
[0057] In step S240, the system obtains the new redemption quantity of the product in the previous collection period and compares the new redemption quantity in the current collection period with the new redemption quantity in the previous collection period.
[0058] In step S250, the system determines the trend of change in the demand for the corresponding product based on the comparison results of the new exchange quantity between the current collection period and the previous collection period.
[0059] Specifically, when the number of new exchanges in the current collection period is greater than the number of new exchanges in the previous collection period, the trend of demand for the corresponding product is determined to be a demand growth state; when the number of new exchanges in the current collection period is equal to the number of new exchanges in the previous collection period, and the number of new exchanges is greater than zero, the trend of demand for the corresponding product is determined to be a demand stable state; when the number of new exchanges in the current collection period is less than the number of new exchanges in the previous collection period, and the number of new exchanges in the current collection period is greater than zero, the trend of demand for the corresponding product is determined to be a demand decline state; when the number of new exchanges in the current collection period is zero, the trend of demand for the corresponding product is determined to be a state of no new demand.
[0060] After acquiring the corresponding new exchange quantity in each new collection cycle, the system updates the trend of the demand for the corresponding goods in the above manner, and uses the updated trend of the demand for goods as the basis for judging the supply gap and determining the supply adjustment method.
[0061] Reference Figure 3 The process of determining supply gaps and judging supply timelines is explained.
[0062] In step S310, the system determines the total demand for goods to be fulfilled. Specifically, the system determines the number of target goods that have been successfully redeemed as of the current time based on real-time redemption data, and obtains the supply completion status data and supply acceptance relationship corresponding to the target goods. Based on the supply completion status data, the system determines the number of goods that have entered the preset supply completion status, and determines the number of goods that have not yet entered the preset supply completion status among the number of target goods that have been successfully redeemed as the total demand for goods to be fulfilled.
[0063] The preset delivery completion status can be set according to the performance requirements of the welfare activity, such as setting it to the "shipped" status or the "received" status, without limitation here.
[0064] In step S320, the system obtains the current available quantity of the supplier associated with the target product. The current available quantity represents the quantity of goods the supplier can actually use for fulfilling the welfare activity at the current point in time. Specifically, the current available quantity can be determined based on the supplier's current inventory, occupied inventory, and the supply quantity locked for the welfare activity.
[0065] In some implementations, the current available quantity can also be determined based on the supplier's current supply arrangements for the welfare activity, so that the current available quantity corresponds to the quantity of goods that can actually be put into fulfillment of this welfare activity at the current time, rather than the supplier's total inventory quantity. For the supply quantity that has been taken over to other suppliers through the supply adjustment task, the corresponding taken-over quantity is included in the current available quantity of the corresponding taking-over supplier, and updated accordingly from the available quantity corresponding to the original supply taking-over relationship.
[0066] In step S330, the system compares the total demand for goods currently pending fulfillment with the current available quantity. When the total demand for goods currently pending fulfillment is greater than the current available quantity, the system determines that there is a supply gap, and determines the size of the supply gap based on the quantity difference between the total demand for goods currently pending fulfillment and the current available quantity.
[0067] If the total demand for goods currently pending fulfillment is less than or equal to the current available supply, then the current supply is determined to be sufficient to cover the current demand for goods pending fulfillment, and no supply gap is generated.
[0068] After determining that a supply gap exists, the system further executes step S410 to determine whether the existing supplier can replenish the supply gap through the regular replenishment process within the latest available time.
[0069] In step S410, the system determines the latest available time for the target product based on the activity time constraint data. The latest available time is used to limit the latest point in time when the target product completes its supply preparation and can enter the supply state according to the welfare activity fulfillment requirements. The activity time constraint data also includes the fulfillment lead time corresponding to the target product, which represents the time reserved for the target product to complete sorting, warehousing, delivery, or other fulfillment processing after the welfare redemption deadline.
[0070] In step S420, the system obtains the current time and determines the length of time between the current time and the latest delivery time, and determines the length of time as the remaining delivery preparation time.
[0071] In step S430, the system obtains the replenishment cycle of supplier A for the target product. The replenishment cycle is used to characterize the time required for supplier A to complete the replenishment process from initiating replenishment to the new product reaching a state where it can be shipped to the current welfare activity.
[0072] In step S440, the system compares the remaining supply preparation time with the replenishment cycle. When the remaining supply preparation time is less than the replenishment cycle, it is determined that supplier A cannot, through the regular replenishment process, bring the goods corresponding to the supply gap to a supply status ready for fulfillment of the current welfare activity before the latest available supply time.
[0073] Reference Figure 4 This document explains the process of selecting suppliers and determining the supply acceptance method after the supply adjustment is triggered.
[0074] In step S500, the system triggers the supply adjustment process based on the supply adjustment requirements and enters the candidate supplier screening process.
[0075] In step S510, the system obtains the target product, supply gap, and remaining supply preparation time corresponding to the supply adjustment requirement, and obtains the changing trend of the demand for the target product as the basis for subsequent candidate supplier selection and supply acceptance method determination.
[0076] In step S520, the system, based on the generated supply adjustment requirements, retrieves candidate suppliers associated with the target product for which there is a supply gap from a pre-established candidate supplier set. The candidate supplier set stores information on suppliers eligible to participate in welfare activities, and this information includes at least a supplier identifier, a product identifier available, a current available quantity, and a replenishment cycle for the corresponding product. The system retrieves the candidate supplier corresponding to the target product from the candidate supplier set based on the product identifier of the target product.
[0077] In step S530, the system determines the supply conditions for each candidate supplier. Specifically, the system first determines whether the candidate supplier can provide the target product based on the product identifier corresponding to the candidate supplier. After determining that the candidate supplier can provide the target product, the system obtains the current available quantity of the target product from the candidate supplier and compares the current available quantity with the supply gap.
[0078] When the current available quantity is greater than or equal to the supply gap, the system determines that the candidate supplier can directly take over the supply gap, and determines the quantity corresponding to the supply gap as the supply quantity that the candidate supplier can take over.
[0079] When the current available quantity is less than the supply gap, the system further obtains the replenishment cycle of the candidate supplier for the target product and compares the replenishment cycle with the remaining supply preparation time. When the replenishment cycle is less than or equal to the remaining supply preparation time, it is determined that the candidate supplier can form new supply capacity through replenishment, and the available supply quantity of the candidate supplier is determined based on the current available quantity and the quantity of products that can be replenished within the remaining supply preparation time. When the replenishment cycle is greater than or equal to the remaining supply preparation time, it is determined that the candidate supplier cannot form new supply capacity within the latest available supply time.
[0080] The quantity of goods that can be replenished within the remaining supply preparation time refers to the quantity of goods that the candidate supplier, according to its corresponding replenishment process, can replenish within the remaining supply preparation time and bring the newly added goods to a supply status suitable for fulfilling this welfare activity. The system can determine the quantity of goods that can be replenished based on the single replenishment quantity, replenishment batch, and corresponding replenishment cycle provided in advance by the candidate supplier. When the remaining supply preparation time is insufficient to complete a full replenishment cycle, the quantity of goods corresponding to that replenishment batch will not be included in the quantity of goods that can be replenished.
[0081] If no candidate supplier is available to fill the supply gap before the latest delivery time, the system generates a corresponding supply risk warning and records the supply gap, the remaining supply preparation time, and information on candidate suppliers that do not meet the supply acceptance conditions, for subsequent supply status monitoring and handling. The latest delivery time is determined based on the welfare redemption deadline and the goods fulfillment lead time, and is used to reserve time for sorting, warehousing, delivery, or other fulfillment processing required after the redemption deadline for the target goods.
[0082] After identifying the supplier, the system further executes step S540 to determine the supply acceptance method based on the changing trend of the demand for the target product. The supply acceptance method is used to determine whether the supply gap will be filled by one supplier or jointly by multiple suppliers.
[0083] When the demand trend for the target product is in a state of increasing demand, the system first determines whether there is a supplier whose current supply quantity can cover the entire supply gap. Since the increasing demand indicates that the new exchange demand for the corresponding product is still increasing, the system prioritizes selecting a single supplier from among the suppliers whose current supply quantity can cover the entire supply gap. This reduces the splitting of the current supply task and preserves the supply capacity of other candidate suppliers for subsequent new supply demands. If such a supplier exists, in step S550, a supplier capable of covering the entire supply gap is selected to take over the supply gap, and the supply quantity corresponding to that supplier is determined based on the quantity of the supply gap.
[0084] In some implementations, when the demand for the target product is stable, the system allocates the supply gap according to the supply capacity of each supplier; when the demand is declining or there is no new demand, the system prioritizes selecting suppliers from those whose current supply capacity can cover the supply gap, in order to reduce additional replenishment needs.
[0085] For example, in this embodiment, the identified supply gap is 200 units, and the current available supply quantity of supplier B is 300 units. Therefore, the system determines that supplier B will be solely responsible for the 200-unit supply gap and generates a corresponding supply adjustment task.
[0086] When there is no single supplier capable of covering the entire supply gap, the system further identifies multiple suppliers that can collectively cover the supply gap and determines the corresponding supply allocation quantity based on the current available supply quantity of each supplier.
[0087] For example, when the supply gap is 200 units, and the supply capacity of supplier B and supplier D is 150 units and 100 units respectively, 150 units can be allocated to supplier B and the remaining 50 units can be allocated to supplier D until the supply gap is completely covered.
[0088] After generating a supply adjustment task, the system sends the task to the corresponding supplier and updates the supply relationship and supply capacity data for the target product based on the task. This ensures that supply gaps already covered by the supplier are not repeatedly included in the original supplier's supplementary supply needs, and subsequent supply gap assessments are based on the updated overall available quantity of the product. If the redemption quantity of the target product continues to change during subsequent data collection periods, the system re-acquires the updated real-time redemption data and re-executes the supply gap assessment and supply adjustment based on the updated product demand, current available quantity, and remaining supply preparation time.
[0089] Those skilled in the art will understand that the above embodiments are illustrative of the invention and are not intended to limit the scope of protection of the invention. Modifications and variations can be made to the above embodiments without departing from the spirit and scope of the invention. Furthermore, the present invention also provides a computer-readable storage medium storing a computer program thereon, which, when run on a processor, causes the processor to execute the above-described supply risk identification and adjustment method. Therefore, any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.
Claims
1. A supply chain intelligent management method based on big data, characterized in that, include: Obtain data on activity time constraints and commodity supply capacity related to welfare activities; During the welfare activities, real-time exchange data representing the demand for goods is periodically acquired, and the changing trend of the demand for goods is determined based on the real-time exchange data collected over a continuous period. Based on the real-time exchange data and the commodity supply capacity data, the total demand for commodities to be fulfilled is determined, and based on the relationship between the total demand for commodities to be fulfilled and the current available quantity corresponding to the commodity supply capacity data, it is determined whether there is a supply gap. When the supply gap is determined to exist, based on the activity time constraint data and the commodity supply capacity data, it is determined whether the supply gap can be made up before the latest available time of the corresponding commodity through the regular replenishment process; When it is determined that the supply gap cannot be made up within the latest available time through the regular replenishment process, a supply adjustment is triggered, and the supply acceptance method corresponding to the supply adjustment is determined according to the changing trend of the demand for the goods. After the supply adjustment is executed, the updated real-time exchange data is periodically obtained, and the determination of the supply gap and the fulfillment judgment of the regular replenishment process are re-executed based on the updated real-time exchange data until the welfare activity ends.
2. The method according to claim 1, characterized in that, The periodic acquisition of real-time exchange data representing commodity demand includes: During the benefit redemption period, the system continuously acquires successfully confirmed employee benefit redemption records according to a preset collection cycle, and categorizes the benefit redemption records according to product identifiers to obtain the new redemption quantity corresponding to each product in the current collection cycle.
3. The method according to claim 2, characterized in that, Determining the trend of changes in commodity demand includes: Compare the number of new exchanges in the current collection period with the number of new exchanges in the previous collection period, and determine the trend of change in the demand for the corresponding products based on the comparison results. The trend of change in the demand for the commodity includes at least one of the following states: demand growth, demand stability, demand decline, and no new demand.
4. The method according to claim 1, characterized in that, Determining the total demand for goods currently pending fulfillment includes: The number of goods that have been successfully redeemed is determined based on the real-time redemption data, and the number of goods that have not yet entered the preset completion of supply status is determined from the number of goods that have been successfully redeemed. The number of goods that have not yet entered the preset completion of supply status is determined as the total demand for goods to be fulfilled at present.
5. The method according to claim 1, characterized in that, Determining whether a supply gap exists includes: Obtain the current available quantity of goods from one or more suppliers associated with the goods in the welfare activity, and determine the total available quantity of the goods currently available for the welfare activity based on the current available quantity of goods from the one or more suppliers; Compare the total demand for goods currently pending fulfillment with the current available quantity; When the total demand for goods to be fulfilled is greater than the current available quantity, a supply gap is determined, and the quantity of the supply gap is determined based on the quantity difference between the total demand for goods to be fulfilled and the current available quantity.
6. The method according to claim 1, characterized in that, The determination of whether the supply gap can be made up through the regular replenishment process within the latest available delivery time includes: The latest delivery time for the product is determined based on the activity time constraint data. Determine the length of time between the current time and the latest available delivery time to obtain the remaining delivery preparation time; Obtain the supplier's replenishment cycle for the product; The remaining supply preparation time is compared with the replenishment cycle, and the results of the comparison are used to determine whether the regular replenishment process can make up for the supply gap before the latest delivery time.
7. The method according to claim 6, characterized in that, The step of determining whether the conventional replenishment process can make up for the supply gap before the latest available delivery time based on the comparison results includes: When the remaining supply preparation time is less than the replenishment cycle, it is determined that the regular replenishment process cannot make up the supply gap before the latest delivery time, and a supply adjustment request is generated.
8. The method according to claim 7, characterized in that, The triggering of supply adjustments includes: Retrieve candidate suppliers associated with the goods for which the supply gap exists from a pre-established set of candidate suppliers; The supplier will be selected based on the supply capacity of each candidate supplier. Based on the quantity of the supply gap, determine the corresponding supply quantity of the supplier to accept the supply, and generate a supply adjustment task.
9. The method according to claim 3, characterized in that, Before determining the trend of changes in commodity demand, the following is also included: Set an initial observation phase, and continuously acquire the actual commodity redemption results for a continuous collection period during the initial observation phase; When the number of consecutive collection cycles corresponding to the actual commodity redemption results reaches the preset number of consecutive cycles, the initial observation phase ends, and the trend of commodity demand is determined based on the actual commodity redemption results of the consecutive collection cycles.
10. The method according to claim 3, characterized in that, The step of determining the supply acceptance method corresponding to the supply adjustment based on the changing trend of the demand for the commodity includes: When the demand for the commodity is trending towards growth, a single supplier that can currently supply enough goods to cover the supply gap should be selected from the suppliers. When there is no single supplier capable of covering the supply gap, the supply gap is allocated to the multiple suppliers based on the supply capacity of each supplier. When the demand for the commodity is stable, the supply gap is allocated according to the supply capacity of each supplier. When the demand for the commodity is trending downwards or there is no new demand, priority should be given to selecting suppliers whose current supply can cover the supply gap to fill the gap.
