Equipment docking system of large equipment engine

Through the integration of the virtual docking system and the physical assembly system, industrial networks and automation equipment are used to realize automated docking and assembly of large equipment engines, solving the problems of assembly complexity and high precision requirements, and improving assembly efficiency and accuracy.

CN221812402UActive Publication Date: 2024-10-08SICHUAN ZHONGWU TECH
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202323610123.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-10-08
Estimated Expiration
2033-12-27

AI Technical Summary

Technical Problem

In the assembly process of large equipment engines in the aerospace field, due to the assembly complexity and high precision requirements, existing technology mainly relies on manual operations, resulting in long assembly times, large errors, and serious sealing problems, which affects the digital production efficiency of the product. Existing automation technology mainly assists measurement and has not achieved true automation and intelligent docking.

Method used

Through the integration of the virtual docking system and the physical assembly system, the industrial network is used to connect laser trackers, six-degree-of-freedom platforms, assembly robots and other equipment to realize a full-process solution from assembly calculation to automatic docking assembly, combining virtual assembly terminals and data acquisition units , to achieve accurate positioning and automatic docking of docking data.

Benefits of technology

It has realized the automated docking and assembly of large equipment engines, improved assembly efficiency and accuracy, reduced manual errors, shortened the repair cycle, and improved the digital production capabilities of products.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221812402U_ABST
    Figure CN221812402U_ABST
Patent Text Reader

Abstract

The utility model discloses an equipment docking system of a large-scale equipment engine, which comprises a virtual docking subsystem, a real object assembly subsystem and a data acquisition unit for providing assembly data or field docking data for each subsystem, the virtual docking subsystem, the real object assembling subsystem and the data acquisition unit are connected into a whole through an industrial switch network; wherein the virtual docking subsystem comprises a comprehensive detection unit and a virtual assembly terminal. The utility model provides an equipment docking system of a large-scale equipment engine, which organically integrates a virtual assembly system and a real object assembly system through an industrial network, thereby realizing a full-process scheme from assembly calculation to automatic docking assembly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of equipment docking, and more specifically, to an equipment docking system for a large equipment engine. Background Art

[0002] In the aerospace field, the drawings of the engine combustion chamber and pipelines are strictly confidential and will not be provided to suppliers, so the detailed dimensions of the assembly surface cannot be obtained. In the existing technology, the physical docking assembly includes two steps: the docking assembly of the rear opening of the combustion chamber and the pipeline, and the docking assembly of the front opening of the combustion chamber and the actuator.

[0003] Among them, in the docking assembly of the rear opening of the combustion chamber and the pipeline, due to its assembly complexity and extremely high precision requirements, most domestic units still use relatively traditional manual operations to complete it. It is necessary to rely on the experience of workers and use tooling to move and adjust the posture of the pipeline. This process sometimes takes a long time and repeated docking and assembly will occur. At the same time, since the price of the equipment is very expensive, if the surface is damaged during the assembly process, the consequences are immeasurable. At the same time, the measurement data of the assembly surface before assembly relies on manual measurement and manual entry, and the errors caused by human factors are large, and the data after assembly into the product cannot be accurately calculated. In addition, because the parts are large in size and heavy in weight, it is difficult to move the whole part and rotate around the product axis. Furthermore, due to the sealing problem after the product is assembled, it is also impossible to use measurement tools to measure the assembly data. These are not conducive to the digital production of the product. The measured out-of-tolerance data of the combustion chamber assembly surface cannot be used to accurately locate the out-of-tolerance parts, resulting in a long repair cycle for the out-of-tolerance parts of the product, low efficiency, and a large workload.

[0004] In order to solve the above-mentioned problems of manual operation, currently only one or two large aerospace production units in China have developed relatively automated assembly technologies. However, these studies basically remain at the level of auxiliary measurement, mostly focusing on improving measurement accuracy and enriching measurement methods, such as intelligent visual measurement. The purpose of the research is only to use optical measurement methods to establish the central axis for docking, and to change the original manually operated tooling into an automated control system to assist manual operation. Manual operation does not need to be performed on site, making manual operation more convenient. This is fundamentally different from true automation and intelligence.

[0005] At the same time, although these technologies have conducted research on virtual assembly in a small range, they have not interconnected the virtual assembly system with the docking system, resulting in inconsistency in the process control of the two during work, affecting the docking effect. Utility Model Content

[0006] An object of the present invention is to solve the above-mentioned problems and / or disadvantages and to provide advantages which will be described below.

[0007] In order to achieve these purposes and other advantages of the utility model, a device docking system for a large-scale equipment engine is provided, comprising a virtual docking subsystem and a physical assembly subsystem, and a data acquisition unit for providing assembly data or on-site docking data for each subsystem, wherein the virtual docking subsystem, the physical assembly subsystem, and the data acquisition unit are connected as a whole through an industrial switch network;

[0008] Wherein, the virtual docking subsystem includes a comprehensive detection unit and a virtual assembly terminal;

[0009] The physical assembly subsystem includes: multiple laser trackers, six-degree-of-freedom platforms, assembly robots, linear guide slides, on-site control boxes, on-site explosion-proof operation screens and / or billboards, T-Mac six-dimensional posture measuring instruments, target balls, and accompanying tooling for fixing the parts to be docked.

[0010] Preferably, the industrial switch network comprises:

[0011] A fiber ring network built with at least two 100M managed switches;

[0012] A serial fiber network constructed through two managed switches with optical ports;

[0013] Layer 3 Gigabit managed switch I and Layer 3 Gigabit managed switch II, which are respectively connected to the optical fiber ring network and the serial optical fiber network;

[0014] Wherein, the laser tracker, six-degree-of-freedom platform, on-site control box, on-site explosion-proof operation screen and / or signboard are used to construct at least two sets of control units at the workstation on the workshop level through an optical fiber ring network;

[0015] The data acquisition units distributed in the workstations at the workshop level are connected to the data server and monitoring terminal in the control room at the workshop level through a serial optical fiber network and a three-layer gigabit network management switch II;

[0016] Each group of control units is connected to the virtual assembly terminal in the control room at the workshop level through an optical fiber ring network and a three-layer gigabit network management switch I.

[0017] Preferably, the linear guide slides are relatively arranged on two sides of the docking device, and the assembly robot is arranged on the linear guide slides;

[0018] The control cabinet of the assembly robot is connected to the virtual assembly terminal and the central control cabinet in the control room of the workshop layer through a three-layer gigabit network management switch I.

[0019] Preferably, the three-layer gigabit managed switch I is communicatively connected with the enterprise-level intelligent warehousing system, intelligent transportation system, upper-level management and control system, and comprehensive detection unit through a corresponding security router.

[0020] The utility model at least includes the following beneficial effects: the utility model organically integrates the virtual assembly system and the physical assembly system through the industrial network, thereby realizing a full-process solution from assembly calculation to automatic docking assembly.

[0021] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 A system block diagram of a device docking system for a large-scale device engine in one embodiment of the utility model;

[0023] Figure 2 It is a system topology diagram of the virtual assembly subsystem and the physical assembly subsystem of the utility model;

[0024] Figure 3 This is a schematic diagram of the overall structure of the docking platform in the embodiment of the utility model;

[0025] Figure 4 for Figure 3 Schematic diagram of the structure of the mid-plane bottom plate;

[0026] Figure 5 for Figure 3 , a schematic diagram of the structure of a two-degree-of-freedom adjustment device on a plane bottom plate;

[0027] Figure 6 for Figure 3 , a schematic diagram of the structure of the support assembly on the flat bottom plate;

[0028] Figure 7 This is a schematic diagram of the structure of a tool for butting special-shaped workpieces in an embodiment of the utility model;

[0029] Figure 8 for Figure 7 Schematic diagram of the structure of the clamping assembly. DETAILED DESCRIPTION

[0030] The present invention will be further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.

[0031] It should be understood that terms such as “having”, “including” and “comprising” used herein do not specify the existence or addition of one or more other elements or combinations thereof.

[0032] It should be noted that in the description of the present invention, the orientation or position relationship indicated by the term is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0033] In the description of the present utility model, unless otherwise clearly stipulated and limited, the terms "installed", "provided with", "sleeved / connected", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection. It can be a mechanical connection or an electrical connection. It can be a direct connection or an indirect connection through an intermediate medium. It can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood according to specific circumstances.

[0034] In addition, in the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0035] Example 1

[0036] A device docking system for large equipment engines, such as Figure 1-2 As shown, it includes a virtual docking subsystem 1 and a physical assembly subsystem 2, and a data acquisition unit 3 (which is configured to include a multimedia recorder 30 and multiple security cameras 31) for providing assembly data or on-site docking data for each subsystem, and the virtual docking subsystem, the physical assembly subsystem, and the data acquisition unit are connected together through an industrial switch network 4;

[0037] Wherein, the virtual docking subsystem includes a comprehensive detection unit 10 (also referred to as a comprehensive detection system) and a virtual assembly terminal 11;

[0038] The physical assembly subsystem includes: multiple laser trackers 20 arranged on the workshop floor, a six-degree-of-freedom platform (also called a workstation host) 21, an assembly robot (not shown), a linear guide slide (not shown), an on-site control box 22, an on-site explosion-proof operation screen and / or a billboard 23, a T-Mac six-dimensional posture measuring instrument (not shown), a target ball (not shown), and accompanying tooling (not shown) for fixing the parts to be docked.

[0039] In actual applications, the virtual assembly system and the physical assembly system are organically integrated through the industrial network to achieve a full-process solution from assembly calculation to automatic docking assembly.

[0040] Example 2

[0041] This embodiment 2 is a preferred embodiment of the present invention. Figure 1 As shown, the following improvements are disclosed based on Implementation 1:

[0042] The industrial switch network includes:

[0043] A fiber ring network 40 constructed through at least two 100M managed switches;

[0044] A serial optical fiber network 41 constructed by two network management switches with optical ports;

[0045] A three-layer gigabit managed switch I 42 and a three-layer gigabit managed switch II 43 respectively connected to the optical fiber ring network and the serial optical fiber network;

[0046] Wherein, the laser tracker, six-degree-of-freedom platform, on-site control box, on-site explosion-proof operation screen and / or signboard are used to construct at least two groups of control units 24 at the workstation on the workshop level through an optical fiber ring network;

[0047] The data acquisition units distributed in the workstations at the workshop level are connected to the data server 32 and the monitoring terminal (also called desktop monitoring client) 33 in the control room at the workshop level through the serial optical fiber network and the three-layer gigabit network management switch II;

[0048] Each group of control units is connected to the virtual assembly terminal in the control room at the workshop level through an optical fiber ring network and a three-layer gigabit network management switch I.

[0049] Working principle: According to different control levels, different industrial switches are designed to build corresponding communications to connect the industrial layer with the enterprise layer, so that the docking terminal can directly use the virtual assembly terminal to achieve integration and integration between subsystems, making management and subsequent control more convenient.

[0050] Example 3

[0051] This embodiment 3 is a preferred embodiment of the present invention. Figure 1 As shown, the following improvements are disclosed based on Implementation 1:

[0052] The linear guide slides are relatively arranged on two sides of the docking device, and the assembly robot is arranged on the linear guide slides;

[0053] The control cabinet (also called KRC4) 25 of the assembly robot is connected to the virtual assembly terminal and the central control cabinet 26 in the control room of the workshop level through the three-layer gigabit network management switch I;

[0054] The three-layer gigabit managed switch I is connected to the enterprise-level intelligent warehousing system 6, intelligent transportation system 7, upper-level management and control system 8, and comprehensive detection unit through the corresponding security router 5.

[0055] Working principle: After completing the virtual assembly simulation and obtaining the equipment assembly centerline, the physical assembly is completed in the assembly and testing station, which includes 1 six-degree-of-freedom platform, 2 assembly robots, 1 laser tracker and 4 matching linear slides, 1 T-Mac six-dimensional attitude tracker, 1 electronic billboard, 2 touch terminals, 3 hydraulic lifts, 4 workbenches, 1 actuator storage table, 1 explosion-proof cabinet and 1 positive pressure cabinet of the control system.

[0056] The physical assembly steps include:

[0057] Step 1: The AGV of the logistics transfer system takes away the accompanying tooling of the large equipment engine pipeline at the installation and testing station.

[0058] Step 2: AGV transports the pipeline's accompanying tooling to the large warehouse.

[0059] Step 3: Daliku takes the pipe out of the warehouse, moves it to the pipe accompanying tooling of the AGV, and fixes and clamps it.

[0060] Step 4: The AGV moves the pipeline and the accompanying tooling to the six-degree-of-freedom platform of the assembly and testing station, fixes and clamps them, and the AGV withdraws from the assembly and testing station.

[0061] Step 5: The heavy-load AGV of the logistics transfer system moves the combustion chamber of the large equipment engine together with the arc-shaped support frame to the designated position of the installation and testing station, and the heavy-load AGV withdraws from the installation and testing station.

[0062] Step 6: The small AGV of the logistics transfer system goes to the small warehouse to transport the direct parts of the large equipment engine to the designated location of the assembly and testing station, and the small AGV withdraws from the assembly and testing station.

[0063] Step 7: The small AGV of the logistics transfer system goes to the explosion-proof operation room, transports the actuator and accompanying tooling to the designated location of the installation and testing station, and the small AGV evacuates from the installation and testing station.

[0064] Step 8: Manually place target balls at the characteristic points of the combustion chamber rear opening and the pipeline, record the coordinates of these points using a laser tracker, and combine the coordinates of the optimal position characteristic points calculated by virtual assembly to determine the static docking coordinate system of the rear opening and the motion coordinate system of the pipeline. The 6D deviation between the two coordinate systems is fed back to the T-Mac six-dimensional attitude measuring instrument.

[0065] Step 9, before assembly, perform multimedia recording of the rear opening assembly surface of the large equipment engine.

[0066] Step 10, the six-degree-of-freedom platform and its slide transport pipeline, combined with the numerical value of the T-Mac six-dimensional attitude measuring instrument, form a closed-loop motion system, and finally dock the pipeline into the rear opening of the combustion chamber until the two coordinate systems coincide.

[0067] Step 11: The pipe docking mechanism is withdrawn, and the two assembly robots tighten the bolts at the rear opening and apply a specified torque. Bolts that cannot be assembled by the robot are completed manually.

[0068] Step 12, install the opened parts after manual processing.

[0069] Step 13, the docking equipment including a laser tracker and two assembly robots move to the front opening position of the combustion chamber.

[0070] Step 14, install the T-Mac six-dimensional posture measuring instrument on the gripper of the actuator. After the assembly robot picks up the actuator, the current position of the actuator can be measured in real time by T-Mac.

[0071] Step 15: manually place target balls at the characteristic points of the front opening of the combustion chamber and the actuator, record the coordinates of these points by a laser tracker, and combine the coordinates of the characteristic points at the optimal position calculated by virtual assembly to determine the static docking coordinate system of the front opening and the motion coordinate system of the actuator. The 6D deviation between the two coordinate systems is fed back to the T-Mac six-dimensional attitude measuring instrument.

[0072] Step 16, assemble the robot handling actuator, combine the values ​​of the T-Mac six-dimensional attitude measuring instrument to form a closed-loop motion system, and finally dock the actuator into the front opening of the combustion chamber until the two coordinate systems coincide.

[0073] Step 17, the two assembly robots tighten the front openings of the fastening bolts and apply a torque of a specified value.

[0074] Step 18, manually install the parts at the top cover of the actuator and complete the remaining work.

[0075] Step 19: Check the air tightness of the product.

[0076] Step 20: The heavy-duty AGV of the logistics transfer system transports the large equipment engine products from the installation and testing station away.

[0077] Example 4

[0078] Figure 3-Figure 6 The utility model shows a docking platform used in actual physical docking, comprising a plane bottom plate 101, on which a support assembly 107 matching with the flange of the cone cylinder is arranged, and a connecting plate 128 contacting the open end of the cone cylinder is also arranged on the plane bottom plate 101; a two-degree-of-freedom adjustment device for adjusting the spatial position of the connecting plate 128 is arranged between the connecting plate 128 and the plane bottom plate 101, and the two-degree-of-freedom adjustment device is arranged on the plane bottom plate 101, and the connecting plate 128 is arranged on the two-degree-of-freedom adjustment device;

[0079] The connecting plate 128 is provided with a locking mechanism which abuts against the open end of the cone.

[0080] Working principle:

[0081] During use of the utility model, the cone cylinder flange is placed on the support assembly 107, the open end of the cone cylinder is placed on the connecting plate 128, the cone cylinder is fixed to the docking platform by the locking mechanism on the connecting plate 128, and the spatial position of the connecting plate 128 is adjusted by the two-degree-of-freedom adjustment device, so that the docking platform can adapt to cone cylinders of different specifications.

[0082] In the above scheme, the front end of the top of the support assembly 107 is provided with an arc-shaped groove that is consistent with the outer shape of the flange, and the side of the arc-shaped groove is provided with a through hole connected to the cone flange, and the cone flange is connected to the arc-shaped groove through a fixing mechanism. It should be noted that the fixing mechanism here can be connected by bolt connection, or can be a pin connection or any other connection method that can achieve integrated fixing of multiple components. With this technical method, the support assembly 107 fixes the cone flange to ensure that the cone does not move or rotate during docking or movement.

[0083] In the above scheme, the two-degree-of-freedom adjustment device includes: a lifting adjustment mechanism and an axial adjustment mechanism. The lifting adjustment mechanism is arranged on the plane bottom plate, and the axial adjustment mechanism is arranged on the top of the lifting adjustment mechanism. With this technical method, the height position of the connecting plate 128 is changed by adjusting the lifting adjustment mechanism, and the axial position of the connecting plate 128 is changed by adjusting the axial adjustment mechanism. With the two-degree-of-freedom adjustment device, the docking platform can adapt to cones of different specifications.

[0084] In the above scheme, the locking mechanism includes: a pneumatic clamp 102 and a support wheel 103. The pneumatic clamp 102 abuts against the inner arc surface of the open end of the cone, and the support wheel 103 abuts against the outer arc surface of the open end of the cone; the pneumatic clamp 102 and the support wheel 103 are both arranged on the connecting plate 128, and the support wheels 103 are symmetrically arranged on both sides of the pneumatic clamp 102. With this technical method, the locking device fixes the open end of the cone to ensure that the cone does not move or rotate during docking or movement.

[0085] In the above scheme, the lifting and adjusting device includes: a lifting bracket 104, a lifting push rod 105 for adjusting the up and down position of the lifting bracket 104, and a driving component I connected to the lifting push rod 105; it also includes: a pair of limit blocks 121 arranged on the plane bottom plate 101, which are used to limit the axial push-out position of the lifting push rod 105, and each limit block 121 is respectively located on both sides of the lifting push rod 105. Two connecting rods hinged in the middle constitute an X-shaped lifting bracket 104 (the X-shaped lifting bracket 104 includes at least one layer in actual application, and can also be set to a multi-layer structure according to actual needs). The lifting bracket 104 is symmetrically arranged at both ends of the connecting plate 128. A fixed plate 116 is arranged on the top of the lifting bracket 104, and a slide rail Ⅰ126 is fixedly connected to one end of the bottom of the fixed plate 116. A slider Ⅰ125 is slidably connected to the slide rail Ⅰ126. One end of the upper end of the lifting bracket 104 is hinged to the fixed plate 116, and the other end is hinged to the slider Ⅰ125. The plane bottom plate 101 is provided with a slide rail Ⅱ123, and a slider Ⅱ122 is slidably connected to the slide rail Ⅱ123. One end of the lower end of the lifting bracket 104 is hinged to the plane bottom plate 101, and the other end is hinged to the slider Ⅱ122.

[0086] A lifting push rod 105, wherein a through hole for the first adjusting screw rod 117 to pass through is opened on the side of the middle part of the lifting push rod 105, and both ends of the lifting push rod 105 are fixedly connected to corresponding sliders II 122 respectively;

[0087] The driving component I comprises: a transmission component I and a driving component I.

[0088] The transmission component I comprises: a first adjusting screw rod 117, on which a screw rod nut I27 is provided, and the screw rod nut I27 is fixedly connected to the lifting push rod 105;

[0089] The screw rod mounting seat Ⅰ118 is fixedly connected to the plane bottom plate 101 and is located at the middle and end of the first adjusting screw rod 117;

[0090] The driving component I includes: a coupling I 119, a reducer I 120, and a servo motor I 106;

[0091] Among them, the screw rod mounting seat Ⅰ118 is provided with a bearing at a position matching with the first adjusting screw rod 117. One end of the first adjusting screw rod 117 is connected to one end of the reducer Ⅰ120 through the coupling Ⅰ119, and the other end of the reducer Ⅰ120 is also connected to the servo motor Ⅰ106. With this technical method, the reducer Ⅰ120 is driven by the servo motor Ⅰ106, and the reducer Ⅰ120 drives the first adjusting screw rod 117 on the coupling Ⅰ119 to rotate, and then the screw rod nut Ⅰ27 drives the slider Ⅱ122 on the lifting push rod 105 to slide on the slide rail Ⅱ123, and finally drives the lifting and lowering adjustment of the connecting plate 128 on the lifting bracket 104, and the limit block 121 limits the axial movement distance of the lifting push rod 105 on the plane bottom plate 101. Through the lifting and lowering adjustment device, the docking platform can adapt to cones of different heights.

[0092] In the above solution, the axial adjustment device includes: a sliding plate 113 , a slider III 114 for adjusting the front and rear position of the sliding plate 113 , and a driving component II connected to the slider III 114 .

[0093] A slide rail III 115 is fixedly connected to the top of the fixed plate 116 , and a slider III 114 is slidably connected to the slide rail III 115 .

[0094] The sliding plates 113 are fixedly connected to the top of the slider III 114 , and one of the sliding plates 113 is provided with a through hole for the second adjusting screw rod 112 to pass through, and the two ends of the connecting plate 128 are fixedly connected to the corresponding sliding plates 113 .

[0095] The driving component II includes: a transmission component II and a driving component II.

[0096] The transmission component II includes: a second adjusting screw rod 112, on which a screw rod nut II 124 is provided, and the screw rod nut II 124 is fixedly connected to the sliding plate 113;

[0097] The screw rod mounting seat II 111 is fixedly connected to the top of the fixing plate 116 and is located at the middle and end of the second adjusting screw rod 112;

[0098] The driving component II includes: a coupling II 110, a reducer II 109, and a servo motor II 108;

[0099] Among them, the screw rod mounting seat II111 is provided with a bearing at a position matching with the second adjusting screw rod 112. One end of the second adjusting screw rod 112 is connected to one end of the reducer II109 through the coupling II110, and the other end of the reducer II109 is also connected to the servo motor II108. With this technical method, the reducer II109 is driven by the servo motor II108, and the reducer II109 drives the second adjusting screw rod 112 on the coupling II110 to rotate, and then the screw rod nut II124 drives the slider III114 on the sliding plate 113 to slide on the slide rail III115, and finally drives the axial adjustment of the connecting plate 128 on the sliding plate 113. Through the axial adjustment device, the docking platform can adapt to cones of different lengths.

[0100] Example 5

[0101] Figure 7-Figure 8 The utility model shows a tool for docking special-shaped workpieces used in actual physical docking, including an L-shaped connecting plate 201, on one side of which a switching mechanism 214 for cooperating with a six-degree-of-freedom manipulator is provided, and the tool is characterized in that it also includes a clamping assembly arranged on the other side of the L-shaped connecting plate 201 for fixing the special-shaped workpiece 208 to be docked; wherein the L-shaped connecting plate 201 and the clamping assembly are connected via a force sensor I 202.

[0102] Working principle:

[0103] The special-shaped workpiece 208 is first fixed by the clamping assembly, and the six-degree-of-freedom manipulator is connected to the transfer mechanism 214 to assemble the special-shaped workpiece 208 to other parts. During the assembly process, the assembly force can be monitored in real time by the force sensor I 202. When the special-shaped workpiece 208 is docked with the docking workpiece, the axis of the special-shaped workpiece 208 is aligned with the hole of the docking workpiece. When docking, no assembly force will be generated. Once the axis of the special-shaped workpiece 208 is not aligned with the hole of the docking workpiece, the surface of the special-shaped workpiece 208 and the surface of the docking workpiece will be squeezed. Abnormal assembly force is generated. At this time, the force sensor I 202 uploads a signal to the control system, and the control system terminates the assembly. Ensure that the special-shaped workpiece 208 is prevented from being damaged during the docking process of the special-shaped workpiece 208.

[0104] In the above solution, the clamping assembly includes: a rectangular shell, a clamping mechanism is arranged inside the rectangular shell, and the clamping mechanism is connected to the special-shaped workpiece to be docked through a connecting mechanism arranged in pairs. With this technical solution, the special-shaped workpieces are connected by the clamping mechanism arranged in the shell and the connecting mechanism arranged on the clamping mechanism.

[0105] In the above solution, the clamping assembly is connected to the outer periphery of the L-shaped connecting plate 201 by means of a plurality of guide posts 203. With this technical solution, the force on the clamping assembly in the axial direction is guided by the plurality of guide posts 203, and when the clamping assembly is not subjected to force, the guide posts 203 restore the clamping assembly to its initial position.

[0106] In the above scheme, the clamping mechanism includes: a cylinder 205, a clamp 209, a force sensor II 210, and a support block with a T-shaped structure; the piston rod of the cylinder 205 passes through the shell and is fixedly connected to the top of the clamp 209, the protruding part of the support block is connected to the bottom surface of the clamp 209 through a fixing mechanism, the force sensor II 210 is attached to the protruding shaft of the support block, and the upper surface of the force sensor II 210 is tightly fitted to the bottom of the clamp 209; the upper and lower surfaces of the clamp 209 are respectively provided with two guide rods 204 that can pass through the upper and lower surfaces of the shell, and the shell is provided with a guide sleeve 211 at a position matching the guide rod 204. By adopting this technical solution, the loosening and clamping of the clamp 209 are completed through the cooperation of the cylinder 205 and the guide rod 204. During the clamping process, the clamping force is monitored in real time through the force sensor II 210 attached to the support block to prevent the connecting rod 206 from falling off the clamp 209 when the clamping force is too small, and to prevent the clamp 209 and the connecting rod 206 from being damaged when the clamping force is too large.

[0107] In the above scheme, two connecting rods 206 are arranged on the connecting mechanism, and one of the two connecting rods 206 is a special-shaped connecting rod 207; the clamp is provided with grooves I 212 and II 213 that are consistent with the appearance of the two connecting rods 206; wherein, one side of the special-shaped connecting rod 207 that matches the groove I 212 is provided with an integrally formed limiting boss I 271, and both sides of the connecting rod 206 that match the groove II 213 are provided with integrally formed limiting bosses II 261. With this technical scheme, the connection stability between the clamp and the connecting rod 206 is enhanced, the special-shaped connecting rod 207 ensures that the connecting rod and the clamp will not rotate, and the limiting boss on the clamp limits the radial movement of the connecting rod 206.

[0108] The above solutions are only an illustration of a preferred example, but are not limited thereto. When implementing the present utility model, appropriate replacement and / or modification can be performed according to user needs.

[0109] The number of devices and processing scales described here are used to simplify the description of the utility model. Applications, modifications and variations of the utility model are obvious to those skilled in the art.

[0110] Although the embodiments of the present invention have been disclosed above, they are not limited to the applications listed in the specification and the embodiments. It can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily realized. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described here.

Claims

1. A device docking system for a large equipment engine, characterized in that: It includes a virtual docking subsystem and a physical assembly subsystem, and a data acquisition unit that provides assembly data or on-site docking data for each subsystem, wherein the virtual docking subsystem, the physical assembly subsystem, and the data acquisition unit are connected together through an industrial switch network; Wherein, the virtual docking subsystem includes a comprehensive detection unit and a virtual assembly terminal; The physical assembly subsystem includes: a plurality of laser trackers, a six-degree-of-freedom platform, an assembly robot, a linear guide slide, an on-site control box, an on-site explosion-proof operation screen and / or a billboard, a T-Mac six-dimensional posture measuring instrument, a target ball, and accompanying tooling for fixing the parts to be docked; The industrial switch network includes: A fiber ring network built with at least two 100M managed switches; A serial fiber network constructed through two managed switches with optical ports; Layer 3 Gigabit managed switch I and Layer 3 Gigabit managed switch II, which are respectively connected to the optical fiber ring network and the serial optical fiber network; Wherein, the laser tracker, six-degree-of-freedom platform, on-site control box, on-site explosion-proof operation screen and / or signboard are used to construct at least two sets of control units at the workstation on the workshop level through an optical fiber ring network; The data acquisition units distributed in the workstations at the workshop level are connected to the data server and monitoring terminal in the control room at the workshop level through a serial optical fiber network and a three-layer gigabit network management switch II; Each group of control units is connected to the virtual assembly terminal in the control room at the workshop level through an optical fiber ring network and a three-layer gigabit network management switch I; The linear guide slides are relatively arranged on two sides of the docking device, and the assembly robot is arranged on the linear guide slides; The control cabinet of the assembly robot is connected to the virtual assembly terminal and the central control cabinet in the control room of the workshop level through a three-layer gigabit network management switch I; The three-layer gigabit managed switch I is connected to the enterprise-level intelligent warehousing system, intelligent transportation system, upper-level management and control system, and comprehensive detection unit through corresponding security routers.

Citation Information

Cited By

  • Assembling method of large equipment engine and matched equipment docking system

    CN117549071A

  • Method for assembling large equipment engines and mating equipment docking system

    CN117549071B