Pressure-controlled underground temporary closing valve

By designing a pressure-controlled downhole temporary closing valve, using fiber composite and aluminum alloy constant pressure valves and fixed sealing structures, the problem of long temporary well sealing operation period and high cost in oil and gas well testing operations has been solved, and the wellbore has been realized The rapid resumption of production and safe and reliable production layer pressure control reduce operating costs and pollution risks.

CN221810822UActive Publication Date: 2024-10-08SINOPEC OILFIELD SERVICE CORPORATION +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420310423.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-10-08
Estimated Expiration
2034-02-20

AI Technical Summary

Technical Problem

The existing technology temporarily seals the well during oil and gas well testing operations, which has a long cycle and high cost. It is also prone to failure in complex underground environments, making it difficult to achieve stable and reliable production layer pressure control.

Method used

A pressure-controlled downhole temporary closing valve is designed, which includes a constant pressure valve part and a fixed sealing part. It is made of fiber composite materials and aluminum alloy materials. It realizes non-pressure operation and wellbore operation through reverse threaded connection and hydraulic setting tools. Quick resumption of production.

Benefits of technology

It achieves the reliability and safety of temporary plugging of production zones, reduces well killing and drilling and sweeping processes, reduces mud and workover costs, and improves operation timeliness and safety factor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221810822U_ABST
    Figure CN221810822U_ABST
Patent Text Reader

Abstract

The utility model discloses a pressure control type underground temporary closing valve which comprises a fixed sealing part and a constant pressure valve part, and the upper end of the constant pressure valve part is connected with the lower end of the fixed sealing part. The constant pressure valve part comprises a constant pressure valve body and a constant pressure valve core; a downward valve seat is arranged in the constant-pressure valve body, and the constant-pressure valve element is arranged in the valve seat and cannot move upwards. When the temporary plugging device is actually used on site, the operation principle is simple, temporary plugging of a production layer is reliable, non-well-killing shaft operation and rapid recovery of production can be achieved, the operation safety coefficient is increased, well killing, drilling and sweeping procedures and pollution of slurry plugging slurry to the production layer are reduced, the slurry and well repairing cost is reduced, and the operation time efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of oil and gas well operation, in particular to a pressure-controlled downhole temporary closing valve. Background Art

[0002] At present, more and more types of temporary sealing operations need to be realized in the process of oil and gas well testing. The traditional temporary sealing process mainly involves cement plugging, inserting drillable bridge plugs to temporarily seal the layer, and then using drilling and sweeping to remove the plugging. This method has a long operation cycle, requires well pressure and even plugging, and is difficult to remove after plugging, which causes serious damage to the oil and gas layer. If soluble bridge plugs are used for plugging, the dissolution rate is affected by factors such as high temperature and brine, and the purpose of stable and reliable plugging cannot be achieved, which poses a greater risk of well control.

[0003] Publication (Announcement) No.: CN217976113U, discloses a temporary well sealing string, including an oil pipe string, a pipe plugger is arranged at the lower part of the oil pipe string; a hydraulic bypass valve is arranged at the lower end of the oil pipe string; and a mechanical packer is arranged at the lower end of the oil pipe string; wherein, when the oil pipe string is pressed down, the hydraulic bypass valve is closed, and the mechanical packer is set; when the oil pipe string is lifted up, the hydraulic bypass valve is opened, and the mechanical packer is unsealed. The utility model is simple to operate, and overcomes the problems of long operation time and high cost of traditional temporary well sealing.

[0004] The prior art has the technical problems of complex structure and easy failure in complex underground environment.

[0005] Publication (announcement) number: CN113982523A, discloses a well repairing device capable of realizing temporary well sealing and well killing, which is composed of a well repairing device body, wherein the well repairing device comprises a pipe string for temporary well sealing, well killing and well repairing, wherein the pipe string is provided with a hydraulically releasable well killing tie-back seal cylinder, a well killing float shoe, a plug valve, a well sealing device seat sealing mechanism, a well sealer and a mechanically released well killing tie-back in sequence from bottom to top; the tie-back seal cylinder, the plug valve, the well killing float shoe and the well sealing device seat sealing mechanism are connected by API casing threads; the well sealer and the well sealing device seat sealing mechanism are connected by left-handed special threads; the invention can realize the connection with the oil well casing quickly and efficiently, and can realize the recovery of the device with high quality at the same time.

[0006] The prior art has the technical problems of complex structure and easy failure in complex underground environment.

[0007] Publication (Announcement) No.: CN217001783U, discloses a non-snubbing operation device, wherein a track tube is arranged inside a spring tube, and a track is arranged on the inner wall of the spring tube; a rotation positioning track is arranged on the outer wall of the track tube, and the rotation positioning track includes a plurality of reset tracks, pressure relief tracks and reversing grooves; a track pin is arranged inside the rotation positioning track, and when the track tube is pressed downward / pressure relief upward, it slides cyclically along the lower end of the reset track, the upper end of the reversing groove and the lower end of the pressure relief track to guide the track tube to open / close the valve flap. The utility model realizes the well-killing function by controlling the opening and closing of the valve flap when the track tube is pressed downward through the relative movement of the track pin in the rotation positioning track of the track tube.

[0008] This prior art is prone to technical problems such as track blockage and structural failure in complex underground environments.

[0009] In short, the technical solutions of the above-disclosed technologies, the technical problems to be solved and the beneficial effects produced are all different from the present utility model. Regarding more technical features, technical problems to be solved and the beneficial effects of the present utility model, there is no technical inspiration in the above-disclosed technical documents. Utility Model Content

[0010] In view of the above-mentioned defects in the prior art, the purpose of the utility model is to provide a pressure-controlled downhole temporary closing valve to solve the problem of temporary pressure plugging of the production layer during the oil and gas test operation. It can realize production layer pressure control, wellbore operation without well killing and efficient production resumption, increase the safety factor of the operation, reduce the well killing, drilling and sweeping procedures and pollution to the production layer, reduce the cost of mud and well repair, and improve the operation time efficiency.

[0011] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0012] The pressure-controlled downhole temporary closing valve comprises a fixed sealing part and a constant pressure valve part, wherein the upper end of the constant pressure valve part is connected to the lower end of the fixed sealing part; the constant pressure valve part comprises a constant pressure valve body and a constant pressure valve core; a downward valve seat is arranged in the constant pressure valve body, and the constant pressure valve core is arranged in the valve seat and cannot move upward.

[0013] Furthermore, the constant pressure valve core and the constant pressure valve body are connected via a first shear nail.

[0014] Furthermore, a first sealing ring is provided on the side wall of the constant pressure valve core, and the constant pressure valve body is made of fiber composite material and aluminum alloy material.

[0015] Furthermore, the fixed sealing part comprises a central tube, a retaining ring is arranged on the outer wall of the lower end of the central tube, and a lower slip, a lower cone, a rubber cylinder assembly, an upper cone, and an upper slip are sequentially mounted on the retaining ring;

[0016] Specifically, the lower end of the central tube is connected to the upper end of the constant pressure valve body by using reverse thread.

[0017] Further, the rubber cylinder assembly comprises an upper pressure ring, a rubber cylinder, and a lower pressure ring, wherein the upper pressure ring is between the rubber cylinder and the upper cone, and the lower pressure ring is between the rubber cylinder and the lower cone;

[0018] A second sealing ring is arranged between the lower end of the central tube and the upper end of the constant pressure valve body.

[0019] Furthermore, a setting power part is also provided, and the setting power part includes a thrust sleeve, a pull rod, a push cylinder, and a hydraulic setting tool;

[0020] Specifically, the lower end of the push cylinder is connected to the upper end of the thrust sleeve, and the upper end is in contact with the hydraulic setting tool;

[0021] Specifically, the lower end of the thrust sleeve is inserted into the upper end of the center pipe, the lower end of the thrust sleeve is in contact with the upper end of the upper slip, and a locking ring is arranged between the thrust sleeve and the center pipe;

[0022] Specifically, the locking ring is connected to the upper end of the center tube to prevent the thrust sleeve from moving upward;

[0023] Specifically, the pull rod is connected to the hydraulic setting tool, and the lower end of the pull rod is connected to the central pipe and the locking ring using a second shear nail.

[0024] Furthermore, a circulation hole is provided on the side wall of the push cylinder.

[0025] Compared with the prior art, the utility model has the following beneficial effects:

[0026] When actually used on site, the operating principle is simple, the temporary plugging of the production layer is reliable, and it can achieve wellbore operation without well killing and rapid resumption of production, which increases the safety factor of the operation, reduces the pollution of the production layer to the well killing, drilling and sweeping processes and mud plugging slurry, reduces the mud and well repair costs, and improves the operation time efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is a schematic diagram of the structure of the utility model pressure-controlled downhole temporary closing valve;

[0028] In the figure: 1. constant pressure valve part; 11. constant pressure valve body; 12. first shear pin; 13. first sealing ring; 14. constant pressure valve core; 15. second sealing ring; 2. fixed sealing part; 21. lower slip; 22. lower cone; 23. center tube; 24. rubber cylinder assembly; 25. upper cone; 26. upper slip; 3. setting power part; 31. second shear pin; 32. locking ring; 33. thrust sleeve; 34. pull rod; 35. push cylinder; 36. hydraulic setting tool. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] Embodiment 1:

[0031] See also Figure 1 The pressure-controlled downhole temporary closing valve provided by the utility model comprises a constant pressure valve part 1, a fixed sealing part 2, and a sealing power part 3 which are sequentially connected from bottom to top.

[0032] The constant pressure valve part 1 includes a constant pressure valve body 11 and a constant pressure valve core 14; a downward valve seat is arranged in the constant pressure valve body 11, and the constant pressure valve core 14 is arranged in the valve seat and cannot move upward. The constant pressure valve core 14 is also connected to the constant pressure valve body 11 through a first shear nail 12 to strengthen the pressure that the constant pressure valve core 14 can withstand. The side wall of the constant pressure valve core 14 is provided with a first sealing ring 13 to prevent liquid from passing through the gap between the constant pressure valve body 11 and the constant pressure valve core 14. The constant pressure valve body 11 is made of fiber composite material and aluminum alloy material, both of which have good drilling performance. According to the needs of the site, it can be drilled out by a flat-bottomed grinding shoe.

[0033] The fixed sealing part 2 includes a center tube 23, and a retaining ring is arranged on the outer wall of the lower end of the center tube 23, and the lower slip 21, the lower cone 22, the rubber cylinder assembly 24, the upper cone 25, and the upper slip 26 are sequentially mounted on the retaining ring; the rubber cylinder assembly 24 includes an upper pressure ring, a rubber cylinder, and a lower pressure ring, and the upper pressure ring is between the rubber cylinder and the upper cone 25, and the lower pressure ring is between the rubber cylinder and the lower cone 22; the lower end of the center tube 23 is connected to the upper end of the constant pressure valve body 11 by using a reverse thread, and a second sealing ring 15 is arranged between the lower end of the center tube 23 and the upper end of the constant pressure valve body 11.

[0034] The sealing power part 3 includes a thrust sleeve 33, a pull rod 34, a push cylinder 35, and a hydraulic sealing tool 36; the lower end of the push cylinder 35 is connected to the upper end of the thrust sleeve 33, and the upper end is in contact with the hydraulic sealing tool 36; the thrust sleeve 33 is inserted into the upper end of the center pipe 23, and the lower end of the thrust sleeve 33 is in contact with the upper end of the upper cava 26. A locking ring 32 is arranged between the thrust sleeve 33 and the center pipe 23, and the locking ring 32 is connected to the upper end of the center pipe to prevent the thrust sleeve 33 from moving upward. The pull rod 34 is connected to the hydraulic sealing tool 36, and the lower end of the pull rod is connected to the center pipe 23 and the locking ring 32 using a second shear nail 31.

[0035] The side wall of the push cylinder 35 is provided with a circulation hole.

[0036] It should be noted that the hydraulic setting tool 36 is a prior art, and its function is to push the push cylinder 35 to move downward, which is clear to those skilled in the art.

[0037] Embodiment 2:

[0038] This embodiment provides a method for using a pressure-controlled downhole temporary closing valve:

[0039] S1. Run the pressure-controlled temporary closing valve, and use the continuous tubing with pressure without killing the well, or use the tubing after killing the well;

[0040] S2, go down to the designed well depth, pressurize the hydraulic sealing tool 36, the pressure is transmitted to the push cylinder 35, the push cylinder 35 squeezes the thrust sleeve 33, the lower cone 22, the rubber cylinder assembly 24, the upper cone 25, and the upper slip 26 move downward together, so that the lower slip 21 opens and bites the casing, the rubber cylinder assembly expands under force and fits with the casing to achieve sealing, and the upper slip 26 is pushed out by the upper cone 25 to open and bite the casing. When the sealing force reaches 12-14T, the second shear pin 31 is sheared, the pull rod 34 is separated from the center pipe 23, and the hydraulic sealing tool 36 is extracted from the upper part; the release pressure is controlled by controlling the number and quality of the second shear pins 31;

[0041] S3, at this time, the constant pressure valve core 14 blocks the formation pressure from flowing upward, and the upper wellbore can be replaced with clean water or annular protection fluid according to the design to implement the wellbore operation without well killing. After the production string group is lowered and the gas tree is installed, the constant pressure valve core 14 is knocked down from the plugging seat by means of in-well pressurization, the middle channel is restored, and production is resumed;

[0042] S4. When the pipe string needs to be raised, lower the pipe string, release the lower slip 21, the rubber sleeve assembly 24 and the upper slip 26 in sequence, rotate the pipe string in the direction of unfastening the reverse thread, release the connection between the constant pressure valve body 11 and the center pipe 23, and raise the pipe string. The remaining part can be removed as a whole by drilling and sweeping.

[0043] All components and connection methods of components not discussed in this application belong to the known technologies in this technical field and can be directly applied without further explanation.

[0044] In the present invention, the term "plurality" means two or more than two, unless otherwise clearly defined. The terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense. For example, "connect" can be a fixed connection, a detachable connection, or an integral connection; "connected" can be a direct connection or an indirect connection through an intermediate medium. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0045] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by terms such as "up", "down", "left", "right", "front" and "back" are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or unit referred to must have a specific direction, be constructed and operated in a specific orientation, and therefore, cannot be understood as a limitation on the present invention.

[0046] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "specific embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0047] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A pressure-controlled downhole temporary closing valve, comprising a fixed sealing part, characterized in that: It also includes a constant pressure valve part, the upper end of which is connected to the lower end of the fixed sealing part; the constant pressure valve part includes a constant pressure valve body and a constant pressure valve core; The constant pressure valve body is provided with a downward valve seat, and the constant pressure valve core is arranged in the valve seat and cannot move upward; The fixed sealing part comprises a central tube, a retaining ring is arranged on the outer wall of the lower end of the central tube, and a lower slip, a lower cone, a rubber cylinder assembly, an upper cone, and an upper slip are sequentially mounted on the retaining ring; A setting power part is also provided, and the setting power part includes a thrust sleeve, a pull rod, a push cylinder, and a hydraulic setting tool; The lower end of the push cylinder is connected to the upper end of the thrust sleeve, and the upper end is in contact with the hydraulic setting tool; The lower end of the thrust sleeve is inserted into the upper end of the center tube, the lower end of the thrust sleeve is in contact with the upper end of the upper slip, and a locking ring is arranged between the thrust sleeve and the center tube; The locking ring is connected to the upper end of the center tube to prevent the thrust sleeve from moving upward; The pull rod is connected to a hydraulic setting tool, and the lower end of the pull rod is connected to a center pipe and a locking ring using a second shear nail.

2. The pressure-controlled downhole temporary closing valve according to claim 1, characterized in that: The constant pressure valve core and the constant pressure valve body are also connected via a first shear nail.

3. The pressure-controlled downhole temporary closing valve according to claim 1, characterized in that: The side wall of the constant pressure valve core is provided with a first sealing ring, and the constant pressure valve body is made of fiber composite material and aluminum alloy material.

4. The pressure-controlled downhole temporary closing valve according to claim 1, characterized in that: The lower end of the central tube is connected to the upper end of the constant pressure valve body by using reverse thread.

5. The pressure-controlled downhole temporary closing valve according to claim 4, characterized in that: The rubber cylinder assembly comprises an upper pressure ring, a rubber cylinder and a lower pressure ring, wherein the upper pressure ring is between the rubber cylinder and the upper cone, and the lower pressure ring is between the rubber cylinder and the lower cone; A second sealing ring is arranged between the lower end of the central tube and the upper end of the constant pressure valve body.

6. The pressure-controlled downhole temporary closing valve according to claim 1, characterized in that: The side wall of the push cylinder is provided with a circulation hole.