A method for dual-link communication and charge / discharge control of optical-storage collaborative EMS

By employing a photovoltaic-storage collaborative EMS dual-link communication and charging/discharging control method, the problem of unstable communication in the EMS project in Romania was solved. This enabled photovoltaic priority power supply to the load and automatic charging of energy storage, supports IEC 61850 and DNP3.0 protocols, meets the grid dispatch requirements, and improves communication reliability and real-time command execution.

CN123122011APending Publication Date: 2026-11-17SHUANGDENG GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611204802.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-10
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The existing energy management system (EMS) in the Romanian project suffers from problems such as single communication links, incompatible protocols, and imperfect photovoltaic-storage coordination strategies, resulting in communication interruptions, high latency, and high command loss rates, which fail to meet the grid dispatching requirements.

Method used

The design incorporates a photovoltaic-storage collaborative EMS dual-link communication and charging/discharging control method. It adopts fiber-optic-3G dual-link communication and automatic switching to achieve priority supply of photovoltaic power to the load and automatic charging of the storage with the remaining power. It supports IEC 61850 and DNP3.0 protocols and performs closed-loop command execution and interface design.

Benefits of technology

It achieves optimal coordination between photovoltaic and energy storage loads, improves localization adaptability, meets grid dispatch requirements, ensures communication reliability and real-time command execution, and reduces communication interruption rate and latency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123122011A_ABST
    Figure CN123122011A_ABST
Patent Text Reader

Abstract

This invention relates to the field of energy management technology, and in particular provides a method for photovoltaic-storage coordinated EMS dual-link communication and charge / discharge control. The method includes designing a photovoltaic-storage-load coordinated charge / discharge strategy; implementing fiber-optic-3G dual-link communication and automatic switching; a closed-loop execution process for scheduling commands; and designing a communication interface. This method achieves optimization of photovoltaic-storage-load coordination, improves localization adaptability, and meets the needs of power grid dispatching.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of energy management technology, and in particular to a method for photovoltaic-storage collaborative EMS dual-link communication and charge / discharge control. Background Technology

[0002] Energy Management Systems (EMS) have gradually become the standard configuration for grid-connected operation of renewable energy power plants in overseas projects such as Romania, covering multiple scenarios such as frequency regulation, reserve, and peak-valley arbitrage. Their deployment scale and operational data are constantly accumulating, and they undertake the key function of information exchange with local transmission operators (TSOs). However, existing EMS systems have the following significant shortcomings: Single communication link: relying solely on fiber optics or mobile networks, the local network is highly volatile, and fiber optic coverage in some areas is incomplete, making communication interruptions likely; inability to directly connect to local dispatchers / traders: requiring a third-party platform for relay, resulting in high communication latency (≥500ms) and high command loss rate (3%~5%); protocol incompatibility: not adapted to the commonly used IEC61850 and DNP3.0 protocols in Romania, making connection difficult and compatibility poor; imperfect photovoltaic-storage synergy strategy: failing to implement the logic of prioritizing photovoltaic power supply to loads and automatically charging storage with surplus power locally, unable to discharge to the grid during designated periods according to grid dispatchers / traders' instructions; unable to stably execute dispatch instructions under fluctuating communication conditions, making it difficult to meet the actual operational needs of the Romanian project. Summary of the Invention

[0003] In view of this, the present invention provides a method for photovoltaic-storage collaborative EMS dual-link communication and charge / discharge control, in order to optimize photovoltaic-storage load collaboration, improve localization adaptability, and meet the needs of power grid dispatch.

[0004] In a first aspect, the present invention provides a method for dual-link communication and charge / discharge control of a photoelectric storage-coordinated EMS, the method comprising: Step 1: Design a coordinated charging and discharging strategy for photovoltaic-storage-load; Step 2: Based on Step 1, perform fiber-optic-3G dual-link communication and automatic switching; Step 3: Based on Step 2, execute the closed-loop process of the scheduling instructions; Step 4: Based on Step 3, design the communication interface.

[0005] Optionally, step 1 includes: a. Local consumption priority logic, EMS collects photovoltaic power generation Ppv, load power consumption Pload, energy storage state of charge SOC and allowable charging and discharging power in real time; The load is supplied with photovoltaic power, Pload-use = min(Ppv, Pload); the remaining photovoltaic power is calculated as: Psurplus = Ppv-Pload; if there is remaining Psurplus > 0, the energy storage is not fully charged, or there is no dispatching instruction to prohibit charging: the remaining power is automatically used to charge the energy storage; if the photovoltaic power is insufficient: according to the dispatching / trader instructions, the power consumption of the load is supplemented by the grid or the energy storage. b. Grid dispatch discharge logic: EMS receives instructions from Romanian traders / dispatch centers, including: permitted discharge time period, discharge power target, total discharge amount / duration, priority, and emergency shutdown command; During designated nighttime hours or specified periods, the EMS controls the energy storage to deliver electrical energy to the grid, participate in market transactions or peak shaving; discharge constraints: greater than or equal to the minimum SOC, less than or equal to the power conversion system PCS power limit, and follow the current dispatch instructions; c. Instruction priority: Scheduling / trader instructions take precedence over local self-charging logic; upon receiving a prohibition on charging / forced discharge / emergency shutdown, the local strategy is immediately suspended, and the scheduling instruction is executed first.

[0006] Optionally, step 2 includes: Fiber optic as the primary link, 3G as a backup hot standby; real-time monitoring: signal strength, transmission delay, and packet loss rate; fiber optic priority condition: signal strength ≥ 70dBm, latency ≤100ms, packet loss rate <0.5%; Automatic 3G switching: When the fiber optic cable is faulty, interrupted, or the signal is weak, it will automatically switch, with a switching time ≤50ms; Compatible with mainstream operators: Orange, Vodafone, frequency band 900MHz / 2100MHz; Automatic reconnection after disconnection, command caching, and network latency compensation.

[0007] Optionally, step 3 includes: The dual-link receiver receives the charging and discharging instructions from the dispatcher / trader. It is encrypted using the advanced encryption standard AES-128, verified by identity, and decrypted and verified by CRC-16 based on the 16-bit generator polynomial. It extracts the time period, power, duration, priority, and emergency shutdown signal. It performs a security comparison by linking with the SOC, load, photovoltaic, PCS status, and fault status. It executes the following processes in sequence: (1) Photovoltaic-load-energy storage charging; (2) Specified time period-energy storage discharging-grid. The execution results are sent back to the dispatch center in real time for feedback, with a feedback delay of ≤50ms.

[0008] Optionally, step 4 includes: Modular interface, supporting IEC 61850 and DNP3.0 protocols; baud rate of 9600~115200bps, data format of 8N1 / 8E1; built-in CRC-16 check and identity code check to reject illegal commands; opto-isolation ≥2500V to resist power grid electromagnetic interference; and supports hot-swapping for easy field maintenance.

[0009] Optionally, the control logic of step 1 includes local consumption logic: first, photovoltaic power supplies the load, and then the remaining power charges the energy storage; grid dispatch logic: after receiving the instruction, the power is discharged to the grid during a specified period.

[0010] Optionally, the control logic in step 2 includes communication assurance: automatic switching between fiber optic and 3G, and reliable real-time transmission of commands.

[0011] Optionally, the control logic of step 3 includes an instruction closed loop, which sequentially goes through: instruction reception, decryption verification, parsing, security comparison, execution, and result feedback.

[0012] In a second aspect, embodiments of the present invention provide a computer-readable storage medium comprising a stored program, wherein, when the program is executed, the device containing the computer-readable storage medium performs the method of optical-storage collaborative EMS dual-link communication and charge / discharge control in the first aspect or any possible implementation thereof.

[0013] Thirdly, embodiments of the present invention provide an electronic device, including: one or more processors; a memory; and one or more computer programs, wherein the one or more computer programs are stored in the memory, and the one or more computer programs include instructions that, when executed by the device, cause the device to perform the method of optical-storage collaborative EMS dual-link communication and charge / discharge control in the first aspect or any possible implementation of the first aspect.

[0014] The technical solution provided by this invention includes designing a photoelectric-storage-load coordinated charging and discharging strategy; performing fiber-optic-3G dual-link communication and automatic switching; a closed-loop execution process for scheduling commands; and designing a communication interface. This method achieves the optimization of photoelectric-storage-load coordination, improves localization adaptability, and meets the needs of power grid dispatching. Attached Figure Description

[0015] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0016] Figure 1 A flowchart of a method for optical-storage collaborative EMS dual-link communication and charge / discharge control provided in an embodiment of the present invention; Figure 2 This is a block diagram of energy flow control for a photovoltaic storage load provided in an embodiment of the present invention; Figure 3 A flowchart of the scheduling instruction execution provided in an embodiment of the present invention; Figure 4 This is a schematic diagram of an electronic device provided in an embodiment of the present invention. Detailed Implementation

[0017] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0018] The terminology used in the embodiments of this invention is for the purpose of describing particular embodiments only and is not intended to limit the invention. The singular forms “a,” “the,” and “the” used in the embodiments of this invention are also intended to include the plural forms unless the context clearly indicates otherwise.

[0019] It should be understood that the term "and / or" used in this article is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, or B existing alone. Additionally, the character " / " in this article generally indicates that the preceding and following related objects have an "or" relationship.

[0020] Depending on the context, the word "if" as used here can be interpreted as "when," "when," "in response to determination," or "in response to detection." Similarly, depending on the context, the phrase "if determination" or "if detection (of the stated condition or event)" can be interpreted as "when determination," "in response to determination," "when detection (of the stated condition or event)," or "in response to detection (of the stated condition or event)."

[0021] This invention provides a method for dual-link communication and charge / discharge control of optical-storage coordinated EMS, such as... Figures 1 to 3 As shown, the method includes: Step 1: Design a coordinated charging and discharging strategy for photovoltaic-storage-load; In this embodiment of the invention, step 1 includes: a. Local consumption priority logic, EMS collects photovoltaic power generation Ppv, load power consumption Pload, energy storage state of charge SOC and allowable charging and discharging power in real time; The load is supplied with photovoltaic power, Pload-use = min(Ppv, Pload); the remaining photovoltaic power is calculated as: Psurplus = Ppv-Pload; if there is remaining Psurplus > 0, the energy storage is not fully charged, or there is no dispatching instruction to prohibit charging: the remaining power is automatically used to charge the energy storage; if the photovoltaic power is insufficient: according to the dispatching / trader instructions, the power consumption of the load is supplemented by the grid or the energy storage. b. Grid dispatch discharge logic: EMS receives instructions from Romanian traders / dispatch centers, including: permitted discharge time period, discharge power target, total discharge amount / duration, priority, and emergency shutdown command; During designated nighttime hours or specified periods, the EMS controls the energy storage to deliver electrical energy to the grid, participate in market transactions or peak shaving; discharge constraints: greater than or equal to the minimum SOC, less than or equal to the power conversion system PCS power limit, and follow the current dispatch instructions; c. Instruction priority: Scheduling / trader instructions take precedence over local self-charging logic; upon receiving a prohibition on charging / forced discharge / emergency shutdown, the local strategy is immediately suspended, and the scheduling instruction is executed first.

[0022] In this embodiment of the invention, the control logic of step 1 includes local consumption logic: first, photovoltaic power supplies the load, and then the remaining power charges the energy storage; grid dispatch logic: after receiving the instruction, the power is discharged to the grid during a specified period.

[0023] Step 2: Based on Step 1, perform fiber-optic-3G dual-link communication and automatic switching; In this embodiment of the invention, step 2 includes: Fiber optic as the primary link, 3G as a backup hot standby; real-time monitoring: signal strength, transmission delay, and packet loss rate; fiber optic priority condition: signal strength ≥ 70dBm, latency ≤100ms, packet loss rate <0.5%; Automatic 3G switching: When the fiber optic cable is abnormal, interrupted, or the signal is weak, it will automatically switch, with a switching time ≤50ms; Compatible with mainstream operators (Romania): Orange, Vodafone, frequency band 900MHz / 2100MHz; Automatic reconnection after disconnection, command caching, and network latency compensation.

[0024] In this embodiment of the invention, the control logic of step 2 includes communication assurance: automatic switching between fiber optic and 3G, and reliable real-time transmission of commands.

[0025] Step 3: Based on Step 2, execute the closed-loop process of the scheduling instructions; In this embodiment of the invention, step 3 includes: The dual-link receiver receives the charging and discharging instructions from the dispatcher / trader. It is encrypted using the advanced encryption standard AES-128, verified by identity, and decrypted and verified by CRC-16 based on the 16-bit generator polynomial. It extracts the time period, power, duration, priority, and emergency shutdown signal. It performs a security comparison by linking with the SOC, load, photovoltaic, PCS status, and fault status. It executes the following processes in sequence: (1) Photovoltaic-load-energy storage charging; (2) Specified time period-energy storage discharging-grid. The execution results are sent back to the dispatch center in real time for feedback, with a feedback delay of ≤50ms.

[0026] In this embodiment of the invention, the control logic of step 3 includes an instruction closed loop, which sequentially goes through: instruction reception (receiving instructions from the superior scheduling authority), decryption verification (verifying the integrity and encryption of the instructions), parsing (extracting key information from the instructions), security comparison (comparing with the security rule base), execution (performing specific scheduling operations), and result feedback (feedback of the execution results to the superior authority).

[0027] Step 4: Based on Step 3, design the communication interface.

[0028] In this embodiment of the invention, step 4 includes: Modular interface, supporting IEC 61850 and DNP3.0 protocols; baud rate of 9600~115200bps, data format of 8N1 / 8E1; built-in CRC-16 check and identity code check to reject illegal commands; opto-isolation ≥2500V to resist power grid electromagnetic interference; and supports hot-swapping for easy field maintenance.

[0029] The technical solution provided by this invention includes designing a photoelectric-storage-load coordinated charging and discharging strategy; performing fiber-optic-3G dual-link communication and automatic switching; a closed-loop execution process for scheduling commands; and designing a communication interface. This method achieves the optimization of photoelectric-storage-load coordination, improves localization adaptability, and meets the needs of power grid dispatching.

[0030] The method of this invention prioritizes the supply of photovoltaic power to the load, and automatically charges the energy storage with the remaining power; it receives instructions from the Romanian dispatcher / trader and feeds the energy storage power back to the grid during the specified time period; it automatically switches between fiber optic and 3G to ensure that instructions are not interrupted or lost; and it executes the charging and discharging plan safely, stably, and traceably to meet the localization operation requirements of the Romanian project.

[0031] The system of this invention includes a photovoltaic array, on-site load, energy storage system (battery + PCS), EMS energy management system, fiber optic communication module, 3G communication module, Romanian trader / grid dispatch center, and power grid.

[0032] The present invention has the following beneficial effects: 1) Optimal synergy between photovoltaic and energy storage loads: Photovoltaics prioritize power supply to the load, and surplus electricity is used to charge energy storage, thereby improving the self-consumption rate; 2) Meets the dispatching needs of the Romanian power grid: Power can be supplied to the grid during designated time periods in response to trader / dispatch instructions; 3) High reliability of dual-link communication: automatic switching between fiber optic and 3G, communication interruption rate <0.1%, latency ≤100ms; 4) Direct connection to local dispatch: Supports IEC61850 and DNP3.0, no intermediate platform required; 5) Traceable closed-loop instruction system: The entire process of receiving, parsing, executing, and providing feedback is traceable, meeting the regulatory requirements for overseas projects; 6) Strong localization adaptation: The network, protocol, and scheduling rules are all optimized for the Romanian project.

[0033] The various steps in the embodiments of the present invention can be performed by an electronic device. This electronic device includes, but is not limited to, tablet computers, portable PCs, and desktop computers.

[0034] This invention provides a computer-readable storage medium including a stored program, wherein, when the program is running, it controls the electronic device containing the computer-readable storage medium to execute the above-described method for optical-storage cooperative EMS dual-link communication and charge / discharge control.

[0035] Figure 4 A schematic diagram of an electronic device provided in an embodiment of the present invention, such as... Figure 4 As shown, the electronic device 21 includes a processor 211, a memory 212, and a computer program 213 stored in the memory 212 and executable on the processor 211. When the computer program 213 is executed by the processor 211, it implements the method of optical storage cooperative EMS dual-link communication and charge / discharge control in the embodiment. To avoid repetition, it will not be described in detail here.

[0036] Electronic device 21 includes, but is not limited to, processor 211 and memory 212. Those skilled in the art will understand that... Figure 4 This is merely an example of electronic device 21 and does not constitute a limitation on electronic device 21. It may include more or fewer components than shown, or combine certain components, or different components. For example, electronic device may also include input / output devices, network access devices, buses, etc.

[0037] The processor 211 may be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor.

[0038] The memory 212 can be an internal storage unit of the electronic device 21, such as a hard disk or RAM of the electronic device 21. The memory 212 can also be an external storage device of the electronic device 21, such as a plug-in hard disk, Smart Media Card (SMC), Secure Digital (SD) card, or FlashCard equipped on the electronic device 21. Furthermore, the memory 212 can include both internal and external storage units of the electronic device 21. The memory 212 is used to store computer programs and other programs and data required by network devices. The memory 212 can also be used to temporarily store data that has been output or will be output.

[0039] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working processes of the systems, devices, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.

[0040] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A method for optical storage cooperative EMS dual-link communication and charge-discharge control, characterized in that, The method includes: Step 1: Design a coordinated charging and discharging strategy for photovoltaic-storage-load; Step 2: Based on Step 1, perform fiber-optic-3G dual-link communication and automatic switching; Step 3: Based on Step 2, execute the closed-loop process of the scheduling instructions; Step 4: Based on Step 3, design the communication interface.

2. The method of claim 1, wherein, Step 1 includes: a. Local consumption priority logic, EMS collects photovoltaic power generation Ppv, load power consumption Pload, energy storage state of charge SOC and allowable charging and discharging power in real time; The load is supplied with photovoltaic power, Pload-use = min(Ppv, Pload); the remaining photovoltaic power is calculated as: Psurplus = Ppv-Pload; if there is remaining Psurplus > 0, the energy storage is not fully charged, or there is no dispatching instruction to prohibit charging: the remaining power is automatically used to charge the energy storage; if the photovoltaic power is insufficient: according to the dispatching / trader instructions, the power consumption of the load is supplemented by the grid or the energy storage. b. Grid dispatch discharge logic: EMS receives instructions from Romanian traders / dispatch centers, including: permitted discharge time period, discharge power target, total discharge amount / duration, priority, and emergency shutdown command; During designated nighttime hours or specified periods, the EMS controls the energy storage to deliver electrical energy to the grid, participate in market transactions or peak shaving; discharge constraints: greater than or equal to the minimum SOC, less than or equal to the power conversion system PCS power limit, and follow the current dispatch instructions; c. Instruction priority: Scheduling / trader instructions take precedence over local self-charging logic; upon receiving a prohibition on charging / forced discharge / emergency shutdown, the local strategy is immediately suspended, and the scheduling instruction is executed first.

3. The method of claim 2, wherein, Step 2 includes: Optical fiber as the main link, 3G as backup hot standby; Real-time monitoring: signal strength, transmission delay, packet loss rate; Optical fiber priority conditions: signal strength ≥ 70dBm, delay ≤100ms, packet loss rate <0.5%; Automatic switching to 3G: when the optical fiber is abnormal, interrupted, weak signal, then automatically switch, switching time ≤50ms; Adapt to mainstream operators: Orange, Vodafone, frequency band 900MHz / 2100MHz; Broken line automatic reconnection, command cache, network delay compensation.

4. The method according to claim 3, characterized in that, Step 3 includes: The dual-link receiver receives the charging and discharging instructions from the dispatcher / trader. It is encrypted using the advanced encryption standard AES-128, verified by identity, and decrypted and verified by CRC-16 based on the 16-bit generator polynomial. It extracts the time period, power, duration, priority, and emergency shutdown signal. It performs a security comparison by linking with the SOC, load, photovoltaic, PCS status, and fault status. It executes the following processes in sequence: (1) Photovoltaic-load-energy storage charging; (2) Specified time period-energy storage discharging-grid. The execution results are sent back to the dispatch center in real time for feedback, with a feedback delay of ≤50ms.

5. The method according to claim 4, characterized in that, Step 4 includes: Modular interface, supporting IEC 61850 and DNP3.0 protocols; baud rate of 9600~115200bps, data format of 8N1 / 8E1; built-in CRC-16 check and identity code check to reject illegal commands; opto-isolation ≥2500V to resist power grid electromagnetic interference; and supports hot-swapping for easy field maintenance.

6. The method according to claim 1, characterized in that, The control logic of step 1 includes local consumption logic: first, photovoltaic power supplies the load, and then the remaining electricity charges the energy storage; grid dispatch logic: after receiving the instruction, the power is discharged to the grid during a specified period.

7. The method according to claim 1, characterized in that, The control logic in step 2 includes communication assurance: automatic switching between fiber optic and 3G, and reliable real-time transmission of commands.

8. The method according to claim 1, characterized in that, The control logic of step 3 includes an instruction closed loop, which sequentially goes through: instruction reception, decryption verification, parsing, security comparison, execution, and result feedback.

9. A computer-readable storage medium, characterized in that, The computer-readable storage medium includes a stored program, wherein, when the program is executed, it controls the device containing the computer-readable storage medium to perform the method of optical-storage collaborative EMS dual-link communication and charge / discharge control as described in any one of claims 1 to 8.

10. An electronic device, characterized in that, include: One or more processors; Memory; And one or more computer programs, wherein the one or more computer programs are stored in the memory, the one or more computer programs including instructions that, when executed by the device, cause the device to perform the method of optical storage co-located EMS dual-link communication and charge / discharge control as described in any one of claims 1 to 8.