A method for integrated wiring of strong and weak current systems in prefabricated interior decoration for non-residential renovation projects.
By generating a candidate path network for integrated power and low-voltage cabling in the renovation of non-residential buildings and prefabricating prefabricated interior components in the factory, the problems of low construction efficiency and electromagnetic interference in the renovation of non-residential buildings are solved, and efficient and safe integrated power and low-voltage cabling is achieved.
Patent Information
- Application Number
- CN202611316576.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-28
- Publication Date
- 2026-11-17
AI Technical Summary
Existing prefabricated interior decoration technology lacks a systematic integrated wiring scheme for strong and weak current in the process of converting non-residential buildings into affordable rental housing. This results in low construction efficiency, long construction period, serious cross-interference of lines, great potential electromagnetic interference, and inconvenient maintenance.
By obtaining the original structural parameters of the building to be renovated, a candidate path network for integrated power and low voltage wiring is generated. Prefabricated interior components that integrate power and low voltage lines are prefabricated in the factory, assembled on-site, and connected to the incoming line to achieve integrated power and low voltage wiring.
It enables factory production and on-site assembly of power and data cabling, improving construction efficiency and project quality stability, avoiding electromagnetic interference, simplifying line connection and maintenance, and enhancing the safety and reliability of electrical systems.
Smart Images

Figure CN123121341A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building electrical engineering technology, and more specifically, to a method for integrated wiring of strong and weak current systems in prefabricated interior decoration for non-residential renovation projects. Background Technology
[0002] With the advancement of urbanization, a large number of non-residential buildings, such as commercial offices and industrial plants, need to be converted into affordable rental housing due to functional adjustments or policy requirements—a process known as "non-residential to affordable rental housing conversion projects." As various cities have successively introduced policies for converting non-residential buildings into affordable rental housing, these projects have become an important way to revitalize existing assets and increase the supply of affordable housing. These projects typically convert idle and inefficiently used commercial, office, hotel, factory, R&D, and warehouse buildings into affordable rental housing. Unlike traditional new residential projects, non-residential to affordable rental housing conversion projects involve functional transformation and renovation based on existing building structures. The original purpose of the building was not designed for residential use; its internal spatial layout, structural load-bearing capacity, and water, electricity, and gas network configurations are all designed to meet the original non-residential functions. During the renovation process, functional zones need to be redefined while preserving the original main structure, and necessary electrical and communication points need to be added. Furthermore, the renovated unit types are usually standardized and uniform, requiring short renovation cycles and high delivery standards. However, existing prefabricated interior decoration technology is still limited to simple pre-reserved holes or post-drilling when it comes to integrating with power and low-voltage wiring, lacking a systematic integrated power and low-voltage wiring solution tailored to the characteristics of non-residential renovation projects.
[0003] Traditional on-site wiring methods are inefficient and time-consuming, making it difficult to meet the rapid delivery needs of non-residential renovation projects. The lack of integrated design for strong and weak current lines and the separate construction on-site can easily lead to cross-interference and unstable connection quality. The interfaces between factory-prefabricated components and on-site electrical systems are not uniform, making it difficult to connect the wiring during assembly and affecting the safety and reliability of the overall electrical system. The physical isolation measures for strong and weak current lines are insufficient, posing a risk of electromagnetic interference and making subsequent maintenance and replacement inconvenient. Summary of the Invention
[0004] This invention provides a method for integrated wiring of strong and weak current systems in prefabricated interior decoration for non-residential renovation projects, comprising: Obtain the original structural parameters of the building to be renovated, and generate a candidate path network for integrated power and low voltage cabling based on the original structural parameters; The power supply points and low-voltage information points of each functional zone are determined based on the candidate path network, and the wiring requirements of each functional zone are generated based on the power supply points and low-voltage information points. Based on the wiring requirements, prefabricated interior components with integrated high-voltage and low-voltage wiring are manufactured in the factory. The prefabricated modular interior components are transported to the renovation site and assembled on-site according to the candidate path network. The assembled high-voltage and low-voltage lines are connected to their respective incoming high-voltage and low-voltage power lines to complete the integrated wiring of high-voltage and low-voltage systems.
[0005] Furthermore, the step of obtaining the original structural parameters of the building to be renovated and generating a candidate path network for integrated power and data cabling based on the original structural parameters includes: Obtain the original structural drawings of the building to be renovated, and extract the floor slab thickness data, wall thickness data, and beam and column location data of each floor from the original structural drawings; Based on the floor slab thickness data, wall thickness data, and beam and column location data, determine the wiring channels for high-voltage and low-voltage lines that are allowed to be laid in each floor. Connect the wiring channels on each floor to generate a candidate path network for integrated power and data cabling.
[0006] Further, the step of determining the high-voltage power supply points and low-voltage information points of each functional zone based on the candidate path network, and generating the wiring requirements of each functional zone based on the high-voltage power supply points and the low-voltage information points, includes: Based on the candidate path network, the spatial connectivity of each floor is extracted, and the functional zones are divided according to the spatial connectivity. Based on the functions of each functional area, match the corresponding high-voltage electrical equipment configuration table and low-voltage information equipment configuration table; The locations of high-voltage power supply points in each functional zone are determined according to the high-voltage power supply equipment configuration table, and the locations of low-voltage information points in each functional zone are determined according to the low-voltage information equipment configuration table. Based on the power supply points and low-voltage information points of each functional zone, the wiring requirements for each functional zone are generated.
[0007] Furthermore, generating the wiring requirements for each functional zone based on the high-voltage power supply points and low-voltage information points includes: Based on the rated power of the high-voltage electrical equipment corresponding to the high-voltage electrical points in each functional zone, calculate the total high-voltage load power of each functional zone. The total high-voltage load power is the sum of the rated power of each high-voltage electrical equipment multiplied by the simultaneous use coefficient. Based on the bandwidth requirements of the low-voltage information devices corresponding to the low-voltage information points in each functional zone, the total low-voltage bandwidth of each functional zone is calculated, where the total low-voltage bandwidth is the sum of the bandwidth requirements of each low-voltage information device. The specifications of the high-voltage lines for each functional zone are determined based on the total high-voltage load power, and the specifications of the low-voltage lines for each functional zone are determined based on the total low-voltage bandwidth. Based on the specifications of the high-voltage and low-voltage lines for each functional zone, the wiring requirements for each functional zone are generated.
[0008] Furthermore, the prefabricated interior components, which integrate high-voltage and low-voltage wiring in the factory according to the wiring requirements, include: The specifications and integrated wiring types of each prefabricated interior component are determined based on the wiring requirements. According to the specifications and the type of integrated circuit, prefabricated interior components are manufactured in the factory, and high-voltage and low-voltage circuits are integrated inside the prefabricated interior components. A high-voltage interface and a low-voltage interface are provided at a predetermined position on the surface of the prefabricated interior component. The high-voltage interface is electrically connected to the high-voltage line, and the low-voltage interface is electrically connected to the low-voltage line. Electrical performance tests are performed on the prefabricated modular interior components, and the qualified modular interior components are numbered and packaged.
[0009] Furthermore, the prefabricated interior components include prefabricated wall panels, prefabricated floor panels, and prefabricated ceiling panels; integrating high-voltage and low-voltage wiring within the prefabricated interior components includes: Power cable trays and low-voltage cable trays are installed inside the prefabricated wall panel. Power cables are laid in the power cable trays and low-voltage cables are laid in the low-voltage cable trays. The distance between the power cable trays and the low-voltage cable trays is greater than or equal to a preset distance. Power cable trays and low-voltage cable trays are installed inside the prefabricated floor. Power cables are laid in the power cable trays and low-voltage cables are laid in the low-voltage cable trays. The distance between the power cable trays and the low-voltage cable trays is greater than or equal to a preset distance. Power cable trays and low-voltage cable trays are installed inside the prefabricated ceiling panel. Power cables are laid in the power cable trays and low-voltage cables are laid in the low-voltage cable trays. The distance between the power cable trays and the low-voltage cable trays is greater than or equal to a preset distance.
[0010] Furthermore, the step of transporting the prefabricated modular interior components to the renovation site and assembling them on-site according to the candidate path network includes: Based on the candidate path network, the installation positions of each prefabricated interior component are marked at the renovation site; Install the prefabricated interior components sequentially according to the installation location; During the installation of each of the prefabricated interior components, the power lines between adjacent prefabricated interior components are electrically connected through power connectors. The low-voltage wiring between adjacent prefabricated interior components is electrically connected using a low-voltage connector. After all the prefabricated interior components are installed, a continuity test is performed on the high-voltage and low-voltage power lines.
[0011] Furthermore, the step of electrically connecting the high-voltage lines between adjacent prefabricated interior components via high-voltage connectors includes: Align the first high-voltage line output terminal of the first prefabricated interior component with the second high-voltage line input terminal of the second prefabricated interior component. Insert the first end of the high-voltage connector into the output end of the first high-voltage line, and insert the second end of the high-voltage connector into the input end of the second high-voltage line; The high-voltage connector enables electrical connection between the output terminal of the first high-voltage line and the input terminal of the second high-voltage line.
[0012] Furthermore, the step of electrically connecting the low-voltage wiring between adjacent prefabricated interior components using a low-voltage connector includes: Align the first low-voltage line output terminal of the first prefabricated interior component with the second low-voltage line input terminal of the second prefabricated interior component. Insert the first end of the low-voltage connector into the output end of the first low-voltage line, and insert the second end of the low-voltage connector into the input end of the second low-voltage line; The low-voltage connector enables electrical connection between the outgoing terminal of the first low-voltage line and the incoming terminal of the second low-voltage line.
[0013] Furthermore, the step of connecting the assembled high-voltage and low-voltage lines to their respective incoming high-voltage and low-voltage power lines to complete the integrated high-voltage and low-voltage wiring includes: The first access point of the incoming high-voltage power line and the second access point of the incoming low-voltage power line are determined based on the candidate path network. At the first access point, the inlet end of the power line is electrically connected to the inlet power line. At the second access location, the inlet end of the low-voltage line is electrically connected to the inlet low-voltage line; A first protective device is installed between the power line's inlet end and the power line itself. A second protection device is installed between the inlet end of the low-voltage line and the inlet low-voltage wire.
[0014] The embodiments of the present invention have at least the following beneficial effects: 1. By obtaining the original structural parameters of the building to be renovated, a candidate path network for integrated power and low voltage cabling is generated. Based on this, prefabricated interior components with integrated power and low voltage lines are manufactured in the factory, realizing the factory production and on-site assembly construction of power and low voltage cabling. This effectively solves the problems of complex on-site cabling processes, long construction cycles, and difficulty in uniformly controlling quality in traditional on-site cabling, and greatly improves the construction efficiency and project quality stability of non-residential renovation projects.
[0015] 2. By installing power and low-voltage cable trays with appropriate spacing inside the prefabricated wall panels, floors, and ceilings, the power and low-voltage lines are laid separately and standardized interfaces are reserved. This achieves physical isolation and integrated layout of power and low-voltage lines, effectively avoiding electromagnetic interference between power and low-voltage signals, ensuring the integrity of low-voltage information transmission and the safety of power supply, and facilitating future maintenance and replacement of the lines.
[0016] 3. By adopting standardized high-voltage and low-voltage connectors, rapid connection of wiring between adjacent prefabricated interior components is achieved. Protective devices are installed at the entry point, and continuity testing is conducted to ensure the reliability of the wiring connection. This enables modular rapid assembly and safe access of the high-voltage and low-voltage systems, effectively reducing the technical difficulty of on-site construction and the risk of human error, and improving the overall safety performance and ease of operation and maintenance of the electrical system. Attached Figure Description
[0017] The above and other objects, features, and advantages of exemplary embodiments of the present invention will become readily apparent from the following detailed description taken in conjunction with the accompanying drawings. Several embodiments of the invention are illustrated in the drawings by way of example and not limitation, wherein: Figure 1 This is a flowchart illustrating an embodiment of the present invention of a prefabricated wiring method for non-residential renovation with integrated power and low voltage wiring. Detailed Implementation
[0018] The principles and spirit of the invention will now be described with reference to several exemplary embodiments. It should be understood that these embodiments are provided merely to enable those skilled in the art to better understand and implement the invention, and are not intended to limit the scope of the invention in any way. Rather, these embodiments are provided to make the invention more thorough and complete, and to fully convey the scope of the invention to those skilled in the art.
[0019] The following is for reference. Figure 1 , Figure 1 This is a flowchart illustrating an embodiment of the prefabricated interior wiring method for non-residential renovation projects, integrating both strong and weak current wiring. Figure 1 As shown, a method for integrated wiring of strong and weak current systems in prefabricated interior decoration for non-residential renovation includes: S1: Obtain the original structural parameters of the building to be renovated, and generate a candidate path network for integrated power and low voltage cabling based on the original structural parameters.
[0020] Non-residential to affordable housing conversion refers to transforming non-residential buildings into affordable housing, such as converting industrial plants or office buildings into affordable rental housing. Original structural parameters refer to the inherent structural information of the building before conversion, including the thickness of floor slabs, the thickness of walls, and the planar position and cross-sectional dimensions of beams and columns. The candidate path network is a topological connectivity graph consisting of all available channels for laying power and data cables within the building. This graph uses channel intersections as nodes and channel segments as edges, and is used for subsequent planning of the routing of all lines.
[0021] Non-residential to affordable housing conversion projects involve diverse building types, including commercial offices, industrial plants, and R&D facilities, whose original structural parameters differ significantly from those of the original residential buildings. The original structural parameters obtained in the aforementioned steps, including floor slab thickness data, wall thickness data, and beam and column location data, are fundamental to determining the wiring pathways for power and data cables after the renovation. Because non-residential to affordable housing conversion projects require the preservation of the original main structure to the greatest extent possible and prohibit large-scale chiseling and grooving of load-bearing components, it is necessary to accurately identify the permissible space for cable laying based on the original structural parameters to determine the wiring pathways.
[0022] During implementation, the original structural drawings of the building are first obtained, typically in the form of CAD electronic files or scanned copies of paper. If the drawings are paper, they are converted into digital images using a high-precision scanner and then converted into CAD format using vectorization software. The drawings are then opened using AutoCAD software, and the floor slab thickness annotations, wall thickness annotations, and beam / column outline coordinates are extracted either manually or by writing AutoLISP scripts. Based on this data, areas where cables can be laid are marked on each floor plan, excluding spaces occupied by load-bearing components such as beams and columns. These areas are the wiring channels, such as cavities within non-load-bearing walls, open spaces under the floor, and spaces above the ceiling. Finally, the intersections of all channels within the same floor are connected, and upper and lower floors are connected via pre-drilled holes in the floor slabs or vertical electrical shafts, forming a candidate path network covering the entire building. This network can be constructed using graph theory methods in Python's Network X library, where nodes are 3D coordinate points and edges are traversable straight line segments.
[0023] S11: Obtain the original structural drawings of the building to be renovated, and extract the floor slab thickness data, wall thickness data, and beam and column location data of each floor from the original structural drawings.
[0024] The original structural drawings are the as-built design drawings of the building before the renovation. Floor slab thickness data, i.e., the thickness of the concrete layer of each floor slab, is extracted from the drawings; for example, h=120 indicates 120 millimeters. Wall thickness data, i.e., the horizontal width of each wall, for example, 200 thick indicates 200 millimeters. Beam and column location data, i.e., the plane coordinates of the center point of each beam and column and their cross-sectional length and width dimensions, are extracted. Extraction can be done manually by recording the data in a table, or by writing a program to automatically recognize the dimensions and outlines in the drawings. For example, in AutoCAD, the quick selection function can be used to select all text objects, filter out text containing "thickness" or "h=", and parse their numerical values; beam and column locations are obtained by extracting the boundary coordinates of closed polylines.
[0025] S12: Based on the floor slab thickness data, wall thickness data, and beam and column location data, determine the wiring channels for high-voltage and low-voltage lines that are allowed to be laid on each floor.
[0026] High-voltage power lines refer to 220V AC power supply lines, while low-voltage power lines refer to signal lines such as network, telephone, and television lines. Wiring channels refer to the physical spaces within a building where these lines can pass through. Based on floor slab thickness, if the floor slab thickness is not less than 100 mm, conduits with a diameter not exceeding 20 mm can be embedded within its protective layer to form horizontal channels. Based on wall thickness, if the non-load-bearing wall thickness is not less than 100 mm, vertical cable trays can be created within the wall; load-bearing walls are not allowed to have trays and therefore cannot be used as channels. Beams and columns act as obstacles, and within a certain radius around them, such as within 200 mm below the beam, channels cannot be established. Considering these constraints, all available strip areas are marked on each floor plan, including vertical strips along non-load-bearing walls, horizontal strips along the raised floor level, and horizontal strips at the top of the suspended ceiling space; these areas constitute the wiring channels.
[0027] S13: Connect the cabling channels on each floor to generate a candidate path network for integrated power and low voltage cabling.
[0028] Connect all endpoints of passageways within each floor, such as the junction of wall panels and floors. Simultaneously, connect vertical passageways between floors, such as electrical shafts or pre-drilled holes, as cross-floor edges to the corresponding floor nodes. Transform all passageway segments into graph edges, and all endpoints and intersections into graph nodes, forming an undirected graph. This graph is the candidate path network, recording the 3D coordinates of each node and the length of each edge, which will be used later to find the shortest path from the entrance to each socket. The generation process is programmable; input is the coordinates of all passageway segments, and output is a list of nodes and an adjacency matrix.
[0029] S2: Determine the power supply points and low-voltage information points of each functional area based on the candidate path network, and generate the cabling requirements of each functional area based on the power supply points and low-voltage information points.
[0030] Functional zoning refers to the different usable spaces within each residential unit after renovation, such as bedrooms, living rooms, kitchens, and bathrooms. High-voltage electrical points refer to locations where power outlets, dedicated air conditioner outlets, lighting switches, etc., need to be installed. Low-voltage information points refer to locations where network modules, telephone modules, television modules, etc., need to be installed. Cabling requirements include the required conductor cross-sectional area, network cable type, and recommended paths from the entry point to each point. During implementation, the functional zones are first divided using a candidate path network and building floor plan. Then, the equipment configuration table is matched according to the zone functions to determine the point coordinates. Finally, the load and bandwidth are calculated to generate a requirements table containing specifications and paths.
[0031] S21: Extract the spatial connectivity of each floor based on the candidate path network, and divide each functional area according to the spatial connectivity.
[0032] Spatial connectivity refers to the location of doorways and corridors between rooms on the same floor, as well as the locations of staircases and elevators between floors. The coordinates of each node are extracted from the candidate path network and compared with the wall boundaries on the architectural floor plan to determine which nodes belong to the same room area. Then, based on the redesigned apartment layout, each room area is divided into independent living units, and each unit is further divided into functional areas such as bedrooms, living rooms, kitchens, and bathrooms. For example, the room outlines can be automatically generated using the room function of BIM software and matched with the nodes of the candidate path network for spatial affiliation.
[0033] S22: Match the corresponding high-voltage electrical equipment configuration table and low-voltage information equipment configuration table according to the functions of each functional area.
[0034] A standard configuration template library is pre-established, with different equipment lists corresponding to different functional areas. For example, the bedroom configuration list includes 1 light fixture, 1 air conditioner, 2 bedside sockets, 1 desk socket, and low-voltage wiring includes 1 network socket and 1 telephone socket. The living room configuration list includes light fixtures, a TV socket, an air conditioner, and a sofa socket, with low-voltage wiring including a network socket and a TV signal socket. The kitchen configuration list includes light fixtures, a refrigerator socket, a microwave socket, and a rice cooker socket, with a network socket optional. The bathroom configuration list includes light fixtures, an exhaust fan, and a water heater socket, with generally no low-voltage wiring. During implementation, the corresponding configuration list is retrieved from the template library based on the functional area names indicated in the design drawings, and the rated power and bandwidth requirements of each device are recorded.
[0035] S23: Determine the locations of high-voltage power supply points in each functional zone according to the high-voltage power supply equipment configuration table, and determine the locations of low-voltage information supply points in each functional zone according to the low-voltage information supply equipment configuration table.
[0036] For each functional area, map each device in the configuration table to a specific installation location. For example, bedside double sockets in a bedroom are installed on the walls on either side of the bed, 0.3 meters from the ground; air conditioner sockets are installed near the air conditioner's location, 0.5 meters from the ceiling. These locations are marked with coordinates on the floor plan, and their installation heights are recorded. Low-voltage points, such as network sockets, are typically installed alongside high-voltage sockets, but the horizontal distance between them is maintained at no less than 0.15 meters to avoid electromagnetic interference. The coordinates, height, type, and power or bandwidth requirements of all points are summarized into a point list.
[0037] S24: Generate the wiring requirements for each functional zone based on the power supply points and low-voltage information points of each functional zone.
[0038] First, calculate the total power load of each functional zone based on the rated power of the electrical equipment corresponding to the power outlets in that zone. The total power load is the sum of the rated power of all electrical equipment multiplied by a simultaneous usage factor. For example, a bedroom has 50W lighting, 2000W air conditioning, 200W bedside socket, and 200W desk socket, totaling 2450W. With a simultaneous usage factor of 0.5, the total power load is 2450W multiplied by 0.5, which equals 1225W. The simultaneous usage factor is determined based on the functional zone type: 0.4 to 0.6 for bedrooms, 0.5 to 0.7 for living rooms, 0.7 to 0.9 for kitchens, and 0.3 to 0.5 for bathrooms. The calculation formula for the total power load is as follows:
[0039] in Total high-voltage load power for a functional zone, in watts; The rated power of the i-th high-voltage electrical equipment in the functional zone, in watts, is read from the equipment nameplate or product manual. The coefficients are dimensionless and can be used simultaneously; typical values are shown in the range above.
[0040] Next, calculate the total low-voltage bandwidth based on the bandwidth requirements of the low-voltage information equipment corresponding to the low-voltage information points in each functional area. The total low-voltage bandwidth is the sum of the bandwidth requirements of all low-voltage information equipment. For example, if a bedroom has a network socket requiring 1000 Mbps, and the bandwidth of a telephone socket is negligible, then the total low-voltage bandwidth is 1000 Mbps. The bandwidth requirements are obtained from the equipment specifications; for example, a gigabit network card requires 1000 Mbps. The calculation of the total low-voltage bandwidth is shown in the following formula:
[0041] in Total low-voltage bandwidth for functional zones, in megabits per second; The bandwidth requirement of the j-th weak current information device within the functional partition is expressed in megabits per second.
[0042] Then determine the specifications of the power line based on the total power load. If For watts less than or equal to 2000 watts, use copper core wires with a cross-sectional area of 2.5 square millimeters; if For wattages greater than 2000 watts and less than or equal to 5000 watts, use copper core wires with a cross-sectional area of 4 square millimeters; if For wattages greater than 5000 watts, use copper core wires with a cross-sectional area of 6 square millimeters. Determine the low-voltage wiring specifications based on the total bandwidth of the low-voltage circuit. If... For speeds less than or equal to 100 megabits per second, use Category 5e unshielded twisted-pair cable; if... For speeds greater than 100 megabits per second and less than or equal to 1000 megabits per second, use Category 6 unshielded twisted-pair cable; if... For speeds greater than 1000 megabits per second, Category 6 shielded twisted-pair cable or fiber optic cable is selected. Finally, based on the power and low-voltage wiring specifications of each functional zone and combined with the candidate path network, the shortest path from the entry point to each location is planned. The Dijkstra algorithm is used to calculate the shortest path, and the paths and specifications are summarized to generate a cabling requirement table for each functional zone.
[0043] S3: Prefabricated interior components with integrated power lines and low-voltage lines, manufactured in the factory according to wiring requirements.
[0044] Prefabricated interior components refer to interior decoration components that are prefabricated in a factory, including prefabricated wall panels, prefabricated flooring, and prefabricated ceiling panels. These components have pre-installed wiring, and only assembly is required on-site. During implementation, according to the wiring type and specifications required for each component in the wiring requirements table, the cable trays are fixed in the component frame in the workshop, wires or network cables are threaded through them, and interface panels are installed.
[0045] S31: Determine the specifications and integrated wiring types of each prefabricated interior component based on wiring requirements.
[0046] Specifications include the length, width, and thickness of the components. These dimensions are derived from architectural design drawings; for example, the wall panel height is the floor's net height, and the width is a modular dimension. Integrated wiring types are categorized as high-voltage only, low-voltage only, and mixed high-voltage / low-voltage. This is determined based on the required number of points within the component's coverage area. For instance, a wall panel covering the headboard area of a bedroom that integrates both high-voltage and low-voltage wiring is a mixed type.
[0047] S32: Based on specifications and integrated wiring type, prefabricate modular interior components in the factory, integrating high-voltage and low-voltage wiring inside the modular interior components.
[0048] In practice, prefabricated interior components include wall panels, flooring, and ceiling panels, which are treated as follows.
[0049] S321: Power cable trays and low-voltage cable trays are installed inside the prefabricated wall panels. Power cables are laid in the power cable trays and low-voltage cables are laid in the low-voltage cable trays. The distance between the power cable trays and the low-voltage cable trays is greater than or equal to the preset distance.
[0050] The prefabricated wall panels utilize a double-layer gypsum board or calcium silicate board composite structure with a pre-reserved cavity in the middle. Within the cavity, partitions separate high-voltage and low-voltage wiring troughs, with the center-to-center distance between the two troughs not less than a predetermined spacing, which is 50 mm according to electromagnetic compatibility standards. Copper core conductors of appropriate cross-sectional area are run through the high-voltage wiring troughs, while network cables of appropriate type are run through the low-voltage wiring troughs. Junction boxes are installed at both ends of the wiring troughs, with sufficient wire ends provided for on-site connections.
[0051] S322: Power cable trays and low-voltage cable trays are installed inside the prefabricated floor. Power cables are laid in the power cable trays and low-voltage cables are laid in the low-voltage cable trays. The distance between the power cable trays and the low-voltage cable trays is greater than or equal to the preset distance.
[0052] The prefabricated floor uses a raised access floor structure, with a baseboard containing prefabricated cable trays laid on the support frame. The cable trays are also divided into two independent channels: one for high-voltage wiring and one for low-voltage wiring, spaced at least 50 mm apart. High-voltage wires are laid horizontally along the floor, while low-voltage wires run parallel but are separated to avoid interference.
[0053] S323: Power cable trays and low-voltage cable trays are installed inside the prefabricated ceiling panel. Power cables are laid in the power cable trays and low-voltage cables are laid in the low-voltage cable trays. The distance between the power cable trays and the low-voltage cable trays is greater than or equal to the preset distance.
[0054] The prefabricated ceiling panels use a light steel keel gypsum board structure, with metal or flame-retardant PVC cable trays fixed on the keel. The cable trays run in the same direction as the ceiling panel splicing, with strong and weak current cable trays separated and a spacing of no less than 50 mm. An additional shielding layer can be installed on the weak current side.
[0055] S33: A high-voltage interface and a low-voltage interface are set at a preset position on the surface of the prefabricated interior component. The high-voltage interface is electrically connected to the high-voltage line, and the low-voltage interface is electrically connected to the low-voltage line.
[0056] The preset location refers to the installation point determined on the component surface based on the coordinates of the points in the wiring requirements. The high-voltage interface uses an 86-type metal box, with reliable crimping to the high-voltage wires inside; the low-voltage interface uses an RJ45 network module or telephone module box, with network cables terminated according to the T568B wiring sequence. The interface panels are pre-installed at the factory; simply insert the equipment on-site.
[0057] S34: Conduct electrical performance testing on prefabricated assembled interior components, and number and package the qualified assembled interior components.
[0058] Electrical performance testing includes insulation resistance testing of the high-voltage components, using a 500V megohmmeter to measure the insulation resistance between conductors and between conductors and ground, requiring a value greater than 2 megohms; continuity testing uses a multimeter to measure the continuity of each circuit; and withstand voltage testing applies 1500V AC voltage for 1 minute without breakdown. For the low-voltage components, a Fluke network tester is used to test link length, attenuation, and crosstalk, requiring compliance with TIA / EIA-568 standards. After passing the tests, each component is uniquely numbered according to the floor and installation sequence, for example, F2-W-03 indicates the third component on the second-floor wall panel. Then, it is packaged with plastic film and foam material, labeled with directional markings and numbers to prevent damage during transportation.
[0059] S4: Transport the prefabricated modular interior components to the renovation site and assemble them on-site according to the candidate path network.
[0060] After the numbered components are transported to the site, they are assembled according to the coordinate information provided by the candidate path network. The assembly sequence is floor first, then wall panels, and finally ceiling, with electrical connections made via connectors during the assembly process.
[0061] S41: Based on the candidate path network, mark the installation positions of each prefabricated interior component at the renovation site.
[0062] Using a total station or laser level, based on the three-dimensional coordinates of each node in the candidate path network, display installation baselines on the ground, walls, and ceiling. For example, mark the laying boundary of each floorboard on the ground, and mark the height control lines and vertical seam lines of each wall panel on the walls to ensure accurate component installation.
[0063] S42: Install the prefabricated interior components in sequence according to the installation location.
[0064] Starting from one corner of the room, first lay the prefabricated flooring, assembling each piece and aligning it with the floor markings. Next, install the prefabricated wall panels, starting from the entrance door and working inwards, paying attention to verticality and flatness. Finally, install the prefabricated ceiling panels, starting from the center of the room and extending outwards, fixing them to the joists. Use a spirit level and straightedge during installation to check for even gaps.
[0065] S43: During the installation of various prefabricated interior components, the power lines between adjacent prefabricated interior components shall be electrically connected through power connectors.
[0066] A high-voltage connector is a quick-connect terminal block with a male-female mating structure. Its rated current matches the circuit current, for example, 16 amps. When two components are joined adjacently, the connector is used to mate the high-voltage output terminal of one component with the high-voltage input terminal of the other component. The specific operation is as follows.
[0067] S431: Align the first high-voltage line output terminal of the first prefabricated interior component with the second high-voltage line input terminal of the second prefabricated interior component.
[0068] The first and second prefabricated interior components are two adjacent components. Check the position of the side wiring ends of both, and adjust the component positions so that the center lines of the two ends coincide to ensure smooth subsequent insertion.
[0069] S432: Insert the first end of the high-voltage connector into the output terminal of the first high-voltage line, and insert the second end of the high-voltage connector into the input terminal of the second high-voltage line.
[0070] The two ends of the high-voltage connector are inserted into the corresponding terminals, and a plug-in crimping structure is usually used to make the metal spring contact tightly with the wire conductor.
[0071] S433: The high-voltage connector enables electrical connection between the outgoing terminal of the first high-voltage line and the incoming terminal of the second high-voltage line.
[0072] After the connector is inserted, its internal metal contacts crimp the two wires together, forming a low-resistance conductive path. After installation, use a multimeter in resistance mode to measure the continuity resistance; it should be less than 0.1 ohms.
[0073] S44: Connect the low-voltage wiring between adjacent prefabricated interior components using a low-voltage connector.
[0074] The low-voltage connector is an RJ45 crystal head connector or a dedicated network connector, used to connect two segments of network cable to ensure continuous signal transmission. The specific operation is as follows.
[0075] S441: Align the first low-voltage line output terminal of the first prefabricated interior component with the second low-voltage line input terminal of the second prefabricated interior component.
[0076] The first low-voltage line outgoing terminal and the second low-voltage line incoming terminal are located on the sides of adjacent components, each pre-installed with an RJ45 female connector. When assembling the two components, ensure that the two female connectors are aligned.
[0077] S442: Insert the first end of the low-voltage connector into the output terminal of the first low-voltage line, and insert the second end of the low-voltage connector into the input terminal of the second low-voltage line.
[0078] Both ends of the low-voltage connector are RJ45 males, which are inserted into two female sockets to achieve mechanical and electrical connections.
[0079] S443: Connect the output terminal of the first low-voltage line to the input terminal of the second low-voltage line using a low-voltage connector.
[0080] After insertion, ensure wire pairs are connected according to the T568B wiring sequence. Use a network tester to check connectivity and wiring sequence, ensuring all 8 wires are conductive and in the correct sequence.
[0081] S45: After all prefabricated interior components are installed, conduct continuity tests on the power lines and low-voltage lines.
[0082] After all components are installed, each circuit is tested. For high-voltage circuits, use a multimeter to measure the resistance from the incoming terminal to each socket; it should be less than 0.5 ohms. Check for short circuits. For low-voltage circuits, use a network tester to test the connectivity and length of each link, ensuring that all information points can communicate normally.
[0083] S5: Connect the assembled high-voltage and low-voltage lines to the corresponding incoming high-voltage and low-voltage power lines respectively to complete the integrated wiring of high-voltage and low-voltage lines.
[0084] The incoming high-voltage power line refers to the main power supply line introduced into the residential unit from the external power distribution network, typically 220V AC. The incoming low-voltage power line refers to the main signal line introduced from the external communication network, typically fiber optic or copper Ethernet. During implementation, the access location is determined, electrical connections are made, and protective devices are installed.
[0085] S51: Determine the first access point of the incoming high-voltage power line and the second access point of the incoming low-voltage power line based on the candidate path network.
[0086] The first access point is the high-voltage line node in the candidate path network that is closest to the high-voltage power line terminal, usually located at the high-voltage distribution box near the entrance door. The second access point is the low-voltage line node in the candidate path network that is closest to the low-voltage power line terminal, usually located at the low-voltage distribution box near the entrance door, with a horizontal distance of not less than 0.3 meters between the two.
[0087] S52: At the first access point, connect the power line's inlet end to the power line entering the house.
[0088] The power line entry point is the starting point of the entire prefabricated interior power line system. It is connected to the live wire, neutral wire, and ground wire of the incoming power line respectively, using terminal block crimping or welding to ensure reliable contact.
[0089] S53: At the second access point, connect the inlet of the low-voltage line to the inlet low-voltage power line.
[0090] The entry point of the low-voltage line is the starting point of the entire prefabricated interior low-voltage line. If the entry point is fiber optic, it is spliced using a fiber optic fusion splicer; if it is a network cable, it is terminated using an RJ45 connector to ensure that the signal attenuation is within the allowable range.
[0091] S54: A first protection device shall be installed between the incoming end of the power line and the incoming power line.
[0092] The first protective device is an overcurrent protection device, such as a miniature circuit breaker or a fuse. Its rated current is determined based on the total power load of the residential unit, typically ranging from 16 amps to 40 amps. It is installed in the power distribution box and connected in series between the incoming power line and the incoming power line terminal.
[0093] S55: A second protective device shall be installed between the incoming end of the low-voltage line and the incoming low-voltage wire.
[0094] The second protection device is an overvoltage protection device, such as a surge protector, used to prevent damage to low-voltage equipment caused by lightning strikes or power grid fluctuations. It is installed inside the low-voltage wiring box and properly grounded. After completing the above connections, the entire integrated wiring system for non-residential converted prefabricated interior electrical systems is finished.
[0095] The above embodiments of the present invention have the following beneficial effects: 1. By obtaining the original structural parameters of the building to be renovated, a candidate path network for integrated power and low voltage cabling is generated. Based on this, prefabricated interior components with integrated power and low voltage lines are manufactured in the factory, realizing the factory production and on-site assembly construction of power and low voltage cabling. This effectively solves the problems of complex on-site cabling processes, long construction cycles, and difficulty in uniformly controlling quality in traditional on-site cabling, and greatly improves the construction efficiency and project quality stability of non-residential renovation projects.
[0096] 2. By installing power and low-voltage cable trays with appropriate spacing inside the prefabricated wall panels, floors, and ceilings, the power and low-voltage lines are laid separately and standardized interfaces are reserved. This achieves physical isolation and integrated layout of power and low-voltage lines, effectively avoiding electromagnetic interference between power and low-voltage signals, ensuring the integrity of low-voltage information transmission and the safety of power supply, and facilitating future maintenance and replacement of the lines.
[0097] 3. By adopting standardized high-voltage and low-voltage connectors, rapid connection of wiring between adjacent prefabricated interior components is achieved. Protective devices are installed at the entry point, and continuity testing is conducted to ensure the reliability of the wiring connection. This enables modular rapid assembly and safe access of the high-voltage and low-voltage systems, effectively reducing the technical difficulty of on-site construction and the risk of human error, and improving the overall safety performance and ease of operation and maintenance of the electrical system.
[0098] Furthermore, the storage medium in the embodiments of this application stores program instructions capable of implementing all the above methods. These program instructions can be stored in the storage medium in the form of a software product, including several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) or processor to execute all or part of the steps of the methods described in the various embodiments of this application. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks, or terminal devices such as computers, servers, mobile phones, and tablets.
[0099] The above description is merely an explanation of some preferred embodiments of the present invention and the technical principles employed. Those skilled in the art should understand that the scope of the invention as described in the embodiments of the present invention is not limited to technical solutions formed by specific combinations of the above-described technical features, but should also cover other technical solutions formed by arbitrary combinations of the above-described technical features or their equivalents without departing from the above-described inventive concept. For example, technical solutions formed by substituting the above-described features with (but not limited to) technical features with similar functions disclosed in the embodiments of the present invention.
Claims
1. A non-residential prefabricated interior strong and weak electricity integrated wiring method, characterized in that, include: Obtain the original structural parameters of the building to be renovated, and generate a candidate path network for integrated power and low voltage cabling based on the original structural parameters; The power supply points and low-voltage information points of each functional zone are determined based on the candidate path network, and the wiring requirements of each functional zone are generated based on the power supply points and low-voltage information points. Based on the wiring requirements, prefabricated interior components with integrated high-voltage and low-voltage wiring are manufactured in the factory. The prefabricated modular interior components are transported to the renovation site and assembled on-site according to the candidate path network. The assembled high-voltage and low-voltage lines are connected to their respective incoming high-voltage and low-voltage power lines to complete the integrated wiring of high-voltage and low-voltage systems.
2. The non-residential improvement insurance installation method according to claim 1, wherein, The process of obtaining the original structural parameters of the building to be renovated and generating a candidate path network for integrated power and data cabling based on the original structural parameters includes: Obtain the original structural drawings of the building to be renovated, and extract the floor slab thickness data, wall thickness data, and beam and column location data of each floor from the original structural drawings; Based on the floor slab thickness data, wall thickness data, and beam and column location data, determine the wiring channels for high-voltage and low-voltage lines that are allowed to be laid in each floor. Connect the wiring channels on each floor to generate a candidate path network for integrated power and data cabling.
3. The non-residential improvement insurance installation method according to claim 1, wherein, The step of determining the power supply points and low-voltage information points of each functional zone based on the candidate path network, and generating the wiring requirements of each functional zone based on the power supply points and low-voltage information points, includes: Based on the candidate path network, the spatial connectivity of each floor is extracted, and the functional zones are divided according to the spatial connectivity. Based on the functions of each functional area, match the corresponding high-voltage electrical equipment configuration table and low-voltage information equipment configuration table; The locations of high-voltage power supply points in each functional zone are determined according to the high-voltage power supply equipment configuration table, and the locations of low-voltage information points in each functional zone are determined according to the low-voltage information equipment configuration table. Based on the power supply points and low-voltage information points of each functional zone, the wiring requirements for each functional zone are generated.
4. The integrated wiring method for strong and weak current systems in prefabricated interior decoration of non-residential renovation projects according to claim 3, characterized in that, The step of generating wiring requirements for each functional zone based on the high-voltage power supply points and low-voltage information points includes: Based on the rated power of the high-voltage electrical equipment corresponding to the high-voltage electrical points in each functional zone, calculate the total high-voltage load power of each functional zone. The total high-voltage load power is the sum of the rated power of each high-voltage electrical equipment multiplied by the simultaneous use coefficient. Based on the bandwidth requirements of the low-voltage information devices corresponding to the low-voltage information points in each functional zone, the total low-voltage bandwidth of each functional zone is calculated, where the total low-voltage bandwidth is the sum of the bandwidth requirements of each low-voltage information device. The specifications of the high-voltage lines for each functional zone are determined based on the total high-voltage load power, and the specifications of the low-voltage lines for each functional zone are determined based on the total low-voltage bandwidth. Based on the specifications of the high-voltage and low-voltage lines for each functional zone, the wiring requirements for each functional zone are generated.
5. The integrated wiring method for strong and weak current systems in prefabricated interior decoration of non-residential renovation projects according to claim 1, characterized in that, The prefabricated interior components, which integrate high-voltage and low-voltage wiring in the factory according to the wiring requirements, include: The specifications and integrated wiring types of each prefabricated interior component are determined based on the wiring requirements. According to the specifications and the type of integrated circuit, prefabricated interior components are manufactured in the factory, and high-voltage and low-voltage circuits are integrated inside the prefabricated interior components. A high-voltage interface and a low-voltage interface are provided at a predetermined position on the surface of the prefabricated interior component. The high-voltage interface is electrically connected to the high-voltage line, and the low-voltage interface is electrically connected to the low-voltage line. Electrical performance tests are performed on the prefabricated modular interior components, and the qualified modular interior components are numbered and packaged.
6. The integrated wiring method for strong and weak current systems in prefabricated interior decoration of non-residential renovation projects according to claim 5, characterized in that, The prefabricated interior components include prefabricated wall panels, prefabricated floor panels, and prefabricated ceiling panels; integrating high-voltage and low-voltage wiring within the prefabricated interior components includes: Power cable trays and low-voltage cable trays are installed inside the prefabricated wall panel. Power cables are laid in the power cable trays and low-voltage cables are laid in the low-voltage cable trays. The distance between the power cable trays and the low-voltage cable trays is greater than or equal to a preset distance. Power cable trays and low-voltage cable trays are installed inside the prefabricated floor. Power cables are laid in the power cable trays and low-voltage cables are laid in the low-voltage cable trays. The distance between the power cable trays and the low-voltage cable trays is greater than or equal to a preset distance. Power cable trays and low-voltage cable trays are installed inside the prefabricated ceiling panel. Power cables are laid in the power cable trays and low-voltage cables are laid in the low-voltage cable trays. The distance between the power cable trays and the low-voltage cable trays is greater than or equal to a preset distance.
7. The integrated wiring method for strong and weak current systems in prefabricated interior decoration of non-residential renovation projects according to claim 1, characterized in that, The process of transporting the prefabricated modular interior components to the renovation site and assembling them on-site according to the candidate path network includes: Based on the candidate path network, the installation positions of each prefabricated interior component are marked at the renovation site; Install the prefabricated interior components sequentially according to the installation location; During the installation of each of the prefabricated interior components, the power lines between adjacent prefabricated interior components are electrically connected through power connectors. The low-voltage wiring between adjacent prefabricated interior components is electrically connected using a low-voltage connector. After all the prefabricated interior components are installed, a continuity test is performed on the high-voltage and low-voltage power lines.
8. The integrated wiring method for strong and weak current systems in prefabricated interior decoration of non-residential renovation projects according to claim 7, characterized in that, The step of electrically connecting the high-voltage lines between adjacent prefabricated interior components via a high-voltage connector includes: Align the first high-voltage line output terminal of the first prefabricated interior component with the second high-voltage line input terminal of the second prefabricated interior component. Insert the first end of the high-voltage connector into the output end of the first high-voltage line, and insert the second end of the high-voltage connector into the input end of the second high-voltage line; The high-voltage connector enables electrical connection between the output terminal of the first high-voltage line and the input terminal of the second high-voltage line.
9. The integrated wiring method for strong and weak current systems in prefabricated interior decoration of non-residential renovation projects according to claim 7, characterized in that, The step of electrically connecting the low-voltage wiring between adjacent prefabricated interior components using a low-voltage connector includes: Align the first low-voltage line output terminal of the first prefabricated interior component with the second low-voltage line input terminal of the second prefabricated interior component. Insert the first end of the low-voltage connector into the output end of the first low-voltage line, and insert the second end of the low-voltage connector into the input end of the second low-voltage line; The low-voltage connector enables electrical connection between the output terminal of the first low-voltage line and the input terminal of the second low-voltage line.
10. The integrated wiring method for strong and weak current systems in prefabricated interior decoration of non-residential renovation projects according to claim 1, characterized in that, The step of connecting the assembled high-voltage and low-voltage lines to their respective incoming high-voltage and low-voltage power lines to complete the integrated high-voltage and low-voltage wiring includes: The first access point of the incoming high-voltage power line and the second access point of the incoming low-voltage power line are determined based on the candidate path network. At the first access point, the inlet end of the power line is electrically connected to the inlet power line. At the second access location, the inlet end of the low-voltage line is electrically connected to the inlet low-voltage line; A first protection device is installed between the power line's inlet end and the power line itself. A second protection device is installed between the inlet end of the low-voltage line and the inlet low-voltage wire.