A multi-mode collaborative optimization control method and system for an energy management system of an energy storage plant test platform
By constructing an optimized battery compartment test model and multi-mode collaborative control, the problems of lack of interaction between the test and the power grid, low utilization of idle resources, and control conflict risks in the energy storage factory test platform were solved, thus achieving safe, stable, and efficient energy storage testing.
Patent Information
- Application Number
- CN202611375608.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-07
- Publication Date
- 2026-11-17
AI Technical Summary
Traditional energy storage plant testing platforms suffer from problems such as lack of interaction between testing and the power grid, low utilization of idle energy storage resources, risk of control conflicts, and insufficient scheduling flexibility. Existing energy management systems have failed to effectively address the special operational needs of energy storage testing scenarios.
By constructing a battery compartment test optimization model, using the energy management system to collect multi-source data, establishing and solving the objective function, the start time of the battery compartment test steps and the charging and discharging power are optimized. Combined with anti-reverse current, test task completion time limit and inverter rated power constraints, multi-mode collaborative optimization control of the battery compartment is achieved.
It has enabled the safe and stable operation of the energy storage plant testing platform, avoided backflow risks, improved the utilization rate of idle resources, reduced testing costs, and ensured the continuity and efficient completion of the testing process.
Smart Images

Figure CN123121797A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of energy management technology for energy storage systems, and in particular to a multi-mode collaborative optimization control method and system for an energy management system of an energy storage factory test platform. Background Technology
[0002] With the rapid development of the electrochemical energy storage industry, energy storage battery packs must undergo rigorous charge and discharge tests before leaving the factory. Traditional energy storage factory testing platforms typically employ a manual operation mode, where testing personnel independently control the charging and discharging equipment of their respective battery packs from various host computers to complete the tests. In this mode, each testing station operates independently, and the testing process is disconnected from the factory's power management, resulting in the following technical problems:
[0003] Lack of interaction between testing and the power grid: During testing, high-power charging and discharging of the battery compartment may cause power from the grid connection point to be fed back to the power grid (reverse current risk), affecting power grid safety. The existing testing system lacks effective anti-reverse current control measures.
[0004] Low utilization rate of idle energy storage resources: The test battery compartment has energy storage capacity during idle periods and can be used as a power bank resource. However, the idle energy storage resources cannot be dynamically charged and discharged according to the factory's test electricity cost, resulting in insufficient utilization of energy storage resources.
[0005] Controlling the risk of conflict: Directly applying external power control to the test equipment may interrupt the ongoing test process, leading to invalid test data or even equipment damage. This is because charging normally follows a fixed power, but human error could alter the charging and discharging power of the battery compartment during the test.
[0006] Insufficient scheduling flexibility: Test tasks have strict timing requirements, while energy storage scheduling needs to respond to changes in factory test electricity costs and load. There is a contradiction between the two in terms of time scale, and existing technologies cannot achieve both simultaneously.
[0007] Existing energy storage management systems (EMS) are mainly designed for grid-connected energy storage power stations or industrial and commercial energy storage scenarios. They focus on single peak shaving and valley filling (i.e., using the principle of peak-valley arbitrage to charge and discharge the battery compartment) or demand response functions, without considering the special operational requirements of "test task priority and energy dispatch coordination" in energy storage testing scenarios. Summary of the Invention
[0008] The purpose of this invention is to provide a multi-mode collaborative optimization control method and system for the energy management system of an energy storage factory testing platform. By solving the objective function of the constructed battery compartment testing optimization model, the optimal start time and corresponding power of the battery compartment test steps under each testing mode are obtained, along with the power curves of the battery compartment under each power bank mode. Then, the host computer controls the corresponding battery compartment to perform charge and discharge tests according to the received power. The reverse current risk is avoided based on the charge and discharge status, thus optimizing the operating efficiency of the testing system while ensuring the stable execution of the testing process. This invention is achieved through the following technical solutions.
[0009] In a first aspect, the present invention provides a multi-mode collaborative optimization control method for the energy management system of an energy storage plant test platform, comprising: collecting multi-source data under the grid connection point of the energy storage plant using the energy management system, and establishing a battery compartment test optimization model based on the multi-source data; wherein, the operating modes of the battery compartment include test mode, power bank mode and static mode;
[0010] The objective function of the battery compartment test optimization model is constructed by testing the electricity cost and the charging and discharging power of the battery compartment during the corresponding test electricity cost period. The constraints of the objective function include anti-reverse current constraints, test task completion time constraints, test step continuity constraints, and converter rated power constraints.
[0011] The objective function is solved based on the constraints to obtain the optimization results of the battery compartment test optimization model. The optimization results include the start time of each test step of each battery compartment and the corresponding power and dynamic charge and discharge power curves.
[0012] The optimization results are converted into control commands and sent to the test host computer. The test host computer is then controlled to execute the corresponding battery compartment power control and to provide real-time feedback on the charging and discharging status of each battery compartment to the energy management system.
[0013] If the energy management system detects a reverse current risk at the energy storage plant's grid connection point through the received charging and discharging status, it will prioritize charging the battery compartments in power bank mode to absorb the reverse current power. If the reverse current risk still exists after charging the battery compartments in power bank mode, it will forcibly terminate the current operation of a battery compartment that is in test mode and is performing a discharging operation.
[0014] This invention focuses on optimizing the charging and discharging strategy of energy storage battery compartments in an energy storage factory. Based on preset test procedure requirements, the energy storage battery compartments are charged and discharged to ultimately meet factory standards. During the charging and discharging tests of the energy storage battery compartments, the testing process cannot be interrupted. The Energy Management System (EMS) needs to consider the current load, test electricity costs, and test plan status to set the optimal charging and discharging strategy for each battery compartment, generating the start time and corresponding power for each test procedure. This is then converted into control commands and sent to the host computer, which controls the corresponding battery compartments to charge and discharge according to the power values.
[0015] The factory's grid connection point includes various equipment such as the tested energy storage battery compartment, the converter PCS controlling the charging and discharging of the battery compartment, and conventional loads. The Energy Management System (EMS) monitors the converter PCS and grid connection point meters in real time, collecting the State of Charge (SOC), charging and discharging power of each battery compartment, and real-time power data of the grid connection point. Based on the collected data, the EMS establishes a rolling scheduling model with the optimization objective of minimizing the factory's testing electricity cost. It dynamically optimizes the charging and discharging power curves of each battery compartment to achieve efficient energy utilization and power supply-demand balance. Simultaneously, by scheduling energy storage through charging and discharging equipment and idle battery compartments, reverse power flow at the grid connection point is restricted, thereby improving the overall operating efficiency of the energy system and reducing the factory's overall electricity cost. Therefore, this invention provides a control method that can coordinate battery compartment testing and energy management, and optimize the operating efficiency of the testing system while ensuring the stable execution of the testing process.
[0016] Optionally, the test mode refers to the mode in which the battery compartment performs various test steps, the power bank mode refers to the mode in which the battery compartment can be used as a scheduling resource and its power changes continuously with the charging and discharging state, and the static mode refers to the mode in which the battery compartment stops running, neither charging nor discharging, and waits for the mode switching command; the optimization results specifically include the start time of the test steps and the corresponding power of each battery compartment in the test mode, and the dynamic charging and discharging power curves of each battery compartment in the power bank mode.
[0017] Optionally, solving the objective function includes: solving the objective function at preset rolling cycles to determine the start time and corresponding power of the test steps for the battery compartment in test mode, and the dynamic charging and discharging power curves of each battery compartment in power bank mode. The start time and corresponding power of the test steps for the battery compartment in test mode are kept fixed in subsequent rolling cycles. In each subsequent rolling optimization cycle, the objective function is solved to obtain the start time and corresponding power of the test steps for the newly added test battery compartment, and the dynamic charging and discharging power curves of the remaining power bank mode battery compartments.
[0018] Optionally, the objective function can be calculated using the following formula:
[0019] ,
[0020] In the formula, Describe the objective function. This indicates the battery compartment serial number, with a value ranging from 1 to... , This represents the total number of battery compartments. The value is 0 to 100. , For the total time, for Electricity price at any time Battery compartment In the future The charging and discharging power at any given time This indicates that the battery compartment is discharging. This indicates that the battery compartment is charging.
[0021] Optionally, backflow prevention constraint means the total power at the grid connection point is less than or equal to zero, and backflow risk at the grid connection point of the energy storage plant means the total power at the grid connection point is detected to be greater than zero. The formula for calculating the total power at the grid connection point is as follows:
[0022] = ,
[0023] In the formula, This indicates the battery compartment serial number, with a value ranging from 1 to... , This represents the total number of battery compartments. For a moment, express The total power at the grid connection point at any given time is the cumulative charging and discharging power of each battery compartment at the grid connection point.
[0024] Optionally, the test task completion time constraint refers to completing all test steps for at least one battery compartment within a specific time period, expressed as follows:
[0025] ,
[0026] ,
[0027] In the formula, This represents the test step number, with a value ranging from 1 to... , Indicates the total number of test steps. Battery compartment In the The start time of each test step, battery compartment In the The start time of each test step Battery compartment In the The duration of each test step, For hours, For a preset specific time, The rated capacity of the battery compartment or the set recharge capacity value.
[0028] Optionally, the test step continuity constraint means that once the test step of the battery compartment starts, it cannot be stopped until the current test step is completed.
[0029] Optionally, the energy storage plant grid connection point includes a battery compartment, an inverter that controls the charging and discharging of the battery compartment, and a test host computer that controls the inverter to perform tests on the battery compartment. The battery compartment, inverter, and test host computer are all communicatively connected; wherein, one inverter controls multiple battery compartments.
[0030] The multi-source data includes battery compartment information, inverter information, test information, and operating mode information for each battery compartment. The battery compartment information includes the battery compartment's SOC, voltage, and current. The inverter information includes the battery compartment's charging and discharging power. The test information includes the sequence number of the battery compartment in the test state, the charging and discharging power of the battery compartment in each test step, and the duration of the test step. The battery compartment's operating mode information includes test mode, power bank mode, and idle mode. Each test step includes discharging residual power, charging and discharging test, idle, and recharging.
[0031] Optionally, the rated power constraint of the converter means that the sum of the charging and discharging power of the battery compartment under the same converter cannot exceed the rated power of the converter.
[0032] Secondly, the present invention provides a multi-mode collaborative optimization control system for the energy management system of an energy storage plant testing platform, comprising:
[0033] The battery compartment test optimization model construction module is used to collect multi-source data from energy storage plants and grid-connected points using the energy management system, and to build a battery compartment test optimization model based on the multi-source data; the battery compartment's operating modes include test mode, power bank mode, and static mode.
[0034] The objective function construction module is used to construct the objective function of the battery compartment test optimization model based on the test electricity cost and the charging and discharging power of the battery compartment during the corresponding test electricity cost period. The constraints of the objective function include anti-reverse current constraints, test task completion time constraints, test step continuity constraints, and converter rated power constraints.
[0035] The objective function solving module is used to solve the objective function based on the constraints to obtain the optimization results of the battery compartment test optimization model. The optimization results include the start time of each test step of each battery compartment and the corresponding power and dynamic charge and discharge power curves.
[0036] The optimization result conversion module is used to convert the optimization results into control commands and send them to the test host computer, and control the test host computer to execute the corresponding battery compartment power control, and provide real-time feedback on the charging and discharging status of each battery compartment to the energy management system.
[0037] The anti-reverse current module is used by the energy management system to detect the risk of reverse current at the energy storage plant and grid connection point by receiving the charging and discharging status. It prioritizes the charging of the battery compartment in power bank mode to absorb the reverse current power. If the risk of reverse current still exists after the battery compartment in power bank mode is charged, the current operation of a battery compartment in test mode that is performing the discharge operation will be forcibly terminated.
[0038] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0039] The multi-mode collaborative optimization control method of the energy management system of the energy storage factory test platform provided by this invention can eliminate control conflicts and ensure zero interference in the test process by dividing the operation into three modes: battery compartment test mode, power bank mode, and static mode. While completing the battery compartment test task, the idle resources of the battery compartment in power bank mode are converted into adjustable energy storage devices, thereby reducing test costs.
[0040] The multi-mode collaborative optimization control method of the energy management system of the energy storage factory test platform provided by this invention solves the start time and corresponding power of the test step of the battery compartment in test mode and the dynamic power curve of the battery compartment in power bank mode by using a fixed period and rolling solution method. This ensures that the test process of the battery compartment is not interrupted, and the power of the battery compartment in power bank mode is continuously updated according to the actual load of the factory and the test cost. The battery compartment in power bank mode is promptly converted to static mode and then converted to test mode. This reduces the test electricity cost while ensuring efficient completion of the battery compartment test.
[0041] The multi-mode collaborative optimization control method of the energy management system of the energy storage factory test platform provided by the present invention can strictly limit the economic optimization within the feasible domain of testing and safety by setting constraints on the objective function. This ensures that the test plan is completed on time and effectively, and also ensures that the factory does not feed back power to the grid. It realizes safe, stable and feasible automatic scheduling in the battery compartment test scenario of the energy storage factory.
[0042] The multi-mode collaborative optimization control method for the energy management system of the energy storage factory testing platform provided by this invention, through a set emergency mode, responds quickly when a reverse current risk is detected. First, it calls the charging mode battery compartment to charge, ensuring that the testing process of each battery compartment is not interrupted. When the reverse current risk cannot be eliminated, it forcibly terminates the discharge step of one test mode battery compartment (generally selecting a battery compartment with a large remaining discharge capacity), ensuring that energy is fed back to the grid at the lowest cost, thus guaranteeing grid safety. Attached Figure Description
[0043] Figure 1 The diagram shown is a schematic flowchart of a multi-mode collaborative optimization control method for an energy management system of an energy storage plant test platform according to an embodiment of the present invention.
[0044] Figure 2 The diagram shown is a schematic representation of the emergency mode process in one embodiment of the present invention.
[0045] Figure 3 The diagram shown is a topology diagram of an energy storage factory test platform in one embodiment of the present invention. Detailed Implementation
[0046] The following description, in conjunction with the accompanying drawings and specific embodiments, provides further details. In this description, it should be understood that the terms "first," "second," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Therefore, a feature defined with "first," "second," etc., may explicitly or implicitly include one or more of that feature.
[0047] Example 1
[0048] This embodiment provides a multi-mode collaborative optimization control method for the energy management system of an energy storage plant test platform, such as... Figure 1 As shown, it includes:
[0049] The energy management system collects multi-source data from energy storage plants and grid-connected points, and establishes a battery compartment test optimization model based on the multi-source data; the battery compartment's operating modes include test mode, power bank mode, and static mode.
[0050] The objective function of the battery compartment test optimization model is constructed by testing the electricity cost and the charging and discharging power of the battery compartment during the corresponding test electricity cost period. The constraints of the objective function include anti-reverse current constraints, test task completion time constraints, test step continuity constraints, and converter rated power constraints.
[0051] The objective function is solved based on the constraints to obtain the optimization results of the battery compartment test optimization model. The optimization results include the start time of each test step of each battery compartment and the corresponding power and dynamic charge and discharge power curves.
[0052] The optimization results are converted into control commands and sent to the test host computer. The test host computer is then controlled to execute the corresponding battery compartment power control and to provide real-time feedback on the charging and discharging status of each battery compartment to the energy management system.
[0053] If the energy management system detects a reverse current risk at the energy storage plant's grid connection point through the received charging and discharging status, it will prioritize charging the battery compartments in power bank mode to absorb the reverse current power. If the reverse current risk still exists after charging the battery compartments in power bank mode, it will forcibly terminate the current operation of a battery compartment that is in test mode and is performing a discharging operation.
[0054] Example 2
[0055] Based on Example 1, this example introduces the specific implementation process of a multi-mode collaborative optimization control method for an energy management system of an energy storage plant test platform, specifically including the following:
[0056] I. Constructing a Battery Compartment Test Optimization Model
[0057] In one specific embodiment of the present invention, the energy storage plant topology diagram is as follows: Figure 2 As shown, the energy storage plant's grid connection point includes a battery compartment, a converter controlling the charging and discharging of the battery compartment, and a test host computer controlling the converter to perform tests on the battery compartment; one converter controls multiple battery compartments. The energy storage plant is equipped with an Energy Management System (EMS) and an anti-reverse current device. When the EMS detects a reverse current risk at the energy storage plant's grid connection point, it first employs the emergency mode described in later steps. If the reverse current risk persists after executing the emergency mode, the connection between the grid and the energy storage plant is disconnected via the anti-reverse current device. The battery compartment, converter, and test host computer are all communicatively connected. The test host computer and the EMS are also communicatively connected.
[0058] In this invention, firstly, a multi-source data is acquired using an Energy Management System (EMS). This multi-source data includes battery compartment information, inverter information, and test information. Battery compartment information includes the battery compartment's State of Charge (SOC), voltage, and current. Inverter information includes the battery compartment's charging and discharging power. Test information includes the sequence number of the battery compartment under test, the charging and discharging power of the battery compartment in each test step, and the duration of each test step. Each test step includes discharging residual power, charging and discharging testing, resting, and recharging. Then, the acquired multi-source data is used to construct a battery compartment test optimization model to coordinate battery compartment testing and energy management.
[0059] In this invention, the test mode refers to the mode in which the battery compartment performs various test steps; the power bank mode refers to the mode in which the battery compartment can be used as a scheduling resource, and its power continuously changes with the charging and discharging state; and the static mode refers to the mode in which the battery compartment stops operating, neither charging nor discharging, waiting for the mode switching command. In power bank mode, the battery compartment charges and stores energy when electricity prices are low, and discharges to supply the test battery compartment when electricity prices are high. This demonstrates the energy storage function of the power bank mode battery compartment. Furthermore, and more importantly, the power bank mode battery compartment can also prevent backflow, the details of which will be discussed in subsequent steps.
[0060] II. Constructing the Objective Function
[0061] In one specific embodiment of the present invention, the formula for calculating the objective function is as follows:
[0062] ,
[0063] In the formula, Describe the objective function. This indicates the battery compartment serial number, with a value ranging from 1 to... , This represents the total number of battery compartments. The value is 0 to 100. , For the total time, for Electricity price at any time Battery compartment In the future The charging and discharging power at any given time This indicates that the battery compartment is discharging. This indicates that the battery compartment is charging.
[0064] III. Solve the objective function to obtain the optimization results.
[0065] 3.1 Constraints on the Objective Function
[0066] In one specific embodiment of the present invention, the constraints of the objective function include anti-reverse current constraints, test task completion time constraints, test step continuity constraints, and converter rated power constraints; the specific details are as follows:
[0067] 3.1.1 Anti-backflow constraints
[0068] Backflow prevention constraint refers to the total power at the grid connection point being less than or equal to zero. Backflow risk at the grid connection point of an energy storage plant refers to the detected total power at the grid connection point being greater than zero. The formula for calculating the total power at the grid connection point is as follows:
[0069] = ,
[0070] In the formula, This indicates the battery compartment serial number, with a value ranging from 1 to... , This represents the total number of battery compartments. For a moment, express The total power at the grid connection point at any given time is the cumulative charging and discharging power of each battery compartment at the grid connection point.
[0071] In practical applications, backflow occurs when a factory feeds electricity back into the grid. This is indicated by the detection that the total power at the grid connection point is greater than zero. Preventing backflow means preventing this feeding back into the grid. The only way to do this is to increase the load, meaning to charge the factory's equipment more and stop discharging equipment. Therefore, it is essential to control the total power at the grid connection point to be less than or equal to zero.
[0072] 3.1.2 Time Limit Constraints for Test Task Completion
[0073] The test task completion time constraint refers to completing all test steps for at least one battery compartment within a specific time frame, as expressed below:
[0074] ,
[0075] ,
[0076] In the formula, This represents the test step number, with a value ranging from 1 to... , Indicates the total number of test steps. Battery compartment In the The start time of each test step, battery compartment In the The start time of each test step Battery compartment In the The duration of each test step, For hours, For a specific preset time.
[0077] As can be seen from the formula above, the end time of the previous test step must be less than the start time of the next test step. In this embodiment, Setting it to 24 means that at least one battery compartment must complete all testing steps within 24 hours. The size is related to the power of the battery compartment. This indicates the capacity of the battery compartment. During the charging and discharging process, Determine the rated capacity of the battery compartment; during the recharge process, Retrieve the recharge capacity value set in the battery compartment.
[0078] 3.1.3 Test Step Continuity Constraints
[0079] The test step continuity constraint means that once a test step for the battery compartment begins, it cannot be stopped until the current test step is completed.
[0080] 3.1.4 Converter rated power constraint
[0081] The rated power constraint of a converter refers to the fact that the sum of the charging and discharging power of the battery compartments under the same converter cannot exceed the rated power of that converter. In this embodiment, such as Figure 2 As shown, one inverter controls two battery compartments, meaning the sum of the charging and discharging power of the two battery compartments under each inverter cannot exceed the rated power of that inverter. The expression is as follows:
[0082] ,
[0083] In the formula, and These are the rated discharge power and rated charging power of the converter. to They represent The charging or discharging power of each converter.
[0084] 3.2 Solving the objective function
[0085] In one specific embodiment of the present invention, solving the objective function includes: solving the objective function at preset rolling cycles to determine the start time and corresponding power of the test step in the test mode battery compartment, and the dynamic charging and discharging power curves of each battery compartment in the power bank mode. The start time and corresponding power of the test step in the test mode battery compartment remain fixed in subsequent rolling cycles. In each subsequent rolling optimization cycle, the objective function is solved to obtain the start time and corresponding power of the test step in the newly added test battery compartment, and the dynamic charging and discharging power curves of the remaining power bank mode battery compartments.
[0086] like Figure 3 As shown, this embodiment sets up 8 battery compartments, where battery compartments 1-3 are designated as test battery compartments, and battery compartments 4-8 are designated as power bank mode battery compartments. After the first solution of the objective function (i.e., solving the objective function within the first rolling cycle), the start time and corresponding power of each test step for test battery compartments 1-3 are obtained, as well as the dynamic charging and discharging power curves of power bank mode battery compartments 4-8. The solution results for test battery compartments 1-3 will be fixed and will not change with subsequent solutions of the objective function.
[0087] After the second rolling cycle, the second objective function is solved. If battery compartment 5 out of battery compartments 4-8 has been converted to a stationary mode, it indicates that this battery compartment can be tested. In the subsequent rolling cycle objective function solution, the start time and power of each test step for battery compartment 5 are solved, along with the dynamic charging and discharging power curves of battery compartments 4 and 6-8 in power bank mode. If no battery compartment has been converted to a stationary mode in the second objective function solution, it indicates that no battery compartment can be converted to test mode. In this case, only the dynamic power curve of the battery in power bank mode needs to be optimized. That is, during the second objective function solution process, the start time and corresponding power of each test step for test battery compartments 1-3 remain fixed.
[0088] IV. Conversion Optimization Results
[0089] In one specific embodiment of this invention, multiple test host computers are connected to a grid connection point. Each test host computer corresponds to a converter PCS, and each PCS has two battery compartments. The EMS, based on collected multi-source data, calculates the start time and corresponding power of each test step for the test battery compartment according to the objective function and constraints, as well as the charging and discharging power curves of the battery compartment in power bank mode. The EMS then converts the optimization results into control commands and sends them to the test host computers. Based on the received commands, the test host computers send power values at different times to the PCS of the test mode and power bank mode battery compartments, respectively. The PCS then controls the corresponding battery compartments to charge and discharge according to the power values. Simultaneously, the PCS feeds back the charging and discharging status of the battery compartments to the EMS.
[0090] V. Execute Emergency Mode
[0091] In one specific embodiment of the present invention, if the energy management system detects a reverse current risk at the grid connection point of the energy storage plant through the received charging and discharging status, that is, if the total power of the grid connection point is detected... If the value is greater than 0, the battery compartment in power bank mode will be charged first to absorb the reverse current power. If there is still a risk of reverse current after the battery compartment in power bank mode is charged, the current process of a battery compartment in test mode that is performing the discharge process will be forcibly terminated (generally, a battery compartment with a larger remaining discharge capacity will be selected).
[0092] This is because backflow occurs when the factory feeds electricity back into the grid, meaning the total power at the grid connection point is detected to be greater than zero. Preventing backflow means preventing this feeding back into the grid, and the only way to do this is to increase the load, meaning to charge the factory's equipment more and stop the equipment that is discharging. Therefore, it is essential to control the total power at the grid connection point to be less than or equal to zero.
[0093] Example 3
[0094] This embodiment introduces a multi-mode collaborative optimization control system for the energy management system of an energy storage plant test platform, characterized by including:
[0095] The battery compartment test optimization model construction module is used to collect multi-source data from energy storage plants and grid-connected points using the energy management system, and to build a battery compartment test optimization model based on the multi-source data; the battery compartment includes test mode, power bank mode and static mode;
[0096] The objective function construction module is used to construct the objective function of the battery compartment test optimization model based on the test electricity cost and the charging and discharging power of the battery compartment during the corresponding test electricity cost period. The constraints of the objective function include anti-reverse current constraints, test task completion time constraints, test step continuity constraints, and converter rated power constraints.
[0097] The objective function solving module is used to solve the objective function based on the constraints to obtain the optimization results of the battery compartment test optimization model. The optimization results include the start time of each test step of each battery compartment and the corresponding power and dynamic charge and discharge power curves.
[0098] The optimization result conversion module is used to convert the optimization results into control commands and send them to the test host computer, and control the test host computer to execute the corresponding battery compartment power control, and provide real-time feedback on the charging and discharging status of each battery compartment to the energy management system.
[0099] The anti-reverse current module is used by the energy management system to detect the risk of reverse current at the energy storage plant and grid connection point by receiving the charging and discharging status. It prioritizes the charging of the battery compartment in power bank mode to absorb the reverse current power. If the risk of reverse current still exists after the battery compartment in power bank mode is charged, the current operation of a battery compartment in test mode that is performing the discharge operation will be forcibly terminated.
[0100] The embodiments of the present invention have been described above with reference to the accompanying drawings. However, the present invention is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make many other forms under the guidance of the present invention without departing from the spirit and scope of the claims. All of these forms are within the protection scope of the present invention.
Claims
1. A multi-mode collaborative optimization control method for the energy management system of an energy storage plant test platform, characterized in that, include: The energy management system collects multi-source data from energy storage plants and grid-connected points, and establishes a battery compartment test optimization model based on the multi-source data; the battery compartment's operating modes include test mode, power bank mode, and static mode. The objective function of the battery compartment test optimization model is constructed by testing the electricity cost and the charging and discharging power of the battery compartment during the corresponding test electricity cost period. The constraints of the objective function include anti-reverse current constraints, test task completion time constraints, test step continuity constraints, and converter rated power constraints. The objective function is solved based on the constraints to obtain the optimization results of the battery compartment test optimization model. The optimization results include the start time of each test step of each battery compartment and the corresponding power and dynamic charge and discharge power curves. The optimization results are converted into control commands and sent to the test host computer. The test host computer is then controlled to execute the corresponding battery compartment power control and to provide real-time feedback on the charging and discharging status of each battery compartment to the energy management system. If the energy management system detects a reverse current risk at the energy storage plant's grid connection point through the received charging and discharging status, it will prioritize charging the battery compartments in power bank mode to absorb the reverse current power. If the reverse current risk still exists after charging the battery compartments in power bank mode, it will forcibly terminate the current operation of a battery compartment that is in test mode and is performing a discharging operation.
2. The multi-mode collaborative optimization control method for the energy management system of the energy storage plant test platform according to claim 1, characterized in that, Test mode refers to the mode in which the battery compartment performs various test steps. Power bank mode refers to the mode in which the battery compartment can be used as a scheduling resource, and its power changes continuously with the charging and discharging state. Static mode refers to the mode in which the battery compartment stops operating, neither charging nor discharging, and waits for the mode switching command. The optimization results specifically include the start time of the test steps and the corresponding power of each battery compartment in test mode, and the dynamic charging and discharging power curves of each battery compartment in power bank mode.
3. The multi-mode collaborative optimization control method for the energy management system of the energy storage plant test platform according to claim 2, characterized in that, Solving the objective function includes: solving the objective function at preset rolling cycles to determine the start time and corresponding power of the test steps for the battery compartment in test mode, and the dynamic charging and discharging power curves of each battery compartment in power bank mode. The start time and corresponding power of the test steps for the battery compartment in test mode remain fixed in subsequent rolling cycles. In each subsequent rolling optimization cycle, the objective function is solved to obtain the start time and corresponding power of the test steps for the newly added test battery compartment, and the dynamic charging and discharging power curves of the remaining power bank mode battery compartments.
4. The multi-mode collaborative optimization control method for the energy management system of the energy storage plant test platform according to claim 1, characterized in that, The formula for calculating the objective function is as follows: , In the formula, Describe the objective function. This indicates the battery compartment serial number, with a value ranging from 1 to... , This represents the total number of battery compartments. The value is 0 to 100. , For the total time, for Electricity price at any time Battery compartment In the future The charging and discharging power at any given time This indicates that the battery compartment is discharging. This indicates that the battery compartment is charging.
5. The multi-mode collaborative optimization control method for the energy management system of the energy storage plant test platform according to claim 1, characterized in that, Backflow prevention constraint refers to the total power at the grid connection point being less than or equal to zero. Backflow risk at the grid connection point of an energy storage plant refers to the detected total power at the grid connection point being greater than zero. The formula for calculating the total power at the grid connection point is as follows: = , In the formula, This indicates the battery compartment serial number, with a value ranging from 1 to... , This represents the total number of battery compartments. For a moment, express The total power at the grid connection point at any given time is the cumulative charging and discharging power of each battery compartment at the grid connection point.
6. The multi-mode collaborative optimization control method for the energy management system of the energy storage plant test platform according to claim 1, characterized in that, The test task completion time constraint refers to completing all test steps for at least one battery compartment within a specific time frame, as expressed below: , , In the formula, This represents the test step number, with a value ranging from 1 to... , This indicates the total number of test steps. Battery compartment In the The start time of each test step, battery compartment In the The start time of each test step Battery compartment In the The duration of each test step, For hours, For a preset specific time, The rated capacity of the battery compartment or the set recharge capacity value.
7. The multi-mode collaborative optimization control method for the energy management system of the energy storage plant test platform according to claim 1, characterized in that, The test step continuity constraint means that once a test step for the battery compartment begins, it cannot be stopped until the current test step is completed.
8. The multi-mode collaborative optimization control method for the energy management system of the energy storage plant test platform according to claim 1, characterized in that, The energy storage plant grid connection point includes a battery compartment, an inverter that controls the charging and discharging of the battery compartment, and a test host computer that controls the inverter to perform tests on the battery compartment. The battery compartment, inverter, and test host computer are all communicatively connected; one inverter controls multiple battery compartments. The multi-source data includes battery compartment information, inverter information, test information, and operating mode information for each battery compartment. The battery compartment information includes the battery compartment's SOC, voltage, and current. The inverter information includes the battery compartment's charging and discharging power. The test information includes the sequence number of the battery compartment in the test state, the charging and discharging power of the battery compartment in each test step, and the duration of the test step. The battery compartment's operating mode information includes test mode, power bank mode, and idle mode. Each test step includes discharging residual power, charging and discharging test, idle, and recharging.
9. The multi-mode collaborative optimization control method for the energy management system of the energy storage plant test platform according to claim 8, characterized in that, The rated power constraint of a converter refers to the fact that the sum of the charging and discharging power of the battery compartment under the same converter cannot exceed the rated power of the converter.
10. A multi-mode collaborative optimization control system for an energy management system of an energy storage plant test platform, characterized in that, include: The battery compartment test optimization model construction module is used to collect multi-source data from energy storage plants and grid-connected points using the energy management system, and to build a battery compartment test optimization model based on the multi-source data; the battery compartment's operating modes include test mode, power bank mode, and static mode. The objective function construction module is used to construct the objective function of the battery compartment test optimization model based on the test electricity cost and the charging and discharging power of the battery compartment during the corresponding test electricity cost period. The constraints of the objective function include anti-reverse current constraints, test task completion time constraints, test step continuity constraints, and converter rated power constraints. The objective function solving module is used to solve the objective function based on the constraints to obtain the optimization results of the battery compartment test optimization model. The optimization results include the start time of each test step of each battery compartment and the corresponding power and dynamic charge and discharge power curves. The optimization result conversion module is used to convert the optimization results into control commands and send them to the test host computer, and control the test host computer to execute the corresponding battery compartment power control, and provide real-time feedback on the charging and discharging status of each battery compartment to the energy management system. The anti-reverse current module is used by the energy management system to detect the risk of reverse current at the energy storage plant and grid connection point by receiving the charging and discharging status. It prioritizes the charging of the battery compartment in power bank mode to absorb the reverse current power. If the risk of reverse current still exists after the battery compartment in power bank mode is charged, the current operation of a battery compartment in test mode that is performing the discharge operation will be forcibly terminated.