Creeping formwork device
By introducing guide rods and adjustable-length diagonal braces into the climbing formwork device, the problem of difficulty in climbing the formwork device at the angle of the bridge tower is solved, and the smooth progress and beautiful effect of tower column construction are achieved.
Patent Information
- Application Number
- CN202420058601.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Priority Date
- 2023-02-25
- Filing Date
- 2024-01-09
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-09
AI Technical Summary
The existing climbing formwork device is difficult to climb smoothly at the angle between adjacent tower segments of the bridge tower, which affects the construction progress and aesthetic effect.
A climbing formwork device including a climbing formwork guide rail, a hydraulic cylinder, a supporting platform, a climbing formwork lower frame body, a climbing formwork upper frame body and a formwork assembly is designed. The guide rail is realized through the guide rod and the first diagonal support rod with adjustable length. The swing and tilt angle adjustment ensures that the climbing formwork device can be raised and fixed smoothly at the included angle.
It realizes the smooth climbing of the climbing formwork device between the bridge tower column segments, ensuring the smooth progress and beautiful effect of the construction. In particular, by adjusting the length of the diagonal brace and the cooperation of the hydraulic cylinder, precise angles can be achieved. Position and angle adjustment.
Smart Images

Figure CN221798176U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction facilities, in particular to a climbing formwork device. Background Art
[0002] At present, when carrying out high-altitude building construction, climbing formwork casting is usually used for construction. Climbing formwork casting is to use a set of climbing formwork devices during the casting process, and realize layer-by-layer casting through the self-climbing of the climbing formwork device. For example, the Chinese utility model specification with authorization announcement number CN210563388U discloses a hydraulic climbing formwork device, including a plurality of wall-mounted mounts fixed to the wall, a climbing formwork lower frame is hung on the wall-mounted mounts, a climbing formwork guide rail that can be hung on the wall-mounted mounts is passed through the climbing formwork lower frame, an upper reversing box and a lower reversing box are arranged on the climbing formwork guide rail, the upper reversing box is connected and fixed to the climbing formwork lower frame, a hydraulic cylinder is connected between the upper reversing box and the lower reversing box, the hydraulic cylinder realizes the alternating wall climbing of the climbing formwork lower frame and the climbing formwork guide rail on the wall-mounted mount through the upper reversing box and the lower reversing box; a main operating platform is laid on the top of the climbing formwork lower frame, a climbing formwork upper frame and a template track are installed on the main operating platform, a slide is slidably arranged on the template track, a template moving back rib is installed on the slide, a template is installed on the template moving back rib, the slide moves along the template track driven by the driving component, thereby synchronously driving the template to close or withdraw the mold. When the lower frame of the climbing formwork and the upper frame of the climbing formwork are hung on the wall-attached mount, the mold is closed, and the mold is withdrawn after the mold is cast. Then, the tongue direction in the upper reversing box and the lower reversing box is adjusted and the hydraulic cylinder is started. At this time, the hydraulic cylinder drives the climbing formwork guide rail to climb relative to the lower frame of the climbing formwork attached to the wall through the upper reversing box and the lower reversing box. When the climbing formwork guide rail is lifted to the upper wall-attached mount, the tongue direction in the upper reversing box and the lower reversing box is adjusted again and the hydraulic cylinder is started. At this time, the hydraulic cylinder drives the lower frame of the climbing formwork to climb relative to the climbing formwork guide rail attached to the wall through the upper reversing box and the lower reversing box. After the lower frame of the climbing frame climbs into place, the mold is closed again, and the mold is withdrawn again after the mold is cast. The above operation is repeated until the overall casting is completed. This climbing formwork device is suitable for the construction of straight columns or walls, and the climbing formwork device gradually rises in the vertical direction.
[0003] The bridge tower is a key component of the cable-stayed bridge, and the bridge tower is usually made of reinforced concrete structure. The bridge tower generally includes a tower base and left and right symmetrical tower columns, and the lower end of the tower column is connected to the tower base. In the concrete pouring construction of the tower column, the climbing formwork casting method can be used for construction. The climbing formwork device is fixed on the tower column segment that has completed the concrete pouring construction. The template of the climbing formwork device is used to enclose the concrete pouring cavity. After the steel bars are tied in the concrete pouring cavity, concrete is poured. The concrete pouring construction of the upper tower column segment is carried out. After the concrete of the tower column segment solidifies, the climbing formwork device can be climbed to prepare for the concrete pouring construction of the upper tower column segment.
[0004] In order to make the bridge tower more beautiful and enhance the landscape effect, the inclination angles of the tower segments in the left and right tower columns are basically gradual (that is, there is an angle between adjacent tower segments), and the inclination angles of the walls on the same side of adjacent tower segments will change slightly, so that the bridge tower has a unique shape (such as a teardrop shape). If conventional climbing formwork devices are used for construction, it is difficult to achieve smooth climbing of the climbing formwork device between adjacent tower segments with an angle (the inclination angles of the walls of two adjacent tower segments are different). Summary of the invention
[0005] The technical problem to be solved by the utility model is to provide a climbing formwork device, which can smoothly climb between adjacent tower column segments with an included angle, which is conducive to ensuring the smooth progress and progress of tower column construction. The adopted technical solution is as follows:
[0006] A climbing formwork device comprises a climbing formwork guide rail, a hydraulic cylinder, a supporting platform, a climbing formwork lower frame, a climbing formwork upper frame and a formwork assembly, wherein the top of the climbing formwork lower frame is connected to the supporting platform, the bottom of the climbing formwork upper frame is connected to the supporting platform, the formwork assembly is mounted on the supporting platform, an upper reversing box and a lower reversing box are arranged on the climbing formwork guide rail, and the hydraulic cylinder is connected between the upper reversing box and the lower reversing box. The characteristic is that: the climbing formwork device also comprises a guide rod, the upper end of the guide rod is hinged to the inner end of the supporting platform, a first diagonal support rod with adjustable length is arranged between the supporting platform and the guide rod, the upper end of the first diagonal support rod is hinged to the supporting platform, and the lower end of the first diagonal support rod is hinged to the lower end or the middle part of the guide rod; the upper reversing box is connected and fixed to the guide rod.
[0007] During construction, the climbing formwork guide rail is connected to the wall surface of the tower column segment through the wall attachment device, and the supporting platform and the lower frame of the climbing formwork are also connected to the wall surface of the tower column segment through the wall attachment device to fix the entire climbing formwork device. When climbing is required, the climbing formwork guide rail is first separated from the wall attachment device, and then the length of the first diagonal support rod is adjusted to make the climbing formwork guide rail, the guide rod and the hydraulic cylinder swing around the hinge at the upper end of the guide rod to a certain angle, so that the climbing formwork guide rail is parallel to the wall surface of the previous tower column segment that has just completed concrete pouring and solidification, and then the climbing formwork guide rail is raised by the hydraulic cylinder, and then the climbing formwork guide rail is fixed to the wall surface of the previous tower column segment through the wall attachment device; then the supporting platform and the lower frame of the climbing formwork are separated from the wall attachment device, and then the guide rod, the supporting platform, the lower frame of the climbing formwork, the upper frame of the climbing formwork and the formwork assembly are raised together by the hydraulic cylinder, and then the supporting platform and the lower frame of the climbing formwork are fixed to the new position through the wall attachment device. Since the climbing formwork guide rail, guide rod and hydraulic cylinder can swing a certain angle around the hinge at the upper end of the guide rod to adjust the inclination angle, the climbing formwork device can smoothly climb between adjacent tower column segments with an angle. In addition, when the climbing formwork device reaches a new position, the inclination angle of the supporting platform can be adjusted by adjusting the length of the first diagonal support rod (usually the supporting platform is adjusted to a horizontal position or a substantially horizontal position).
[0008] In the present invention, the inner side refers to a side close to the tower column segment, and the outer side refers to a side away from the tower column segment.
[0009] Usually, the hydraulic cylinder and the climbing formwork guide rail are parallel to each other, and the guide rod and the climbing formwork guide rail are parallel to each other.
[0010] Usually, the supporting platform or the lower frame of the climbing formwork is provided with a hydraulic system capable of controlling the extension and retraction of the hydraulic cylinder piston rod.
[0011] In the above-mentioned climbing formwork device, the formwork assembly is used to enclose a casting cavity for the tower column segment to be cast, the supporting platform and the lower frame of the climbing formwork serve as supporting structures, and the upper frame of the climbing formwork and the lower frame of the climbing formwork serve as enclosing structures. Construction workers can stand on the supporting platform, the upper frame of the climbing formwork and the lower frame of the climbing formwork to perform operations.
[0012] In the preferred embodiment, the guide rod is provided with a sleeve or a slider, which can move along the length direction of the climbing formwork guide rail. When the sleeve is used, the sleeve is fixedly connected to the guide rod, and the sleeve is sleeved on the climbing formwork guide rail (the sleeve can slide with the climbing formwork guide rail, and the size of the inner through hole of the sleeve can also be slightly larger than the guide rod). When the slider is used, the slider is fixedly connected to the guide rod, and the slider is installed on the climbing formwork guide rail and slides with the climbing formwork guide rail (usually, it is required that there is an anti-loosening structure between the slider and the climbing formwork guide rail, for example, the slide groove on the slider that matches the climbing formwork guide rail is a T-shaped slide groove or a dovetail slide groove).
[0013] In a preferred embodiment, the first diagonal support rod comprises an upper screw rod, a lower screw rod and an internally threaded tube, the upper screw rod and the lower screw rod are respectively provided with external threads with opposite thread rotation directions, the two ends of the internally threaded tube are respectively provided with internal threads matching the upper screw rod and the lower screw rod, the upper end of the upper screw rod is hinged to the bottom of the supporting platform (the upper end of the upper screw rod is usually hinged to the middle part of the bottom of the supporting platform or the part close to the outer end), and the lower end of the lower screw rod is hinged to the lower end or the middle part of the guide rod. More preferably, an adjustment handle is provided on the outer wall of the internally threaded tube.
[0014] In the preferred embodiment, the template assembly includes a translation guide rail, a translation seat, a back rib frame and a template. The translation guide rail is arranged on the supporting platform and runs inward and outward. The translation seat is installed on the translation guide rail and slides with the translation guide rail. The lower end of the back rib frame is hinged to the translation seat. A length-adjustable template diagonal support rod is arranged between the back rib frame and the translation seat. The lower end of the template diagonal support rod is hinged to the translation seat. The upper end of the template diagonal support rod is hinged to the middle or upper part of the back rib frame. The template is installed on the back rib frame. The template assembly also includes a translation seat position adjustment mechanism that can drive the translation seat to move along the translation guide rail. The translation seat position adjustment mechanism can drive the translation seat to move inward or outward along the translation guide rail to achieve mold closing or mold removal of the template. The inclination angle of the template can be adjusted by adjusting the length of the template diagonal support rod.
[0015] In a more preferred embodiment, the above-mentioned template assembly also includes a strip fixing groove and a back rib frame support foot. The strip fixing groove is fixedly installed on the inner edge of the translation seat, the lower end of the back rib frame is hinged to the top of the inner groove wall of the strip fixing groove, the upper end of the back rib frame support foot is fixedly connected to the lower end of the back rib frame, and the back rib frame support foot is in the cavity of the strip fixing groove. During construction, the translation seat is driven to move inward along the translation guide rail by the translation seat position adjustment mechanism until the inner groove wall of the strip fixing groove is in close contact with the outer wall of the tower column segment on which the concrete pouring construction has been completed, and the inclination angle of the back rib frame is adjusted by adjusting the length of the template diagonal support rod, so that the inclination angle of the back rib frame is roughly equal to the preset inclination angle of the template; then the template is installed on the inner side of the back rib frame, and the inclination angle of the template is further calibrated (the inclination angle of the inner side surface of the template can be measured by an angle measuring instrument; if the inclination angle of the inner side surface of the template is equal to its preset inclination angle, the inclination angle calibration of the template is completed; if there is a deviation between the inclination angle of the inner side surface of the template and its preset inclination angle, the length of the template diagonal support rod is fine-tuned, thereby fine-tuning the inclination angle of the back rib frame and the template), so that the inclination angle of the template is equal to its preset inclination angle, and the lower edge of the template is fitted with the corresponding part of the edge of the top surface of the tower column segment on which the concrete pouring construction has been completed. By the above method, templates are installed around the tower column segment that has completed the concrete pouring construction, so that each template together encloses a forming mold cavity for pouring the previous tower column segment; on this basis, the two templates on the opposite sides are tightened inward by the tie rod before pouring the concrete. The back rib frame is positioned and reinforced by the strip fixing groove and the back rib frame support feet to balance the tension of the tie rod. Therefore, on the side of the outer wall of the previous tower column segment that tilts outward from bottom to top, it is only necessary to make the lower edge of the template fit with the corresponding part of the top edge of the tower column segment that has completed the concrete pouring construction, and there is no need to make the lower end of the template closely contact the outer wall of the next tower column segment, thereby avoiding the formation of a small section of excess concrete on the upper side of the contact part after the concrete pouring of the previous tower column segment is completed, and the template can be more accurately located at the predetermined position.
[0016] In a further preferred embodiment, at least one screw hole is provided on the outer wall of the strip-shaped fixing groove, and a limit screw is installed in the screw hole, and the end of the limit screw can contact and cooperate with the outer wall of the back-rib frame support leg. After calibrating the inclination angle of the template, the limit screw is rotated so that the end of the limit screw is in close contact with the outer wall of the back-rib frame support leg, which can prevent the back-rib frame support leg from swinging outward, thereby making the position of the template more stable. Usually, the number of screw holes provided on the outer wall of the strip-shaped fixing groove is at least two.
[0017] In a more preferred solution, the above-mentioned template diagonal support rod comprises an upper screw rod, a lower screw rod and an internal threaded tube, the upper screw rod and the lower screw rod are respectively provided with external threads and the threads are rotated in opposite directions, and the two ends of the internal threaded tube are respectively provided with internal threads matching the upper screw rod and the lower screw rod, the upper end of the upper screw rod is hinged to the back rib frame, and the lower end of the lower screw rod is hinged to the translation seat. More preferably, an adjustment handle is provided on the outer wall of the above-mentioned internal threaded tube. When the internal threaded tube is rotated by the adjustment handle, the depth of the upper screw rod and the lower screw rod screwed into the internal threaded tube can be adjusted, thereby adjusting the length of the template diagonal support rod, and then adjusting the inclination angle of the back rib frame and the template.
[0018] In a specific solution, the above-mentioned translation seat position adjustment mechanism includes an adjustment screw, a nut and a rotating handle. The adjustment screw can be rotatably mounted on the supporting platform and is parallel to the translation guide rail. The rotating handle is connected to one end of the adjustment screw. The nut is fixedly connected to the translation seat and meshes with the adjustment screw. Manual operation rotates the rotating handle to drive the adjustment screw to rotate. The adjustment screw then drives the nut and the translation seat to move inward or outward along the translation guide rail, thereby realizing the mold closing or mold removal of the template.
[0019] In another specific solution, the above-mentioned translation seat position adjustment mechanism includes a rack, a gear and a rotating handle. The rack is installed on the translation seat and is parallel to the translation guide rail. The gear is rotatably installed on the support platform through a gear shaft. The gear is meshed with the rack, and the rotating handle is connected to one end of the gear shaft. Manual operation rotates the rotating handle to drive the gear to rotate, and the gear then drives the rack and the translation seat to move inward or outward along the translation guide rail, thereby achieving mold closing or demolding of the template. Usually, it is necessary to set a structure on the support platform to prevent the gear from rotating by itself, such as the gear pin disclosed in the Chinese utility model specification with authorization announcement number CN210563388U.
[0020] In the preferred embodiment, the climbing formwork upper frame includes an upper horizontal frame, two upper vertical frames and at least one upper adjustment rod with adjustable length. The two upper vertical frames are arranged side by side inside and outside, the lower ends of the two upper vertical frames are respectively hinged to the supporting platform, and the inner end and outer end of the upper horizontal frame are respectively hinged to the two upper vertical frames (the hinged parts of the upper vertical frames and the upper horizontal frames can be the upper ends or the middle parts of the upper vertical frames); one end of the upper adjustment rod is hinged to the upper horizontal frame, and the other end of the upper adjustment rod is hinged to an upper vertical frame. The upper horizontal frame and the two upper vertical frames together form the climbing formwork upper frame. There are usually at least two upper adjustment rods, and the upper adjustment rods are usually parallel to each other and arranged in sequence from left to right. By adjusting the length of each upper adjustment rod, the inclination angle of the upper vertical frame can be adjusted to make it closer to the wall or away from the wall, thereby adjusting the inclination angle of the climbing formwork upper frame. By adjusting the inclination angle of the climbing formwork upper frame, the various parts of the climbing formwork upper frame can be kept at an appropriate distance from the tower wall, which is more convenient for operation and avoids the threat to the safety of operators caused by the climbing formwork upper frame being far away from the tower wall.
[0021] In a more preferred embodiment, the upper adjustment rod comprises an upper screw rod, a lower screw rod and an internally threaded tube, the upper screw rod and the lower screw rod are respectively provided with external threads with opposite thread rotation directions, the two ends of the internally threaded tube are respectively provided with internal threads matching the upper screw rod and the lower screw rod, the upper end of the upper screw rod is hinged to the upper horizontal frame, and the lower end of the lower screw rod is hinged to an upper vertical frame. More preferably, an adjustment handle is provided on the outer wall of the internally threaded tube.
[0022] In the preferred embodiment, the lower frame of the climbing formwork comprises a lower horizontal frame, two lower vertical frames and at least one lower adjustment rod with adjustable length. The two lower vertical frames are arranged side by side inside and outside, the upper ends of the two lower vertical frames are respectively hinged to the supporting platform, and the inner end and outer end of the lower horizontal frame are respectively hinged to the two lower vertical frames (the hinged parts of the lower vertical frames and the lower horizontal frames can be the upper ends or the middle parts of the lower vertical frames); one end of the lower adjustment rod is hinged to the lower horizontal frame, and the other end of the lower adjustment rod is hinged to the lower vertical frame. The lower horizontal frame and the two lower vertical frames together form the lower frame of the climbing formwork, which plays a protective role. There are usually at least two lower adjustment rods, and the lower adjustment rods are usually parallel to each other and arranged in sequence from left to right. By adjusting the length of each lower adjustment rod, the inclination angle of the lower vertical frame can be adjusted to make it close to the wall or away from the wall, thereby adjusting the inclination angle of the lower frame of the climbing formwork. By adjusting the inclination angle of the lower frame of the climbing formwork, the various parts of the lower frame of the climbing formwork can be kept at an appropriate distance from the tower wall, which is more convenient for operation and avoids the threat to the safety of operators caused by the lower frame of the climbing formwork being far away from the tower wall.
[0023] In a more preferred solution, the lower adjustment rod comprises an upper screw rod, a lower screw rod and an internally threaded tube, the upper screw rod and the lower screw rod are respectively provided with external threads with opposite thread rotation directions, the two ends of the internally threaded tube are respectively provided with internal threads matching the upper screw rod and the lower screw rod, the upper end of the upper screw rod is hinged to a lower vertical frame, and the lower end of the lower screw rod is hinged to a lower horizontal frame. More preferably, an adjustment handle is provided on the outer wall of the internally threaded tube.
[0024] Usually, the upper horizontal frame, upper vertical frame, lower horizontal frame and lower vertical frame are respectively rectangular frames connected by multiple rods (such as steel pipes, steel profiles or steel bars). On the basis of the rectangular frame, other rods can be added to connect the opposite sides or adjacent sides of the rectangular frame.
[0025] When the climbing formwork device of the utility model needs to climb, the climbing formwork guide rail, the guide rod and the hydraulic cylinder are first swung together at a certain angle around the hinge of the upper end of the guide rod, so that the climbing formwork guide rail is parallel to the wall surface of the upper tower column segment that has just completed concrete pouring and solidification, so that the climbing formwork guide rail can rise smoothly (the climbing formwork guide rail will not be hindered by the wall surface of the upper tower column segment when rising), and the climbing formwork guide rail is parallel to the wall surface of the upper tower column segment when reaching the wall surface of the upper tower column segment, which is more convenient to move the climbing formwork guide rail to a predetermined new position and fix it. Therefore, the climbing formwork device can climb smoothly between adjacent tower column segments with an angle, which is conducive to ensuring the smooth progress and construction progress of the tower column construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a structural schematic diagram of a preferred embodiment of the utility model;
[0027] Figure 2 It is a schematic diagram of a state in which the climbing formwork guide rail is moved to a predetermined new position and fixed in a preferred embodiment of the utility model;
[0028] Figure 3 It is a schematic diagram of the state in which the entire climbing formwork device rises to a new position in a preferred embodiment of the utility model. DETAILED DESCRIPTION
[0029] like Figure 1-Figure 3 As shown, the climbing formwork device in this embodiment includes a climbing formwork guide rail 1, a guide rod 2, a hydraulic cylinder 3, a supporting platform 4, a climbing formwork lower frame 5, a climbing formwork upper frame 6 and a formwork assembly 7. The top of the climbing formwork lower frame 5 is connected to the supporting platform 4, the bottom of the climbing formwork upper frame 6 is connected to the supporting platform 4, the formwork assembly 7 is installed on the supporting platform 4, and an upper reversing box 12 and a lower reversing box 13 are provided on the climbing formwork guide rail 1. The hydraulic cylinder 3 is connected between the upper reversing box 12 and the lower reversing box 13; the upper end of the guide rod 2 is hinged to the inner end of the supporting platform 4, and a first diagonal support rod 8 with adjustable length is provided between the supporting platform 4 and the guide rod 2, the upper end of the first diagonal support rod 8 is hinged to the supporting platform 4, and the lower end of the first diagonal support rod 8 is hinged to the middle part of the guide rod 2; the upper reversing box 12 is connected and fixed to the guide rod 2. There are two climbing formwork guide rails 1, guide rods 2, hydraulic cylinders 3, upper reversing boxes 12, and lower reversing boxes 13, respectively, which are divided into two groups arranged side by side on the left and right (each group includes a climbing formwork guide rail, a guide rod, a hydraulic cylinder, an upper reversing box and a lower reversing box).
[0030] In this embodiment, the hydraulic cylinder 3 is parallel to the climbing formwork guide rail 1, and the guide rod 2 is parallel to the climbing formwork guide rail 1. In this embodiment, the cylinder body of the hydraulic cylinder 3 is connected to the upper reversing box 12, and the piston rod of the hydraulic cylinder 3 is connected to the lower reversing box 13.
[0031] The supporting platform or the lower frame of the climbing formwork is provided with a hydraulic system capable of controlling the extension and retraction of the hydraulic cylinder piston rod. The structure of climbing can be realized by controlling the extension and retraction of the hydraulic cylinder piston rod, and conventional technical means can be adopted, which will not be described in detail here.
[0032] In this embodiment, a sliding sleeve 9 is provided on the guide rod 2, and the sliding sleeve 9 can move along the length direction of the climbing formwork guide rail 1. The sliding sleeve 9 is fixedly connected to the guide rod 2, and the sliding sleeve 9 is sleeved on the climbing formwork guide rail 1 (the sliding sleeve can be slidably matched with the climbing formwork guide rail, and the size of the inner through hole of the sliding sleeve can also be slightly larger than the guide rod).
[0033] The first diagonal brace 8 comprises an upper screw rod 81, a lower screw rod 82 and an internal threaded tube 83. The upper screw rod 81 and the lower screw rod 82 are respectively provided with external threads and the threads are rotated in opposite directions. Both ends of the internal threaded tube 83 are respectively provided with internal threads matching the upper screw rod 81 and the lower screw rod 82. The upper end of the upper screw rod 81 is hinged to the bottom of the supporting platform 4 (the upper end of the upper screw rod is usually hinged to the middle part of the bottom of the supporting platform or the part close to the outer end), and the lower end of the lower screw rod 82 is hinged to the middle part of the guide rod 2. An adjustment handle 84 is provided on the outer wall of the internal threaded tube 83. When the internal threaded tube 83 is rotated by adjusting the handle 84, the depth of the upper screw rod 81 and the lower screw rod 82 screwed into the internal threaded tube 83 can be adjusted, thereby adjusting the length of the first diagonal brace 8, and then adjusting the angle between the guide rod 2 and the supporting platform 4.
[0034] In this embodiment, the template assembly 7 includes a translation guide rail 71, a translation seat 72, a back rib frame 73, an outer template 74, a strip fixing groove 76, a back rib frame support foot 77 and a template diagonal support rod 75 with adjustable length. The translation guide rail 71 is arranged on the supporting platform 4 and is in an inside-outside direction. The translation seat 73 is installed on the translation guide rail 71 and slides with the translation guide rail 71. The strip fixing groove 76 is fixedly installed on the inner edge of the translation seat 73. The lower end of the back rib frame 73 is fixed with the strip fixing groove 76. The top of the inner groove wall of the fixed groove 76 is hinged, the upper end of the back rib frame support foot 77 is fixedly connected to the lower end of the back rib frame 73, the back rib frame support foot 77 is in the cavity of the strip fixed groove 76, the lower end of the template diagonal support rod 75 is hinged to the translation seat 72, the upper end of the template diagonal support rod 75 is hinged to the middle or upper part of the back rib frame 73, and the outer template 74 is installed on the back rib frame 73; the template assembly also includes a translation seat position adjustment mechanism that can drive the translation seat 72 to move along the translation guide rail 71. The translation seat position adjustment mechanism can drive the translation seat 72 to move inward or outward along the translation guide rail 71 to achieve mold closing or mold removal of the outer template 74. By adjusting the length of the template diagonal support rod 75, the inclination angle of the outer template 74 can be adjusted. During construction, the translation seat 72 is driven by the translation seat position adjustment mechanism to move inwardly along the translation guide rail 71 until the inner groove wall of the strip fixing groove 76 is in close contact with the outer wall of the tower column segment on which the concrete pouring construction has been completed, and the inclination angle of the back rib frame 73 is adjusted by adjusting the length of the template diagonal support rod 75, so that the inclination angle of the back rib frame 73 is approximately equal to the preset inclination angle of the template 74; then the template 74 is installed on the inner side of the back rib frame 73, and the inclination angle of the template 74 is further calibrated (the inclination angle of the inner side surface of the template can be measured by an angle measuring instrument; if the inclination angle of the inner side surface of the template is equal to its preset inclination angle, the inclination angle calibration of the template is completed; if there is a deviation between the inclination angle of the inner side surface of the template and its preset inclination angle, the length of the template diagonal support rod is fine-tuned, thereby fine-tuning the inclination angle of the back rib frame and the template), so that the inclination angle of the template 74 is equal to its preset inclination angle, and the lower edge of the template 74 is fitted with the corresponding portion of the edge of the top surface of the tower column segment on which the concrete pouring construction has been completed.
[0035] At least two (for example, two) screw holes 78 are provided on the outer wall of the strip-shaped fixing groove 76, and a limit screw 79 is installed in the screw hole 78, and the end of the limit screw 79 can contact and cooperate with the outer wall of the back frame support leg 77. After calibrating the inclination angle of the template 74, the limit screw 79 is rotated so that the end of the limit screw 79 is in close contact with the outer wall of the back frame support leg 77, which can prevent the back frame support leg 77 from swinging outward, thereby making the position of the template 74 more stable.
[0036] The template diagonal support rod 75 comprises an upper screw rod 751, a lower screw rod 752 and an internal threaded tube 753. The upper screw rod 751 and the lower screw rod 752 are respectively provided with external threads and the threads are rotated in opposite directions. Both ends of the internal threaded tube 753 are respectively provided with internal threads matching the upper screw rod 751 and the lower screw rod 752. The upper end of the upper screw rod 751 is hinged to the back rib frame 73, and the lower end of the lower screw rod 752 is hinged to the translation seat 72. An adjustment handle 754 is provided on the outer wall of the internal threaded tube 753. When the internal threaded tube is rotated by adjusting the handle 754, the depth of the upper screw rod 751 and the lower screw rod 752 screwed into the internal threaded tube 753 can be adjusted, thereby adjusting the length of the template diagonal support rod 75, and then adjusting the inclination angle of the back rib frame 73 and the template 74.
[0037] In this embodiment, the translation seat position adjustment mechanism includes an adjustment screw 710, a nut (not shown) and a rotating handle 711. The adjustment screw 710 is rotatably mounted on the supporting platform 4 and is parallel to the translation guide rail 71. The rotating handle 711 is connected to one end of the adjustment screw 710. The nut is fixedly connected to the translation seat 72 and meshes with the adjustment screw 710. Manual operation rotates the rotating handle 711 to drive the adjustment screw 710 to rotate. The adjustment screw 710 then drives the nut and the translation seat 72 to move inward or outward along the translation guide rail 71, thereby realizing the mold closing or mold removal of the template 74.
[0038] The climbing formwork upper frame 6 includes an upper horizontal frame 61, two upper vertical frames 62, 63 and at least one upper adjustment rod 64 with adjustable length. The two upper vertical frames 62, 63 are arranged side by side inside and outside. The lower ends of the two upper vertical frames 62, 63 are respectively hinged to the supporting plane 4. The inner end and outer end of the upper horizontal frame 61 are respectively hinged to the two upper vertical frames 62, 63 (the part where the upper vertical frame and the upper horizontal frame are hinged can be the upper end or the middle part of the upper vertical frame); one end of the upper adjustment rod 64 is hinged to the upper horizontal frame 61, and the other end of the upper adjustment rod 64 is hinged to the upper vertical frame 62 (it can also be hinged to the upper vertical frame 63). In this embodiment, two upper adjustment rods 64 are provided, and the two upper adjustment rods 64 are parallel to each other and arranged side by side left and right. By adjusting the length of each upper adjustment rod 64, the inclination angle of the upper vertical frames 62, 63 can be adjusted to make them close to the wall or away from the wall, thereby adjusting the inclination angle of the climbing formwork upper frame 6. By adjusting the inclination angle of the climbing formwork upper frame 6, it is possible to maintain a suitable distance between each part of the climbing formwork upper frame 6 and the tower column wall.
[0039] The upper adjustment rod 64 includes an upper screw rod 641, a lower screw rod 642 and an internal threaded tube 643. The upper screw rod 641 and the lower screw rod 642 are respectively provided with external threads and the threads are rotated in opposite directions. The two ends of the internal threaded tube 643 are respectively provided with internal threads matching the upper screw rod 641 and the lower screw rod 642. The upper end of the upper screw rod 641 is hinged to the upper horizontal frame, and the lower end of the lower screw rod 642 is hinged to the upper vertical frame 62 (and can also be hinged to the upper vertical frame 63). An adjustment handle 644 is provided on the outer wall of the internal threaded tube 643. When the internal threaded tube 643 is rotated by adjusting the handle 644, the depth of the upper screw rod 641 and the lower screw rod 642 screwed into the internal threaded tube 643 can be adjusted, thereby adjusting the length of the upper adjustment rod 64.
[0040] The lower frame 5 of the climbing formwork includes a lower horizontal frame 51, two lower vertical frames 52, 53 and at least one lower adjustment rod 54 with adjustable length. The two lower vertical frames 52, 53 are arranged side by side inside and outside. The upper ends of the two lower vertical frames 52, 53 are respectively hinged to the supporting platform 4. The inner end and outer end of the lower horizontal frame 51 are respectively hinged to the two lower vertical frames 52, 53 (the part where the lower vertical frame and the lower horizontal frame are hinged can be the upper end or the middle part of the lower vertical frame); one end of the lower adjustment rod 54 is hinged to the lower horizontal frame 51, and the other end of the lower adjustment rod 54 is hinged to the lower vertical frame 52 (it can also be hinged to the lower vertical frame 53). In this embodiment, two lower adjustment rods 54 are provided, and the two lower adjustment rods 54 are parallel to each other and arranged side by side left and right. By adjusting the length of each lower adjustment rod 54, the inclination angle of the lower vertical frames 52, 53 can be adjusted to make them close to the wall or away from the wall, thereby adjusting the inclination angle of the lower frame 5 of the climbing formwork. By adjusting the inclination angle of the lower frame 5 of the climbing formwork, it is possible to maintain a suitable distance between each part of the lower frame 5 of the climbing formwork and the wall surface of the tower column.
[0041] The lower adjustment rod 54 includes an upper screw rod 541, a lower screw rod 542 and an internal threaded tube 543. The upper screw rod 541 and the lower screw rod 542 are respectively provided with external threads and the threads are rotated in opposite directions. The two ends of the internal threaded tube 543 are respectively provided with internal threads matching the upper screw rod 541 and the lower screw rod 542. The upper end of the upper screw rod 541 is hinged to the lower vertical frame 52 (or can be hinged to the lower vertical frame 53), and the lower end of the lower screw rod 542 is hinged to the lower horizontal frame 51. An adjustment handle 544 is provided on the outer wall of the internal threaded tube 543. When the internal threaded tube 543 is rotated by adjusting the handle 544, the depth of the upper screw rod 541 and the lower screw rod 542 screwed into the internal threaded tube 543 can be adjusted, thereby adjusting the length of the lower adjustment rod 54.
[0042] In this embodiment, the upper horizontal frame 61, the upper vertical frame 62, the upper vertical frame 63, the lower horizontal frame 51, the lower vertical frame 52, and the lower vertical frame 53 are respectively rectangular frames connected by multiple rods (such as steel pipes, steel profiles or steel bars). On the basis of the rectangular frame, other rods can be added to connect the opposite sides or adjacent sides of the rectangular frame.
[0043] The working principle of the above climbing formwork device is briefly described as follows:
[0044] In the climbing formwork device, the formwork assembly 7 is used to enclose a casting cavity for the tower column segment to be cast, the supporting platform 4 and the climbing formwork lower frame 5 serve as supporting structures, and the climbing formwork upper frame 6 and the climbing formwork lower frame 5 serve as enclosing structures. Construction workers can stand on the supporting platform 4, the climbing formwork upper frame 6 and the climbing formwork lower frame 5 to perform operations.
[0045] During construction, the climbing formwork guide rail 1 is connected to the wall surface of the tower column segment 11-1 through the wall attachment device 10, and the supporting platform 4 and the climbing formwork lower frame 5 are also connected to the wall surface of the tower column segment 11-1 through the wall attachment device to fix the entire climbing formwork device.
[0046] When climbing is required, the climbing formwork guide rail 1 is first separated from the wall attachment device 10, and then the length of the first diagonal support rod 8 is adjusted to make the climbing formwork guide rail 1, the guide rod 2 and the hydraulic cylinder 3 swing together at a certain angle around the hinge at the upper end of the guide rod 2, so that the climbing formwork guide rail 1 is parallel to the wall surface of the upper tower column segment 11-2 where concrete pouring and solidification have just been completed, and then the climbing formwork guide rail 1 is raised by the hydraulic cylinder 3, and then the climbing formwork guide rail 1 is fixed to the wall surface of the upper tower column segment 11-2 by the wall attachment device 10 (such as Figure 2 Then, the supporting platform 4 and the lower frame 5 of the climbing formwork are separated from the wall attachment device, and the guide rod 2, the supporting platform 4, the lower frame 5 of the climbing formwork, the upper frame 6 of the climbing formwork and the formwork assembly 7 are raised together by the hydraulic cylinder 3, and then the supporting platform 4 and the lower frame 5 of the climbing formwork are fixed in the new position by the wall attachment device (as shown in FIG. Figure 3 as shown).
[0047] The climbing process is achieved by using the upper reversing box 12 and the lower reversing box 13 in conjunction with the extension and retraction of the hydraulic cylinder piston rod: when the climbing formwork guide rail 1 needs to be raised (at this time, the guide rod 2, the supporting platform 4, the climbing formwork lower frame 5, etc. are fixed), the lower reversing box 13 grasps the climbing formwork guide rail 1, the upper reversing box 12 releases the climbing formwork guide rail 1, and then the piston rod of the hydraulic cylinder 3 contracts, so that the climbing formwork guide rail 1 rises a certain distance; then the upper reversing box 12 grasps the climbing formwork guide rail 1, the lower reversing box 13 releases the climbing formwork guide rail 1, and the piston rod of the hydraulic cylinder 3 extends, so that the lower reversing box 13 drops a certain distance; then the lower reversing box 13 grasps the climbing formwork guide rail 1 again, the upper reversing box 12 releases the climbing formwork guide rail 1 again, and then the piston rod of the hydraulic cylinder 3 contracts again, so that the climbing formwork guide rail 1 rises a certain distance again; this cycle is repeated to gradually lift the climbing formwork guide rail 1. When it is necessary to raise the guide rod 2, the supporting platform 4, the lower frame 5 of the climbing formwork, the upper frame 6 of the climbing formwork and the formwork assembly 7 together (at this time, the position of the climbing formwork guide rail 1 is fixed), the lower reversing box grasps the climbing formwork guide rail 1, and the upper reversing box 12 releases the climbing formwork guide rail 1, and then the piston rod of the hydraulic cylinder 3 extends to raise the guide rod 2, the supporting platform 4, the lower frame 5 of the climbing formwork, the upper frame 6 of the climbing formwork and the formwork assembly 7 together for a distance; then the upper reversing box 12 grasps the climbing formwork guide rail 1, and the lower reversing box 13 releases the climbing formwork guide rail Rail 1, the piston rod of the hydraulic cylinder 3 contracts, causing the lower reversing box 13 to rise a certain distance; then the lower reversing box 13 grabs the climbing formwork guide rail 1 again, and the upper reversing box 12 releases the climbing formwork guide rail 1 again, and then the piston rod of the hydraulic cylinder 3 extends again, causing the guide rod 2, the supporting platform 4, the climbing formwork lower frame 5, the climbing formwork upper frame 6 and the formwork assembly 7 to rise a certain distance together again; this cycle is repeated to gradually lift the guide rod 2, the supporting platform 4, the climbing formwork lower frame 5, the climbing formwork upper frame 6 and the formwork assembly 7.
[0048] When the climbing formwork device reaches a new position, the inclination angle of the supporting platform 4 can be adjusted by adjusting the length of the first diagonal support rod 8 (usually the supporting platform is adjusted to be in a horizontal position or a substantially horizontal position).
[0049] In other embodiments, in order to achieve the cooperation between the guide rod and the climbing formwork guide rail, a slider can be provided on the guide rod, and the slider can move along the length direction of the climbing formwork guide rail. The slider is fixedly connected to the guide rod, and the slider is installed on the climbing formwork guide rail and slidably cooperates with the climbing formwork guide rail (usually, an anti-loosening structure is required between the slider and the climbing formwork guide rail, for example, the slide groove on the slider that cooperates with the climbing formwork guide rail is a T-shaped slide groove or a dovetail slide groove).
[0050] In other embodiments, the translation seat position adjustment mechanism may also adopt other structures, for example: including a rack, a gear and a rotating handle, the rack is mounted on the translation seat and is parallel to the translation guide rail, the gear is rotatably mounted on the support platform through a gear shaft, the gear is meshed with the rack, and the rotating handle is connected to one end of the gear shaft. Manual operation rotates the rotating handle to drive the gear to rotate, and the gear then drives the rack and the translation seat to move inward or outward along the translation guide rail, thereby achieving mold closing or demolding of the template. A structure to prevent the gear from rotating by itself can be set on the support platform, such as the gear pin disclosed in the Chinese utility model specification with authorization announcement number CN210563388U.
Claims
1. A climbing formwork device, comprising a climbing formwork guide rail, a hydraulic cylinder, a supporting platform, a climbing formwork lower frame, a climbing formwork upper frame and a formwork assembly, wherein the top of the climbing formwork lower frame is connected to the supporting platform, the bottom of the climbing formwork upper frame is connected to the supporting platform, the formwork assembly is mounted on the supporting platform, an upper reversing box and a lower reversing box are arranged on the climbing formwork guide rail, and the hydraulic cylinder is connected between the upper reversing box and the lower reversing box, characterized in that: The climbing formwork device also includes a guide rod, the upper end of the guide rod is hinged to the inner end of the supporting platform, a first oblique support rod with adjustable length is provided between the supporting platform and the guide rod, the upper end of the first oblique support rod is hinged to the supporting platform, and the lower end of the first oblique support rod is hinged to the lower end or middle part of the guide rod; the upper reversing box is connected and fixed to the guide rod.
2. The climbing formwork device according to claim 1 is characterized in that: The hydraulic cylinder is parallel to the climbing formwork guide rail, and the guide rod is parallel to the climbing formwork guide rail.
3. The climbing formwork device according to claim 1 is characterized in that: The guide rod is provided with a sliding sleeve or a sliding block, and the sliding sleeve or the sliding block can move along the length direction of the climbing formwork guide rail; When a sliding sleeve is used, the sliding sleeve is fixedly connected to the guide rod, and the sliding sleeve is sleeved on the climbing formwork guide rail; When a slider is used, the slider is fixedly connected to the guide rod, and the slider is installed on the climbing formwork guide rail and slidably cooperates with the climbing formwork guide rail.
4. The climbing formwork device according to any one of claims 1 to 3, characterized in that: The template assembly includes a translation guide rail, a translation seat, a back rib frame and a template. The translation guide rail is arranged on the supporting platform and runs inward and outward. The translation seat is installed on the translation guide rail and slides with the translation guide rail. The lower end of the back rib frame is hinged to the translation seat. A template diagonal support rod with adjustable length is provided between the back rib frame and the translation seat. The lower end of the template diagonal support rod is hinged to the translation seat, and the upper end of the template diagonal support rod is hinged to the middle or upper part of the back rib frame. The template is installed on the back rib frame. The template assembly also includes a translation seat position adjustment mechanism that can drive the translation seat to move along the translation guide rail.
5. The climbing formwork device according to claim 4 is characterized in that: The template assembly also includes a strip fixing groove and a back rib frame support foot. The strip fixing groove is fixedly installed on the inner edge of the translation seat. The lower end of the back rib frame is hinged to the top of the inner groove wall of the strip fixing groove. The upper end of the back rib frame support foot is fixedly connected to the lower end of the back rib frame. The back rib frame support foot is in the cavity of the strip fixing groove.
6. The climbing formwork device according to claim 5 is characterized in that: At least one screw hole is arranged on the outer groove wall of the strip-shaped fixing groove, and a limiting screw is installed in the screw hole, and the end of the limiting screw can contact and cooperate with the outer side wall of the back rib frame support foot.
7. The climbing formwork device according to claim 4 is characterized in that: The translation seat position adjustment mechanism includes an adjustment screw, a nut and a rotating handle. The adjustment screw is rotatably mounted on the supporting platform and is parallel to the translation guide rail. The rotating handle is connected to one end of the adjustment screw. The nut is fixedly connected to the translation seat and meshes with the adjustment screw. Alternatively, the translation seat position adjustment mechanism includes a rack, a gear and a rotating handle, the rack is installed on the translation seat and is parallel to the translation guide rail, the gear is rotatably installed on the supporting platform through a gear shaft, the gear is meshed with the rack, and the rotating handle is connected to one end of the gear shaft.
8. The climbing formwork device according to any one of claims 1 to 3, characterized in that: The climbing formwork upper frame comprises an upper horizontal frame, two upper vertical frames and at least one upper adjustment rod with adjustable length. The two upper vertical frames are arranged side by side inside and outside. The lower ends of the two upper vertical frames are respectively hinged to the supporting platform, and the inner end and the outer end of the upper horizontal frame are respectively hinged to the two upper vertical frames; one end of the upper adjustment rod is hinged to the upper horizontal frame, and the other end of the upper adjustment rod is hinged to an upper vertical frame; The lower frame of the climbing formwork includes a lower horizontal frame, two lower vertical frames and at least one lower adjusting rod with adjustable length. The two lower vertical frames are arranged side by side inside and outside, the upper ends of the two lower vertical frames are respectively hinged to the supporting platform, and the inner end and outer end of the lower horizontal frame are respectively hinged to the two lower vertical frames; one end of the lower adjusting rod is hinged to the lower horizontal frame, and the other end of the lower adjusting rod is hinged to a lower vertical frame.
9. The climbing formwork device according to claim 4 is characterized in that: The climbing formwork upper frame comprises an upper horizontal frame, two upper vertical frames and at least one upper adjustment rod with adjustable length. The two upper vertical frames are arranged side by side inside and outside. The lower ends of the two upper vertical frames are respectively hinged to the supporting platform, and the inner end and the outer end of the upper horizontal frame are respectively hinged to the two upper vertical frames; one end of the upper adjustment rod is hinged to the upper horizontal frame, and the other end of the upper adjustment rod is hinged to an upper vertical frame; The lower frame of the climbing formwork includes a lower horizontal frame, two lower vertical frames and at least one lower adjusting rod with adjustable length. The two lower vertical frames are arranged side by side inside and outside, the upper ends of the two lower vertical frames are respectively hinged to the supporting platform, and the inner end and outer end of the lower horizontal frame are respectively hinged to the two lower vertical frames; one end of the lower adjusting rod is hinged to the lower horizontal frame, and the other end of the lower adjusting rod is hinged to a lower vertical frame.
10. The climbing formwork device according to claim 9, characterized in that: The first diagonal support rod, the template diagonal support rod, the upper adjustment rod and the lower adjustment rod all include an upper screw rod, a lower screw rod and an internal threaded tube. The upper screw rod and the lower screw rod are respectively provided with external threads with opposite thread rotation directions. Both ends of the internal threaded tube are respectively provided with internal threads matching the upper screw rod and the lower screw rod; an adjustment handle is provided on the outer wall of the internal threaded tube; In the first diagonal support rod, the upper end of the upper screw rod is hinged to the bottom of the supporting platform, and the lower end of the lower screw rod is hinged to the lower end or middle part of the guide rod; In the template diagonal brace, the upper end of the upper screw is hinged to the back rib frame, and the lower end of the lower screw is hinged to the translation seat; In the upper adjustment rod, the upper end of the upper screw rod is hinged to the upper horizontal frame, and the lower end of the lower screw rod is hinged to an upper vertical frame; In the lower adjusting rod, the upper end of the upper screw rod is hinged to the lower vertical frame, and the lower end of the lower screw rod is hinged to the lower horizontal frame.
