Arc welding control methods
By alternately controlling the wire feed and current in consumable electrode arc welding, combined with CO2 shielding gas, the problem of difficult molten droplet transfer was solved, thus improving the stability of the molten pool and the welding quality.
Patent Information
- Application Number
- CN202580028365.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2024-04-17
- Filing Date
- 2025-04-14
- Publication Date
- 2026-11-17
AI Technical Summary
In consumable electrode arc welding, especially when CO2 is used as the shielding gas, the droplets are difficult to transfer, and crater depressions and spatter are easily formed at the end of the arc, affecting the welding quality.
By alternating forward and reverse feeds of the welding wire during the actual welding process, and controlling the welding current and feed rate at the end of the arc, the molten droplets are transferred stably. Combined with CO2 shielding gas, this ensures the stability of the molten pool and reduces crater depression.
It achieves stable formation of the molten pool during arc welding, reduces crater depression and spatter, and improves welding quality and efficiency.
Smart Images

Figure CN123125072A_ABST
Abstract
Description
Technical Field
[0001] This disclosure relates to methods for controlling electric arc welding. Background Technology
[0002] In consumable electrode arc welding, an arc is generated between the welding wire (which serves as the consumable electrode) and the base material to be welded. At the end of the arc welding process (also known as the arc end period), the speed of the welding wire along the welding line decreases and eventually stops. However, the welding current itself does not change, so the arc generated during the arc end period has the same arc length and arc force as during other periods. Therefore, near the weld end point, a crater is formed, sometimes resulting in a shrinkage cavity. The formation of craters and shrinkage cavities can sometimes lead to weld defects. In particular, in a welding method called pulse welding, welding is performed by alternating between a peak current and a base current with a lower value than the peak current flowing through the welding wire. In pulse welding, while ensuring sufficient heat input to the base material, the peak current flows during or immediately after the peak current, causing the molten droplet to detach from the welding wire and transfer to the base material. On the other hand, during the peak current period, the arc length is longer and the arc force is stronger. Therefore, the aforementioned craters and contraction holes are more likely to form.
[0003] Therefore, Patent Document 1 proposes a method in which the wire feed speed is controlled by periodically repeating the forward and reverse feeds of the welding wire during the arc-end period in pulse welding, thereby causing the molten droplets formed at the tip of the welding wire to short-circuit and transfer to the base metal. In this way, the formation of crater depressions near the weld termination point at the weld site can be suppressed during the arc-end period. This allows for the removal or reduction of manual correction work, i.e., post-treatment (crater post-treatment), of large crater depressions near the weld termination point at the weld site. Furthermore, it can suppress products with large residual depressions. Moreover, it can suppress the generation of sputtering during the arc-end period.
[0004] Furthermore, Patent Document 2 discloses a structure for detecting the detachment of molten droplets from the tip of the welding wire in pulse welding where a peak current and a base current lower than the peak current flow periodically through the welding wire. In this case, if the detachment of molten droplets is not detected by the detachment detection unit during the reverse feed of the welding wire, the welding wire is fed forward at a fixed speed after the reverse feed period ends. Furthermore, if the detachment of molten droplets is detected by the detachment detection unit during the period when the welding wire is fed forward at a fixed speed, the forward and reverse feeds of the welding wire are repeated periodically.
[0005] Alternatively, if, during the forward feed of the welding wire, droplet detachment is detected by the detachment detection unit during the period from the point when the commanded value of the welding wire feed speed becomes maximum until the switch to the reverse feed period, the welding wire is fed forward at a fixed speed at the point when switching from reverse feed to forward feed. Furthermore, if droplet detachment is detected by the detachment detection unit during the period when the welding wire is fed forward at a fixed speed, the forward and reverse feeds of the welding wire are repeated periodically.
[0006] In this way, it is possible to prevent molten droplets from dripping onto the base material at unwanted times and causing spatter during welding.
[0007] Prior art literature
[0008] Patent documents
[0009] Patent Document 1: JP Patent No. 5978465
[0010] Patent Document 2: JP Patent No. 7041034 Summary of the Invention
[0011] -The problem the invention aims to solve-
[0012] In pulse welding, the frequency of welding current fluctuations can be synchronized with the formation / detachment of molten droplets, enabling smooth droplet transfer. Generally, pulse welding is widely used in consumable electrode arc welding such as Metal Inert Gas Welding and Metal Active Gas Welding.
[0013] On the other hand, in consumable electrode arc welding, a shielding gas with low reactivity with molten metal is generally blown into the welding area of the base metal to prevent the molten base metal, welding wire, and surrounding air from reacting. CO2 (carbonic acid) is commonly used as this shielding gas. CO2 is cheaper to obtain than inert gases such as argon. Furthermore, using CO2 as a shielding gas allows for easier arc concentration, resulting in a deeper penetration into the base metal.
[0014] However, when CO2 is used as a shielding gas, the arc reaction force increases, making it more difficult for the molten droplets to fall (detach) and transfer. Therefore, in metal inert gas arc welding and metal highly reactive gas shielded arc welding, the method of using CO2 as a shielding gas is not adopted when performing pulse welding with a fixed wire feed speed.
[0015] This disclosure was made in view of this purpose, and its object is to provide an arc welding control method that can stably form a molten pool in the base material before and after the switch between the actual welding period and the end of the arc, and can suppress the generation of crater depressions and the like near the end of the weld at the weld position.
[0016] -Methods for solving problems-
[0017] To achieve the above objectives, the arc welding control method disclosed herein generates an arc between a welding wire, which serves as a consumable electrode, and a base material for welding. The method is characterized by comprising at least the following steps: a first step, during the formal welding period, alternating forward and reverse feeds of the welding wire while varying the welding current flowing through the welding wire at a given period, thereby causing the molten droplet to detach from the tip of the welding wire and transfer towards the base material; and a second step, during the arc-end period following the formal welding period, allowing the welding current to flow through the welding wire, and alternating forward and reverse feeds of the welding wire while short-circuiting the welding wire and the base material, thereby causing the molten droplet formed at the tip of the welding wire to transfer towards the base material. Short-circuit transfer, the arc-end period being the period from the end of the formal welding period to when the average feed rate of the welding wire becomes zero, the period including a peak current period during which a peak current flows through the welding wire, and a base current period during which a base current flows through the welding wire following the peak current period, the base current being lower than the peak current, the average feed rate during the formal welding period during which the welding current varies at a given period to cause the droplet to detach from the transfer is higher than or equal to the average feed rate at the beginning of the arc-end period during which the welding wire is alternately fed forward and backward to short-circuit transfer the droplet.
[0018] -Invention Effects-
[0019] According to this disclosure, a molten pool can be stably formed in the base material before and after the switch between the actual welding period and the end of the arc. Furthermore, the amount of sputtering is suppressed, and the size of the crater is smaller near the weld termination point at the weld joint, thereby enabling the formation of a weld joint without a crater. Attached Figure Description
[0020] Figure 1 This is a schematic structural diagram of the arc welding apparatus according to Embodiment 1.
[0021] Figure 2 This is a schematic structural diagram of another arc welding apparatus according to Embodiment 1.
[0022] Figure 3 It is a graph showing the waveforms of welding current, welding voltage, and wire feed speed.
[0023] Figure 4 This is a graph showing the waveforms of the welding current, welding voltage, and wire feed speed involved in Embodiment 2.
[0024] Figure 5 This is a graph showing the waveforms of the welding current, welding voltage, and wire feed speed involved in Embodiment 3.
[0025] Figure 6 This is a graph showing the waveforms of the welding current, welding voltage, and wire feed speed involved in Embodiment 4.
[0026] Figure 7 This is a graph showing the waveforms of the welding current, welding voltage, and wire feed speed involved in Embodiment 5. Detailed Implementation
[0027] The embodiments of this disclosure are described below with reference to the accompanying drawings. Furthermore, the following description of preferred embodiments is merely illustrative and is not intended to limit this disclosure, its applications, or its uses.
[0028] (Implementation Method 1)
[0029] [Structure of the arc welding apparatus]
[0030] Figure 1 This is a schematic structural diagram of the arc welding apparatus according to Embodiment 1. Figure 2 This is a schematic diagram of another arc welding device.
[0031] like Figure 1As shown, the arc welding apparatus 30 includes a primary rectifier 2, a switch 3, a transformer 4, a secondary rectifier 5 and a DCL 6, a drive unit 7, a welding voltage detection unit 8, a welding current detection unit 9, a short circuit / arc detection unit 10, a short circuit control unit 11, an arc control unit 12, and a wire feed speed control unit 13. Here, the primary rectifier 2 rectifies the power input from the input power source 1. The switch 3 converts the output of the primary rectifier 2 into alternating current. The transformer 4 transforms the output of the switch 3. The secondary rectifier 5 and the DCL 6 rectify the output of the transformer 4. The drive unit 7 controls the switch 3. The welding voltage detection unit 8 detects the welding voltage. The welding current detection unit 9 detects the welding current. The short circuit / arc detection unit 10 detects whether the welding state is a short circuit state or an arc state based on at least one of the outputs of the welding voltage detection unit 8 and the welding current detection unit 9. The short circuit control unit 11 controls the welding output when the welding state is short circuit. The arc control unit 12 controls the welding output when the arc is active. The wire feed speed control unit 13 controls the wire feed speed corresponding to the set current.
[0032] Furthermore, the welding wire 21, which serves as a consumable electrode and is stored in the wire storage section 20, is fed by the wire feed motor 22. The welding wire 21 is powered via the chip 23 provided on the welding torch 26. Moreover, an electric arc 24 is generated between the welding wire 21 and the base material 25, which is the workpiece to be welded, to perform welding. In addition, the welding torch 26 is moved, for example, by attaching to the manipulator 18 that constitutes an industrial robot.
[0033] In addition to its general structure as part of the welding power supply unit 14, the arc welding apparatus 30 also includes a manipulator 18 constituting an industrial robot and a robot control unit 16 for controlling the manipulator 18. The wire feed speed, corresponding to the set current from the welding condition setting unit 15 within the robot control unit 16, is sent as a speed signal from the wire feed speed control unit 13 to the wire feed motor 22. Furthermore, the wire feed speed output from the wire feed speed control unit 13 is transmitted as a speed signal to the short-circuit control unit 11 or the arc control unit 12 for welding output control under short-circuit or arc conditions. The welding condition setting unit 15 is used to set welding-related conditions such as set current and set voltage.
[0034] In the short-circuit control unit 11, a short-circuit determination signal is received from the short-circuit / arc detection unit 10, and a short-circuit current is output. Control is then applied to melt the tip of the welding wire 21 to facilitate short-circuit release. Furthermore, in the arc control unit 12, to ensure arc length and the formation of molten droplets at the tip of the welding wire 21, the following control is applied: immediately after short-circuit release, a high current is output, and then the current is shifted to a low level through current control and voltage control to facilitate short-circuiting.
[0035] In addition, constituting Figure 1 The various structural components of the arc welding apparatus 30 shown can be constructed individually or in combination.
[0036] Furthermore, the arc welding apparatus 30 also includes an industrial robot comprising a manipulator 18 and a robot control device 16 for controlling the movement of the manipulator 18, and a welding power supply device 14. The industrial robot includes a welding condition setting unit 15. Additionally, the welding power supply device 14 may be configured to include a switch unit 3, a drive unit 7, a welding current detection unit 9, a welding voltage detection unit 8, a short circuit / arc detection unit 10, a short circuit control unit 11, an arc control unit 12, and a wire feed speed control unit 13.
[0037] In addition, it is also possible to Figure 2 The welding power supply device 14 shown is configured to be housed within the robot control device 17. This configuration allows for a more compact and integrated arrangement of the arc welding equipment.
[0038] [Overview of Arc Welding Control Methods]
[0039] Figure 3 This is a graph showing the waveforms of welding current, welding voltage, and wire feed speed. Furthermore, in this embodiment, the base material 25 is mild steel, and the welding wire 21 is also made of mild steel. Additionally, the shielding gas blown onto the base material 25 during welding is CO2. However, the materials of the base material 25 and the welding wire 21, as well as the type of shielding gas, are not particularly limited to these.
[0040] Although not illustrated, after a given time has elapsed since the switch of welding torch 26 was turned on, Figure 3 The formal welding period Th is shown to begin. The formal welding period Th is the period during which the base material 25 substantially forms weld seams and other welded parts (not shown).
[0041] like Figure 3 As shown, during the actual welding period Th, the feed action is controlled by the wire feed speed control unit 13 and the wire feed motor 22, causing the welding wire 21 to periodically repeat forward and reverse feeds at a given period (hereinafter referred to as the wire feed cycle). Furthermore, in the following description, the feed speed of the welding wire 21 will be referred to as the wire feed speed Wf. When the wire feed speed Wf is positive, the welding wire 21 is fed forward, and the tip of the welding wire 21 moves towards the base material 25. When the wire feed speed Wf is negative, the welding wire 21 is fed backward, and the tip of the welding wire 21 moves away from the base material 25. Moreover, the time average value of the wire feed speed Wf, i.e., the average feed speed, increases with time, while the average feed speed during the actual welding period Th is a fixed value (=Wfh).
[0042] Furthermore, the welding current Aw flowing through the welding wire 21 is controlled by the arc control unit 12 to vary periodically. Specifically, after the base current Ib flows through the welding wire 21, a peak current Ip, with a current value higher than the base current Ib, flows through the welding wire 21. The period during which the peak current Ip flows through the welding wire 21 is called the peak current period Tp, and the period during which the base current Ib flows through the welding wire 21 is called the base current period Tb. The sum of the peak current period Tp and the subsequent base current period Tb corresponds to the variation period Tf of the welding current Aw (hereinafter simply referred to as the period Tf). Furthermore, the reciprocal of the period Tf corresponds to the variation frequency Fa of the welding current Aw.
[0043] In other words, during the actual welding period Th, similar to normal pulse welding, the welding current Aw varies periodically. Specifically, the peak current period Tp through which the peak current Ip flows and the base current period Tb through which the base current Ib flows are alternately repeated. In this embodiment, the molten droplet formed at the tip of the welding wire 21 immediately following the peak current period Tp is detached due to inertial force and drips (detaches) and transfers to the base material 25.
[0044] Furthermore, the period Tf corresponds to the aforementioned wire feed period during the actual welding period Th. During the actual welding period Th, the maximum forward feed speed of the welding wire 21 within one period Tf is called the second forward feed speed Wff2, and the maximum reverse feed speed is called the second reverse feed speed Wfg2. In the following explanation, the maximum reverse feed speed refers to the case where the absolute value of the reverse feed speed becomes the maximum value. That is, it is the value that makes the reverse feed speed of the welding wire 21 the fastest. Furthermore, in the following explanation, the reverse feed speed is set to be compared as a large or small absolute value. Furthermore, the acceleration of the welding wire 21 during forward feed is called the forward feed acceleration Aff, and the acceleration of the welding wire 21 during reverse feed is called the reverse feed acceleration Afg.
[0045] During the formal welding period Th, at time point P1, the arc end signal is input from the welding condition setting unit 15 to the wire feed speed control unit 13, thus beginning the arc end period Te. During the arc end period Te, the feeding action of the welding wire 21 is controlled so that the maximum value of the reverse feed speed within one wire feed cycle is fixed, while the maximum value of the forward feed speed decreases with each wire feed cycle. Therefore, the average feed speed Wfe during the arc end period Te decreases with time, starting from the average feed speed Wfh during the formal welding period Th; in other words, it decreases as the number of repetitions of the forward and reverse feeds of the welding wire 21 increases. The maximum value of the reverse feed speed within one wire feed cycle during the arc end period Te is called the first reverse feed speed Wfg, and the maximum value of the forward feed speed is called the first forward feed speed Wff. The first reverse feed speed Wfg during the arc end period Te is controlled to be less than the second reverse feed speed Wfg2 during the formal welding period Th. In other words, the reverse feed rate of the welding wire 21 during the end of the arc Te is less than the reverse feed rate of the welding wire 21 during the formal welding period Th.
[0046] Furthermore, starting from the beginning time point P1 of the arc end period Te, or immediately before it, the welding current Aw decreases. If it reaches the base current Ib, then for a given period up to time point P2, the welding current Aw remains at the base current Ib. If the welding voltage Vw is lower than the arc determination level voltage Va (also known as the voltage threshold Va), then from time point P2, the control of the welding output switches from the arc control unit 12 to the short-circuit control unit 11.
[0047] Starting from time point P2, the welding wire 21 periodically repeats forward and reverse feeds multiple times, thereby short-circuiting with the base material 25 at a fixed period, and repeatedly releasing the short circuit from the base material 25. The welding wire 21 is heated by allowing welding current Aw to flow through it, thereby forming a molten droplet at the tip of the welding wire 21. At the timing of the short circuit between the welding wire 21 and the base material 25, the molten droplet transfers to the base material 25. Furthermore, during the period from the time the short circuit is released until the next short circuit, an arc 24 is generated between the welding wire 21 and the base material 25. At the time of the short circuit between the welding wire 21 and the base material 25, the welding current Aw increases; if the welding wire 21 separates from the base material 25 and generates the arc 24, the welding current Aw decreases. Furthermore, corresponding to the generation of the arc 24, the welding voltage Vw increases; if the welding wire 21 and the base material 25 are short-circuited, the welding voltage Vw drops to zero or near zero. Corresponding to the feeding action of welding wire 21, the welding current Aw and welding voltage Vw periodically repeat the aforementioned changes.
[0048] Furthermore, the so-called set current is a time-dependent moving average of the welding current Aw, which is preset during each period of arc welding. The average feed rate Wfe during the arc-ending period Te is determined correspondingly to the set current. In addition, the welding voltage Vw at the time of arc 24 formation and the peak value of the welding current Aw before and after short-circuit release during the arc-ending period Te also decrease over time.
[0049] At time point P3 when the average feed rate Wfe becomes zero, the arc-ending period Te ends, and the burn-back period Tbb begins. That is to say, the arc-ending period Te is the period from the time point P1 when the arc-ending signal is input to the time point P3 when the average feed rate Wfe becomes zero.
[0050] During the reheating period Tbb, the welding torch 26 remains stationary, while the welding wire 21 is fed in reverse at a fixed speed, specifically the first reverse feed speed Wfg, and a fixed reheating current IE flows through the welding wire 21. In this way, during the reheating period Tbb, an arc 24 is generated between the welding wire 21 and the base material 25, the welding wire 21 ignites, and a molten metal ball forms at its tip. At the point P4 when the formation of the metal ball ends, the reheating period Tbb ends, and both the welding current Aw and the welding voltage Vw become zero. By setting the reheating period Tbb, it is possible to prevent the welding wire 21 from becoming stuck to the base material 25. Furthermore, it is possible to prevent the welding wire 21 from becoming stuck to the chip 23. Moreover, since the distance between the welding wire 21 and the base material 25 can be ensured, arc initiation can be reliably performed when starting the next arc welding operation.
[0051] Furthermore, the wire feed speed Wf during forward feed, the wire feed speed Wf during reverse feed, and the frequency of the alternating forward and reverse feed cycles, as well as their reciprocals, are independently set during the arc-end period Te and the actual welding period Th. Additionally, the ratio of the forward feed amount to the reverse feed amount and the speed ratio of the welding wire 21 during forward feed are also independently set during the arc-end period Te and the actual welding period Th. Here, the speed ratio during the arc-end period Te is expressed as an absolute value representing the ratio of the first forward feed speed Wff to the first reverse feed speed Wfg, based on the average feed speed Wfe. Furthermore, the speed ratio during the actual welding period Th is expressed as an absolute value representing the ratio of the second forward feed speed Wff2 to the second reverse feed speed Wfg2, based on the average feed speed Wfh.
[0052] During the arc-ending period Te, the welding wire 21 is short-circuited with the base material 25. These values are optimized to stabilize the subsequent repetitive cycle of the arc 24 generated between the base material 25 and the tip of the welding wire 21. On the other hand, during the actual welding period Th, these values are optimized to allow the molten droplets formed at the tip of the welding wire 21 to detach due to inertial forces and transfer towards the base material 25. Figure 3 In the arc-ending period Te, the maximum reverse feed rate of the welding wire 21, i.e., the first reverse feed rate Wfg, is fixed. During both the arc-ending period Te and the reheating period Tbb, the maximum reverse feed rate Wfg remains the same. Therefore, the short-circuit state of the welding wire 21 is more stable when the reverse feed rate is at its maximum. Furthermore, the short-circuit release of the welding wire 21 is more stable. Additionally, as long as there are no adverse effects on short-circuit release, the maximum reverse feed rate Wfg of the welding wire 21 can be variable, not fixed.
[0053] Basically, as the average feed rate Wfe decreases within Te during the arc-end period, the maximum reverse feed rate (first reverse feed rate) Wfg also decreases. Furthermore, the maximum reverse feed rate Wfg within Te during the arc-end period and the maximum reverse feed rate within Tbb during the burn-back period do not necessarily have to be the same.
[0054] Furthermore, during the arc-ending period Te, the speed ratio is 1, meaning that the first reverse feed speed Wfg and the first forward feed speed Wff are set to be equal based on the average feed speed Wfe. Similarly, during the actual welding period Th, the second reverse feed speed Wfg2 and the second forward feed speed Wff2 are also set to be equal based on the average feed speed Wfh. However, this is not a limitation. The speed ratio can also be set in the range of 1 to 4 during each period, taking into account factors such as the ignition of the welding wire 21. For example, during the actual welding period Th, the ratio of the second reverse feed speed Wfg2 to the second forward feed speed Wff2 can be set to 1:4 based on the average feed speed Wfh.
[0055] In this embodiment, during the arc-end period Te and the actual welding period Th, periodic feed control is performed to repeat the forward and reverse feeds of the welding wire 21 at a fixed frequency and speed amplitude set for each period, but this is not particularly limited. The feed control of the welding wire 21 can also be non-periodic. For example, during the arc-end period Te, the welding wire 21 can be fed forward, and the reverse feed operation can be switched at the point when the short circuit / arc detection unit 10 detects a short circuit between the welding wire 21 and the base material 25. In this case, the forward feed operation can also be switched after a given time has elapsed since the start of the reverse feed. Furthermore, during the actual welding period Th, the peak current Ip can be allowed to flow through the welding wire 21 at the point when the welding voltage Vw falls below the voltage threshold Va due to the short circuit / arc detection unit 10, and the base current Ib can be allowed to flow after a given time. Alternatively, it can be set such that, during the period when the base current Ib flows, at the point when the welding voltage Vw drops to the voltage threshold Va, the peak current Ip flows through the welding wire 21 for a given time.
[0056] [Effects, etc.]
[0057] As explained above, the arc welding control method of this embodiment is an arc welding control method that generates an arc 24 between the welding wire 21, which serves as a consumable electrode, and the base material 25 to perform welding, and includes at least the first step and the second step shown below.
[0058] In step 1, during the formal welding period Th, while alternating forward and reverse feeds of the welding wire 21, the welding current Aw is varied with a given period Tf, thereby causing the molten droplet to detach from the tip of the welding wire 21 and transfer to the base material 25.
[0059] In step 2, during the arc-ending period Te set after the formal welding period Th, the welding current Aw is allowed to flow through the welding wire 21, and the welding wire 21 and the base material 25 are short-circuited while the forward and reverse feeds of the welding wire 21 are repeated alternately, thereby causing the molten droplets formed at the tip of the welding wire 21 to be short-circuited and transferred to the base material 25.
[0060] The arc-ending period Te is the period from the end of the formal welding period Th (the first time point) P1 to the point P3 when the average feed rate Wfe of the welding wire 21 becomes zero.
[0061] The period Tf includes the peak current period Tp during which the peak current Ip flows through the welding wire 21, and the base current period Tb during which the base current Ib flows through the welding wire 21 following the peak current period Tp. The value of the base current Ib is lower than the value of the peak current Ip.
[0062] The average feed rate Wfh during the formal welding process is the same as the average feed rate Wfe at the start time P3 of the arc-end process Te.
[0063] In this embodiment, during the actual welding period Th, so-called pulse welding is performed, in which the peak current Ip and the base current Ib flow alternately through the welding wire 21. Furthermore, by alternating the forward and reverse feeds of the welding wire 21 at a given frequency and speed amplitude, the molten droplets formed at the tip of the welding wire 21 can be smoothly removed. Additionally, the frequency during the actual welding period Th is the reciprocal of the period Tf, which is the sum of the peak current period Tp and the base current period Tb.
[0064] According to this embodiment, during the actual welding period Th, by alternately and repeatedly feeding the welding wire 21 in the forward and reverse directions, the molten droplets grown at the tip of the welding wire 21 are subjected to gravitational vibration, causing the droplets to fall off. Therefore, by using CO2 as the shielding gas, even if the droplets are difficult to detach due to the arc reaction force, the weld can be reliably transferred to the base material 25 in each cycle Tf. Thus, for example, the width and height of the weld formed on the base material 25 can be fixed throughout its length direction.
[0065] Furthermore, according to this embodiment, an arc-ending period Te is provided following the formal welding period Th. During the arc-ending period Te, the wire feed speed Wf is controlled with a given frequency and speed amplitude, causing the welding wire 21 to alternately feed forward and backward, repeatedly short-circuiting the molten droplet towards the base material 25. In this way, the amount of sputtering is suppressed, the size of the crater is smaller, and a crater-free area can be formed at the weld. In particular, before and after switching from the formal welding period Th to the arc-ending period Te, the molten pool can be stably grown and formed in the base material 25, thus suppressing the generation of sputtering during the arc-ending period Te. As a result, post-processing work such as manual correction of large craters can be eliminated or reduced. In addition, the outflow of products with large residual craters can be suppressed.
[0066] The first reverse feed rate Wfg during the arc-ending period Te is controlled to a fixed value. The first forward feed rate Wff during the arc-ending period Te is controlled to decrease as the number of repetitions of the forward and reverse feeds of the welding wire 21 increases. The second reverse feed rate Wfg2 during the actual welding period Th is controlled to be greater than the first reverse feed rate Wfg during the arc-ending period Te. The second forward feed rate Wff2 during the actual welding period Th is controlled to be greater than the first forward feed rate Wff during the arc-ending period Te.
[0067] In this way, during the arc-ending period Te, the average feed rate Wfe can decrease over time. Therefore, at the end time P1 of the formal welding period Th, the average feed rate Wfe during the arc-ending period Te and the average feed rate Wfh during the formal welding period Th can be set to be the same, allowing for smooth transfer of the welding wire 21's feed action. Furthermore, the second forward feed rate Wff2 during the formal welding period Th, where the molten droplet is detached and transferred, can be greater than the first forward feed rate Wff during the arc-ending period Te, where the molten droplet is short-circuited and transferred. Also, the second reverse feed rate Wfg2 during the formal welding period Th can be greater than the first reverse feed rate Wfg during the arc-ending period Te. In this way, the average feed rate Wfh can be increased to a desired value, ensuring the feed amount of the welding wire 21 corresponding to the welding current Aw during the formal welding period Th, where the molten droplet is detached and transferred.
[0068] Furthermore, the welding current Aw is reduced at the beginning of the arc-ending period Te or immediately before the end of the formal welding period Th, allowing the base current Ib to flow through the welding wire 21. Additionally, during the formal welding period Th, after the welding voltage between the welding wire 21 and the base material 25 gradually decreases and falls below a given voltage threshold Va, the welding current Aw decreases from the beginning of the arc-ending period Te or immediately before the end of the formal welding period Th. Preferably, after the welding current Aw is maintained at the base current Ib for a given period, the welding wire 21 and the base material 25 are short-circuited while the forward and reverse feeds of the welding wire 21 are alternately repeated multiple times. During the formal welding period Th, compared to the case where the feed speed of the welding wire 21, i.e., the wire feed speed Wf, is set to a fixed speed, the arc length shortens as the feed speed of the welding wire 21 increases due to the alternating repetition of the forward and reverse feeds. Therefore, during the period when the welding current Aw is maintained at the base current Ib for a given period, the welding voltage Vw gradually decreases.
[0069] In this way, the arc 24 can be set to a stable state, and molten droplets can grow at the tip of the welding wire 21. As a result, the welding wire 21 and the base metal 25 can reliably transfer the molten droplets to the base metal 25 at the initial short-circuit point. Furthermore, by detecting the stable state of the arc 24, the welding state can be reliably transferred to the end of the arc, Te.
[0070] Furthermore, around the end of the formal welding period Th, the peak current Ip flows through the welding wire 21. The welding current Aw is reduced in one or more stages from this state to transfer to the base current Ib. In this way, the arc 24 can be set to a stable state at the beginning of the arc end period Te, and the welding state can be smoothly transferred to the short-circuit transfer state between the welding wire 21 and the base material 25.
[0071] Preferably, the base current Ib is 50A or more and 200A or less, immediately following the start of the arc-ending period Te or immediately preceding the end of the formal welding period Th. By setting the base current Ib in this way, it is possible to suppress excessive melting of the welding wire 21 while making arc interruption less likely.
[0072] Furthermore, in this embodiment, the time waveform of the wire feed rate Wf is controlled to be a sine wave during the arc-end period Te and the actual welding period Th, but it is not particularly limited to this. For example, the feeding action of the welding wire 21 can also be controlled to make the time waveform a trapezoidal wave. This control can also be applied to embodiments 2 to 5 shown later.
[0073] Furthermore, preferably, the arc-ending period Te ends and the reheating period Tbb begins at time point P3 when the average feed rate Wfe becomes zero. Preferably, the maximum value Wfg of the reverse feed rate during the arc-ending period Te is fixed, and the maximum value Wfg of the reverse feed rate is also the same during both the arc-ending period Te and the reheating period Tbb. In this way, the state of the tip of the welding wire 21 is stable, thus ensuring stable welding initiation during the next arc welding process. That is, during the next arc welding process, good arc welding can be performed from the welding start time.
[0074] (Implementation Method 2)
[0075] Figure 4 This is a graph showing the waveforms of the welding current, welding voltage, and wire feed speed involved in Embodiment 2. Additionally, for ease of explanation, in Figure 4 In the accompanying drawings shown thereafter, the same symbols are used for the same parts as in Embodiment 1, and detailed descriptions are omitted.
[0076] Figure 4 Among the various waveforms shown, the time waveform of the peak current Ip during the formal welding period is as follows: Figure 3 The peak current Ip in Embodiment 1 shown has a different time waveform. Specifically, as shown... Figure 4 As shown, control is performed during the formal welding process within Th so that the peak current value of the last current flowing through the welding wire 21, i.e., the second peak current value Ip2, is lower than the previous peak current value, i.e., the first peak current value Ip.
[0077] The second peak current value Ip2 is lower than the first peak current value Ip, and is set to below 350A. The second peak current value Ip2 can be appropriately changed according to the period Tf, the material of the welding wire 21, the wire diameter, and the set current during the actual welding period Th.
[0078] As mentioned above, assuming that at the beginning of the arc-ending period Te, the base current Ib flows through the welding wire 21, and a molten droplet grows at the tip of the welding wire 21, the short-circuit transfer between the welding wire 21 and the base material 25 can proceed smoothly. However, if a molten droplet of the size of the tip of the welding wire 21 is formed at the beginning time P1 of the arc-ending period Te, the droplet may sometimes detach before the short-circuit transfer begins. If this happens, the short-circuit release will be difficult when the welding wire 21 and the base material 25 are initially short-circuited due to the absence of a molten droplet at the tip of the welding wire 21. To ensure smooth short-circuit release, during the final peak current period Tp of the welding process Th, the detachment and growth of the molten droplet are suppressed by reducing the current value to the second peak current value Ip2. Thus, at the beginning of the arc-ending period Te, the state in which the molten droplet remains at the tip of the welding wire 21 during the period when the base current Ib flows through the welding wire 21 can be set, allowing for smooth initial short-circuit release of the welding wire 21.
[0079] In addition, Figure 4 In this process, the peak current Ip2 is set as the second peak current value Ip2 only within the period Tf immediately preceding the end of the formal welding period Th, but this is not a particular limitation. For example, the peak current values within multiple periods Tf immediately preceding the end of the formal welding period Th can also be set as the second peak current value Ip2. As long as the state of molten droplet residue remaining at the tip of the welding wire 21 can be achieved at the beginning of the arc-ending period Te, during the period when the basic current Ib flows through the welding wire 21, sputtering and other phenomena can be suppressed during the initial short-circuit release of the welding wire 21. In other words, one or more periods Tf immediately preceding the end of the formal welding period Th are designated as the first period. The peak current value within the first period, i.e., the second peak current value Ip2, is controlled to be lower than the peak current value within the formal welding period Th preceding the first period, i.e., the first peak current value Ip.
[0080] Furthermore, according to this embodiment, the same effects as those achieved by the method shown in Embodiment 1 can be achieved. That is, the detachment of molten droplets from the welding wire 21 during the formal welding period Th can be stabilized. In addition, the amount of sputtering is suppressed, the size of the crater is smaller near the weld end point at the weld site, and furthermore, a weld site without crater depressions can be formed. A molten pool can be stably formed in the base material 25 before and after switching from the formal welding period Th to the arc end period Te, thus suppressing the generation of sputtering during the arc end period Te. Through these measures, post-processing work such as manual correction of large depressions can be eliminated or reduced. In addition, the outflow of products with residual large depressions can be suppressed.
[0081] (Implementation Method 3)
[0082] Figure 5This is a graph showing the waveforms of the welding current, welding voltage, and wire feed speed involved in Embodiment 3.
[0083] Figure 4 Among the various waveforms shown, the time waveform of the peak current Ip during the formal welding period is as follows: Figure 4 The time waveforms of the peak current Ip shown are different. Specifically, as... Figure 5 As shown, control is performed during the formal welding period Th so that the peak current period Tp2 of the last peak current Ip flowing through the welding wire 21, i.e. the second peak current period, is shorter than the peak current period Tp of the previous peak current Ip, i.e. the first peak current period.
[0084] The second peak current period Tp2 is set to be shorter within a range of 50% to 80% relative to the first peak current period Tp. The second peak current period Tp2 can be appropriately changed according to the period Tf, the material of the welding wire 21, the wire diameter, and the set current during the actual welding period Th.
[0085] As described in Embodiment 2, if a droplet the size of the tip of the welding wire 21 is formed at the beginning time P1 of the arc-ending period Te, the droplet may detach before the short-circuit transfer begins. In this case, if the short-circuit release occurs initially within Te during the arc-ending period, sputtering or the like may occur. To suppress the generation of such sputtering or the like, the detachment and growth of the droplet are suppressed by making the second peak current period Tp2, at the end of the formal welding period Th, shorter than the first peak current period Tp preceding it. Thus, at the beginning of the arc-ending period Te, the state in which the droplet remains at the tip of the welding wire 21 during the period when the base current Ib flows through the welding wire 21 can be set, and the generation of sputtering or the like can be suppressed at the initial short-circuit release of the welding wire 21.
[0086] In addition, Figure 5In this process, the peak current period is designated as the second peak current period Tp2 only within one cycle Tf immediately preceding the end of the formal welding period Th, but this is not a particular limitation. For example, the peak current period can also be designated as the second peak current period Tp2 within multiple cycles Tf immediately preceding the end of the formal welding period Th. This is only necessary as long as the initial state of the arc-ending period Te, during which the base current Ib flows through the welding wire 21, is such that molten droplets remain at the tip of the welding wire 21, and sputtering is suppressed during the initial short-circuit release of the welding wire 21. In other words, one or more cycles Tf immediately preceding the end of the formal welding period Th are designated as the second period. The period during which the peak current Ip flows within the second period, i.e., the second peak current period Tp2, is controlled to be shorter than the period during which the peak current Ip flows within the formal welding period Th preceding the second period, i.e., the first peak current period Tp.
[0087] Furthermore, according to this embodiment, the same effects as those achieved by the method shown in Embodiment 1 can be achieved. That is, the detachment of molten droplets from the welding wire 21 during the formal welding period Th can be stabilized. In addition, the amount of sputtering is suppressed, the size of the crater is smaller near the weld end point at the weld site, and furthermore, a weld site without crater depressions can be formed. A molten pool can be stably formed in the base material 25 before and after switching from the formal welding period Th to the arc end period T, thus suppressing the generation of sputtering during the arc end period Te. Through these measures, post-processing work such as manual correction of large depressions can be eliminated or reduced. In addition, the outflow of products with residual large depressions can be suppressed.
[0088] (Implementation Method 4)
[0089] The end time of Th during the formal welding process is not limited to the aforementioned time point P1, but can also be near time point P1. For example, the vicinity of time point P1 could be a point around time point P1 where the wire feed rate Wf reaches a given value Wfh, or a point around time point P1 where the wire feed rate Wf becomes zero. Furthermore, it could also be a point after a given first time has elapsed since time point P1.
[0090] Alternatively, the end time of Th during the formal welding process can be set as the time point after time point P1 when the wire feed rate Wf reaches the given speed threshold Ws.
[0091] When the end time of the formal welding period Th is set at the time point (P5) after time point P1 when the wire feed speed Wf reaches the given speed threshold Ws, it is preferable to set the second arc end period Te2 between the formal welding period Th and the arc end period Te.
[0092] Figure 6 This is a graph showing the waveforms of the welding current, welding voltage, and wire feed speed involved in Embodiment 4. Figure 6 The fact that a second arc-ending period Te2 is set between the formal welding period Th and the arc-ending period Te is related to... Figure 3 The waveforms shown in Embodiment 1 are different. Figure 6 In the example shown, the second arc-ending period Te2 is the period from time point P1 to time point P5 when the wire feed speed Wf reaches the speed threshold Ws, and the arc-ending period Te is the period from time point P5 to the aforementioned time point P3. Furthermore, the speed threshold Ws is a value lower than the average feed speed Wfh during the main welding period Th. In addition, in this case, the average feed speed Wfh during the main welding period Th is higher than the average feed speed Wfe at the start time of the arc-ending period Te. Furthermore, after time point P5, the welding torch 26 does not move along the welding line in the welding direction and stops at the position reached at time point P5.
[0093] During the end of the second arc (Te2) and the actual welding period (Th), the time waveforms of the wire feed rate (Wf), welding voltage (Vw), and welding current (Aw) are similar. That is, it can also be set that during the end of the second arc (Te2), the welding current (Aw) flowing through the welding wire 21 is periodically varied with a time Tf while alternating between forward and reverse feeds of the welding wire 21, so that the molten droplets detach from the tip of the welding wire 21 and transfer to the base material 25.
[0094] Furthermore, the average feed rate within Te2 during the end of the second arc is controlled to be lower than the average feed rate Wfh during Th during the main welding period, and higher than the average feed rate Wfe during Te during the end of the arc. In other words, the set current within Te2 during the end of the second arc is controlled to be higher than the set current during Te during the end of the arc, and lower than the set current during Th during the main welding period.
[0095] When there is a significant difference between the set current during the welding process (Th) and the set current during the arc-ending period (Te), it is necessary to increase the set current during the arc-ending period (Te). Correspondingly, the average feed rate (Wfe) is also set higher. However, if the average feed rate (Wfe) is excessively increased during the arc-ending period (Te) when short-circuit transfer occurs, the welding wire 21 may sometimes penetrate the base metal 25 during forward feed and suddenly break off when in contact with the base metal 25 during reverse feed. If this happens, spatter is likely to occur. In addition, the crater near the weld termination point at the weld joint becomes larger.
[0096] Therefore, as shown in this embodiment, a second arc-ending period Te2 is provided between the main welding period Th and the arc-ending period Te, and the set current and average feed rate during the second arc-ending period Te2 are appropriately set. In this way, even if there is a large difference between the set current during the main welding period Th and the set current during the arc-ending period Te, the generation of sputtering and the increase in the size of the crater during the arc-ending period Te can be suppressed.
[0097] In addition, such as Figure 6 As shown, preferably, the peak current and base current within Te2 decrease in stages during the end of the second arc. This allows for a staged reduction in the heat input to the base material 25 within Te2 during the end of the second arc, suppressing unevenness in the appearance and shape of the welded area. Furthermore, arc 24 can be stabilized during the transition from the end of Te2 during the second arc and from Te2 to the end of Te.
[0098] In addition, the phased reduction rates of peak current, base current, and average feed rate Wfe during Te2 at the end of the second arc can be the same as or different from those during Te at the end of the arc.
[0099] For example, by making the reduction rate in Te2 during the second arc end period lower than the reduction rate in Te during the arc end period, the change in the reduction of heat input to the opposing base material 25 during the transition from the formal welding period Th to the arc end period Te can be further mitigated, and the arc 24 can be further stabilized during the transition from the formal welding period Th to the second arc end period Te2 and the arc end period Te.
[0100] Furthermore, according to this embodiment, the same effects as those achieved by the method shown in Embodiment 1 can be achieved. That is, the detachment of molten droplets from the welding wire 21 during the formal welding period Th can be stabilized. In addition, the amount of sputtering is suppressed, the size of the crater is smaller, and a crater without depressions can be formed at the weld site. A molten pool can be stably formed in the base material 25 before and after switching from the formal welding period Th to the arc end period T, thus suppressing the generation of sputtering during the arc end period Te. Through these measures, post-processing work such as manual correction of large depressions can be eliminated or reduced. Furthermore, the outflow of products with large residual depressions can be suppressed.
[0101] (Implementation Method 5)
[0102] Figure 7 This is a graph showing the waveforms of the welding current, welding voltage, and wire feed speed involved in Embodiment 5. Figure 6The point that a crater period Tc is set between the formal welding period Th and the arc-end period Te is related to... Figure 2 The waveforms shown in Embodiment 1 are different. Figure 7 In the example shown, the crater period Tc is the period from time point P1 to time point P6, and the arc end period Te is the period from time point P6 to the aforementioned time point P3. Furthermore, after time point P2, the welding torch 26 does not move along the welding line in the welding direction and stops at the position reached at time point P2.
[0103] As mentioned above, in arc welding, a crater with a depression is often formed at the weld joint near the end of the weld. Therefore, in the arc welding control method of this disclosure, a Te is set at the end of the arc, and the depression is reduced and the size of the crater is decreased by short-circuiting the molten droplet between the welding wire 21 and the base material 25.
[0104] However, depending on the welding conditions during the formal welding period Th, the crater depression sometimes becomes too large and cannot be completely filled during the arc-ending period Te. In such cases, as shown in this embodiment, by setting the crater period Tc between the formal welding period Th and the arc-ending period Te, the size of the crater and the depression are reduced more effectively.
[0105] Furthermore, during the crater period Tc, similar to the arc-end period Te, the molten droplets are repeatedly short-circuited and transferred between the welding wire 21 and the base metal 25. This suppresses sputtering. Additionally, during the crater period Tc, the wire feed rate Wf is controlled to be lower than that during the main welding period Th. Specifically, during the crater period Tc, the reverse feed rate is controlled to be the same as the first reverse feed rate Wfg during the arc-end period Te. On the other hand, the maximum value of the forward feed rate is also fixed as during the main welding period Th, but its value is controlled to be lower than the second forward feed rate Wff2 during the main welding period Th. As a result, the average feed rate during the crater period Tc is a fixed value, but it is controlled to be lower than the average feed rate Wfh during the main welding period Th.
[0106] In this embodiment, during the crater period Tc, the welding current Aw flows through the welding wire 21, and while alternating between forward and reverse feeds of the welding wire 21, the welding wire 21 and the base material 25 are short-circuited, causing the molten droplets formed at the tip of the welding wire 21 to transfer to the base material 25 via the short-circuit transfer. However, this is not a limitation; for example, the welding current Aw can flow through the welding wire 21 as it does during the actual welding period Th. That is, during the crater period Tc, instead of short-circuiting the welding wire 21 and the base material 25 to transfer the molten droplets formed at the tip of the welding wire 21 to the base material 25, the molten droplets are transferred from the tip of the welding wire 21 to the base material 25 by alternating between forward and reverse feeds of the welding wire 21 and changing the welding current Aw periodically with a time interval Tf.
[0107] In this way, even when the crater is large, it can be filled quickly. Furthermore, in this case, it is preferable to make the set current during the crater period Tc less than the set current during the main welding period Th, so that the heat input to the crater does not become excessive. Therefore, the peak current value during the crater period Tc is less than the peak current value Ip during the main welding period Th. Moreover, it is preferable to make the base current value during the crater period Tc less than the base current value Ib during the main welding period Th, within a range that does not cause arc interruption.
[0108] Furthermore, according to this embodiment, the same effects as those achieved by the method shown in Embodiment 1 can be achieved. That is, the detachment of molten droplets from the welding wire 21 during the formal welding period Th can be stabilized. In addition, the amount of sputtering is suppressed, the size of the crater is smaller, and a weld area without crater depressions can be formed. A molten pool can be stably formed in the base material 25 before and after switching from the formal welding period Th to the arc end period T, thus suppressing the generation of sputtering during the arc end period Te. Through these measures, post-processing work such as manual correction of large depressions can be eliminated or reduced. Furthermore, the outflow of products with residual large depressions can be suppressed.
[0109] (Other implementation methods)
[0110] New embodiments can be created by appropriately combining the constituent elements shown in Embodiments 1 to 5. For example, in Embodiment 2, as shown in Embodiment 3, the peak current period flowing through the second peak current Ip2 can be made shorter than the peak current period flowing through the first peak current Ip. In this way, it is possible to reliably suppress the detachment of molten droplets from the welding wire 21 before and after the transition from the formal welding period Th to the arc end period Te.
[0111] Furthermore, in Embodiments 2 and 3, examples are shown where, within one or more cycles Tf immediately preceding the end of the formal welding period Th, the peak current value is made smaller than the previous peak current value, or the peak current period is made shorter than the previous peak current period. However, by methods other than these, it is also possible to suppress the detachment of molten droplets from the welding wire 21 before and after switching from the formal welding period Th to the arc end period Te, and to suppress sputtering during the initial short-circuit release within the arc end period Te.
[0112] For example, in Figure 3 In the example shown, the feeding action of the welding wire 21 can also be controlled during the reverse feeding of the welding wire 21 in one or more cycles Tf immediately before the end of the formal welding period Th, so that the reverse feeding acceleration Afg is less than the reverse feeding acceleration Afg in the preceding formal welding period Th.
[0113] In other words, one or more cycles Tf immediately preceding the end of the formal welding period Th are designated as the third period. The absolute value of the reverse feed acceleration Afg of the welding wire 21 during the third period is controlled to be less than the absolute value of the reverse feed acceleration Afg during the formal welding period Th preceding the third period. Furthermore, the aforementioned first period, second period, and / or third period can be the same period or different periods.
[0114] In this way, it is also possible to suppress the detachment of molten droplets from the welding wire 21 before and after the transition from the formal welding period Th to the arc-end period Te, and to suppress sputtering during the initial short-circuit release within the arc-end period Te.
[0115] Furthermore, while this application describes arc welding using CO2 as a shielding gas as an example, the type of shielding gas used in the arc welding of this disclosure is not particularly limited to this. The shielding gas can also be a mixture of inert gases such as argon (Ar) and CO2. When the shielding gas is predominantly CO2, the arc reaction force is relatively large, and in typical pulse welding, as mentioned above, the molten droplet is difficult to detach. On the other hand, according to the arc welding control method of this disclosure, even when using a shielding gas with a high arc reaction force, the detachment of the molten droplet from the welding wire 21 can be stabilized within Th during the actual welding period. In addition, when the CO2 mixing ratio in the shielding gas is 25% or more, the effects related to the method of this disclosure are particularly effective.
[0116] However, the mixing ratio of CO2 in the shielding gas is not particularly limited to this; it can be either CO2 or argon. Furthermore, the shielding gas can also be a gas that does not contain CO2, such as inert gases like argon or helium. Additionally, the materials of the welding wire 21 and the base metal 25 are not limited to mild steel.
[0117] Even without using a shielding gas with high arc reaction force such as CO2, the detachment of molten droplets from the welding wire 21 during the main welding period Th can be stabilized in the same way as described above, and the shape of the crater can be repaired during the arc-end period Te at the end of the welding process. In particular, during the main welding period Th, by alternately repeating the forward and reverse feeds of the welding wire 21, a force is applied to the molten droplets in addition to gravity, which shakes the droplets off, and the molten droplets can be stably detached and transferred to the base material 25 within each cycle Tf. Furthermore, even by reducing the peak current Ip, droplet detachment can be achieved, thus suppressing sputtering during the main welding period Th.
[0118] Industrial availability
[0119] The arc welding control method disclosed herein can suppress the amount of sputtering, and the size of the crater is smaller near the end of the welding at the welding site, thereby forming a weld site without a crater. In addition, it can suppress the generation of sputtering during the end of the arc, and is therefore useful.
[0120] Explanation of reference numerals in the attached figures
[0121] 1. Input power
[0122] 2.1 Primary rectifier section
[0123] 3 Switch section
[0124] 4 Transformers
[0125] 5. Secondary rectifier section
[0126] 6 DCL
[0127] 7. Drive Unit
[0128] 8 Welding Voltage Detection Department
[0129] 9 Welding Current Detection Department
[0130] 10 Short Circuit / Arc Detection Unit
[0131] 11 Short Circuit Control Section
[0132] 12 Arc Control Unit
[0133] 13 Wire feed speed control unit
[0134] 14 Welding power supply device
[0135] 15 Welding Condition Setting Section
[0136] 16. Robot control device
[0137] 17. Robot control device
[0138] 18. Manipulator
[0139] 20. Silk Material Preservation Department
[0140] 21 Welding wire
[0141] 22 Wire feed motor
[0142] 23 chips
[0143] 24 Electric Arc
[0144] 25. Base Material
[0145] 26 Welding torches
[0146] 30 Arc Welding Equipment
[0147] Ip peak current
[0148] Ip2 second peak current
[0149] Ib base current
[0150] During Ta's deceleration
[0151] During Tbb's resurgence
[0152] During the Tc crater period
[0153] Te During the end of the arc
[0154] Te2, during the end of the second arc
[0155] During the formal welding period
[0156] During peak current Tp
[0157] During the second peak current period of Tp2
[0158] During Tb base current period
[0159] Tf cycle
[0160] Va is the voltage threshold for determining the arc level.
[0161] Wfa deceleration speed
[0162] Wfe Average feed rate during the end of the electric arc
[0163] Wfh Average feed rate during formal welding
[0164] Wff First positive feed rate
[0165] Wff2 Second Forward Feed Rate
[0166] Wfg First Reverse Feed Speed
[0167] Wfg2 is the second reverse feed rate.
Claims
1. An arc welding control method, wherein an arc is generated between a welding wire (serving as a consumable electrode) and a base material to perform welding, the arc welding control method comprising at least: Step 1: During the actual welding process, while alternately repeating the forward and reverse feeds of the welding wire, the welding current flowing through the welding wire is varied at a given period, thereby causing the molten droplet to detach from the tip of the welding wire and transfer towards the base material; and Step 2 involves, during the arc-ending period following the formal welding phase, allowing welding current to flow through the welding wire while alternately repeating the forward and reverse feeds of the welding wire, short-circuiting the welding wire and the base metal. This causes the molten droplets formed at the tip of the welding wire to be transferred towards the base metal via the short-circuit. The arc-ending period is the period from the end of the formal welding period until the average feed rate of the welding wire becomes zero. The period includes a peak current period during which a peak current flows through the welding wire, and a base current period during which a base current flows through the welding wire following the peak current period. The base current is lower than the peak current. The average feed rate during the formal welding period, in which the welding current is varied at a given period to disengage the molten droplet while alternating forward and reverse feeds of the welding wire, is equal to or higher than the average feed rate at the beginning of the arc-ending period, in which the welding current is alternating forward and reverse feeds of the welding wire to short-circuit the molten droplet.
2. The arc welding control method according to claim 1, wherein, The forward feed rate, which is the feed speed of the welding wire during forward feed, the reverse feed rate, which is the feed speed during reverse feed, the speed ratio, which is expressed in absolute value as the ratio of the maximum value of the forward feed rate to the maximum value of the reverse feed rate based on the average feed rate, and the frequency, which is the reciprocal of the wire feed cycle that alternately repeats the forward feed and the reverse feed, are independently set during the end of the arc and the actual welding period.
3. The arc welding control method according to claim 2, wherein, The reverse feed rate during the end of the electric arc is controlled to a fixed maximum value. The maximum value of the forward feed rate during the arc termination period is controlled to decrease as the number of repetitions of the forward and reverse feeds increases. The maximum value of the reverse feed rate during the formal welding period is controlled to be greater than the maximum value of the reverse feed rate during the arc termination period. The maximum value of the forward feed rate during the formal welding period is controlled to be greater than the maximum value of the forward feed rate during the arc termination period.
4. The arc welding control method according to claim 1, wherein, The second peak current value is controlled to be lower than the first peak current value, which is the current value of the peak current during the first period, including one or more cycles immediately preceding the end of the formal welding period, and the first peak current value is the current value of the peak current during the formal welding period preceding the first period.
5. The arc welding control method according to claim 4, wherein, The second peak current value is controlled to be below 350A.
6. The arc welding control method according to claim 1, wherein, The second peak current period is controlled to be shorter than the first peak current period. The second peak current period is the peak current period within a second period that includes one or more cycles immediately preceding the end of the formal welding period. The first peak current period is the peak current period within the formal welding period preceding the second period.
7. The arc welding control method according to claim 6, wherein, The second peak current period is controlled to be more than 50% and less than 80% of the first peak current period.
8. The arc welding control method according to claim 1, wherein, The absolute value of the reverse feed acceleration of the welding wire during the third period, including one or more cycles immediately preceding the end of the formal welding period, is controlled to be less than the absolute value of the reverse feed acceleration during the formal welding period preceding the third period.
9. The arc welding control method according to claim 1, wherein, Control is performed such that the welding current is reduced immediately following the start of the arc-ending period or immediately before the end of the formal welding period, so that the base current flows through the welding wire.
10. The arc welding control method according to claim 9, wherein, After the welding voltage between the welding wire and the base material gradually decreases and falls below a given voltage threshold, and starting immediately after the end of the arc period or immediately before the end of the formal welding period, the welding current decreases. After the welding current is maintained at the base current for a given period, the welding wire and the base material are short-circuited while the forward and reverse feeds of the welding wire are alternately repeated.
11. The arc welding control method according to claim 9, wherein, Control is performed such that the welding current is reduced in one or more stages immediately following the start of the arc-ending period or immediately before the end of the formal welding period, so that the base current flows through the welding wire.
12. The arc welding control method according to claim 9, wherein, The base current flowing through the welding wire immediately following the start of the arc-ending period or immediately before the end of the formal welding period has a value of 50A or more and 200A or less.
13. The arc welding control method according to claim 1, wherein, The end time point during the formal welding process is the first time point of inputting the arc end signal or the vicinity of the first time point, or the time point after the first time point has elapsed since the first time point.
14. The arc welding control method according to claim 13, wherein, The vicinity of the first time point is a time point before or after the first time point when the feed rate of the welding wire becomes the average feed rate during the formal welding period, or when the feed rate becomes zero, or a time point after the first time point when the feed rate of the welding wire reaches a given speed threshold.
15. The arc welding control method according to claim 14, wherein, When the end time point during the formal welding process is the time point after the first time point when the feed rate of the welding wire reaches a given speed threshold, A second arc-ending period is provided between the formal welding period and the arc-ending period. The second arc-ending period is the period from the end time of the formal welding period to the time when the average feed rate reaches a given speed threshold. The arc termination period is the period from when the average feed rate reaches a given speed threshold until it becomes zero. During the end of the second arc, the molten droplet is detached from the tip of the welding wire and transferred to the base material by alternating forward and reverse feeds of the welding wire and varying the welding current flowing through the welding wire in a periodic manner. During the end of the second electric arc, the average feed rate is controlled to decrease over time.
16. The arc welding control method according to claim 1, wherein, Between the formal welding period and the end of the arc period, a crater period is set, starting from the end time of the formal welding period. The arc-ending period is the period from the end time of the arc crater period until the average feed rate becomes zero. During the crater period, the average feed rate is controlled to be constant.
17. The arc welding control method according to claim 16, wherein, During the arc crater period, the molten droplet is transferred from the tip of the welding wire to the base material by alternating forward and reverse feeds of the welding wire and varying the welding current flowing through the welding wire in the periodic manner.
18. The arc welding control method according to claim 16, wherein, During the arc crater period, the welding current is passed through the welding wire, and the welding wire and the base material are short-circuited while the forward and reverse feeds of the welding wire are alternately repeated, thereby causing the molten droplets formed at the tip of the welding wire to be short-circuited and transferred to the base material.
19. The arc welding control method according to claim 1, wherein, The arc termination period ends and the burn-back period begins at the point when the average feed rate becomes zero. The reheating process continues until the formation of the molten metal ball at the tip of the welding wire is complete. The maximum value of the reverse feed rate during the arc-ending period is fixed, and the maximum value of the reverse feed rate is the same during both the arc-ending period and the burn-back period.
20. The arc welding control method according to any one of claims 1 to 19, wherein, The protective gas blown onto the base material during arc welding is a gas with a CO2 mixing ratio of 25% or more.
Citation Information
Patent Citations
Manufacture of lithium battery
JP1984078465A
