Supporting and limiting integrated structure for steel box girder installation

By designing an integrated support and limit structure, and using multiple limit blocks and pads to realize rapid positioning and elevation adjustment of steel box beams, the existing technology problems of complex installation of steel box beams and inconvenient removal of jacks are solved, and improvements are made. Improve construction efficiency.

CN221822717UActive Publication Date: 2024-10-11HEFEI HONGJUXIN STEEL STRUCTURE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420175805.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-25
Publication Date
2024-10-11
Estimated Expiration
2034-01-25

AI Technical Summary

Technical Problem

In the existing steel box girder installation technology, the inelastic deformation of the bracket and the swing of the crane cause the steel box girder segments to be uneven, which increases the complexity of the construction and the cumbersome process. It is also inconvenient to remove the temporary supports and jacks, which reduces the work efficiency. .

Method used

Design an integrated support and limit structure, including a base, pier columns, support beams, square sockets, locking and fixing components, limit components and support cushion components. This is achieved through the use of multiple limit blocks. Accurate positioning and adjusting the elevation by adding or removing pads simplify later dismantling operations.

Benefits of technology

It achieves fast and accurate installation and elevation adjustment of steel box beams, simplifies the construction process, improves work efficiency, and avoids the difficulty of jack adjustment and later dismantling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822717U_ABST
    Figure CN221822717U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of steel box girder installation, and discloses a supporting and limiting integrated structure for steel box girder installation, which comprises a base, buttress stand columns, a supporting cross beam, a square bayonet socket, a steel box girder, a locking and fixing assembly, a limiting assembly and a supporting pad protection assembly. The utility model has the following advantages and effects: a plurality of limiting components can be conveniently, quickly and firmly mounted and fixed on the supporting cross beam, when the steel box girder is mounted, the mounting position of the steel box girder can be accurately limited and positioned by utilizing the joint matching use of a plurality of limiting blocks, and the plurality of limiting components can be conveniently and quickly dismounted in the later period, so that the mounting efficiency is improved. The device is simple and convenient to operate, the working efficiency is improved, the elevation of the steel box girders can be adjusted as required by increasing or decreasing the base plates with different thicknesses and sizes, and when two adjacent steel box girders are in butt joint, the top surfaces of the two adjacent steel box girders can be flush with each other; the problem that a jack is inconvenient to disassemble in the later period due to the fact that the jack is adopted to adjust the height of the steel box girder in the prior art can be effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel box girder installation, in particular to a support and limit integrated structure used for steel box girder installation. Background Art

[0002] Steel box girder, also known as steel plate box girder, is a common structural form for long-span bridges. It is generally used on bridges with large spans. It is called steel box girder because it looks like a box. Steel box girder is generally connected by a full welding method including top plate, bottom plate, web plate, transverse diaphragm, longitudinal diaphragm and stiffening ribs. The top plate is an orthogonal anisotropic bridge deck composed of a cover plate and longitudinal stiffening ribs. The installation of existing steel box girders usually adopts the floor bracket assembly method. The crane hoists the steel box girder segment onto the bracket and welds the adjacent segments in sequence. Since the bracket itself will have a certain inelastic deformation, the top surfaces of adjacent steel box girder segments will not be aligned. Therefore, it is necessary to set a temporary support on the top of the bracket to adjust the elevation of the steel box girder. At the same time, since the crane will swing a certain amplitude when hoisting the steel box girder, the adjacent steel box girder ends will not be aligned left and right, and the steel box girder needs to be adjusted horizontally. The process is cumbersome and not conducive to speeding up the construction progress.

[0003] In response to the above-mentioned problem, the patent with authorization announcement number CN213389732U announces an integrated support and limit structure for the installation of steel box girders, including a steel box girder installation bracket, temporary supports are arranged on both sides of the top of the bracket at regular intervals along the longitudinal direction of the bracket, the bottom of the temporary support is welded to the load-bearing beam at the top of the bracket, a horizontal support surface is arranged on the top of the temporary support facing the inner side of the bracket, and a limit block higher than the support surface is arranged on the top of the temporary support facing the outer side of the bracket; the bottom of the steel box girder is supported on the support surface at the top of the temporary support, and the side wall of the steel box girder is close to the limit block at the top of the temporary support. When the steel box girder is installed, the utility model can complete the vertical support and horizontal limit of the steel box girder at one time, effectively improving the installation and construction efficiency of the steel box girder.

[0004] In actual use, it is found that the above-mentioned existing scheme still has at least the following shortcomings: the steel box girder is supported by adopting a support method of bearing the load with temporary supports, and the height of the steel box girder is adjusted by using jacks. It is inconvenient to remove the temporary supports and jacks after the construction is completed, which increases the working time and reduces the work efficiency. Therefore, we propose a support and limit integrated structure for steel box girder installation to solve the above problems. Utility Model Content

[0005] The purpose of the utility model is to provide an integrated support and limit structure for the installation of a steel box girder, which is convenient for quickly and firmly installing and fixing a plurality of limit components on a supporting crossbeam. When installing the steel box girder, the installation position of the steel box girder can be accurately limited and positioned by using a plurality of limit blocks together, and it is also convenient to quickly remove the plurality of limit components in the later stage. The operation is simple and convenient, and the work efficiency is improved. Moreover, the elevation of the steel box girder can be adjusted as needed by adding or removing pads of different thicknesses. When two adjacent steel box girders are butt-jointed, the top surfaces of the two adjacent steel box girders can be made flush, which can effectively replace the existing problem of using a jack to adjust the height of the steel box girder, which makes it inconvenient to remove the jack in the later stage.

[0006] The above technical objectives of the utility model are achieved through the following technical solutions: a support and limit integrated structure for the installation of a steel box girder, comprising a base, a pier column, a supporting beam, a square socket, a steel box girder, a locking and fixing assembly, a limiting assembly and a supporting cushion assembly, wherein the pier column is fixedly installed on the top of the base, the supporting beam is arranged on the top of the pier column, the square socket is fixedly installed on the bottom of the supporting beam, the steel box girder is arranged on the top of the supporting beam, the locking and fixing assembly is arranged on the pier column, the locking and fixing assembly is used to fix the supporting beam on the pier column, the number of limiting assemblies is set to multiple, and multiple limiting assemblies are all arranged on the top of the supporting beam and are symmetrically distributed in pairs at equal intervals, the limiting assembly is used to limit and position the installation position of the steel box girder, a square slot is opened on the top of the pier column, the square socket is slidably installed in the square slot, the supporting cushion assembly is arranged in the square slot and is located below the square socket, and the supporting cushion assembly is used to support the square socket.

[0007] The utility model is further configured as follows: the locking and fixing assembly includes a connecting seat, a threaded column, a spring washer and a locking nut; the connecting seat is fixedly mounted on the side wall of the pier column; the threaded column is fixedly mounted on the bottom of the supporting beam; the bottom end of the threaded column slides through the connecting seat; the spring washer is sleeved on the threaded column; the top of the spring washer contacts with the bottom of the connecting seat; the locking nut is threadedly sleeved on the threaded column; the top of the locking nut contacts with the bottom of the spring washer.

[0008] The utility model is further configured as follows: the connecting seat and the pier column are integrally formed, and the top end of the threaded column is buried in the supporting crossbeam.

[0009] The utility model is further configured as follows: the number of the locking and fixing components is set to be multiple, and the multiple locking and fixing components are symmetrically distributed in pairs.

[0010] The utility model is further configured as follows: the limit assembly includes a limit block, two slides, a spring, a transverse guide rod and two clamping blocks. A groove is provided at the top of the supporting beam, and clamping grooves are provided on the inner walls on both sides of the groove. The limit block is arranged on the top of the supporting beam and is located above the groove. The bottom outer wall of the steel box beam slides in contact with one side of the limit block. A vertical hole is provided on the top of the limit block, and the vertical hole is connected to the groove. The two slides are slidably installed in the vertical holes. The two ends of the spring are respectively fixedly connected to the side walls of the two slides close to each other, the transverse guide rod is fixedly installed in the vertical hole, and the two slides are slidably sleeved on the transverse guide rod. The tops and bottoms of the two slides extend outside the vertical holes, and the bottoms of the two slides extend into the groove. The two clamping blocks are respectively fixedly installed on the side walls of the two slides away from each other, and the sides of the two clamping blocks away from each other are respectively slidably installed in the corresponding clamping grooves.

[0011] The utility model is further configured as follows: the support pad protection assembly includes a plurality of pads, and the plurality of pads are all slidably installed in the square slots and are located below the square socket.

[0012] The utility model is further configured as follows: the thicknesses of the plurality of pads increase in sequence from top to bottom.

[0013] The beneficial effects of the utility model are:

[0014] The utility model utilizes a limiting assembly composed of a limiting block, two slide plates, a spring, a transverse guide rod and two clamping blocks, so that the limiting assembly can be quickly and securely installed on the supporting cross beam. When installing the steel box beam, the joint use of multiple limiting blocks can accurately limit and locate the installation position of the steel box beam, and it is also convenient to quickly remove multiple limiting assemblies in the later stage. The operation is simple and convenient, and the work efficiency is improved.

[0015] The utility model utilizes a locking and fixing assembly composed of a connecting seat, a threaded column, a spring washer and a locking nut, and utilizes a supporting and cushioning assembly composed of a plurality of pads. By adding or removing pads of different thicknesses, the elevation of the steel box girder can be adjusted as needed. When two adjacent steel box girders are butt-jointed, the top surfaces of the two adjacent steel box girders can be made flush, which can effectively replace the existing problem of using a jack to adjust the height of the steel box girder, which makes it inconvenient to remove the jack at a later stage. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the three-dimensional structure of this embodiment.

[0017] Figure 2 It is a schematic diagram of the main cross-sectional structure of this embodiment.

[0018] Figure 3 yes Figure 2 Schematic diagram of the enlarged structure of part A.

[0019] In the figure, 1, base; 2, pier column; 3, supporting beam; 4, square plug-in socket; 5, steel box beam; 6, locking and fixing assembly; 61, connecting seat; 62, threaded column; 63, spring washer; 64, locking nut; 7, limit assembly; 71, limit block; 72, vertical hole; 73, slide plate; 74, spring; 75, horizontal guide rod; 76, clamping block; 8, square slot; 9, pad; 10, groove; 11, clamping slot. DETAILED DESCRIPTION

[0020] The technical solution of the utility model will be described clearly and completely below in conjunction with specific embodiments. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1 , Figure 2 and Figure 3 The utility model provides a support and limit integrated structure for steel box girder installation, including a base 1, a pier column 2, a support beam 3, a square plug-in seat 4, a steel box girder 5, a locking and fixing component 6, a limit component 7 and a support cushion component, wherein:

[0022] The base 1 is installed and fixed at the required position on the ground, the pier column 2 is fixedly installed on the top of the base 1, the supporting beam 3 is arranged on the top of the pier column 2, the square socket 4 is fixedly installed on the bottom of the supporting beam 3, the steel box beam 5 is arranged on the top of the supporting beam 3, and the locking and fixing component 6 is arranged on the pier column 2. The locking and fixing component 6 is used to fix the supporting beam 3 on the pier column 2. The above-mentioned locking and fixing component 6 includes a connecting seat 61, a threaded column 62, a spring washer 63 and a locking nut 64. The connecting seat 61 is fixedly installed on the side wall of the pier column 2, the threaded column 62 is fixedly installed at the bottom of the supporting beam 3, the bottom end of the threaded column 62 slides through the connecting seat 61, the spring washer 63 is sleeved on the threaded column 62, and the top of the spring washer 63 is fixed to the pier column 2. The bottom of the connecting seat 61 is in contact, and the locking nut 64 is threadedly sleeved on the threaded column 62. The top of the locking nut 64 is in contact with the bottom of the spring washer 63. The threaded connection between the locking nut 64 and the threaded column 62 can be used to assemble and fix the supporting beam 3 on the pier column 2, and it is convenient to disassemble and disassemble the supporting beam 3 and the pier column 2. The spring washer 63 can improve the reliability of the locking nut 64 threadedly installed on the threaded column 62, so that the locking nut 64 is not easy to loosen. The number of locking and fixing components 6 is set to multiple, and the multiple locking and fixing components 6 are symmetrically distributed in pairs. Through the joint use of multiple locking and fixing components 6, the assembly connection between the supporting beam 3 and the pier column 2 is more reliable and stable. The number of limit components 7 is set to multiple , multiple limit components 7 are arranged on the top of the supporting beam 3 and are symmetrically distributed in pairs at equal intervals. The limit components are used to limit the installation position of the steel box beam 5. The above-mentioned limit components 7 include a limit block 71, two slide plates 73, a spring 74, a horizontal guide rod 75 and two clamping blocks 76. A groove 10 is provided on the top of the supporting beam 3, and clamping grooves 11 are provided on the inner walls on both sides of the groove 10. The limit block 71 is arranged on the top of the supporting beam 3 and is located above the groove 10. The bottom outer wall of the steel box beam 5 is slidably fitted with one side of the limit block 71. A vertical hole 72 is provided on the top of the limit block 71, and the vertical hole 72 is connected to the groove 10. The two slide plates 73 are slidably installed in the vertical holes 72, and the two ends of the spring 74 are close to each other with the two slide plates 73 respectively. The two slide plates 73 are slidably mounted on the horizontal guide rod 75. The tops and bottoms of the two slide plates 73 extend outside the vertical hole 72. The bottoms of the two slide plates 73 extend into the groove 10. The two clamping blocks 76 are respectively fixedly mounted on the side walls of the two slide plates 73 away from each other. The sides of the two clamping blocks 76 away from each other are respectively slidably mounted in the corresponding clamping grooves 11. The installation position of the steel box girder 5 can be limited by the limit block 71. The limit block 71 can be securely mounted and fixed on the supporting beam 3 by using the two clamping blocks 76 to respectively engage with the corresponding clamping grooves 11. The two slide plates 73 are used to conveniently adjust the distance between the two clamping blocks 76. The elastic force of the spring 74 is used.The two slide plates 73 can be controlled to reset automatically, and the sliding direction of the two slide plates 73 can be guided by the horizontal guide rod 75, so that the fast disassembly and assembly of the limit assembly 7 can be realized. It should be supplemented that the vertical spacing between the two limit blocks 71 installed on the supporting cross beam 3 and located on both sides is equal to the bottom width of the steel box beam 5, so that the outer walls on both sides of the bottom of the steel box beam 5 can slide and fit with the two limit blocks 71 on both sides respectively, so as to accurately limit the installation position of the steel box beam 5. A square slot 8 is provided on the top of the pier column 2, and the square socket 4 is slidably installed in the square slot 8. The support pad guard assembly is arranged in the square slot 8 and is located below the square socket 4. The support pad guard assembly is used to support the square socket 4. The above-mentioned support pad The protective assembly includes a plurality of pads 9, which are all slidably installed in the square slots 8 and are located below the square socket 4. The square socket 4 can be firmly and stably supported in the square slots 8 by using the plurality of pads 9 together, thereby improving the bearing capacity of the supporting beam 3. The thickness of the plurality of pads 9 increases from top to bottom. By adding or removing pads 9, the height position of the supporting beam 3 can be adjusted, that is, the elevation of the steel box beam 5 can be adjusted, so that when two adjacent steel box beams 5 are docked, the top surfaces of the two adjacent steel box beams 5 can be flush. It should be added that a plurality of pads 9 with different thicknesses can be prefabricated in the factory, and the height of the steel box beam 5 installed on the supporting beam 3 can be accurately fine-tuned by adding or removing pads 9 of the required thickness as required.

[0023] In this embodiment, the connection seat 61 and the pier column 2 are integrally formed, so that the connection seat 61 is more secure and stable, and the top of the threaded column 62 is buried in the supporting beam 3, so that the threaded column 62 is more secure and stable.

[0024] Through the above structure, the integrated support and limit structure for steel box girder installation provided by the utility model is convenient for quickly and firmly installing and fixing multiple limit assemblies 7 on the supporting cross beam 3 when in use. When installing the steel box girder 5, the joint use of multiple limit blocks 71 can accurately limit and locate the installation position of the steel box girder 5, and it is also convenient to quickly remove multiple limit assemblies 7 in the later stage. The operation is simple and convenient, and the work efficiency is improved. Moreover, the elevation of the steel box girder 5 can be adjusted as needed by adding or reducing pads 9 of different thicknesses, which is convenient for When connecting two adjacent steel box beams 5, the top surfaces of the two adjacent steel box beams 5 can be made flush, which can effectively replace the existing problem of using a jack to adjust the height of the steel box beam 5, which makes it inconvenient to remove the jack later. In specific operations, before hoisting the steel box beam 5, the staff takes a limit assembly 7 and squeezes the two slide plates 73 by hand to make the two slide plates 73 slide in a direction close to each other. At this time, the spring 74 is compressed and deformed to generate elastic force, and then the limit block 71 is placed at the bottom of the supporting beam 3, so that the bottoms of the two slide plates 73 are respectively inserted into the grooves. 10, and then release the two slide plates 73. Under the elastic force of the spring 74, the two slide plates 73 can be controlled to automatically reset in the direction away from each other, so that the two clamping blocks 76 are respectively clamped in the corresponding clamping grooves 11, and the limit assembly 7 is quickly and firmly installed on the supporting beam 3. According to the above operation steps, other limit assemblies 7 can be installed and fixed at appropriate positions on the supporting beam 3 in turn. After all the limit assemblies 7 are installed, the steel box beam 5 is hoisted on the supporting beam 3 using a crane, and the steel box beam 5 is installed on the supporting beam 3. During the process of installing the box beam 5, the outer walls on both sides of the bottom of the steel box beam 5 are slidably fitted with the side walls of the corresponding limit blocks 71, so that the installation position of the steel box beam 5 can be accurately limited and positioned. When the limit assembly 7 needs to be disassembled later, the two slide plates 73 are squeezed by hand to make the two slide plates 73 slide in a direction close to each other. When the two slide plates 73 drive the corresponding clamping blocks 76 to slide out of the corresponding clamping grooves 11 respectively, the limit assembly 7 can be disassembled from the supporting cross beam 3, and then according to the above operation steps, multiple limit assemblies 7 can be removed in sequence;

[0025] When there is a deviation in the height of the two adjacent installed steel box girders 5, the staff first measures the height difference between the two adjacent steel box girders 5, and then removes the multiple locking nuts 64 on one of the pier columns 2, that is, releases the fixation of the supporting beam 3, and then uses a crane to lift the supporting beam 3 to a certain height, so that the square socket 4 slides out of the square slot 8 to a suitable height, and then the pads 9 of different thicknesses can be added or reduced as needed. After adjustment, the supporting beam 3 is gradually lowered to allow the square socket 4 to be inserted into the square slot 8, and finally the multiple locking nuts 64 are tightened on the corresponding threaded columns 62 in turn, thus completing the adjustment of the elevation of the steel box girder 5, so that when the two adjacent steel box girders 5 are docked, the top surfaces of the two adjacent steel box girders 5 can be ensured to be flush.

Claims

1. A support and limit integrated structure for steel box girder installation, characterized in that: The invention comprises a base (1), a pier column (2), a supporting beam (3), a square socket (4), a steel box beam (5), a locking and fixing assembly (6), a limiting assembly (7) and a supporting cushion assembly, wherein the pier column (2) is fixedly mounted on the top of the base (1), the supporting beam (3) is arranged on the top of the pier column (2), the square socket (4) is fixedly mounted on the bottom of the supporting beam (3), the steel box beam (5) is arranged on the top of the supporting beam (3), the locking and fixing assembly (6) is arranged on the pier column (2), and the locking and fixing assembly (6) is used to lock the supporting beam (3) is fixed on the pier column (2), the number of the limit components (7) is set to be multiple, and the multiple limit components (7) are all arranged on the top of the supporting beam (3) and are symmetrically distributed in pairs at equal intervals. The limit components are used to limit the installation position of the steel box beam (5). The top of the pier column (2) is provided with a square slot (8), and the square socket (4) is slidably installed in the square slot (8). The support pad protection component is arranged in the square slot (8) and is located below the square socket (4). The support pad protection component is used to support the square socket (4).

2. The integrated support and limit structure for steel box girder installation according to claim 1, characterized in that: The locking and fixing assembly (6) comprises a connecting seat (61), a threaded column (62), a spring washer (63) and a locking nut (64); the connecting seat (61) is fixedly mounted on the side wall of the pier column (2); the threaded column (62) is fixedly mounted on the bottom of the supporting beam (3); the bottom end of the threaded column (62) slides through the connecting seat (61); the spring washer (63) is sleeved on the threaded column (62); the top of the spring washer (63) contacts the bottom of the connecting seat (61); and the locking nut (64) is threadedly sleeved on the threaded column (62); the top of the locking nut (64) contacts the bottom of the spring washer (63).

3. The integrated support and limit structure for steel box girder installation according to claim 2, characterized in that: The connection seat (61) and the buttress column (2) are integrally formed, and the top end of the threaded column (62) is buried in the supporting crossbeam (3).

4. The integrated support and limit structure for steel box girder installation according to claim 1, characterized in that: The number of the locking and fixing components (6) is set to be multiple, and the multiple locking and fixing components (6) are symmetrically distributed in pairs.

5. The integrated support and limit structure for steel box girder installation according to claim 1, characterized in that: The limiting assembly (7) comprises a limiting block (71), two slide plates (73), a spring (74), a transverse guide rod (75) and two clamping blocks (76); a groove (10) is provided at the top of the supporting crossbeam (3); clamping grooves (11) are provided on the inner walls on both sides of the groove (10); the limiting block (71) is arranged at the top of the supporting crossbeam (3) and is located above the groove (10); the bottom outer wall of the steel box beam (5) is slidably fitted with one side of the limiting block (71); a vertical hole (72) is provided at the top of the limiting block (71); the vertical hole (72) is connected to the groove (10); the two slide plates (73) are slidably mounted on the vertical hole (72) and ...1) and the vertical hole (72) is connected to the groove (10); the two slide plates (73) are slidably mounted on the vertical hole (71) and the vertical hole (72) is connected to the groove (10); the two slide plates ( The two ends of the spring (74) are respectively fixedly connected to the side walls of the two slides (73) close to each other, the transverse guide rod (75) is fixedly installed in the vertical hole (72), the two slides (73) are slidably mounted on the transverse guide rod (75), the tops and bottoms of the two slides (73) extend outside the vertical hole (72), the bottoms of the two slides (73) extend into the groove (10), the two clamping blocks (76) are respectively fixedly installed on the side walls of the two slides (73) away from each other, and the sides of the two clamping blocks (76) away from each other are respectively slidably installed in the corresponding clamping grooves (11).

6. The integrated support and limit structure for steel box girder installation according to claim 1, characterized in that: The supporting pad protection assembly comprises a plurality of pads (9), and the plurality of pads (9) are all slidably mounted in the square slots (8) and are located below the square socket (4).

7. The integrated support and limit structure for steel box girder installation according to claim 6, characterized in that: The thickness of the plurality of pads (9) increases sequentially from top to bottom.