Perpendicularity detection device for constructional engineering
By designing a construction engineering verticality detection device that includes a base, a level, a fixed column, an angle plate and a driving component, the problem of the inability to determine the inclination angle of a building with the existing technology is solved, and the accurate measurement and control of the verticality of the building is achieved. Construction adjustments were made to improve construction quality.
Patent Information
- Application Number
- CN202323613328.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-28
AI Technical Summary
Existing verticality detection devices for construction projects cannot determine the inclination angle of the building and determine whether the verticality of the building is within the tolerance range, which affects the construction quality.
A detection device is designed that includes a base, a level, a fixed column, an angle plate, a first measuring scale, a driving component and an adjusting component. Through the cooperation of the fixed column and the angle plate, a motor is used to drive the connecting rod to drive the measuring scale to rotate, combined with the adjusting component. Flat components and adjustment components to achieve accurate measurement of building verticality.
It achieves accurate measurement of building verticality, can determine whether the building is within the tolerance range, provides data to support construction adjustments, and improves construction quality.
Smart Images

Figure CN221802882U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering detection, and in particular to a construction engineering verticality detection device. Background Art
[0002] For buildings, the control measurement of building verticality is an important measurement point during the main construction. Not only should the verticality of each floor be observed, and the control data should be provided to professional quality inspectors so that they can adjust and check the verticality of the building in time. In addition, detailed vertical control lines should be provided to construction personnel. In the construction of building projects, especially in the construction of medium and high-rise buildings, the control of building verticality is an important factor affecting the construction quality.
[0003] A patent with patent number CN219572927U discloses a verticality detection device for construction projects, including a horizontal ruler and a vertical ruler, a connecting frame slidably connected between the horizontal ruler and the vertical ruler, a slide groove is arranged in the horizontal ruler, the slide groove is arranged in a T-shaped groove, a slider is arranged on the connecting frame, the slider is arranged in a T-shaped groove, and the slide groove cooperates with the slider, and the vertical ruler and the horizontal ruler are arranged in a symmetrical structure.
[0004] However, the verticality detection device for construction projects in the above patent still has certain problems during use. The horizontal ruler and the vertical ruler are vertical structures with fixed directions, so that it can only detect whether the construction project is vertical, but cannot further determine its inclination angle, and cannot judge whether the verticality of the construction project is within the tolerance range, which is not conducive to subsequent construction by relevant personnel. For this reason, a verticality detection device for construction projects is proposed, which solves the above problems through detection mechanisms such as fixed columns. Utility Model Content
[0005] The utility model provides a construction engineering verticality detection device, which solves the problem in the related art that the tilt angle cannot be further determined, and whether the verticality of the construction engineering is within the tolerance range cannot be judged, which is not conducive to the subsequent construction of relevant personnel.
[0006] The technical solution of the utility model is as follows:
[0007] A construction engineering verticality detection device comprises a base for support and a level meter for testing level, wherein the level meter is fixedly mounted on the base, and further comprises:
[0008] The detection mechanism includes a fixed column, an angle disk A, a first ruler and a driving assembly. The fixed column is fixedly connected to one end of the top of the base. One end of the first ruler is arranged in a placement groove opened on the top of the fixed column and is rotatably connected to the fixed column. Two angle disks A are provided, and the two angle disks A are respectively arranged on both sides of the first ruler and are fixedly connected to the fixed column. The driving assembly is connected to the first ruler.
[0009] Preferably, the driving assembly includes a motor, a connecting rod and a connecting column, the motor is fixedly mounted on the base, one end of the motor output shaft is fixedly connected to one end of the connecting rod, the connecting column is fixedly connected to the other end of the connecting rod, and the end of the connecting column away from the connecting rod is arranged in a slide groove opened on one side of the first ruler, and is slidably connected to the inner wall of the slide groove.
[0010] Preferably, a group of leveling components are respectively arranged at the four corners of the base, and the leveling components include a threaded rod and a support platform. The threaded rod passes through the base and is threadedly connected to the base. The support platform is arranged at the bottom of the base and is rotatably connected to one end of the threaded rod.
[0011] Preferably, a second ruler is provided on the upper surface of the base, one end of the second ruler is rotatably connected to the fixed column, an angle disk B is attached to the upper surface of the second ruler, and the angle disk B is fixedly sleeved on the outside of the fixed column. The second ruler has the same structure as the first ruler, and the second ruler is arranged perpendicular to the first ruler.
[0012] Preferably, a side of the base close to the motor is flush with a side of the first ruler and a side of the second ruler.
[0013] Preferably, a group of adjustment components are provided on the second ruler and the first ruler, and the adjustment components include a first extension plate, a second extension plate, a sleeve and a screw. The first extension plate and the second extension plate are both arranged in a T shape, and one side of the first extension plate and the second extension plate are flush with the end of the first ruler away from the sleeve. One end of the first extension plate is arranged inside the first ruler and is slidably connected to the first ruler. One end of the second extension plate is arranged inside the first extension plate and is slidably connected to the first extension plate. One end of the sleeve is fixedly connected to the second extension plate, and the other end of the sleeve passes through the end of the first ruler away from the first extension plate and extends into the first ruler, and is slidably connected to the first ruler. One end of the screw is arranged inside the sleeve and is threadedly connected to the sleeve. The other end of the screw passes through the first ruler, extends to the inside of a through slot opened on the first ruler, and is rotatably connected to the first ruler.
[0014] The working principle and beneficial effects of the utility model are:
[0015] 1. In the utility model, the device is moved to a suitable position and the side of the base close to the motor is made to fit with the wall to be measured. The base is adjusted to a horizontal position by respectively screwing the four threaded rods, and then the first ruler and the second ruler are adjusted to a suitable length by screwing the screw rods, and one side of the second ruler is made to fit with the wall. The angle between the base and the second ruler is adjusted to ninety degrees by the action of the angle plate B, and then the motor is started to drive the first ruler connected to the connecting column on the connecting rod to rotate toward the wall, so that one side of the first ruler is made to fit with the wall, and the verticality of the wall is accurately measured by reading the number at the corresponding position of the middle of the first ruler and the scale on the angle plate A, so as to facilitate the subsequent construction adjustment by relevant personnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0017] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the structure of the practical testing mechanism;
[0019] Figure 3 This is the front view of the utility model;
[0020] Figure 4 It is a side view of the utility model;
[0021] In the figure: 1. base; 2. level; 3. detection mechanism; 4. fixing column; 5. angle disk A; 6. first ruler; 7. motor; 8. connecting rod; 9. connecting column; 10. threaded rod; 11. support platform; 12. second ruler; 13. angle disk B; 14. first extension plate; 15. second extension plate; 16. sleeve; 17. screw. DETAILED DESCRIPTION
[0022] The following will be combined with the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Example 1
[0024] like Figure 1 to Figure 4 As shown, this embodiment proposes a construction engineering verticality detection device, including a base 1 for support and a level 2 for testing the level, the level 2 is fixedly mounted on the base 1, and also includes:
[0025] The detection mechanism 3 includes a fixed column 4, an angle disk A5, a first ruler 6 and a driving assembly. The fixed column 4 is fixedly connected to one end of the top of the base 1. One end of the first ruler 6 is arranged in a placement groove opened on the top of the fixed column 4 and is rotatably connected to the fixed column 4. Two angle disks A5 are provided, and the two angle disks A5 are respectively arranged on both sides of the first ruler 6 and are fixedly connected to the fixed column 4. The driving assembly is connected to the first ruler 6.
[0026] Preferably, the driving assembly includes a motor 7, a connecting rod 8 and a connecting column 9, wherein the motor 7 is fixedly mounted on the base 1, one end of the output shaft of the motor 7 is fixedly connected to one end of the connecting rod 8, the connecting column 9 is fixedly connected to the other end of the connecting rod 8, and the end of the connecting column 9 away from the connecting rod 8 is arranged inside a slide groove opened on one side of the first measuring ruler 6, and is slidably connected to the inner wall of the slide groove. The purpose of this arrangement is to achieve the purpose of driving the first measuring ruler 6 connected to the connecting column 9 on the connecting rod 8 to rotate toward the wall through the motor 7, so as to achieve the purpose of fitting one side of the first measuring ruler 6 to the wall.
[0027] Preferably, a set of leveling components is respectively arranged at the four corners of the base 1, and the leveling components include a threaded rod 10 and a support platform 11. The threaded rod 10 passes through the base 1 and is threadedly connected to the base 1. The support platform 11 is arranged at the bottom of the base 1 and is rotatably connected to one end of the threaded rod 10. The purpose of this arrangement is to adjust the base 1 to a horizontal position by screwing the four threaded rods 10 respectively, so as to avoid the uneven ground causing the base 1 to be placed unsteadily and affecting the detection results.
[0028] Preferably, a second ruler 12 is provided on the upper surface of the base 1, one end of the second ruler 12 is rotatably connected to the fixed column 4, an angle plate B13 is attached to the upper surface of the second ruler 12, the angle plate B13 is fixedly sleeved on the outer side of the fixed column 4, the second ruler 12 is consistent with the first ruler 6 in structure, and the second ruler 12 is vertically arranged with the first ruler 6. The purpose of this arrangement is to realize that the device forms a three-axis coordinate through the second ruler 12, the base 1 and the first ruler 6, so as to achieve the purpose of facilitating accurate detection of the wall.
[0029] Preferably, the side of the base 1 close to the motor 7 is flush with the first ruler 6 and the second ruler 12. The purpose of this arrangement is to facilitate the first ruler 6, the second ruler 12 and one end of the base 1 to fit with one side of the wall.
[0030] In this embodiment, the device is moved to a suitable position and the side of the base 1 close to the motor 7 is made to fit with the wall to be measured. The base 1 is adjusted to a horizontal position by respectively screwing the four threaded rods 10, and then the first ruler 6 and the second ruler 12 are adjusted to a suitable length by screwing the screw 17, and one side of the second ruler 12 is made to fit with the wall. The angle between the base 1 and the second ruler 12 is adjusted to ninety degrees by the action of the angle plate B13, and then the motor 7 is started to drive the first ruler 6 connected to the connecting column 9 on the connecting rod 8 to rotate toward the wall, so that one side of the first ruler 6 fits with the wall, and the verticality of the wall is accurately measured by reading the number at the corresponding position of the middle part of the first ruler 6 and the scale on the angle plate A5, so as to facilitate the subsequent construction adjustment by relevant personnel.
[0031] Example 2
[0032] like Figure 1 to Figure 4 As shown, based on the same concept as the above-mentioned embodiment 1, this embodiment further proposes that a group of adjustment components are provided on the second ruler 12 and the first ruler 6, and the adjustment components include a first extension plate 14, a second extension plate 15, a sleeve 16 and a screw 17. The first extension plate 14 and the second extension plate 15 are both arranged in a T shape, and one side of the first extension plate 14 and the second extension plate 15 are both flush with the end of the first ruler 6 away from the sleeve 16. One end of the first extension plate 14 is arranged inside the first ruler 6 and slides with the first ruler 6 The second extension plate 15 is connected with the first extension plate 14 at one end and is slidably connected with the first extension plate 14. The sleeve 16 is fixedly connected with the second extension plate 15 at one end. The other end of the sleeve 16 passes through the first ruler 6 away from the end of the first extension plate 14 and extends to the inside of the first ruler 6 and is slidably connected with the first ruler 6. One end of the screw 17 is disposed inside the sleeve 16 and is threadedly connected with the sleeve 16. The other end of the screw 17 passes through the first ruler 6 and extends to the inside of the through groove opened on the first ruler 6 and is rotatably connected with the first ruler 6.
[0033] In this embodiment, by turning the screw 17, the sleeve 16 drives the first extension plate 14 and the second extension plate 15 to extend from the inside of the first ruler 6, thereby extending the length of the second ruler 12 and the first ruler 6, so as to facilitate the adjustment of the height of the first ruler 6 according to the height of the wall to be detected.
[0034] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A construction engineering verticality detection device, comprising a base (1) for support and a level (2) for testing the level, wherein the level (2) is fixedly mounted on the base (1), and characterized in that: Also includes: A detection mechanism (3), the detection mechanism (3) comprising a fixed column (4), an angle disc A (5), a first ruler (6) and a drive assembly, the fixed column (4) being fixedly connected to one end of the top of the base (1), one end of the first ruler (6) being arranged in a placement groove opened at the top of the fixed column (4) and being rotatably connected to the fixed column (4), two angle discs A (5) being arranged, the two angle discs A (5) being respectively arranged on both sides of the first ruler (6) and being fixedly connected to the fixed column (4), and the drive assembly being connected to the first ruler (6).
2. A construction engineering verticality detection device according to claim 1, characterized in that: The driving assembly comprises a motor (7), a connecting rod (8) and a connecting column (9); the motor (7) is fixedly mounted on the base (1); one end of the output shaft of the motor (7) is fixedly connected to one end of the connecting rod (8); the connecting column (9) is fixedly connected to the other end of the connecting rod (8); the end of the connecting column (9) away from the connecting rod (8) is arranged in a slide groove opened on one side of the first measuring ruler (6) and is slidably connected to the inner wall of the slide groove.
3. A construction engineering verticality detection device according to claim 1, characterized in that: A set of leveling components is respectively arranged at the four corners of the base (1), and the leveling components include a threaded rod (10) and a support platform (11). The threaded rod (10) passes through the base (1) and is threadedly connected to the base (1). The support platform (11) is arranged at the bottom of the base (1) and is rotatably connected to one end of the threaded rod (10).
4. A construction engineering verticality detection device according to claim 1, characterized in that: A second ruler (12) is arranged on the upper surface of the base (1), one end of the second ruler (12) is rotatably connected to the fixed column (4), an angle plate B (13) is attached to the upper surface of the second ruler (12), the angle plate B (13) is fixedly sleeved on the outer side of the fixed column (4), the second ruler (12) is consistent in structure with the first ruler (6), and the second ruler (12) is arranged perpendicular to the first ruler (6).
5. A construction engineering verticality detection device according to claim 1, characterized in that: The side of the base (1) close to the motor (7) is flush with the first ruler (6) and the second ruler (12).
6. A construction engineering verticality detection device according to claim 4, characterized in that: The second measuring ruler (12) and the first measuring ruler (6) are both provided with a group of adjustment components, the adjustment components comprising a first extension plate (14), a second extension plate (15), a sleeve (16) and a screw (17); the first extension plate (14) and the second extension plate (15) are both arranged in a T-shape; one side of the first extension plate (14) and the second extension plate (15) are both flush with the end of the first measuring ruler (6) away from the sleeve (16); one end of the first extension plate (14) is arranged inside the first measuring ruler (6) and is slidably connected to the first measuring ruler (6); one end of the second extension plate (15 ... One end of the sleeve (16) is arranged inside the first extension plate (14) and is slidably connected to the first extension plate (14); one end of the sleeve (16) is fixedly connected to the second extension plate (15); the other end of the sleeve (16) passes through the end of the first ruler (6) away from the first extension plate (14) and extends into the first ruler (6) and is slidably connected to the first ruler (6); one end of the screw rod (17) is arranged inside the sleeve (16) and is threadedly connected to the sleeve (16); the other end of the screw rod (17) passes through the first ruler (6) and extends into a through slot provided on the first ruler (6) and is rotatably connected to the first ruler (6).