A cluster system and method for automotive bench testing

The automotive bench test cluster system enables centralized management and cross-system sharing of bench communication resources, solving the problem of uneven allocation of communication resources, improving testing efficiency and system stability, and avoiding resource waste.

CN123123213APending Publication Date: 2026-11-17UNITED AUTOMOTIVE ELECTRONICS SYST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510615884.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-14
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The current automotive test bench system suffers from an uneven distribution of communication resources, resulting in some test benches having idle communication resources while others lack them, leading to a waste of testing costs and efficiency. Furthermore, there is a lack of an effective test cluster system to solve these problems.

Method used

An automotive bench test cluster system is adopted, which includes benches, separate resources, IO hub resources and servers. It is centrally managed through a resource scheduling subsystem, an access control subsystem and a control subsystem, to achieve the sharing and flexible allocation of bench communication resources. By utilizing cross-system borrowing and clock synchronization between separate resources, system paralysis caused by equipment failure can be avoided.

Benefits of technology

It achieved 100% utilization of bench communication resources, improved testing efficiency, avoided resource waste, enhanced system stability and resource sharing capabilities, and ensured the efficient execution of testing tasks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123123213A_ABST
    Figure CN123123213A_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of automobile testing, in particular to a kind of automobile test bench test cluster system, test method and medium.The system includes: test bench is several, downloads and executes specific test task;Separation type resource, each separation type resource is electrically connected with more than one test bench, according to specific test task allocation test bench participating in test, realize resource link connection;IO HUB resource is, electrically connected with all separation type resources, according to specific test task allocation separation type resource and the communication link of measured piece;Server is, sends control instruction to control test bench, separation type resource and IO HUB resource work.The present application solves the problem that part of test bench exists idle test communication resource when test communication resource is not balancedly configured in part of test bench, and another part of test bench communication resource is short.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of automotive testing technology, and in particular to an automotive bench testing cluster system and method. Background Technology

[0002] With the current trend of "intelligentization" and "electrification" in the automotive industry, car functions are becoming increasingly diverse, and corresponding software modules are becoming more complex. Testing, as the final process to ensure software quality, is therefore becoming increasingly important. Current testing primarily relies on bench resources. However, most current bench systems use fixed resources to adapt to one or more fixed devices under test (DUTs), often resulting in wasted hardware resources. Idle communication resources are often left unused for extended periods, and some bench resources may even have communication resource gaps when adapting to specific projects, necessitating the purchase of additional communication resources to meet project application requirements.

[0003] In addition, different test benches will have different test loads. Some test resources will run at almost full capacity, while some test resources may be idle for a long time. This situation is a significant waste in terms of both test cost and test efficiency. At present, there is no sound and reliable test cluster system in the industry that can effectively solve these problems. Summary of the Invention

[0004] This invention discloses an automotive bench test cluster system and method, which solves the problem of uneven configuration of bench communication resources, where some benches have idle test communication resources while other benches have a shortage of communication resources.

[0005] To achieve the above objectives, on the one hand, an automotive bench test cluster system is provided, the test cluster system comprising: a bench, separate resources, IO HUB resources, and a server;

[0006] There are several test benches; download and execute the specific test tasks.

[0007] The separate resources consist of several units, each of which is electrically connected to one or more test benches. The test benches participating in the test are assigned according to the specific test task to achieve resource link connection.

[0008] The IO HUB resource consists of one unit, which is electrically connected to all separate resources. The communication links between the separate resources and the device under test are allocated according to the specific test task.

[0009] The server consists of a single unit that sends control commands to manage the rack, discrete resources, and IO HUB resources.

[0010] Furthermore, the test cluster system also includes an IO HUB controller, through which the server controls the operation of IO HUB resources.

[0011] Furthermore, the server includes a resource scheduling subsystem, a permission management subsystem, and a control subsystem;

[0012] The resource scheduling subsystem locks resources within a corresponding time period based on the user's reserved time and the specific test bench, discrete resources, and device under test. When the resources requested by the user have been exhausted, the system revokes the user's login privileges, releases the corresponding resources, clears the running program processes, and initializes the corresponding resource combination for the next reservation plan.

[0013] The permission management subsystem controls the login permissions of all users, as well as the usage and operation permissions of the corresponding queue tasks for each user.

[0014] The control subsystem issues control commands to downstream hardware or downstream control programs to achieve corresponding process manipulation.

[0015] Furthermore, the separate resources are connected to the test bench via the first communication module, and all ports of the first communication module are independently programmable;

[0016] Different separate resources are electrically connected via a second communication module;

[0017] The separate resource deployment has an instruction-based automated resource allocation control subsystem, which realizes instruction-based resource combination and connection, as well as cross-system clock synchronization function; when there is cross-system resource borrowing, the borrowed resource port will follow the system time of the main resource and synchronize to the clock accuracy within the allowable error range.

[0018] Furthermore, the first communication module includes any one or more of the following:

[0019] CAN transceiver port, LIN transceiver port, Ethernet transceiver port, FlexRay transceiver port, and IO port.

[0020] Furthermore, the second communication module includes any one or more of the following:

[0021] CAN communication, ETH communication, LIN communication, FlexRay communication, as well as IO communication and clock synchronization lines.

[0022] Furthermore, when there is cross-system resource borrowing, a separate resource is marked as a master resource group, and its corresponding rack is marked as a master rack; all other separate resources are marked as slave resource groups, and their corresponding racks are marked as slave racks.

[0023] The main control unit controls the main resource group and all slave resource groups to achieve resource integration in a specific scenario. After completion, the independent resource groups are split and controlled separately.

[0024] Furthermore, the IO HUB is internally equipped with several sets of relays and switches to achieve specific matching between the upstream discrete resource ports and the downstream device under test (DUT) channels; during the test cycle, the corresponding DUT is fixedly connected to the IO HUB.

[0025] Furthermore, the resource scheduling subsystem communicates and interacts in real time with the bench testing system, the separate resources, and the IO HUB controller; when some downstream resources fail, the corresponding separate resources and bench will be unable to be booked, and all booked queue tasks will be temporarily stopped or terminated.

[0026] To achieve the above objectives, another method for automotive bench testing is provided, the specific method of which is as follows:

[0027] Users configure test tasks through the server;

[0028] The server assigns test scripts and test projects to the corresponding test benches;

[0029] The server issues channel matching parameters to the corresponding separate resources to achieve resource link connection;

[0030] The server issues channel matching parameters to the IO HUB resource to achieve link connection of the device under test;

[0031] The bench test project has been completed.

[0032] Due to the adoption of the above technical solutions, the present invention has the following beneficial effects:

[0033] 1. In this invention, all rack communication resources will be centrally managed and used, avoiding the occupation of fixed resources by traditional rack systems and solving the problem of horizontal sharing of communication resources.

[0034] 2. A set of separate resources can connect multiple test bench systems. However, if a set of separate resources still has a shortage or surplus of communication resources, cross-system resource sharing can be achieved based on the bus connection between separate resources. Based on this resource sharing method, theoretically, 100% utilization of test communication resources can be achieved at peak test times.

[0035] 3. This invention combines multiple sets of separate resources, avoiding system paralysis caused by equipment failure and system stability problems caused by excessive load. Furthermore, the connection between separate resources can also achieve cross-system sharing, enhancing system stability.

[0036] 4. All devices under test (DUTs) are connected to the same I / O hub and to multiple separate resources, enabling direct connection and parallel testing of multiple bench resources and multiple DUTs. This avoids the test task waiting caused by the connection between traditional bench systems and a single DUT, and can maximize system efficiency.

[0037] It should be noted that the terms "first," "second," and similar terms used in this article are merely for describing the constituent elements of the technical solution and do not constitute a limitation on the technical solution, nor should they be interpreted as an indication or implication of the importance of the corresponding elements; elements with terms such as "first," "second," or similar terms indicate that at least one of the elements is included in the corresponding technical solution. Attached Figure Description

[0038] To more clearly illustrate the technical solution of the present invention and facilitate a further understanding of its technical effects, features, and objectives, the present invention will be described in detail below with reference to the accompanying drawings. The drawings constitute an essential part of the specification and are used together with Embodiment 1 of the present invention to illustrate the technical solution of the present invention, but do not constitute a limitation on the present invention.

[0039] The same reference numerals in the attached diagrams represent the same parts, specifically:

[0040] Figure 1 This is a schematic diagram of the structure of an automotive bench testing cluster system.

[0041] Figure 2 This is a schematic diagram of the automotive bench testing method. Detailed Implementation

[0042] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Of course, the specific embodiments described below are merely illustrative of the technical solutions of the present invention, and not intended to limit the invention. Furthermore, the parts described in the embodiments or drawings are merely illustrative examples of relevant parts of the present invention, and not the entirety of the invention.

[0043] Example 1:

[0044] A cluster system for automotive bench testing, such as Figure 1 As shown, it includes: racks, separate resources, IO HUB resources, and servers;

[0045] There are several test benches; download and execute the specific test tasks.

[0046] The separate resources consist of several units, each of which is electrically connected to one or more test benches. The test benches participating in the test are assigned according to the specific test task to achieve resource link connection.

[0047] The IO HUB resource consists of one unit, which is electrically connected to all separate resources. The communication links between the separate resources and the device under test are allocated according to the specific test task.

[0048] The server consists of a single unit that sends control commands to manage the rack, discrete resources, and IO HUB resources.

[0049] In this embodiment, the automotive embedded controller test cluster system integrates multiple test bench resources and designs all test bench communication resources separately. All devices under test (DUTs) are connected to these separate resources via input / output (IO) hubs. Based on this hardware connection design, the server assigns the automated test projects corresponding to the test tasks to specific test benches and allocates hardware resources and establishes connections between the IO hubs and the corresponding DUTs according to the test items and the assigned test communication resources.

[0050] The automotive bench test cluster system comprises five parts: server, bench system, discrete resources, IO hub resources and corresponding controllers, and device under test (DUT). The bench system and DUT are devices used in existing testing methods. The server, discrete resources, and IO hub are described in detail below.

[0051] I. Server:

[0052] The server's internal resource scheduling subsystem locks resources for a specified time based on the user's reserved time, the specific rack, discrete resources, and the DUT. Once the reserved time arrives, the user's access to the reserved resources is allocated to that user. Conversely, when a user's requested resources are exhausted, the server's resource scheduling subsystem revokes the user's login privileges, releases the corresponding resources, clears running program processes, and initializes the corresponding resource combination for the next reservation. The access control subsystem strictly manages the login privileges of all users within the entire rack cluster, as well as the usage and operation permissions of users' corresponding queue tasks. It should be noted that the server's internal resource scheduling and access control subsystems are software modules designed based on the existing hardware of the current test cluster environment. These software modules run on the server and issue control commands to downstream hardware or downstream control programs to achieve corresponding process manipulation, such as channel connection and channel switching.

[0053] The server needs to be backed up and run in parallel to ensure the entire system remains available even if one server fails. The deployed resource scheduling subsystem should run 24 / 7 to handle incoming resource scheduling requests. This subsystem communicates in real-time with downstream rack systems, discrete resources, and IO hub controllers, and promptly reflects failures of downstream resources on the server side. The server also acts as an access control entity, allocating specific user permissions within a given time frame based on reservation information such as user, time, and resource. This permission information is then delegated to the corresponding resources, ensuring that selected resources are accessible only to designated users or can only run specific automated test tasks issued by those users.

[0054] II. Separate Resources

[0055] The separate resources form the first communication module and necessary board control units for the bench system to connect the corresponding test task to the corresponding device under test (DUT). The first communication module includes: CAN transceiver ports, LIN transceiver ports, Ethernet transceiver ports, FlexRay transceiver ports, and I / O ports, etc., and all ports are independently programmable, meaning that all communication transceiver ports can be combined arbitrarily according to requirements. For example, the DUT controller has 6 CAN, 4 LIN, 6 ETH resources, and 10 I / O resources. Correspondingly, the separate resources can be combined to allocate to the corresponding DUT to achieve bus communication with the DUT.

[0056] Different discrete resources are connected through a second communication module to achieve resource sharing across discrete resources. The second communication module includes CAN communication, ETH communication, LIN communication, FlexRay communication, IO communication, and a clock synchronization line. This allows for resource borrowing from adjacent discrete resources when resources are scarce. Since resources are borrowed across systems, clock synchronization between systems is achieved through the clock synchronization line to meet the required test clock accuracy.

[0057] Based on the separate splitting and separate programmable control of resources, the decoupled resource system needs to deploy an instruction-based automated resource allocation programmable control system to realize instruction-based resource combination and connection. At the same time, the resource allocation programmable control system implements cross-system clock synchronization function, and completes clock synchronization and alignment before integrating the communication data of adjacent systems to avoid errors caused by clock inconsistency.

[0058] When resource borrowing occurs across different discrete resources, the borrowed resource ports will follow the system time of the primary resource and synchronize to a clock precision within the allowable error range. A discrete resource is typically divided into 2-3 resource groups, each marked as a master or slave. A discrete resource has one and only one master resource group, and its corresponding upstream rack system is also marked as the master rack. The remaining discrete resource groups are marked as slave resource groups, and their corresponding upstream rack systems are marked as slave racks. When the communication resource requirements of the DUT are large, the master rack can control the master resource group and all slave resource groups to achieve resource integration in a specific scenario. When this specific scenario disappears, the system can still be divided into 2-3 resource groups for separate control. The configuration of master-slave resource groups and corresponding racks allows for flexible combinations to cope with various application scenarios.

[0059] III. IO HUB

[0060] The IO HUB resource and IO HUB controller together form the channel switching and connection between the downstream device under test (DUT) and the discrete resource. Specifically, the IO HUB controller is the control unit that realizes the connection between the discrete resource and the corresponding DUT. The IO HUB resource receives control commands from the IO HUB controller to realize the connection of the hardware interface. The IO HUB internally has several sets of relays and switches, which can realize the specific matching between the specific port of the upstream discrete resource and the channel of the downstream DUT.

[0061] The hardware harness connection between the IO HUB and the specific device under test (DUT) is based on the connection throughout the entire project lifecycle of the DUT. Within the test cluster, the corresponding DUT will be fixedly connected to the IO HUB throughout its lifecycle. The bus communication resources of the upstream discrete resources connected to the IO HUB achieve fixed channel switching. For example, DUT1 has 6 CAN buses, DUT2 has 7 CAN buses, and the third DUT has 5 CAN buses. Within the same rack deployed in the project, such as rack1, the CAN channels 1-6 of the discrete resource 1 connected to it have the bus allocation configuration of DUT1, channels 1-7 have the bus allocation configuration of DUT2, and channels 1-5 have the bus allocation configuration of the third DUT. When specific resource matching is required, it can quickly realize the connection of each resource channel between rack1 and DUT1, or rack1 and DUT2, or with the third DUT.

[0062] The system matches bus resources based on project resources to avoid hardware stability issues caused by inconsistencies in baud rate, sampling points, and protocol stack configuration parameters resulting from arbitrary bus resource allocation. Based on application scenarios, for example, if the bus channel of device under test (DUT) 8 is configured on separate resource 2, when the corresponding resource group within the separate resource is idle, the system can select an idle bench resource, such as bench 5, to connect to separate resource 2. Simultaneously, the DUT8 port at the IO hub switches to separate resource 2, achieving connectivity of the entire test link. When multiple benches and multiple DUTs are connected to the same system and cross-deployed through test projects, higher test resource utilization can be achieved.

[0063] Example 2:

[0064] A vehicle bench test method, such as Figure 2 As shown, the specific method is as follows:

[0065] Users configure test tasks through the server;

[0066] The server assigns test scripts and test projects to the corresponding test benches;

[0067] The server issues channel matching parameters to the corresponding separate resources to achieve resource link connection;

[0068] The server issues channel matching parameters to the IO HUB resource to achieve link connection of the device under test;

[0069] The bench test project has been completed.

[0070] Example 3:

[0071] A method for testing automotive benches is provided. When a user schedules an automated test task based on a CICD Pipeline, the schedule details are as follows: User A, Test content: First item corresponds to the third DUT, Functional Module X under test, Second bench, Scheduled time period 9:00 to 10:00.

[0072] After receiving the reservation task submitted by the user, the server will reserve communication resources and applicable permissions for the connection between the second rack and the third DUT between 9:00 and 10:00 and assign them to user A.

[0073] Once the scheduled time arrives, the server will send the task details to the second rack, simultaneously switching device resources to establish a connection. After receiving the task details, the second rack will execute the corresponding CICDPipeline program. First, the test project for the tested functional module X of the first project will be pulled from the cloud repository to the second rack, where the automated test project will run. During this process, any logins to the second rack by users other than user A will be denied to prevent interference from other users in the test task execution.

[0074] After the test task is completed, the second rack will upload the test results to the cloud space and terminate all processes on the second rack, while releasing permissions to prepare for subsequent scheduled or queued tasks. If the queued task is completed, and the second rack's scheduled test task is for user B to execute the second project, which tests the fifth DUT's test function Y, when the new task arrives, the communication resources corresponding to the second rack will connect with the fifth DUT under the control of the IO HUB control terminal, and start the execution of the specific task after completing the communication check.

[0075] It should be noted that the above embodiments are only for more clearly illustrating the technical solution of the present invention. Those skilled in the art will understand that the implementation of the present invention is not limited to the above content. Any obvious changes, substitutions or replacements made based on the above content do not exceed the scope of the technical solution of the present invention. Other implementations will also fall within the scope of the present invention without departing from the concept of the present invention.

Claims

1. A cluster system for automotive bench testing, characterized in that, The test cluster system includes: test bench, separate resources, IO HUB resources, and servers; There are several test benches; download and execute the specific test tasks. The separate resources consist of several units, each of which is electrically connected to one or more test benches. The test benches participating in the test are assigned according to the specific test task to achieve resource link connection. The IO HUB resource consists of one unit, which is electrically connected to all separate resources. The communication links between the separate resources and the device under test are allocated according to the specific test task. The server consists of a single unit that sends control commands to manage the rack, discrete resources, and IO HUB resources.

2. The automotive bench test cluster system as described in claim 1, characterized in that, The test cluster system also includes an IO HUB controller, through which the server controls the operation of IO HUB resources.

3. The automotive bench test cluster system as described in claim 1, characterized in that, The server includes a resource scheduling subsystem, an access control subsystem, and a control subsystem; The resource scheduling subsystem locks resources within a corresponding time period based on the user's reserved time and the specific test bench, discrete resources, and device under test. When the resources requested by the user have been exhausted, the system revokes the user's login privileges, releases the corresponding resources, clears the running program processes, and initializes the corresponding resource combination for the next reservation plan. The permission management subsystem controls the login permissions of all users, as well as the usage and operation permissions of the corresponding queue tasks for each user. The control subsystem issues control commands to downstream hardware or downstream control programs to achieve corresponding process manipulation.

4. The automotive bench test cluster system as described in claim 1, characterized in that, The separate resource is connected to the test bench through the first communication module, and all ports of the first communication module are independently programmable. Different separate resources are electrically connected via a second communication module; The separate resource deployment has a command-based automated resource allocation control subsystem, which realizes command-based resource combination and connection, as well as cross-system clock synchronization function; When there is a cross-system resource borrowing, the borrowed resource port will follow the system time of the main resource and synchronize to the clock precision within the allowable error range.

5. The automotive bench test cluster system as described in claim 4, characterized in that, The first communication module includes any one or more of the following: CAN transceiver port, LIN transceiver port, Ethernet transceiver port, FlexRay transceiver port, and IO port.

6. The automotive bench test cluster system according to claim 4, characterized in that, The second communication module includes any one or more of the following: CAN communication, ETH communication, LIN communication, FlexRay communication, as well as IO communication and clock synchronization lines.

7. The automotive bench test cluster system according to claim 4, characterized in that, When cross-system resource borrowing occurs, a separate resource is marked as a master resource group, and its corresponding rack is marked as a master rack; all other separate resources are marked as slave resource groups, and their corresponding racks are marked as slave racks. The main control unit controls the main resource group and all slave resource groups to achieve resource integration in a specific scenario. After completion, the independent resource groups are split and controlled separately.

8. The automotive bench test cluster system as described in claim 2, characterized in that, The IO HUB is equipped with several sets of relays and switches to achieve specific matching between the upstream discrete resource ports and the downstream device under test channels; during the test cycle, the corresponding device under test is fixedly connected to the IO HUB.

9. The automotive bench test cluster system according to claim 3, characterized in that, The resource scheduling subsystem communicates and interacts in real time with the bench testing system, the separate resources, and the IO HUB controller. When some downstream resources fail, the corresponding separate resources and benches will be unable to be booked, and all booked queue tasks will be temporarily stopped or terminated.

10. A method for testing automobiles on a test bench, characterized in that, The specific method is as follows: Users configure test tasks through the server; The server assigns test scripts and test projects to the corresponding test benches; The server issues channel matching parameters to the corresponding separate resources to achieve resource link connection; The server issues channel matching parameters to the IO HUB resource to achieve link connection of the device under test; The bench test project has been completed.