Construction project management cabinet
By introducing the connection mechanism, flip locking mechanism and snap-in mechanism into the construction project management cabinet, the cabinet can be arranged vertically or horizontally and quickly disassembled, solving the problem of poor flexibility in the existing technology and improving the convenience of operation. and stability.
Patent Information
- Application Number
- CN202323369689.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-12
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-12
AI Technical Summary
The existing construction project management cabinets have poor flexibility. The upper and lower cabinets can only be spliced up and down, and cannot be spliced sideways. The stability and flexibility of use are insufficient, resulting in inconvenient transportation.
A construction project management cabinet including cabinet No. 1 and cabinet No. 2 is designed. By setting up a connecting mechanism, a flip locking mechanism and a snap-in mechanism, the cabinets can be arranged vertically or horizontally, and have the features of quick installation and disassembly. The convenient disassembly function improves the flexibility and stability of use.
It realizes the quick installation and disassembly of the cabinet and convenient transportation, enhances the convenience of operation and stability of use, and supports two arrangements, up and down, and left and right, which improves the adaptability and practicality of the cabinet.
Smart Images

Figure CN221807472U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of construction engineering, and in particular relates to a construction engineering management cabinet. Background Art
[0002] Construction engineering is a part of construction engineering, which refers to the engineering entity formed by the construction of various buildings and their ancillary facilities and the installation of supporting lines, pipelines and equipment. It includes factories, theaters, hotels, shops, schools, hospitals and residences, etc., to meet people's needs for production, residence, study, public activities, etc.
[0003] After checking the public (announcement) number: CN215604126U, a construction engineering management cabinet is disclosed. This technology discloses "including a lower cabinet and an upper cabinet, the lower cabinet is located below the upper cabinet, and the upper surface of the lower cabinet is symmetrically provided with plug holes, the lower surface of the upper cabinet is symmetrically fixed with plug blocks penetrating the plug holes, and the upper surface of the inner cavity of the lower cabinet is symmetrically fixed with telescopic rods, one end of each telescopic rod is fixedly connected with a plug-in piece penetrating the plug-in block, and a spring is fixedly connected between the plug-in piece and the telescopic rod, etc., which solves the technical problems of the existing archive management cabinets that are relatively fixed in height, occupy a large space, and are inconvenient to carry, etc.";
[0004] However, the flexibility of the cabinet is still poor. The upper cabinet and the lower cabinet can only be spliced up and down, and cannot be spliced from the side. The two can only be placed side by side in a split type, which has poor stability and is not easy to move synchronously. The flexibility of use needs to be improved;
[0005] In order to solve the above problems, a construction project management cabinet is proposed in this application. Utility Model Content
[0006] In order to solve the above problems existing in the prior art, the utility model provides a construction project management cabinet, which has the characteristics of improving the time usage flexibility of two cabinets and convenient operation.
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction project management cabinet, comprising a No. 1 cabinet and a No. 2 cabinet, an inner frame is provided in the No. 2 cabinet, a partition is fixed inside the inner frame, a cabinet door is provided between the No. 1 cabinet and the front end of the inner frame, a connecting mechanism is provided between the No. 1 cabinet and the No. 2 cabinet, a flip locking mechanism is provided between the connecting mechanism and the No. 1 cabinet, a clamping mechanism is provided between the No. 2 cabinet and the inner frame, and the No. 1 cabinet and the No. 2 cabinet can be arranged vertically or horizontally through the connecting mechanism; the connecting mechanism comprises a connecting seat fixed to one side of the upper end of the No. 1 cabinet and a connecting column fixed to the same side of the lower end of the No. 2 cabinet, and a connecting pin connected to the connecting column by a connecting spring, and also comprises a hand-pushing block fixed on the connecting pin; the flip locking mechanism comprises a locking groove provided in the connecting column and a locking plate installed inside the No. 1 cabinet by a locking spring, and a hand-pushing groove provided at one end of the hand-pushing groove.
[0008] As an optimal technical solution for a construction project management cabinet of the utility model, the connecting seat and the connecting column are coaxially arranged, the connecting pin is inserted into the connecting seat through a connecting spring, and the two can rotate relative to each other, and the hand-pull block is located on the inner side of the connecting column.
[0009] As a preferred technical solution for a construction engineering management cabinet of the utility model, the locking grooves are two symmetrical ones, and the locking plate is plug-engaged with the locking grooves via a locking spring.
[0010] As an optimal technical solution for a construction project management cabinet of the utility model, the locking mechanism includes a locking slot opened on the inner side of cabinet No. 2 and a spring fixed in the inner frame, as well as a locking block fixed at the other end of the spring and a hand-gripping plate fixed on the other side of the same end of the spring.
[0011] As a preferred technical solution for a construction engineering management cabinet of the utility model, the card slots are arranged in two groups, and the card blocks are connected to the card slots in a one-way manner through spring pieces.
[0012] As an optimal technical solution for a construction engineering management cabinet of the utility model, the hand-pull plate is located inside the inner frame.
[0013] Compared with the prior art, the beneficial effects of the utility model are: first, the connecting mechanism realizes the rapid installation and disassembly between cabinet No. 1 and cabinet No. 2, and has the characteristics of being easy to transport and carry, while ensuring the convenience of operation and stability of use; secondly, the flip locking mechanism, in cooperation with the connecting mechanism, realizes the flipping of cabinet No. 2 on cabinet No. 1, and can switch between two arrangement modes of up and down and left and right, while being in a connected state, thereby improving the adaptability and practicality of the cabinet, and also ensuring the stability after flipping; finally, the locking mechanism arranges cabinet No. 2 and the inner frame into a split structure that is easily disassembled, which is used to adapt to the use of cabinet No. 1 and cabinet No. 2 in different arrangement modes, and ensure the normal use of the cabinet. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0015] Figure 1 This is a schematic diagram of the structure of the utility model when it is opened in a vertical arrangement state;
[0016] Figure 2 For the utility model Figure 2 Schematic diagram of the structure when the cabinet door is closed;
[0017] Figure 3 It is a schematic diagram of the structure arranged horizontally in the utility model;
[0018] Figure 4 This is a schematic diagram of the structure when the second cabinet is separated from the inner frame in the utility model;
[0019] Figure 5 It is a schematic diagram of the structure of the connection mechanism and the flip locking mechanism in the utility model that is decomposed and cut away;
[0020] Figure 6 It is a partially enlarged structural diagram of the engaging mechanism in the utility model;
[0021] In the figure: 1. Cabinet No. 1; 2. Cabinet No. 2; 3. Inner frame; 31. Partition; 4. Cabinet door; 5. Connecting mechanism; 51. Connecting seat; 52. Connecting column; 53. Connecting spring; 54. Connecting pin; 55. Hand-pull block; 6. Flip locking mechanism; 61. Locking groove; 62. Locking spring; 63. Locking plate; 64. Hand-pull groove; 7. Engaging mechanism; 71. Slot; 72. Shrapnel; 73. Block; 74. Hand-pull plate. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Example
[0024] See also Figure 1-6The utility model provides the following technical solutions: a construction engineering management cabinet, including a No. 1 cabinet 1 and a No. 2 cabinet 2, an inner frame 3 is provided in the No. 2 cabinet 2, a partition 31 is fixed inside the inner frame 3, a cabinet door 4 is provided at the front end of the No. 1 cabinet 1 and the inner frame 3, a connecting mechanism 5 is provided between the No. 1 cabinet 1 and the No. 2 cabinet 2, a flip locking mechanism 6 is provided between the connecting mechanism 5 and the No. 1 cabinet 1, a clamping mechanism 7 is provided between the No. 2 cabinet 2 and the inner frame 3, and the No. 1 cabinet 1 and the No. 2 cabinet 2 can be connected through the connecting mechanism 5. Arranged vertically or horizontally; the connecting mechanism 5 includes a connecting seat 51 fixed to one side of the upper end of cabinet No. 1 and a connecting column 52 fixed to the same side of the lower end of cabinet No. 2, and a connecting pin 54 connected to the connecting column 52 through a connecting spring 53, and also includes a hand-pushing block 55 fixed on the connecting pin 54; the flip locking mechanism 6 includes a locking groove 61 opened in the connecting column 52 and a locking plate 63 installed inside cabinet No. 1 through a locking spring 62, and a hand-pull groove 64 opened at one end of the hand-pull groove 64.
[0025] Specifically, the connecting seat 51 and the connecting column 52 are coaxially arranged, the connecting pin 54 is plugged into the connecting seat 51 through the connecting spring 53, and the two can rotate relative to each other, and the hand-pushing block 55 is located on the inner side of the connecting column 52. In this embodiment, the connecting mechanism 5 realizes the rapid installation and disassembly between the No. 1 cabinet 1 and the No. 2 cabinet 2, has the characteristics of being easy to transport and carry, and can also ensure the convenience of operation and stability of use.
[0026] Specifically, there are two symmetrical locking grooves 61, and the locking plate 63 is plugged and connected to the locking groove 61 through a locking spring 62. In this embodiment, the flip locking mechanism 6 cooperates with the connecting mechanism 5 to realize the flipping of the second cabinet 2 on the first cabinet 1, and can switch between two arrangement modes of up and down and left and right. At the same time, they are in a connected state, which improves the adaptability and practicality of the box, and can also ensure stability after flipping.
[0027] Specifically, the locking mechanism 7 includes a locking slot 71 provided on the inner side of the second cabinet 2 and a spring 72 fixed in the inner frame 3 , a locking block 73 fixed at the other end of the spring 72 and a hand-gripping plate 74 fixed at the other side of the same end of the spring 72 .
[0028] In this embodiment, the locking mechanism 7 sets the second cabinet 2 and the inner frame 3 into a split structure that is easy to disassemble, so as to adapt to the use of the first cabinet 1 and the second cabinet 2 in different arrangements and ensure the normal use of the cabinets.
[0029] Specifically, the card slots 71 are arranged in two groups, and the card blocks 73 are unidirectionally engaged with the card slots 71 via the spring pieces 72. In this embodiment, the engaging structure has the characteristics of convenient operation and high stability.
[0030] Specifically, the hand-grip plate 74 is located on the inner side of the inner frame 3 . In this embodiment, the hand-grip plate 74 protrudes from the inner side of the inner frame 3 , which facilitates the manual operation of the card block 73 and the card slot 71 , and the operation is more convenient.
[0031] The working principle and use process of this utility model:
[0032] Disassembly and assembly of cabinet No. 1 and cabinet No. 2: Pull the connecting pin 54 toward the inside of the connecting column 52 through 56, then coaxially dock the connecting column 52 with the connecting seat 51, loosen the hand-pushing block 55, and plug the connecting pin 54 into the connecting seat 51 under the action of the connecting spring 53 to complete the connection. When disassembling, separate the connecting pin 54 from the connecting column 52, and then take out the connecting column 52 and cabinet No. 2 separately;
[0033] Disassembly and assembly of cabinet No. 2 2 and inner frame 3: directly push the inner frame 3 into cabinet No. 2 2, the clamping block 73 contacts the inner side of cabinet No. 2 and is squeezed inside the inner frame 3 by the spring sheet 72. When the inner frame 3 is completely docked with cabinet No. 2 2, the spring sheet 72 at this time clamps the clamping block 73 in the clamping slot 71. During disassembly, the clamping block 73 is separated from the clamping slot 71 by the outer handle plate 74, and the inner frame 3 can be taken out separately from the inside of cabinet No. 2 2. The clamping slot 71 is set in two groups, which are respectively docked with cabinet No. 1 1 and cabinet No. 2 2 when they are arranged vertically and horizontally;
[0034] When the flip locking mechanism 6 is used, when cabinet No. 1 and cabinet No. 2 are arranged vertically, the locking plate 63 is engaged with the locking groove 61 at the corresponding position under the action of the locking spring 62. When cabinet No. 1 and cabinet No. 2 are arranged horizontally, the locking plate 63 is engaged with the other locking groove 61 under the action of the locking spring 62.
[0035] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A construction project management cabinet, comprising a cabinet No. 1 (1) and a cabinet No. 2 (2), characterized in that: The second cabinet (2) is provided with an inner frame (3), a partition (31) is fixed inside the inner frame (3), the first cabinet (1) and the front end of the inner frame (3) are provided with a cabinet door (4), a connecting mechanism (5) is provided between the first cabinet (1) and the second cabinet (2), a flip locking mechanism (6) is provided between the connecting mechanism (5) and the first cabinet (1), a locking mechanism (7) is provided between the second cabinet (2) and the inner frame (3), and the first cabinet (1) and the second cabinet (2) can be arranged vertically or horizontally through the connecting mechanism (5); The connecting mechanism (5) comprises a connecting seat (51) fixed to one side of the upper end of the first cabinet (1), a connecting column (52) fixed to the same side of the lower end of the second cabinet (2), and a connecting pin (54) connected to the connecting column (52) via a connecting spring (53), and also comprises a hand-gripping block (55) fixed to the connecting pin (54); The flip locking mechanism (6) comprises a locking groove (61) provided in the connecting column (52), a locking plate (63) installed inside the first cabinet (1) via a locking spring (62), and a hand-pull groove (64) provided at one end of the hand-pull groove (64).
2. A construction project management cabinet according to claim 1, characterized in that: The connecting seat (51) and the connecting column (52) are coaxially arranged, the connecting pin (54) is plugged into the connecting seat (51) through a connecting spring (53), and the two can rotate relative to each other, and the hand-gripping block (55) is located on the inner side of the connecting column (52).
3. A construction project management cabinet according to claim 1, characterized in that: The locking grooves (61) are two symmetrical ones, and the locking plate (63) is plug-connected with the locking grooves (61) via a locking spring (62).
4. A construction project management cabinet according to claim 1, characterized in that: The locking mechanism (7) comprises a locking groove (71) provided on the inner side of the second cabinet (2), a spring sheet (72) fixed in the inner frame (3), a locking block (73) fixed at the other end of the spring sheet (72), and a hand-gripping plate (74) fixed at the other side of the same end of the spring sheet (72).
5. A construction project management cabinet according to claim 4, characterized in that: The card slots (71) are arranged in two groups, and the card blocks (73) are connected to the card slots (71) in a one-way snap-fit manner via spring sheets (72).
6. A construction project management cabinet according to claim 5, characterized in that: The hand-gripping plate (74) is located inside the inner frame (3).
