Composite layer foundation for hoisting
By using a three-layer composite layer foundation, including a roadbed layer, an ash layer and a gravel layer, and laying walkway boards on the gravel layer, the problem of the load-bearing of the foundation by the hoisting equipment is solved, and the stable load-bearing and equipment of the foundation are achieved. safe lifting.
Patent Information
- Application Number
- CN202323079185.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-15
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-11-15
AI Technical Summary
The total weight of the hoisting equipment is large, which will have a greater impact on the foundation during hoisting construction, and failure to perform laying and bearing capacity testing can easily lead to the foundation being unable to carry the hoisting equipment.
A composite layer foundation with a three-layer structure is used, including a subgrade layer, a second ash layer and a gravel layer. The subgrade layer carries the second ash layer, and the second ash layer carries the gravel layer. Walkway slabs are laid on the gravel layer and the tires of the equipment are hoisted. Or the crawler tracks are pressed against the walkway board to ensure that the foundation can effectively carry the lifting equipment.
Through this structure, the composite layer foundation can better carry the lifting equipment, avoid foundation collapse, and avoid impact on the equipment through the design of hinged lifting rings.
Smart Images

Figure CN221798039U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of foundation technology, and in particular relates to a composite foundation for hoisting. Background Art
[0002] The total weight of the lifting equipment is very large, which causes a great impact on the foundation during the lifting construction. Failure to lay the foundation and test the bearing capacity in advance can easily lead to the inability of the lifting equipment to carry out the lifting construction. Utility Model Content
[0003] In order to solve the above problems, the present application provides a composite foundation for lifting.
[0004] The purpose of the present application is to provide a composite layer foundation for hoisting. The present application is composed of three layers of different structural composite layers for the foundation structure used for hoisting. The road base layer carries the second ash layer, and the second ash layer carries the gravel layer, forming a foundation capable of carrying hoisting equipment. In addition, the present application lays walkway plates on the composite layer foundation, and the tires or tracks of the hoisting equipment are pressed on the walkway plates, so that the composite layer foundation of the present application can better carry the hoisting equipment.
[0005] A composite foundation for hoisting comprises a road base, a fly ash layer is laid on the road base, a crushed stone layer is laid on the fly ash layer, the crushed stone layer is a graded crushed stone layer, and the fly ash layer contains lime and soil and one or two of cement or fly ash.
[0006] Furthermore, the thickness ratio of the road base layer, the fly ash layer and the crushed stone layer is 6:7:5.
[0007] Furthermore, the thickness of the road base layer is not less than 30 cm.
[0008] Furthermore, the compaction degree of the road base is not less than 95%.
[0009] Furthermore, the design value of the bearing capacity of the road base shall not be less than 490KPa, and the flatness shall not be greater than 5‰.
[0010] Furthermore, a walkway slab is laid on top of the gravel layer.
[0011] Furthermore, the walkway board includes a walkway base plate, and the upper end of the walkway base plate is provided with anti-skid convex strips arranged at intervals.
[0012] Furthermore, a hinged seat is arranged on the walkway base plate, a rotating shaft is hingedly arranged on the hinged seat, and a hanging ring is arranged on the rotating shaft.
[0013] Compared with the prior art, the beneficial effects of this application are:
[0014] 1. The present application is composed of three different structural composite layers for the foundation structure used for hoisting, wherein the road base layer carries the secondary ash layer, and the secondary ash layer carries the crushed stone layer, forming a foundation capable of carrying the hoisting equipment.
[0015] 2. The present application lays a walkway plate on a composite layer foundation, and the tires or tracks of the lifting equipment are pressed on the walkway plate, so that the composite layer foundation of the present application can better bear the lifting equipment, and the lifting ring is hingedly installed on the side of the walkway base plate, so that the lifting ring will not affect the lifting equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The drawings in the specification, which constitute a part of the present application, are used to provide further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.
[0017] Figure 1 This is a layered structure diagram of the foundation of this application;
[0018] Figure 2 This is a schematic diagram of the overall structure of the walkway board of this application.
[0019] In the figure:
[0020] 1. Road base layer, 2. Second ash layer, 3. Gravel layer, 4. Walkway base plate, 5. Anti-slip convex strips, 6. Articulated seat, 7. Rotating shaft, 8. Lifting ring. DETAILED DESCRIPTION
[0021] The present application is further described below in conjunction with the accompanying drawings and embodiments.
[0022] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0023] In the present application, terms such as "upper", "lower", "left", "right", "front", "back", "vertical", "horizontal", "side", "bottom", etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings. They are relational words determined only for the convenience of describing the structural relationships of the various parts or elements of the present application, and do not specifically refer to any part or element in the present application and should not be understood as limitations on the present application.
[0024] Example 1
[0025] The present embodiment discloses a composite foundation for hoisting, which is used to support the hoisting equipment to avoid the collapse of the road surface due to the inability of the foundation to bear the hoisting equipment. The composite foundation of the present embodiment includes a three-layer structure, including a road base layer 1, with the road base layer 1 as the bottom, a fly ash layer 2 is laid above the road base layer 1, and a crushed stone layer 3 is laid above the fly ash layer 2. The crushed stone layer 3 is a graded crushed stone layer 3, wherein the fly ash layer 2 contains lime and soil and one or two of cement or fly ash.
[0026] As a specific implementation plan, in this embodiment, the thickness ratio of the road base layer 1, the second ash layer 2, and the crushed stone layer 3 is 6:7:5, and the thickness of the road base layer 1 is not less than 30cm. For example, in this embodiment, the thickness of the road base layer 1 is 30cm, the thickness of the second ash layer 2 is 35cm, and the thickness of the crushed stone layer 3 is 25cm. The compaction degree of the road base layer 1 is not less than 95%, the bearing capacity design value of the road base layer 1 is not less than 490KPa, and the flatness is not greater than 5‰. You can choose to use a 20t roller to compact 5-6 times, and test the bearing capacity of the foundation before hoisting construction.
[0027] In this embodiment, a walkway plate is laid above the gravel layer 3, so that the tires or crawler tracks of the lifting equipment are pressed on the walkway plate during the lifting construction. The walkway plate includes a walkway base plate 4, and the upper end of the walkway base plate 4 is arranged with anti-skid convex strips 5 arranged at intervals. The walkway base plate 4 is made of steel plate, and the anti-skid convex strips 5 are made of steel bars. The walkway base plate 4 has a hinge seat 6, and a rotating shaft 7 is hingedly installed on the hinge seat 6. The rotating shaft 7 has a lifting ring 8. In this embodiment, the walkway plate is laid on the composite layer foundation, and the tires or crawler tracks of the lifting equipment are pressed on the walkway plate, so that the composite layer foundation of this embodiment can better bear the lifting equipment. The lifting ring 8 is hingedly installed on the side of the walkway base plate 4, so that the lifting ring 8 will not affect the lifting equipment.
[0028] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
[0029] Although the above describes the specific implementation methods of the present application in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present application. Technical personnel in the relevant field should understand that on the basis of the technical solution of the present application, various modifications or deformations that can be made by technical personnel in this field without creative work are still within the scope of protection of the present application.
Claims
1. A composite foundation for hoisting, characterized in that: It comprises a road base layer (1), a lime-ash layer (2) is laid on the road base layer (1), and a crushed stone layer (3) is laid on the lime-ash layer (2); The crushed stone layer (3) is a graded crushed stone layer (3).
2. A composite foundation for hoisting as claimed in claim 1, characterized in that: The thickness ratio of the road base layer (1), the lime-fly ash layer (2) and the crushed stone layer (3) is 6:7:
5.
3. A composite foundation for hoisting as claimed in claim 2, characterized in that: The thickness of the road base layer (1) is not less than 30 cm.
4. A composite foundation for hoisting according to any one of claims 1 to 3, characterized in that: The compaction degree of the road base layer (1) is not less than 95%.
5. A composite foundation for hoisting as claimed in claim 4, characterized in that: The bearing capacity design value of the road base layer (1) is not less than 490 KPa, and the flatness is not greater than 5‰.
6. The composite foundation for hoisting according to claim 1, characterized in that: A walkway plate is laid above the gravel layer (3).
7. A composite foundation for hoisting as claimed in claim 6, characterized in that: The walkway board comprises a walkway base plate (4), and the upper end of the walkway base plate (4) is provided with anti-slip convex strips (5) arranged at intervals.
8. A composite foundation for hoisting as claimed in claim 7, characterized in that: The walkway base plate (4) is provided with an articulated seat (6), a rotating shaft (7) is hingedly provided on the articulated seat (6), and a hanging ring (8) is provided on the rotating shaft (7).