Cement trowelling device
By using a drive motor and a bevel gear movable screw mechanism in the cement troweling device, the automatic movement of the grinding disc is realized, which solves the safety hazards and time-consuming and labor-intensive problems of hand-held devices when processing walls of different heights, and improves work efficiency and Security.
Patent Information
- Application Number
- CN202323305212.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-05
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-05
AI Technical Summary
Most of the existing cement troweling devices are hand-held structures, which require manual climbing when handling walls of different heights, which poses safety risks and is time-consuming and labor-intensive.
A cement troweling device is designed, which uses a driving motor to drive the rotating shaft. It realizes the automatic up and down movement of the grinding disc through a series of bevel gears and movable screw mechanisms. It is combined with an electric telescopic rod to realize the forward and backward movement of the grinding disc and automatically completes the troweling work. .
It reduces the labor force of the staff, ensures personal safety, and improves the safety and efficiency of the smoothing work.
Smart Images

Figure CN221799055U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a cement leveling device. Background Art
[0002] The trowel device, also called the trowel machine, is widely used in the concrete floors or walls of parking lots, squares, and buildings. It is used to raise the slurry and smooth the concrete construction ground to improve the density and wear resistance of the concrete surface. Compared with the original manual troweling, the trowel machine is widely used because it saves time and labor.
[0003] However, most of the current leveling devices are handheld structures. When dealing with walls of different heights, manual climbing is required to bring the leveling device to the specified working height for work. This method not only poses a safety hazard, but is also time-consuming and labor-intensive.
[0004] Therefore, it is necessary to provide a new cement smoothing device to solve the above-mentioned technical problems. Utility Model Content
[0005] In order to solve the above technical problems, the utility model provides a cement leveling device.
[0006] A cement smoothing device provided by the utility model comprises a main frame, a fixed plate is movably provided inside the main frame, a grinding disc is installed on the front side of the fixed plate through symmetrically distributed electric telescopic rods, a working cavity is formed inside the bottom end of the main frame, built-in cavities are formed inside the left and right sides of the main frame, the working cavity is communicated with the built-in cavity, a linkage mechanism is accommodated inside the working cavity, a movable mechanism is provided at the interaction between the linkage mechanism and the fixed plate, and a driving mechanism is provided at the driving end of the linkage mechanism.
[0007] Preferably, the driving mechanism includes a driving motor installed on the outer wall of one side of the main frame, and a driving rotating shaft is fixed to the driving end of the driving motor. The driving rotating shaft rotates away from one end of the driving motor and extends into the interior of the working chamber and is connected to a bearing on the inner wall of one side of the working chamber at the end.
[0008] Preferably, the linkage mechanism comprises first bevel gears symmetrically fixedly sleeved on the outer surface of the driving rotating shaft, and two first bevel gears are both located inside the working cavity.
[0009] Preferably, one side of the two first bevel gears is meshedly connected with a second bevel gear, and the two second bevel gears are both located inside the working cavity.
[0010] Preferably, the movable mechanism comprises a movable screw fixedly disposed on the inner surface of the second bevel gear, and one end of the movable screw away from the second bevel gear rotates and extends into the interior of the built-in cavity and is connected to the top inner wall bearing of the built-in cavity at the end.
[0011] Preferably, a movable nut sleeve is threadedly sleeved on the outer surface of the movable screw rod, and the movable nut sleeve is located inside the built-in cavity.
[0012] Preferably, the movable mechanism further comprises movable slide grooves symmetrically opened on the left and right inner walls of the main frame, and the movable slide grooves are communicated with the built-in cavity.
[0013] Preferably, a movable slide block is movably provided inside the movable slide groove, and one end of the movable slide block located inside the built-in cavity is connected to the movable nut sleeve, and the other end located inside the main frame is connected to the fixed plate.
[0014] Compared with the related art, the cement leveling device provided by the utility model has the following beneficial effects:
[0015] The utility model provides a cement smoothing device, through the provided driving motor, the driving rotating shaft can rotate in the clockwise and counterclockwise directions, so that the two first bevel gears symmetrically installed on the outer wall of the driving rotating shaft will rotate synchronously in the opposite directions of rotation, so that the two second bevel gears respectively meshed with one side of the two first bevel gears will also rotate together, so that the two movable screw rods respectively installed in the inner walls of the two second bevel gears will also rotate synchronously, so that the two movable nut sleeves respectively sleeved on the outer walls of the two movable screw rods will respectively move up and down in the vertical direction on the outer walls thereof along with the rotation of the two movable screw rods, so that the grinding disc installed on the front side of the fixed plate will also move synchronously, and the grinding disc can be moved to a position fitting the wall surface through the forward and backward extension of the two electric telescopic rods, and then cooperate with the up and down movement, thereby realizing automatic smoothing work, which not only reduces the labor of the staff, but also ensures the personal safety of the staff and improves the safety during the smoothing work. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 A structural schematic diagram of a preferred embodiment of a cement leveling device provided by the utility model;
[0017] Figure 2 for Figure 1 A schematic diagram of the front cross-sectional structure of the main frame shown;
[0018] Figure 3 for Figure 1 The schematic diagram of the connection structure between the movable mechanism, the linkage mechanism and the driving mechanism shown;
[0019] Figure 4 for Figure 2 Schematic diagram of the connection structure between the fixed plate and the electric telescopic rod shown.
[0020] Numbers in the figure: 1. Main frame; 2. Grinding disc; 3. Movable mechanism; 31. Movable slide groove; 32. Movable screw rod; 33. Movable nut sleeve; 34. Movable slider; 4. Driving mechanism; 41. Driving motor; 42. Driving rotating shaft; 5. Fixed plate; 6. Electric telescopic rod; 7. Working chamber; 8. Built-in chamber; 9. Linkage mechanism; 91. First bevel gear; 92. Second bevel gear. DETAILED DESCRIPTION
[0021] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.
[0022] Please refer to Figures 1 to 4 A cement leveling device includes a main frame 1, a fixed plate 5 is movably provided inside the main frame 1, a grinding plate 2 is installed on the front side of the fixed plate 5 through a symmetrically distributed electric telescopic rod 6, a working cavity 7 is formed inside the bottom end of the main frame 1, and built-in cavities 8 are formed inside the left and right sides of the main frame 1, the working cavity 7 is communicated with the built-in cavity 8, a linkage mechanism 9 is accommodated inside the working cavity 7, a movable mechanism 3 is provided at the intersection of the linkage mechanism 9 and the fixed plate 5, and a driving mechanism 4 is provided at the driving end of the linkage mechanism 9.
[0023] When in use, when cement leveling of the building fence is required, the driving motor 41 is first started, so that the driving rotating shaft 42 can rotate in both clockwise and counterclockwise directions, so that the two first bevel gears 91 symmetrically mounted on the outer wall of the driving rotating shaft 42 will rotate synchronously in opposite directions, so that the two second bevel gears 92 respectively meshed on one side of the two first bevel gears 91 will also rotate together, so that the two movable screw rods 32 respectively mounted on the inner walls of the two second bevel gears 92 will also rotate synchronously, so that they are respectively sleeved. The two movable nut sleeves 33 connected to the outer walls of the two movable screw rods 32 will move up and down in the vertical direction on their outer walls respectively as the two movable screw rods 32 rotate, so that the grinding plate 2 installed on the front side of the fixed plate 5 will also move synchronously, and through the front and rear extension of the two electric telescopic rods 6, the grinding plate 2 can be moved to a position close to the wall, and then move up and down to realize automated leveling work, which not only reduces the labor of the staff, but also ensures the personal safety of the staff and improves the safety of the leveling work.
[0024] In the specific implementation process, Figure 1 and Figure 3 As shown, the driving mechanism 4 includes a driving motor 41 installed on the outer wall of one side of the main frame 1, and a driving rotating shaft 42 is fixed to the driving end of the driving motor 41. The driving rotating shaft 42 rotates and extends into the interior of the working chamber 7 at one end away from the driving motor 41 and is connected to a bearing on the inner wall of one side of the working chamber 7 at the end.
[0025] When in use, the drive motor 41 is installed on the outer wall of one side of the main frame 1, which can facilitate subsequent maintenance work, and the drive rotating shaft 42 is installed on the driving end of the drive motor 41. When the drive motor 41 is running, the drive rotating shaft 42 can rotate in both clockwise and counterclockwise directions inside the working chamber 7.
[0026] refer to Figure 2 and Figure 3 As shown, the linkage mechanism 9 includes a first bevel gear 91 symmetrically fixedly sleeved on the outer surface of the driving rotating shaft 42 , and one side of two first bevel gears 91 are meshedly connected with a second bevel gear 92 and are both located inside the working chamber 7 .
[0027] When in use, the two first bevel gears 91 are symmetrically mounted on the outer wall of the driving rotating shaft 42. When the driving rotating shaft 42 rotates, the two first bevel gears 91 will rotate synchronously, so that the two second bevel gears 92 respectively meshed on one side of the two first bevel gears 91 will also rotate together.
[0028] refer to Figure 2 and Figure 3 As shown, the movable mechanism 3 includes a movable screw rod 32 fixedly penetrated through the inner surface of the second bevel gear 92, and one end of the movable screw rod 32 away from the second bevel gear 92 rotates and extends into the interior of the built-in cavity 8 and is connected to the top inner wall bearing of the built-in cavity 8 at the end.
[0029] refer to Figure 3 As shown, the outer surface of the movable screw rod 32 is threadedly sleeved with a movable nut sleeve 33 , and the movable nut sleeve 33 is located inside the built-in cavity 8 .
[0030] When in use, the movable screw rod 32 is installed inside the second bevel gear 92. When the second bevel gear 92 rotates with the first bevel gear 91, the movable screw rod 32 will also rotate synchronously. The movable nut sleeve 33 threadedly sleeved on the outer wall of the movable screw rod 32 will move up and down in the vertical direction on the outer wall of the movable screw rod 32 as the movable screw rod 32 rotates.
[0031] refer to Figure 2 and Figure 3 As shown, the movable mechanism 3 further includes movable slide grooves 31 symmetrically opened on the left and right inner walls of the main frame 1 , and the movable slide grooves 31 are communicated with the built-in cavity 8 .
[0032] refer to Figure 3 As shown, a movable slider 34 is movably provided inside the movable slide groove 31 , and one end of the movable slider 34 located inside the built-in cavity 8 is connected to the movable nut sleeve 33 , and the other end located inside the main frame 1 is connected to the fixed plate 5 .
[0033] When in use, the movable slider 34 is connected to the movable nut sleeve 33 and the fixed plate 5 respectively. When the movable nut sleeve 33 moves on the outer wall of the movable screw rod 32, the movable slider 34 will drive the fixed plate 5 to move synchronously, so that the grinding plate 2 installed on the front side of the electric telescopic rod 6 will also move synchronously, and then the cement can be smoothed on the building wall.
[0034] The working principle of a cement leveling device provided by the utility model is as follows:
[0035] When cement leveling of the building wall is required, the driving motor 41 is first started, so that the driving rotating shaft 42 can rotate in both clockwise and counterclockwise directions, so that the two first bevel gears 91 symmetrically mounted on the outer wall of the driving rotating shaft 42 will rotate synchronously in opposite directions, so that the two second bevel gears 92 respectively meshed on one side of the two first bevel gears 91 will also rotate together, so that the two movable screw rods 32 respectively mounted on the inner walls of the two second bevel gears 92 will also rotate synchronously, so that they are respectively sleeved on The two movable nut sleeves 33 on the outer walls of the two movable screw rods 32 will move up and down in the vertical direction on their outer walls respectively as the two movable screw rods 32 rotate, so that the grinding plate 2 installed on the front side of the fixed plate 5 will also move synchronously, and through the front and rear extension of the two electric telescopic rods 6, the grinding plate 2 can be moved to a position close to the wall, and then move up and down to realize automated leveling work, which not only reduces the labor of the staff, but also ensures the personal safety of the staff and improves the safety of the leveling work.
[0036] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A cement leveling device, characterized in that: The invention comprises a main frame (1), wherein a fixed plate (5) is movably arranged inside the main frame (1), a grinding plate (2) is installed on the front side of the fixed plate (5) via symmetrically distributed electric telescopic rods (6), a working cavity (7) is formed inside the bottom end of the main frame (1), and built-in cavities (8) are formed inside the left and right sides of the main frame (1), the working cavity (7) is communicated with the built-in cavity (8), a linkage mechanism (9) is accommodated inside the working cavity (7), a movable mechanism (3) is arranged at the interface between the linkage mechanism (9) and the fixed plate (5), and a driving mechanism (4) is arranged at the driving end of the linkage mechanism (9).
2. A cement leveling device according to claim 1, characterized in that: The driving mechanism (4) comprises a driving motor (41) mounted on an outer wall of one side of the main frame (1); a driving rotating shaft (42) is fixed to a driving end of the driving motor (41); an end of the driving rotating shaft (42) away from the driving motor (41) rotates and extends into the interior of the working chamber (7) and is connected to a bearing on an inner wall of one side of the working chamber (7) at the end thereof.
3. A cement leveling device according to claim 1, characterized in that: The linkage mechanism (9) comprises a first bevel gear (91) symmetrically fixedly sleeved on the outer surface of the driving rotating shaft (42), and two first bevel gears (91) are both located inside the working chamber (7).
4. A cement leveling device according to claim 3, characterized in that: One side of the two first bevel gears (91) is meshedly connected with a second bevel gear (92), and the two second bevel gears (92) are both located inside the working chamber (7).
5. A cement leveling device according to claim 1, characterized in that: The movable mechanism (3) comprises a movable screw rod (32) fixedly arranged on the inner surface of the second bevel gear (92), wherein one end of the movable screw rod (32) away from the second bevel gear (92) rotates and extends into the interior of the built-in cavity (8) and is connected to a bearing on the top inner wall of the built-in cavity (8) at the end thereof.
6. A cement leveling device according to claim 5, characterized in that: The outer surface of the movable screw rod (32) is threadedly sleeved with a movable nut sleeve (33), and the movable nut sleeve (33) is located inside the built-in cavity (8).
7. A cement leveling device according to claim 1, characterized in that: The movable mechanism (3) further comprises movable slide grooves (31) symmetrically arranged on the left and right inner walls of the main frame (1), and the movable slide grooves (31) are in communication with the built-in cavity (8).
8. A cement leveling device according to claim 7, characterized in that: A movable slide block (34) is movably provided inside the movable slide groove (31); one end of the movable slide block (34) located inside the built-in cavity (8) is connected to the movable nut sleeve (33), and the other end located inside the main frame (1) is connected to the fixed plate (5).
