Fabricated steel bearing platform for anchoring pile plate retaining wall of foundation pit

Through the factory prefabricated assembly and chemical anchor bolt fixing technology of the prefabricated steel cap platform, the problem of complex and non-environmental protection in the construction process of the foundation pit anchor pile plate retaining wall has been solved, and the construction period saving, installation accuracy improvement and environmentally friendly construction have been achieved, which is suitable for construction industrialization.

CN221822900UActive Publication Date: 2024-10-11CHONGQING ARCHITECTURAL DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322823818.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-10-20
Publication Date
2024-10-11
Estimated Expiration
2033-10-20

AI Technical Summary

Technical Problem

The construction process of the existing anchor-tensioned pile plate retaining wall in the foundation pit is complex, long-term, and consumes a lot of manpower. The concrete anchor head is large and unsightly, and the on-site tying of steel bars and cast-in-place concrete are not environmentally friendly, and are not suitable for construction industrialization and low-carbon development. direction.

Method used

Prefabricated steel caps are used, including steel cap components, anchoring devices and temporary positioning devices. They are prefabricated and assembled in the factory. Chemical anchors and PVC anchor caps are used to achieve reliable fixing and installation of the steel caps, reducing on-site steel bar tying and concrete installation. Pouring work.

Benefits of technology

It greatly saves the construction period and improves the installation accuracy. The anchor head is small in size and beautiful, realizing green, low-carbon and environmentally friendly construction, supporting the industrialization of construction, and facilitating later dismantling and recycling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822900U_ABST
    Figure CN221822900U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of slide-resistant pile pre-stressed anchor cable bearing platforms, and discloses an assembly type steel bearing platform for a foundation pit anchoring pile plate retaining wall, which comprises slide-resistant piles, a steel bearing platform device and an anchor sealing device. The steel bearing platform device comprises a steel bearing platform assembly and an anchoring device, the steel bearing platform assembly is formed by combining a face plate, a bottom plate, a bottom bearing plate and a side bearing plate, and a semicircular drainage hole is reserved in the bottom bearing plate. The fabricated steel bearing platform can be produced in batches in a factory, and building industrialization is achieved; the steel bearing platform is convenient to mount on site, and the pre-stressed anchor cable can be tensioned after mounting, so that the construction period is greatly shortened; the work of binding steel bars and pouring concrete on a construction site of a traditional concrete bearing platform is omitted, and the concrete bearing platform is green, low-carbon and environment-friendly; for a temporary supporting structure, the steel bearing platform assembly can be conveniently dismantled and recycled in the later period, materials are saved, and low-carbon and environment-friendly effects are achieved. The method has very high engineering practicability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of anti-sliding pile prestressed anchor cable steel cap, in particular to an assembled steel cap for foundation pit anchor pile plate retaining wall. Background Art

[0002] The foundation pit anchor pile plate retaining wall is a commonly used support structure in the foundation pit support field. This support structure gives full play to the stress characteristics of anchor cables and piles. The tension provided by the anchor cables can greatly reduce the bending resistance requirements of the anti-sliding piles. By applying prestress to the anchor cables, the deformation of the foundation pit slope soil can be well controlled to ensure the safety of the foundation pit slope. Therefore, prestressed anchor pile plate retaining walls are widely used in the field of engineering construction. The prestressed anchor cables and anti-sliding piles need to be reliably connected through the cap. The commonly used reinforced concrete cap construction process is as follows: first tie the pressure platform steel bars, where the steel bars need to be connected to the anti-sliding by planting steel bars. After the steel bars are tied, the formwork is closed and the cap concrete is poured. The prestressed anchor cables are tensioned only after the concrete strength reaches the design requirements. After the tensioning cable is stable, the excess anchor cables are cut off, and then the anchor steel mesh is tied. After the steel plate is tied, the formwork is closed and the anchor concrete is poured. The above approach has the following main disadvantages: ① The concrete volume is small and the pouring quality is poor, which affects the service life; ② The process is complicated, the construction period is long, and a lot of manpower is consumed; ③ The concrete anchor head is large and not beautiful; ④ On-site tying of steel bars and pouring of concrete are not environmentally friendly and are no longer suitable for the development direction of building industrialization and low carbon. Utility Model Content

[0003] 1. Technical issues to be solved

[0004] In view of the deficiencies in the prior art, the utility model provides an assembled steel cap for a foundation pit anchor pile plate retaining wall.

[0005] (II) Technical solution

[0006] To achieve the above purpose, the utility model provides the following technical solutions: an assembled steel cap for foundation pit anchor pile plate retaining wall, comprising: anti-slip piles; steel cap device. The steel cap device comprises: a steel cap assembly; an anchoring device, arranged on the anti-slip piles, for anchoring the steel cap assembly; a temporary positioning device, arranged on the anti-slip piles, for temporarily supporting the steel cap assembly and the anchoring device.

[0007] Preferably, the steel cap assembly includes a panel, a base plate, a bottom plate, and side plates. The above four steel plates are processed and assembled in the factory. The size of the above base plate meets the requirements of the local compressive bearing capacity of the anti-slip piles; the side plates are triangular steel plates, which are used to fix the base plate and the panel; the bottom plate is a rectangular steel plate, and the bottom plate is provided with a drainage hole near the base plate. The bottom plate is connected between the base plate and the panel. Holes are left on the front of the panel for the anchor cables to pass through. The thickness of the panel needs to meet the requirements of the in-plane bending bearing capacity. A PVC anchor cap is fixedly installed on the top of the anchor cable. The angle of the anchor cable is large. When the friction between the base plate and the anti-slip pile cannot be self-locking, it is necessary to add an anchoring device to provide shear bearing capacity.

[0008] Preferably, the anchoring device is composed of chemical anchor bolts, which are used to connect the steel cap assembly and the anti-slip piles to ensure that the steel cap assembly is reliably fixed on the anti-slip piles.

[0009] Preferably, the temporary positioning device includes temporary positioning ribs, and the temporary positioning ribs are fixedly connected to the anti-slip piles and are used to temporarily fix the steel cap assembly.

[0010] Preferably, the PVC anchor cap is embedded with butter.

[0011] Preferably, there are two temporary positioning ribs to improve the installation accuracy of the steel cap.

[0012] (III) Beneficial effects

[0013] Compared with the prior art, the utility model provides an assembled steel cap for a foundation pit anchor pile plate retaining wall, which has the following beneficial effects:

[0014] 1. This kind of assembled steel cap for foundation pit anchor pile plate retaining wall can be tensioned after the steel cap is installed through the steel cap assembly and anchoring device, which greatly saves the construction period. After the anchor cable is tensioned, the sealing cap is installed, which is simple and convenient;

[0015] 2. This kind of prefabricated steel cap for foundation pit anchor pile plate retaining wall is prefabricated and assembled in the factory, with reliable engineering quality, reducing the work of tying steel bars and pouring concrete on the construction site, and is green, low-carbon and environmentally friendly. The prefabricated steel cap can be mass-produced to realize the industrialization of construction. For temporary supporting structures, it can be easily dismantled and recycled in the later stage, saving materials, low carbon and environmentally friendly.

[0016] 3. This kind of assembled steel cap used for foundation pit anchor pile plate retaining wall has a small anchor head size and beautiful appearance.

[0017] 4. The assembled steel cap for foundation pit anchor pile plate retaining wall can improve the installation accuracy of the steel cap assembly and the anchoring device by installing a temporary positioning device. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0019] Figure 1 It is a schematic diagram of the structure of the utility model;

[0020] Figure 2 It is a schematic diagram of the left side structure of the utility model;

[0021] Figure 3 This is a schematic diagram of the bottom structure of the utility model;

[0022] Figure 4 This is a schematic diagram of the left side cross-sectional structure of the utility model.

[0023] Figure 5 It is a schematic diagram of the local structure of the utility model.

[0024] In the figure: 1. Anti-sliding piles; 2. Steel cap device; 21. Steel cap assembly; 211. Bottom plate; 212. Panel; 213. Bottom bearing plate; 214. Side bearing plate; 215. Anchor cable; 216. Anchor cap; 217. Drain hole; 218. Chemical bolt; 219. Temporary positioning rib; 2110. Support plate; 2111. Seesaw. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0026] Anti-slip piles 1; steel cap device 2, arranged on the anti-slip piles 1, used for the combination of steel caps; wherein the steel cap device 2 includes: a steel cap assembly 21, arranged on the anti-slip piles 1, used to form a complete steel cap device 2, arranged on the anti-slip piles 1, used to provide positioning and support for the steel cap assembly 21.

[0027] The steel cap assembly 21 includes a bottom plate 211, a panel 212, a bottom bearing plate 213, and a side bearing plate 214. The four plates are processed and assembled in the factory. The panel 212 and the bottom plate 211 have reserved circular holes for the anchor cable 215 to pass through. A PVC anchor cap 216 is installed on the top of the anchor cable 215. The bottom bearing plate 213 is provided with a drainage hole 217. The steel cap assembly 21 is fixedly connected to the front of the anti-slip pile 1 by a chemical anchor bolt 218.

[0028] It includes temporary positioning ribs 219 which are fixedly connected to the anti-sliding pile 1 .

[0029] The temporary positioning rib 219 is provided with a slide groove, and a seesaw 2111 is slidably disposed on the inner wall of the slide groove. A support plate 2110 is hingedly connected to the back of the seesaw 2111 , and the support plate 2110 is fixedly mounted on the front side of the anti-slip pile 1 .

[0030] PVC anchor cap 216, with built-in butter.

[0031] There are two temporary positioning bars 219 in total.

[0032] like Figure 1-5 As shown, when in use, the side of the anti-slip pile 1 that contacts the steel cap is processed to be straight to facilitate the installation of the steel cap, the bottom plate 211 is fixed to the normal side of the anti-slip pile 1 by chemical bolts 212, the two side bearing plates 221 are welded to the front of the bottom plate 211, the bottom bearing plate 222 is welded to the bottom of the side bearing plate 221, and the panel 223 is welded to the front of the side bearing plate 2221. A circular hole matching the size of the anchor cable 224 is reserved on the front of the panel 223, and the panel 223 is perpendicular to the anchor cable 224 to ensure that the anchor cable 224 is tensioned along a straight line. The bottom bearing plate 222 is a rectangular steel plate, and the side bearing plate 221 is a triangular steel plate. The size of the bottom plate 211 meets the local compressive bearing capacity requirements of the anti-slip pile 1, and the thickness of the panel 223 needs to meet the in-plane bending bearing capacity requirements. The steel plates are flat and tight, and groove welding (full penetration) is adopted. The connection process meets the requirements of relevant technical specifications. When the angle of the prestressed anchor cable is large, the friction between the bottom plate and the anti-slip pile cannot be self-locking. The chemical bolts 212 are added to provide shear bearing capacity. After the staggered cables are tensioned, the sealing anchor caps 225 are used to cover the heads, which is convenient for later maintenance. Considering that water may seep into the steel cap if the sealing is not dense, a drainage hole 226 is provided at the bottom bearing plate 222. The temporary positioning rib 231 is fixedly installed on the anti-slip pile 1. The straight end of the seesaw 232 is pressed to form a lever through the hinged support plate 233. The straight end of the seesaw 232 falls, driving the seesaw 232 to slide up in the slide groove of the temporary positioning rib 231. The temporary positioning rib can be removed, and tensioning can be carried out after the steel cap is installed, which greatly saves construction time. After the staggered cables are tensioned, the sealing anchor caps 225 are installed, which is simple and convenient, reduces the work of tying steel bars and pouring concrete on the construction site, is green, low-carbon and environmentally friendly, and adopts assembled steel caps, which can be mass-produced to realize the industrialization of construction, and realize the small and beautiful staggered heads. The temporary support structure can be easily dismantled and recycled in the later stage, saving materials, being low-carbon and environmentally friendly.

Claims

1. An assembled steel cap for a foundation pit anchor pile plate retaining wall, characterized in that: include: Anti-slip piles (1); A steel cap device (2), arranged on the anti-sliding pile (1) and used for assembling the steel cap; Wherein, the steel cap device (2) comprises: A steel cap assembly (21), arranged on the anti-sliding pile (1) and used to form a complete steel cap device (2); A temporary positioning device is arranged on the anti-slip pile (1) and is used to provide positioning and support for the steel cap assembly (21).

2. The assembled steel cap for the foundation pit anchor pile plate retaining wall according to claim 1 is characterized by: The steel cap assembly (21) includes a bottom plate (211), a panel (212), a bottom support plate (213), and a side support plate (214). The four plates are processed and assembled in a factory. The panel (212) and the bottom plate (211) have reserved circular holes for anchor cables (215) to pass through. A PVC anchor cap (216) is installed on the top of the anchor cable (215). The bottom support plate (213) is provided with a drainage hole (217). The steel cap assembly (21) is fixedly connected to the front of the anti-sliding pile (1) by a chemical anchor bolt (218).

3. The assembled steel cap for the foundation pit anchor pile plate retaining wall according to claim 1, characterized in that: The temporary positioning device also includes temporary positioning ribs (219), and the temporary positioning ribs (219) are fixedly connected to the anti-slip pile (1).

4. The assembled steel cap for the foundation pit anchor pile plate retaining wall according to claim 3 is characterized by: The temporary positioning rib (219) is provided with a slide groove, and a seesaw (2111) is slidably provided on the inner wall of the slide groove, a support plate (2110) is hingedly connected to the back of the seesaw (2111), and the support plate (2110) is fixedly mounted on the front side of the anti-slip pile (1).

5. The assembled steel cap for the foundation pit anchor pile plate retaining wall according to claim 2, characterized in that: The PVC anchor cap (216) is embedded with butter.

6. The assembled steel cap for the foundation pit anchor pile plate retaining wall according to claim 4, characterized in that: There are two temporary positioning ribs (219) in total.