Adaptive control system based on voltage-frequency coordination

By collecting grid voltage and frequency data in real time, generating a coordinated response feature vector, identifying and analyzing disturbance areas, determining key regulation nodes and their priorities, and establishing a disturbance compensation regulation model, the problem of insufficient dynamic response and robustness of voltage and frequency coordinated control in existing technologies is solved, and efficient and stable grid regulation is achieved.

CN123121650APending Publication Date: 2026-11-17GUANGZHOU HENGYUAN ENERGY CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611279072.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing voltage-frequency coordinated control technology has shortcomings in dynamic response capability, adaptive adjustment accuracy, and robustness under complex operating conditions. In particular, under conditions of large voltage fluctuations or sudden load changes, the dynamic response speed and stability of the system may be limited, and it is highly dependent on communication and data acquisition, posing potential risks to real-time performance and reliability.

Method used

By acquiring voltage fluctuation curves and frequency deviation sequences collected in real time during power grid operation, calculating phase difference values, generating coordinated response feature vectors by combining load dynamic characteristics, identifying disturbance areas and performing spatial correlation analysis, determining key regulation nodes and their priorities, mapping disturbance impact areas using power output data from distributed energy access points, establishing a disturbance compensation regulation model, and introducing credibility assessment to improve regulation accuracy and reliability.

Benefits of technology

It significantly improves the accuracy of state capture and regulation response of the power grid under complex operating conditions, reduces dispatching errors, enhances the operational stability and economy of the new energy power grid, and reduces the need for reserve capacity configuration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121650A_ABST
    Figure CN123121650A_ABST
Patent Text Reader

Abstract

This invention relates to the field of power system coordinated control technology, specifically an adaptive control system based on voltage-frequency coordination. It includes a state perception module, a disturbance analysis module, a regulation strategy construction module, and an execution optimization module. By acquiring voltage fluctuation curves and frequency deviation sequences, and combining them with load characteristics to generate a coordinated response feature vector, the system analyzes the disturbance impact area mapping information, identifies key regulation nodes and their priorities, and generates disturbance compensation regulation information. The system can accurately capture changes in the power grid operating state, achieve refined identification and targeted regulation of disturbance areas, and introduce credibility assessment to improve regulation reliability. This invention can significantly improve the stability and economy of the power grid under complex operating conditions, reduce dispatching errors, and enhance the operational efficiency of new energy power grids.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power system coordinated control technology, and in particular to an adaptive control system based on voltage-frequency coordination. Background Technology

[0002] With the increasing demand for voltage and frequency coordinated control in power systems, adaptive control systems based on voltage-frequency coordination have gradually become a research hotspot. Existing technologies have made some progress in achieving voltage and frequency coordinated control, but shortcomings remain in dynamic response capability, adaptive adjustment accuracy, and overall system robustness under complex operating conditions. A search revealed a method for coordinated control of a virtual synchronous generator based on frequency deviation using CN113612250B. This patent achieves adaptive adjustment of the virtual moment of inertia and damping coefficient by collecting the virtual rotor angular frequency deviation and rate of change, combined with active-frequency and reactive-voltage control equations. However, this technical solution primarily focuses on frequency control and lacks in-depth exploration of the coordinated optimization mechanism between voltage and frequency. Especially under conditions of large voltage fluctuations, the system's dynamic response speed and stability may be limited. Furthermore, this solution relies on a specific virtual synchronous generator model, limiting its applicability and making it difficult to meet diverse needs in different scenarios.

[0003] On the other hand, a VIQ automatic voltage and reactive power coordinated control system and method, with publication number CN108565867B, is disclosed. This patent achieves adaptive adjustment of generator voltage, frequency, and reactive power through the VIQ coordinated control algorithm and optimizes the grid-connected operation performance of multiple diesel generator sets. However, this technical solution lacks rapid response capability to dynamic load changes in voltage and frequency coordinated control, especially under conditions of sudden load changes or nonlinear loads, where the system's adjustment accuracy and stability may decrease. Furthermore, this solution relies heavily on communication and data acquisition, which may pose potential risks to real-time performance and reliability in practical applications.

[0004] The aforementioned problems indicate that existing voltage-frequency coordinated control technologies still have shortcomings in terms of dynamic response capability, adaptive adjustment accuracy, and robustness under complex operating conditions. Therefore, this invention provides an adaptive control system based on voltage-frequency coordination, aiming to improve the system's dynamic response speed, adaptive adjustment capability, and overall robustness by optimizing the coordinated control strategy of voltage and frequency, thereby meeting the demands of modern power systems for efficient and stable control. Summary of the Invention

[0005] The purpose of this invention is to overcome the shortcomings of existing technologies and propose an adaptive control system based on voltage-frequency coordination.

[0006] To achieve the above objectives, the present invention adopts the following technical solution: an adaptive control system based on voltage-frequency coordination, the system comprising: The state perception module acquires the voltage fluctuation curve and frequency deviation sequence collected in real time during the operation of the power grid. By calculating the phase difference between the voltage fluctuation curve and the frequency deviation sequence, and combining the load dynamic characteristic parameters, a coordinated response feature vector is generated. The disturbance analysis module calls the coordinated response feature vector, combines it with the power output data of the distributed energy access point, and generates disturbance impact area mapping information based on the relationship between load change trend and power fluctuation distribution. The regulation strategy construction module obtains power grid topology data based on the disturbance impact area mapping information, performs spatial correlation analysis on the power flow path between nodes and the disturbance area, identifies key regulation nodes and their corresponding regulation priorities, and generates a set of node regulation priority distribution coordinates. The optimization module calls the node adjustment priority distribution coordinate set, extracts the number index of the covered nodes at the power grid level, marks the adjustment difference items between nodes, and inputs the difference items as external disturbance compensation factors into the adjustment input sequence to generate disturbance compensation adjustment information.

[0007] As a further aspect of the present invention, the coordinated response feature vector includes voltage fluctuation amplitude, frequency deviation slope, phase difference consistency level, and load characteristic matching identifier; the disturbance influence area mapping information includes disturbance principal axis direction distribution, influence area coverage index, power fluctuation classification level, and node number mapping table; the node adjustment priority distribution coordinate set specifically includes node projection junction boundary points, disturbance area and node arrangement correspondence, adjustment path index, and spatial correlation density factor; and the disturbance compensation adjustment information includes external disturbance compensation factor sequence, node-level response trend symbol sequence, predicted adjustment value set, and adjustment segment index structure.

[0008] As a further aspect of the present invention, the state sensing module includes: The voltage fluctuation extraction submodule acquires the voltage fluctuation curves collected in real time during the operation of the power grid, extracts the fluctuation points in each frame sampling period where the voltage amplitude changes beyond a set threshold, establishes a set of fluctuation points, constructs a voltage fluctuation curve structure sequence based on the fluctuation point time series, and generates a voltage fluctuation curve structure sequence. The frequency deviation calculation submodule calls the voltage fluctuation curve structure sequence, extracts the timestamp values ​​of the corresponding fluctuation point pairs in the frequency deviation sequence within adjacent sampling periods, calculates the relative time difference vector, constructs a frequency deviation sequence set based on the time difference, performs ratio calculation on the frequency deviation sequence of continuous sampling periods, calculates the mean value of the frequency deviation gradient, filters out the segments where the frequency deviation exceeds the gradient threshold, and generates a set of frequency deviation gradient values. The phase difference consistency judgment submodule calls the frequency deviation gradient value set, retrieves the average load change vector recorded by the load dynamic characteristic parameters, performs projection calculation on the frequency deviation gradient, compares the angle between it and the load change vector, performs segment filtering based on the set consistency threshold, obtains the proportion of segments where the frequency deviation gradient and the load change vector are consistent, and obtains the coordinated response feature vector.

[0009] As a further aspect of the present invention, the disturbance analysis module includes: The power fluctuation direction extraction submodule calls the collaborative response feature vector to obtain the power output data recorded by the distributed energy access point, identifies the boundary of the equal power region in the power output data, determines the power fluctuation distribution profile based on the set of equal power contour lines, extracts the boundary line direction distribution and performs vectorized fitting according to the position order, and generates a power fluctuation principal axis direction sequence. The angle matching calculation submodule obtains the angle relationship between the vector segment and the calibration frequency deviation direction segment in the cooperative response feature vector according to the power fluctuation main axis direction sequence. It compares the angle between the two sets of direction vectors in the spatial coordinate plane, filters vector pairs with angle deviation values ​​lower than the disturbance angle set threshold, calculates and obtains the regional direction deviation index value, and takes the block with deviation value lower than the disturbance angle threshold as the matching region to generate a direction matching disturbance distribution value set. The spatial association construction submodule matches the disturbance distribution value set according to the direction, retrieves the power flow path information within the time period, establishes a power vector projection layer in a unified spatial coordinate system, locates the intersection block of the projection boundary between the power flow path and the marked disturbance area, extracts the boundary line index value of the overlapping block and generates a spatial geometric coverage group, and establishes the disturbance influence area mapping information.

[0010] As a further aspect of the present invention, the adjustment strategy construction module includes: The node arrangement extraction submodule obtains the disturbance impact area mapping information, collects power grid topology data, extracts the two-dimensional spatial location index corresponding to the node number grid, performs spatial positioning of the nodes in the actual power grid according to their arrangement rows and columns and numbering order, and generates a set of node spatial locations by combining the node connection relationship matrix. The disturbance path mapping submodule calls the set of node spatial locations, collects the power flow direction between nodes, power intensity measurement values, and node connection relationship matrix, calculates the power flow path between nodes based on the power flow direction vector, projects the path direction onto the plane coordinates, determines whether there is an overlap with the coverage of the disturbance influence area mapping information, obtains the spatial path segment where the power flow coincides with the disturbance area, and generates path disturbance overlap distribution data. The intersection node identification submodule extracts the set of coordinate points corresponding to the disturbance segment based on the path disturbance overlap distribution data, identifies the numbering region to which the coordinate points belong in the node arrangement space, performs intersection judgment between the region boundary and the disturbance path boundary, extracts the node number index corresponding to the intersection point, determines the key adjustment node number and corresponding coordinate region, and establishes a node adjustment priority distribution coordinate set.

[0011] As a further aspect of the present invention, the execution optimization module includes: The node signal acquisition submodule calls the node adjustment priority distribution coordinate set, extracts the corresponding node number index at the power grid level, collects the unit node power flow value and load count value recorded by the node monitoring, constructs the operating status data group of each node at the current moment, and generates a set of node operating signals. The trend difference marking submodule obtains the power flow values ​​of nodes in the disturbance zone and adjacent nodes in the non-disturbance zone at the same time point based on the node operation signal set, compares the differences in the direction of change, identifies signal items with inconsistent directions, records the difference items in the form of symbol values, classifies and organizes them into a separate input factor sequence, and obtains a power flow trend difference vector group. The disturbance compensation information generation submodule calls the power flow trend difference vector group, inputs the neural network input sequence structure trained with historical periodic samples, inputs the vector group and the constructed input factor terms in parallel, and performs combined deduction based on power intensity, load change and frequency deviation data input factors to obtain the adjustment value distribution results at the corresponding time point and generate disturbance compensation adjustment information.

[0012] As a further aspect of the present invention, the system further includes: The trusted label assignment module calls the disturbance compensation adjustment information, obtains the adjustment value and the actual running value of the node at each adjustment time point, compares the root mean square error between the adjustment value and the actual running value, and compares it with the set confidence error threshold. The error segment above the threshold is divided into intervals according to the level division rules, and each level division segment is marked as a trusted level identifier, generating a disturbance coverage area and outputting trusted level information. The perturbation coverage area output credibility level information specifically refers to the error interval level index, credibility label mapping result, RMSE fluctuation trend group, and credibility judgment result number table.

[0013] As a further aspect of the present invention, the trusted tag assignment module includes: The error value calculation submodule calls the disturbance compensation adjustment information to obtain the adjustment output power sequence and the actual operating power sequence of each node within the adjustment time period, constructs the error difference set between the corresponding sequence indices, and combines the adjustment power to normalize the error ratio and calculates the normalized power error index. The error segment division submodule calls the set confidence error threshold according to the normalized power error index, groups and classifies the index sequence according to the upper limit of the threshold, establishes index labels for the time period corresponding to the group, and sequentially numbers the error level corresponding to the group to obtain the error level mapping interval value. The credibility level labeling submodule calls the error level mapping interval value, establishes the credibility level interval correspondence rule according to the time mapping table between the level interval and the node number, outputs the credibility label result set corresponding to the node in each time period, and establishes the disturbance coverage area to output credibility level information.

[0014] Compared with the prior art, the advantages and positive effects of the present invention are as follows: In this invention, by acquiring real-time voltage fluctuation curves and frequency deviation sequences during power grid operation, calculating the phase difference between the voltage fluctuation curves and frequency deviation sequences, and generating a coordinated response feature vector by combining load dynamic characteristic parameters, the changing trends of the power grid operating state can be accurately identified, the dynamic evolution of the disturbance region can be determined, and the accuracy of power grid state capture under complex operating conditions can be significantly improved. By combining power output data from distributed energy access points, and performing angle matching and cross-projection based on the relationship between load change trends and power fluctuation distribution, the influence area of ​​disturbances on power grid nodes can be accurately delineated spatially, clarifying the actual spatial location and range of the power flow path being disturbed, thus achieving refined identification of the disturbance region. Based on the spatial correlation and cross-calculation of power flow paths and node layout, key regulation nodes and their corresponding regulation priorities are specifically identified, and the disturbance location and node number are precisely located. Specific regulation of power flow fluctuations in specific node groups is then performed, resulting in highly spatially targeted regulation results. By establishing a neural network regulation model for disturbance compensation, disturbance compensation features are directly incorporated into the regulation input, effectively capturing subtle changes in short-term power flow fluctuations and significantly improving the accuracy of the regulation response. Furthermore, a credibility assessment is introduced based on the adjustment results. By labeling the root mean square error level, the degree of adjustment deviation can be effectively distinguished, improving the reliability of the actual application of the adjustment data. This enables the power grid dispatch center to accurately adjust fluctuating power, reduce dispatching errors, reduce reserve capacity configuration, and enhance the operational stability and economy of the new energy power grid. Attached Figure Description

[0015] Figure 1 This is a system flowchart of the present invention; Figure 2 This is a flowchart illustrating the acquisition process of the state perception module of the present invention. Figure 3 This is a flowchart illustrating the acquisition process of the disturbance analysis module of the present invention. Figure 4 This is a flowchart illustrating the acquisition process of the adjustment strategy construction module of the present invention. Figure 5 This is a flowchart illustrating the process of obtaining the optimization module in this invention. Figure 6 This is a flowchart illustrating the acquisition process of the trusted tag assignment module of this invention. Detailed Implementation

[0016] The technical solution of the present invention will now be described with reference to the accompanying drawings.

[0017] In embodiments of the present invention, words such as "exemplarily," "for example," etc., are used to indicate that something is an example, illustration, or description. Any embodiment or design described as "exemplary" in the present invention should not be construed as being more preferred or advantageous than other embodiments or designs. Specifically, the use of the word "exemplary" is intended to present the concept in a concrete manner. Furthermore, in embodiments of the present invention, the meaning expressed by "and / or" can be both, or either one.

[0018] In the embodiments of this invention, the terms "image" and "picture" may sometimes be used interchangeably. It should be noted that, without emphasizing the distinction between them, they convey the same meaning. Similarly, the terms "of," "corresponding (relevant)," and "corresponding" may sometimes be used interchangeably. It should be noted that, without emphasizing the distinction between them, they convey the same meaning.

[0019] In this embodiment of the invention, sometimes a subscript such as W1 may be written in a non-subscript form such as W1. When the difference is not emphasized, the meaning they express is the same.

[0020] To make the technical problems, technical solutions and advantages of the present invention clearer, a detailed description will be given below in conjunction with the accompanying drawings and specific embodiments.

[0021] Please see Figure 1 This invention provides a technical solution: an adaptive control system based on voltage-frequency coordination, the system comprising: The state perception module acquires the voltage fluctuation curve and frequency deviation sequence collected in real time during the operation of the power grid. By calculating the phase difference between the voltage fluctuation curve and the frequency deviation sequence, and combining the load dynamic characteristic parameters, a coordinated response feature vector is generated. The disturbance analysis module calls the collaborative response feature vector, combines it with the power output data of the distributed energy access point, and generates disturbance impact area mapping information based on the relationship between load change trend and power fluctuation distribution. The regulation strategy construction module obtains power grid topology data based on the disturbance impact area mapping information, performs spatial correlation analysis on the power flow path between nodes and the disturbance area, identifies key regulation nodes and their corresponding regulation priorities, and generates a set of node regulation priority distribution coordinates. The execution optimization module calls the node adjustment priority distribution coordinate set, extracts the number index of the covered nodes at the power grid level, marks the adjustment difference items between nodes, and inputs the difference items as external disturbance compensation factors into the adjustment input sequence to generate disturbance compensation adjustment information; The trusted label assignment module calls the disturbance compensation adjustment information, obtains the adjustment value and the actual running value of the node at each adjustment time point, compares the root mean square error between the adjustment value and the actual running value, and compares it with the set confidence error threshold. The error segment above the threshold is divided into intervals according to the level division rules, and each level division segment is marked as a trusted level identifier, generating the disturbance coverage area output trusted level information.

[0022] The coordinated response feature vector includes voltage fluctuation amplitude, frequency deviation slope, phase difference consistency level, and load characteristic matching identifier. The disturbance impact area mapping information includes the disturbance principal axis direction distribution, impact area coverage index, power fluctuation classification level, and node number mapping table. The node adjustment priority distribution coordinate set specifically includes node projection junction boundary points, the correspondence between disturbance area and node arrangement, adjustment path index, and spatial correlation density factor. The disturbance compensation adjustment information includes the external disturbance compensation factor sequence, node-level response trend symbol sequence, predicted adjustment value set, and adjustment segment index structure. The disturbance coverage area output credibility level information specifically refers to the error interval level index, credibility label mapping result, RMSE fluctuation trend group, and credibility judgment result number table.

[0023] Please see Figure 2 The state awareness module includes: The voltage fluctuation extraction submodule acquires the voltage fluctuation curves collected in real time during the operation of the power grid, extracts the fluctuation points in each frame sampling period where the voltage amplitude changes beyond a set threshold, establishes a set of fluctuation points, constructs a voltage fluctuation curve structure sequence based on the fluctuation point time series, and generates a voltage fluctuation curve structure sequence. First, for a distribution network area with a rated voltage of 10kV, continuous data acquisition is performed with a sampling period of 10ms to form a time-series voltage data stream. For example, the voltage amplitude (unit: kV) acquired in 7 consecutive sampling periods (T1 to T7) is as follows: Then, a voltage fluctuation threshold is set. This threshold is determined based on statistical analysis of the power grid's historical operating data. Specifically, it involves retrieving voltage data from the past six months of stable operation and calculating the standard deviation of voltage changes between adjacent sampling points. kV, and the threshold Set it to 2.5 times that standard deviation, that is kV, then, calculate the absolute value of the voltage amplitude change in each sampling period relative to the previous period. The resulting sequence of changes is Compare each item in the sequence with a threshold. By comparing and filtering out fluctuation points that exceed the threshold, specifically, kV does not exceed the threshold (set to strictly greater than). kV exceeds the threshold The voltage exceeds the threshold value. Therefore, the voltage values ​​at time points T4 and T6 are determined to be fluctuation points, and a set of fluctuation points is established. Finally, based on the chronological order of the fluctuation points in the original time series, these fluctuation points are connected in series to construct the key structure of voltage fluctuation within that time period, generating a voltage fluctuation curve structure sequence.

[0024] The frequency deviation calculation submodule calls the voltage fluctuation curve structure sequence, extracts the timestamp values ​​of the corresponding fluctuation point pairs in the frequency deviation sequence within adjacent sampling periods, calculates the relative time difference vector, constructs a frequency deviation sequence set based on the time difference, performs ratio calculation on the frequency deviation sequence of continuous sampling periods, calculates the mean value of the frequency deviation gradient, filters out the segments where the frequency deviation exceeds the gradient threshold, and generates a set of frequency deviation gradient values. From the voltage fluctuation curve structure sequence Extract the timestamp value corresponding to the fluctuation point, i.e. and Simultaneously, a frequency deviation sequence synchronized with voltage sampling is acquired. This sequence represents the difference between the system frequency and the standard frequency (50Hz) measured within the same sampling period. Assuming the corresponding frequency deviation sequence (unit: Hz) within periods T1 to T7 is... Next, extract in and The corresponding frequency deviation values ​​for these two timestamps are respectively Hz and Hz, then calculate the relative time difference between these two fluctuation points. Since the sampling period is 10ms, and two sampling periods have passed from T4 to T6, the relative time difference is Hz. Based on this, a set containing time differences and corresponding frequency deviation values ​​is constructed, i.e. Furthermore, a ratio calculation is performed on the frequency deviation sequence over N consecutive sampling periods (taking T1 to T7 as an example, N=7). Specifically, the rate of change of the frequency deviation between adjacent sampling periods, i.e., the gradient, is calculated. The resulting gradient sequence (unit: Hz / s) is: The calculation obtains the mean gradient of the frequency deviation during this period. Hz / s, set the gradient threshold This threshold, referencing the frequency change rate limits in the power grid stability guidelines and combined with historical data analysis, is set to three times the standard deviation of the mean frequency gradient under normal operating conditions. Hz / s, filtering out the segments where the absolute value of the frequency deviation gradient exceeds the gradient threshold. In this example, the gradient value... , and The absolute values ​​all exceeded Hz / s, which correspond to the three segments T3-T4, T4-T5, and T5-T6 respectively, generating frequency deviation gradient value sets. .

[0025] The phase difference consistency judgment submodule calls the frequency deviation gradient value set, retrieves the average load change vector recorded by the load dynamic characteristic parameters, performs projection calculation on the frequency deviation gradient, compares the angle between it and the load change vector, performs segment filtering based on the set consistency threshold, obtains the proportion of segments whose frequency deviation gradient is consistent with the load change vector, and obtains the coordinated response feature vector. Calling frequency deviation gradient value set Then, a parameter library containing records of the dynamic characteristics of typical loads in the power grid is retrieved to obtain the average load change vector. This vector is established by statistically averaging the changes in active and reactive power under 30 typical scenarios of large induction motor start-up and shutdown in historical data. It is represented as a fixed direction vector on the power-frequency response plane. Assuming its quantized direction vector is... This indicates that load changes tend to increase both active and reactive power consumption simultaneously. Subsequently, the frequency deviation gradient value set is... Each gradient value is considered as a vector on the time-frequency deviation rate of change plane and projected onto the same two-dimensional plane as the load change vector. For example, for the gradient value... Its vector representation is (where 1 represents a unit time step), for gradient values Its vector representation is Next, the frequency deviation gradient vector and load change vector after each projection are calculated. The angle between ,by For example, it is similar to The included angle is Set a consistency threshold The threshold was set based on the following: simulation experiments showed that in over 85% of load disturbance events, this angle was less than [a certain value]. However, in the source-side disturbance, this proportion is less than 20%, therefore... Set as For all calculated included angles, segment filtering is performed, retaining those with included angles smaller than 100°. The section, assuming it has been calculated, The included angle is (less than) ), The angle between (corresponding to gradient -4) is (greater than) ), The angle between (corresponding to gradient -9) is (greater than) If the interval (T3-T4) is selected, then only the interval (T3-T4) will be selected. Finally, the proportion of all selected intervals to the total number of gradient intervals is calculated. In this example, it is... This value is assigned as one dimension to the collaborative response feature vector, and together with other statistical features (such as the mean of voltage, frequency, and phase difference), it constructs a multi-dimensional vector. For example, the final generated collaborative response feature vector is... ,in 0.85 represents the average phase difference between voltage and frequency changes, and 0.85 represents other statistical indicators.

[0026] Please see Figure 3 The disturbance analysis module includes: The power fluctuation direction extraction submodule calls the collaborative response feature vector to obtain the power output data recorded by the distributed energy access point, identifies the boundary of the equal power region in the power output data, determines the power fluctuation distribution profile based on the set of equal power contour lines, extracts the boundary line direction distribution and performs vectorized fitting according to the position order, and generates the power fluctuation principal axis direction sequence. Call the collaborative response feature vector generated in the preceding steps Meanwhile, the power output data recorded by all distributed energy access points (such as photovoltaic power stations and wind farms) within the specified area during the disturbance period (T3-T6) is obtained, as shown in Table 1.

[0027] Table 1: Power Output Table of Distributed Energy Connection Point As shown in Table 1, this table records the power output of four distributed energy access points at four consecutive time points. First, by analyzing the power data, regions with significant power changes were identified. It was found that the power of DG01 and DG02 experienced a continuous and synchronous significant decrease from time T3 to T6 (from approximately 5.1MW to approximately 3.2MW), while the power of DG03 and DG04 remained basically stable. This indicates the existence of an iso-power region boundary, which separates the stable power region (DG03, DG04) from the power decline region (DG01, DG04). 2) Next, using spatial interpolation, a contour map of power changes from time T3 to T6 is plotted on the geographic plane formed by all DG points to identify the region with the most intense power fluctuations (power decrease zone). The contour line of this region is extracted, which can be approximated as an ellipse centered at DG01 and DG02. Then, the major axis direction of this ellipse contour is calculated and used as the dominant direction of power fluctuation. By linearly fitting the coordinates of DG01 (10,25) and DG02 (12,28), a direction vector is obtained, and its slope is... The direction angle of this vector is This direction, along with other identified secondary fluctuation directions, is sorted and vectorized according to their influence weights (determined by the power change amplitude) to generate a sequence of power fluctuation principal axis directions. .

[0028] The angle matching calculation submodule obtains the angle relationship between the vector segment and the calibration frequency deviation direction segment in the cooperative response feature vector based on the power fluctuation principal axis direction sequence. It compares the angle between the two sets of direction vectors in the spatial coordinate plane, filters vector pairs with angle deviation values ​​lower than the perturbation angle set threshold, calculates and obtains the regional direction deviation index value, and takes the block with deviation value lower than the perturbation angle threshold as the matching region to generate a direction matching perturbation distribution value set. Based on the power fluctuation principal axis direction sequence and call the collaborative response feature vector The calibrated frequency deviation direction segment is the section (T3-T4) selected during the phase difference consistency judgment step, corresponding to the frequency deviation gradient that aligns with the load change vector direction. Its gradient value is 5, and its vector representation is... , direction angle is Next, in the two-dimensional coordinate plane, the power fluctuation principal axis direction vector is... Direction of frequency deviation Perform an angle comparison and calculate the angular deviation between the two. Set a perturbation angle threshold. This threshold was obtained through a retrospective analysis of 50 confirmed source-load disturbance events. Statistical analysis showed that when the disturbance originated from the same event, the angle between the principal axis of power fluctuation and the direction of the consistency frequency deviation was less than 90% of the time. Therefore, Set as Due to the calculated deviation of the included angle Below the disturbance angle setting threshold Therefore, these two vectors are considered as a matched vector pair, and the power fluctuation principal axis is... The represented geographic blocks (i.e., the areas centered on DG01 and DG02) are marked as matching regions. Then, the regional directional deviation index value is calculated and obtained. This index value is defined as... This value reflects the confidence level of the match. Finally, all matching regions with deviation values ​​below the threshold and their corresponding deviation index values ​​are integrated to generate a set of directional matching perturbation distribution values. Region A is the geographic block where DG01 and DG02 are located.

[0029] The spatial association construction submodule matches the disturbance distribution value set according to the direction, retrieves the power flow path information within the time period, establishes a power vector projection layer in a unified spatial coordinate system, locates the intersection block of the projection boundary between the power flow path and the marked disturbance area, extracts the boundary line index value of the overlapping block and generates a spatial geometric coverage group, and establishes the disturbance influence area mapping information. Based on the direction matching perturbation distribution value set The system retrieves power flow data recorded by the power grid dispatch system during the disturbance period (T3-T6). This data includes the power magnitude and direction of each transmission line in the power grid, forming power flow path information. For example, the data shows that at time T4, there are three main power paths: path 1 flows from node N5 to N8 with a power of 20MW; path 2 flows from node N15 to N18 with a power of 35MW and passes through region A; path 3 flows from node N2 to N3 with a power of 15MW. Then, in a unified geographic information spatial coordinate system, the geometry of the disturbance region A (centered at (11,26.5), with the major axis along...) is... An ellipse (in terms of direction) is drawn as a layer. Simultaneously, the three power flow paths are also drawn as vector line segments on the same coordinate system, forming a power vector projection layer. Through layer overlay analysis, the spatial relationship between the power flow paths and the marked disturbance region A is located. It is found that the line segment of path 2 crosses the elliptical range of region A, indicating an intersection of the projection boundary. Paths 1 and 3 do not overlap with region A. Finally, the start and end geographic coordinates of the overlapping portion of path 2 and region A are extracted, and the line number L-1518 associated with path 2 and the boundary line index value of the overlapping block are recorded. This information is integrated into a spatial geometric coverage group, based on which disturbance influence region mapping information is established. .

[0030] Please see Figure 4 The adjustment strategy building module includes: The node arrangement extraction submodule obtains disturbance impact area mapping information, collects power grid topology data, extracts the two-dimensional spatial location index corresponding to the node number grid, spatially locates the arrangement rows and columns and numbering order of nodes in the actual power grid, and generates a set of node spatial locations by combining the node connection relationship matrix. Obtain the mapping information of the disturbance-affected area Simultaneously, power grid topology data for the region was collected from the power grid basic database. This data included the node numbers, types, and connection relationships between all nodes, stored in the form of an adjacency matrix. First, the number grids of nodes N15 and N18 connected to the affected line L-1518, as well as their directly connected first-order neighboring nodes (such as N14, N16, N17, N19), were extracted, and the two-dimensional spatial location indices of these nodes in the power grid geographical layout map were obtained. For example, the coordinates of N15 were (40, 75), and the coordinates of N18 were (55, 90). Then, these... The arrangement of nodes in the actual power grid is spatially located to clarify the row and column relationships and numbering order in the local network structure they form. For example, N14, N15, and N16 are in one row, while N17, N18, and N19 are in another row, and N15 and N18 have a direct physical connection. Finally, the electrical connections between these nodes are confirmed by combining the node connection relationship matrix. For example, the element corresponding to (N15, N18) in the matrix is ​​1, indicating that a connection exists. All this information, including node number, spatial coordinates, and connection relationships, is integrated into a set to generate a set of node spatial locations. .

[0031] The disturbance path mapping submodule calls the node spatial location set, collects the power flow direction between nodes, power intensity measurement values, and node connection relationship matrix, calculates the power flow path between nodes based on the power flow direction vector, projects the path direction onto the plane coordinates, determines whether there is overlap with the coverage of the disturbance influence area mapping information, obtains the spatial path segment where the power flow coincides with the disturbance area, and generates path disturbance overlap distribution data. Call the set of node spatial locations The system collects the power flow direction, power intensity measurements, and node connection matrix between these nodes during the disturbance period (T3-T6) from the SCADA system. For example, the power flow from nodes N15 to N18 is 35 MW at time T4, with the direction from N15 to N18. First, based on the collected power flow direction and intensity, a power flow vector is drawn for each pair of connected nodes. For example, a vector with a starting point of (40,75), an ending point of (55,90), and a weight of 35 is drawn between N15 and N18. The direction of this path in the plane coordinate system (i.e., the line segment from N15 to N18) is calculated. Then, this path is projected onto the established plane coordinate system containing the disturbance influence area A, and the mapping information between the geometric line segment of the path and the disturbance influence area is determined. The system checks whether there is spatial overlap in the coverage area of ​​the disturbance region A (an elliptical region centered on DG01 and DG02) as defined in the data. It is determined that the path segment from N15 to N18 does indeed pass through region A, resulting in a spatial path segment where the power flow coincides with the disturbance region. Finally, this overlapping path segment and its related information (such as its line L-1518, the proportion of the overlapping length to the total path length, etc.) are recorded to generate path disturbance overlap distribution data. .

[0032] The intersection node identification submodule extracts the set of coordinate points corresponding to the disturbance segment based on the path disturbance overlap distribution data, identifies the numbering region to which the coordinate points belong in the node arrangement space, performs intersection judgment between the region boundary and the disturbance path boundary, extracts the node number index corresponding to the intersection point, determines the key adjustment node number and corresponding coordinate region, and establishes a node adjustment priority distribution coordinate set. From path disturbance coincidence distribution data The path segment where the disturbance overlaps is extracted, specifically the 65% segment on line L-1518. A series of continuous coordinate points for this segment in the geographic coordinate system are obtained. These coordinate points are then mapped one by one into the node arrangement space, identifying the power grid node number region to which each coordinate point belongs. Since this path segment connects N15 and N18, all points on the path belong to the region between these two nodes. Then, the boundary of this path segment (i.e., the start and end points of the overlapping segment) is compared with the boundary of disturbance region A to determine the spatial intersection point. It is found that the intersection point is geographically closer to node N18. By calculating the Euclidean distances from the junction point to N15 and N18, it was determined that N18 is closer to N18. Therefore, N18 is identified as a critical regulating node because it is physically closest to the intersection of the disturbance area and the main power flow path. Subsequently, based on N18's criticality in the disturbance propagation path, it is assigned the highest regulating priority, for example, a priority of 1. Its adjacent nodes N15 and N19 are assigned secondary priorities, such as 2 and 3, based on their electrical distance and position in the power flow path. Finally, the numbers, coordinates, and corresponding regulating priorities of these critical regulating nodes are integrated to establish a node regulating priority distribution coordinate set. .

[0033] Please see Figure 5 The optimization module includes: The node signal acquisition submodule calls the node adjustment priority distribution coordinate set, extracts the corresponding node number index at the power grid level, collects the unit node power flow value and load count value recorded by the node monitoring, constructs the operating status data group of each node at the current moment, and generates a set of node operating signals. Adjust the priority distribution coordinate set from the node Extract the node indexes of all nodes requiring adjustment, i.e., {N18, N15, N19}. Then, at the Wide Area Measurement System (WAMS) level of the power grid, accurately collect the operational status monitoring records of these nodes at the current time (e.g., time T7). Specifically, collect the unit node power flow value of node N18 (33MW) and its load count value (12Mvar); collect the power flow value of node N15 (34MW) and its load count value (10Mvar); collect the power flow value of node N19 (18MW) and its load count value (5Mvar). Combine these two key data points for each node to construct the node's operational status data set at the current time. For example, the data set for N18 is (33, 12). Finally, aggregate the data sets of all indexed nodes to generate a node operational signal set. .

[0034] The trend difference marking submodule obtains the power flow values ​​of nodes in the disturbance zone and adjacent nodes in the non-disturbance zone at the same time point based on the node operation signal set, compares the differences in the direction of change, identifies signal items with inconsistent directions, records the difference items in the form of symbol values, classifies and organizes them into a separate input factor sequence, and obtains a power flow trend difference vector group. Obtain the power flow change of the key regulating node N18 identified within the disturbance region from time T6 to T7. Assuming the power flow value of N18 at time T6 is 35MW, its change is as follows: MW indicates a decrease in power. Meanwhile, a comparison is made with node N17, which is adjacent to N18 but not included in the core disturbance area. Assuming the power flow values ​​of N17 collected from the SCADA system at times T6 and T7 are 25MW and 26MW respectively, the change is as follows: MW indicates that power is increasing. Next, at the same time point (time window from T6 to T7), the direction of change of N18 (decreasing) is compared with the direction of change of N17 (increasing). This identifies that the power flow change directions of these two nodes are inconsistent, which is a signal term difference. Then, this difference term is recorded in the form of a specific sign value. For example, -1 indicates opposite directions, +1 indicates the same direction, and 0 indicates no significant change. Here, the recorded value is -1. This difference is categorized and organized, and together with the comparison results of other node pairs, forms a separate input factor sequence. For example, if the comparison result of N15 and the adjacent non-disturbed zone node N14 is consistent in direction, the corresponding factor is +1, resulting in a power flow trend difference vector group. .

[0035] The disturbance compensation information generation submodule calls the power flow trend difference vector group, inputs the neural network input sequence structure trained by historical periodic samples, inputs the vector group and the constructed input factor terms in parallel, and performs combination deduction based on power intensity, load change and frequency deviation data input factors to obtain the regulation value distribution results at the corresponding time point and generate disturbance compensation regulation information; Power flow trend difference vector group As input data, it is fed into the input sequence structure of a deep neural network that has been trained with historical periodic samples (e.g., a dataset containing 10,000 different perturbation scenarios and their optimal adjustment strategies). The input layer of this neural network is designed to receive multiple parallel input factor terms, in addition to the trend difference vector group. In addition, other relevant real-time data factors are input in parallel, including the current power intensity of node N18 (33MW), its load change (a change of +0.5Mvar from T6 to T7), and system frequency deviation data (-0.02Hz at time T7). The neural network model, based on its internally learned weights and bias parameters, performs nonlinear deduction and calculation on these combined input factors. For example, the trend difference factor -1 serves as a strong signal, indicating the need for compensation adjustment of N18 to reverse its downward trend. Combining data such as power intensity, load change, and frequency deviation, the network model infers an optimal adjustment amount. Finally, the output layer of the neural network provides the specific adjustment value distribution for each key node at the next time point (T8). For example, the output might be an increase of 2.5MW of active power injection into N18 and a decrease of 0.5MW of injection into N15, generating disturbance compensation adjustment information. .

[0036] Please see Figure 6 The trusted tag assignment module includes: The error value calculation submodule calls the disturbance compensation adjustment information to obtain the adjustment output power sequence and the actual operating power sequence of each node within the adjustment period, constructs the error difference set between the corresponding sequence indices, and combines the adjustment power to normalize the error ratio and calculate the normalized power error index. Obtain the regulated output power sequence for each regulated node (N18 and N15) within a specified regulation time period (e.g., 5 sampling periods from T8 to T12), i.e., the sequence of command values ​​issued to the actuator. For example, the command sequence for N18 is... MW, and simultaneously, the actual operating power change sequence monitored by sensors at these nodes within the same time period is collected. For example, the actual power change sequence of N18 is... Next, construct a set of error differences between the two sequences at corresponding indices (time points), that is, calculate the difference at each time point. The error sequence for N18 is obtained as follows: MW, then, combining the adjusted power (command power) at each time point, the error at that time point is proportionally normalized, and the calculation formula is as follows: The normalized error sequence is obtained. Finally, a comprehensive operation is performed on the normalized error sequence, such as calculating its root mean square value or maximum value. Here, the mean value operation is used to obtain the normalized power error index of N18 during the adjustment period. .

[0037] The error segment division submodule calls the set confidence error threshold based on the normalized power error index, groups and classifies the index sequence according to the upper limit of the threshold, establishes index labels for the time period corresponding to the group, and sequentially numbers the error level corresponding to the group to obtain the error level mapping interval value. Based on the normalized power error index The system then calls a pre-set confidence error threshold. This threshold system is based on the effectiveness evaluation of a large number of historical adjustment events and expert experience, aiming to distinguish the quality of adjustment effects. Specifically, the thresholds are set as follows: an error index within the range of [0, 0.05] represents "high confidence," (0.05, 0.15] represents "medium confidence," (0.15, 0.3] represents "low confidence," and greater than 0.3 represents "unreliable." First, the calculated error index... Compared with these upper thresholds, it was found that Therefore, the adjustment effect of this node is classified into the "medium confidence" group. Next, a corresponding time period index label is created for this group, namely (T8-T12), and the error level corresponding to this group is numbered. For example, "high confidence" is level 1, "medium confidence" is level 2, "low confidence" is level 3, and "unreliable" is level 4. In this example, the error level of N18 in the (T8-T12) period is numbered 2. Finally, the results of all analyzed nodes and time periods are integrated to obtain the error level mapping interval value. .

[0038] The credibility level labeling submodule calls the error level mapping interval value, establishes the credibility level interval correspondence rule based on the time mapping table between the level interval and the node number, outputs the credibility label result set corresponding to the node in each time period, and establishes the disturbance coverage area to output credibility level information. Call error level mapping range value Based on a pre-defined rule table that matches error level numbers with trust level text labels, a trust level interval correspondence rule is established. This rule is defined as follows: Level 1 corresponds to "High Trust", Level 2 corresponds to "Medium Trust", Level 3 corresponds to "Low Trust", and Level 4 corresponds to "Untrustworthy". First, according to... The information in the table maps the error level 2 of node N18 in the time period (T8-T12) to the text label "medium confidence" through the rule table. Next, the confidence label result set corresponding to node N18 in the time period (T8-T12) is output, that is, {N18, (T8-T12), "medium confidence"}. If the system also evaluates N15 and obtains its error level as 1, then its result set is {N15, (T8-T12), "high confidence"}. Finally, these results are integrated into the overall evaluation report of the disturbance coverage area to form a complete view of time-space-confidence, thereby establishing the output confidence level information of the disturbance coverage area.

[0039] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

1. An adaptive control system based on voltage-frequency coordination, characterized in that, The system includes: The state perception module acquires the voltage fluctuation curve and frequency deviation sequence collected in real time during the operation of the power grid. By calculating the phase difference between the voltage fluctuation curve and the frequency deviation sequence, and combining the load dynamic characteristic parameters, a coordinated response feature vector is generated. The disturbance analysis module calls the cooperative response feature vector, combines it with the power output data of the distributed energy access point, and generates disturbance impact area mapping information based on the relationship between load change trend and power fluctuation distribution. The regulation strategy construction module obtains power grid topology data based on the disturbance impact area mapping information, performs spatial correlation analysis on the power flow path between nodes and the disturbance area, identifies key regulation nodes and their corresponding regulation priorities, and generates a set of node regulation priority distribution coordinates. The optimization module calls the node adjustment priority distribution coordinate set, extracts the number index of the covered nodes at the power grid level, marks the adjustment difference items between nodes, and inputs the difference items as external disturbance compensation factors into the adjustment input sequence to generate disturbance compensation adjustment information.

2. The adaptive control system based on voltage-frequency coordination according to claim 1, characterized in that: The coordinated response feature vector includes voltage fluctuation amplitude, frequency deviation slope, phase difference consistency level, and load characteristic matching identifier. The disturbance impact area mapping information includes disturbance principal axis direction distribution, impact area coverage index, power fluctuation classification level, and node number mapping table. The node adjustment priority distribution coordinate set specifically includes node projection junction boundary points, disturbance area and node arrangement correspondence, adjustment path index, and spatial correlation density factor. The disturbance compensation adjustment information includes external disturbance compensation factor sequence, node-level response trend symbol sequence, predicted adjustment value set, and adjustment segment index structure.

3. The adaptive control system based on voltage-frequency coordination according to claim 1, characterized in that, The state awareness module includes: The voltage fluctuation extraction submodule acquires the voltage fluctuation curves collected in real time during the operation of the power grid, extracts the fluctuation points in each frame sampling period where the voltage amplitude changes beyond a set threshold, establishes a set of fluctuation points, constructs a voltage fluctuation curve structure sequence based on the fluctuation point time series, and generates a voltage fluctuation curve structure sequence. The frequency deviation calculation submodule calls the voltage fluctuation curve structure sequence, extracts the timestamp values ​​of the corresponding fluctuation point pairs in the frequency deviation sequence within adjacent sampling periods, calculates the relative time difference vector, constructs a frequency deviation sequence set based on the time difference, performs ratio calculation on the frequency deviation sequence of continuous sampling periods, calculates the mean value of the frequency deviation gradient, filters out the segments where the frequency deviation exceeds the gradient threshold, and generates a set of frequency deviation gradient values. The phase difference consistency judgment submodule calls the frequency deviation gradient value set, retrieves the average load change vector recorded by the load dynamic characteristic parameters, performs projection calculation on the frequency deviation gradient, compares the angle between it and the load change vector, performs segment filtering based on the set consistency threshold, obtains the proportion of segments where the frequency deviation gradient and the load change vector are consistent, and obtains the coordinated response feature vector.

4. The adaptive control system based on voltage-frequency coordination according to claim 1, characterized in that, The disturbance analysis module includes: The power fluctuation direction extraction submodule calls the collaborative response feature vector to obtain the power output data recorded by the distributed energy access point, identifies the boundary of the equal power region in the power output data, determines the power fluctuation distribution profile based on the set of equal power contour lines, extracts the boundary line direction distribution and performs vectorized fitting according to the position order, and generates a power fluctuation principal axis direction sequence. The angle matching calculation submodule obtains the angle relationship between the vector segment and the calibration frequency deviation direction segment in the cooperative response feature vector according to the power fluctuation main axis direction sequence. It compares the angle between the two sets of direction vectors in the spatial coordinate plane, filters vector pairs with angle deviation values ​​lower than the disturbance angle set threshold, calculates and obtains the regional direction deviation index value, and takes the block with deviation value lower than the disturbance angle threshold as the matching region to generate a direction matching disturbance distribution value set. The spatial association construction submodule matches the disturbance distribution value set according to the direction, retrieves the power flow path information within the time period, establishes a power vector projection layer in a unified spatial coordinate system, locates the intersection block of the projection boundary between the power flow path and the marked disturbance area, extracts the boundary line index value of the overlapping block and generates a spatial geometric coverage group, and establishes the disturbance influence area mapping information.

5. The adaptive control system based on voltage-frequency coordination according to claim 1, characterized in that, The adjustment strategy construction module includes: The node arrangement extraction submodule obtains the disturbance impact area mapping information, collects power grid topology data, extracts the two-dimensional spatial location index corresponding to the node number grid, performs spatial positioning of the nodes in the actual power grid according to their arrangement rows and columns and numbering order, and generates a set of node spatial locations by combining the node connection relationship matrix. The disturbance path mapping submodule calls the set of node spatial locations, collects the power flow direction between nodes, power intensity measurement values, and node connection relationship matrix, calculates the power flow path between nodes based on the power flow direction vector, projects the path direction onto the plane coordinates, determines whether there is an overlap with the coverage of the disturbance influence area mapping information, obtains the spatial path segment where the power flow coincides with the disturbance area, and generates path disturbance overlap distribution data. The intersection node identification submodule extracts the set of coordinate points corresponding to the disturbance segment based on the path disturbance overlap distribution data, identifies the numbering region to which the coordinate points belong in the node arrangement space, performs intersection judgment between the region boundary and the disturbance path boundary, extracts the node number index corresponding to the intersection point, determines the key adjustment node number and corresponding coordinate region, and establishes a node adjustment priority distribution coordinate set.

6. The adaptive control system based on voltage-frequency coordination according to claim 1, characterized in that, The execution optimization module includes: The node signal acquisition submodule calls the node adjustment priority distribution coordinate set, extracts the corresponding node number index at the power grid level, collects the unit node power flow value and load count value recorded by the node monitoring, constructs the operating status data group of each node at the current moment, and generates a set of node operating signals. The trend difference marking submodule obtains the power flow values ​​of nodes in the disturbance zone and adjacent nodes in the non-disturbance zone at the same time point based on the node operation signal set, compares the differences in the direction of change, identifies signal items with inconsistent directions, records the difference items in the form of symbol values, classifies and organizes them into a separate input factor sequence, and obtains a power flow trend difference vector group. The disturbance compensation information generation submodule calls the power flow trend difference vector group, inputs the neural network input sequence structure trained with historical periodic samples, inputs the vector group and the constructed input factor terms in parallel, and performs combined deduction based on power intensity, load change and frequency deviation data input factors to obtain the adjustment value distribution results at the corresponding time point and generate disturbance compensation adjustment information.

7. The adaptive control system based on voltage-frequency coordination according to claim 1, characterized in that, The system also includes: The trusted label assignment module calls the disturbance compensation adjustment information, obtains the adjustment value and the actual running value of the node at each adjustment time point, compares the root mean square error between the adjustment value and the actual running value, and compares it with the set confidence error threshold. The error segment above the threshold is divided into intervals according to the level division rules, and each level division segment is marked as a trusted level identifier, generating a disturbance coverage area and outputting trusted level information. The perturbation coverage area output credibility level information specifically refers to the error interval level index, credibility label mapping result, RMSE fluctuation trend group, and credibility judgment result number table.

8. The adaptive control system based on voltage-frequency coordination according to claim 7, characterized in that, The trusted tag assignment module includes: The error value calculation submodule calls the disturbance compensation adjustment information to obtain the adjustment output power sequence and the actual operating power sequence of each node within the adjustment time period, constructs the error difference set between the corresponding sequence indices, and combines the adjustment power to normalize the error ratio and calculates the normalized power error index. The error segment division submodule calls the set confidence error threshold according to the normalized power error index, groups and classifies the index sequence according to the upper limit of the threshold, establishes index labels for the time period corresponding to the group, and sequentially numbers the error level corresponding to the group to obtain the error level mapping interval value. The credibility level labeling submodule calls the error level mapping interval value, establishes the credibility level interval correspondence rule according to the time mapping table between the level interval and the node number, outputs the credibility label result set corresponding to the node in each time period, and establishes the disturbance coverage area to output credibility level information.

Citation Information

Patent Citations

  • VIQ Automatic Voltage and Reactive Power Coordination Control System and Method

    CN108565867B

  • Variable inertia damping cooperative control method of virtual synchronous generator based on frequency deviation

    CN113612250B