Filling flow control device
By using the collaborative regulation of a variable frequency pump and an electric regulating valve in the rocket filling flow control device, combined with the shunt branch and the control system, the water hammer effect and cavitation problems when the filling flow is reduced are solved, and the metering accuracy and energy efficiency are improved. .
Patent Information
- Application Number
- CN202420658824.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-04-01
AI Technical Summary
During the rocket filling process, as the filling flow rate decreases, the pump lift increases. Excessive pressure will cause energy loss and water hammer effect in the pipeline, affect metering accuracy, and may lead to cavitation.
A filling flow control device is designed, including a main filling path, a branch branch and a control system. Through the coordinated adjustment of the frequency conversion pump and the electric regulating valve, the first control valve is used to flow part of the propellant into the branch branch, reducing the fuel consumption. Pay attention to the pressure in the main line to prevent water hammer effect and cavitation.
It effectively reduces energy loss and pipeline impact, improves the metering accuracy of the filling amount, and avoids the occurrence of cavitation.
Smart Images

Figure CN221823932U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of aerospace rockets, in particular to a filling flow control device. Background Art
[0002] During the rocket refueling process, the requirements for the refueling flow rate are different due to the different capacities of the first and second stage tanks of the rocket body. The refueling flow rate spans dozens of times, from the small flow rate during quantitative replenishment to the large flow rate of the first stage tank. During the conventional propellant refueling process at each launch site, when switching from large flow refueling to small flow refueling, the flow control is achieved by adjusting the electric regulating valve behind the refueling pump. However, when the electric regulating valve controls the flow, as the refueling flow rate decreases and the pump head increases, excessive pressure will not only cause energy loss, but also cause a water hammer effect in the pipeline, causing great impact on the pipeline network and generating great destructive force. At the same time, as the pump outlet pressure increases, the propellant in the pipeline will also rise in temperature, which will not only affect the temperature control effect, but also cause cavitation for the low-boiling point oxidizer pipeline, thereby affecting the metering accuracy of the refueling amount. Utility Model Content
[0003] Therefore, the technical problem to be solved by the utility model is that as the filling flow rate decreases and the pump head increases, excessive pressure will not only cause energy loss, but also cause water hammer effect in the pipeline, causing great impact on the pipeline network, thereby providing a filling flow control device.
[0004] In order to solve the above problems, the utility model provides a filling flow control device, comprising:
[0005] A main filling path, one end of which is in communication with the material storage structure, and the other end of which is in communication with the rocket body tank. A variable frequency pump is provided on the main filling path, and the variable frequency pump is located between the material storage structure and the rocket body tank. An electric regulating valve is provided on the main filling path, and the electric regulating valve is located between the variable frequency pump and the rocket body tank.
[0006] A shunt branch, one end of which is connected to the main filling path between the electric regulating valve and the arrow body tank, and the other end of which is connected to the storage structure, and a first control valve is provided on the shunt branch;
[0007] A control system is electrically connected to the variable frequency pump, the electric regulating valve and the first control valve respectively.
[0008] Furthermore, a float valve core control valve is provided at the feed port of the arrow body tank, and the float valve core control valve is electrically connected to the control system.
[0009] Furthermore, it also includes:
[0010] An emptying branch, one end of which is connected to the main filling path between the electric regulating valve and the rocket body tank, and the other end of which is connected to the emptying storage structure. A second control valve is provided on the emptying branch, and the second control valve is electrically connected to the control system.
[0011] Furthermore, it also includes:
[0012] A reflux branch, one end of which is connected to the main filling path between the electric regulating valve and the rocket body tank, and the other end of which is connected to the storage structure. A third control valve is provided on the reflux branch, and the third control valve is electrically connected to the control system.
[0013] Furthermore, it also includes:
[0014] A return branch, one end of which is connected to the main filling path between the electric regulating valve and the arrow body tank, and the other end of which is connected to the storage structure and / or the emptying storage structure. A fourth control valve is arranged on the return branch, and the fourth control valve is electrically connected to the control system.
[0015] Furthermore, the other end of the diversion branch is connected to the return branch.
[0016] Furthermore, the end of the reflux branch connected to the material storage structure has a fifth control valve, the end of the vent branch connected to the vent storage structure has a sixth control valve, and the fifth control valve and the sixth control valve are both electrically connected to the control system.
[0017] Furthermore, the first control valve, the second control valve, the third control valve, the fourth control valve, the fifth control valve and the sixth control valve are all pneumatic valves.
[0018] Furthermore, the material storage structure is a filling tank.
[0019] Furthermore, the venting storage structure is a venting tank.
[0020] The utility model has the following advantages:
[0021] The utility model discloses a filling flow control device, which comprises a frequency conversion pump arranged on a filling main road, a flow branch arranged on the filling main road between an electric regulating valve and a rocket body tank, a first control valve arranged on the flow branch, a control system electrically connected with the frequency conversion pump, the electric regulating valve and the first control valve, so that when the flow needs to be adjusted, the control system controls the frequency conversion pump and the electric regulating valve to adjust the flow of the propellant in the filling main road at the same time, opens the first control valve to allow part of the propellant to enter the flow branch, thereby reducing the pressure in the filling main road, preventing water hammer effect and cavitation phenomenon, and ensuring the metering accuracy of the filling amount. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0023] Figure 1 It is a structural schematic diagram of the filling flow control device in the embodiment of the utility model;
[0024] Description of reference numerals:
[0025] 1. Filling main line; 2. Storage structure; 3. Rocket body tank; 4. Frequency conversion pump; 5. Electric regulating valve; 6. Diversion branch; 7. First control valve; 8. Float valve core control valve; 9. Drain branch; 10. Drain storage structure; 11. Second control valve; 12. Return branch; 13. Third control valve; 14. Discharge branch; 15. Fourth control valve; 16. Fifth control valve; 17. Sixth control valve. DETAILED DESCRIPTION
[0026] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0028] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0029] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0030] like Figure 1 As shown, this embodiment discloses a filling flow control device, including: a filling main path 1, a shunt branch 6 and a control system. One end of the filling main path 1 is connected to the material storage structure 2, and the other end of the filling main path 1 is connected to the arrow body tank 3. A variable frequency pump 4 is provided on the filling main path 1, and the variable frequency pump 4 is located between the material storage structure 2 and the arrow body tank 3. An electric regulating valve 5 is provided on the filling main path 1, and the electric regulating valve 5 is located between the variable frequency pump 4 and the arrow body tank 3. One end of the shunt branch 6 is connected to the filling main path 1 between the electric regulating valve 5 and the arrow body tank 3, and the other end of the shunt branch 6 is connected to the material storage structure 2. A first control valve 7 is provided on the shunt branch 6. The control system is electrically connected to the variable frequency pump 4, the electric regulating valve 5 and the first control valve 7 respectively.
[0031] Specifically, a variable frequency pump 4 is provided on the main filling path 1, and the variable frequency pump 4 transports the propellant in the storage structure 2 to the rocket body tank 3 through the main filling path 1. An electric regulating valve 5 is provided on the main filling path 1 between the variable frequency pump 4 and the rocket body tank 3. The electric regulating valve 5 and the variable frequency pump 4 are electrically connected to the control system respectively. When it is necessary to control the propellant flow, the control system controls the variable frequency pump 4 to reduce the power, so that the speed of extracting the propellant is reduced, and the control system controls the electric regulating valve 5 to adjust the opening to reduce the propellant flow. At the same time, the shunt branch 6 is connected to the main filling path 1 between the electric regulating valve 5 and the rocket body tank 3, and the control system controls the first control valve 7 to open, so that part of the propellant in the main filling path 1 enters the shunt branch 6, and the propellant flow can be further adjusted. The metering accuracy of the filling amount is ensured.
[0032] Preferably, in this embodiment, the material storage structure 2 is a filling tank.
[0033] Furthermore, a float valve core control valve 8 is provided at the feed port of the arrow body tank 3, and the float valve core control valve 8 is electrically connected to the control system.
[0034] Specifically, Figure 1 As shown, the float valve core control valve 8 can detect the amount of propellant in the rocket body tank 3. When the propellant in the rocket body tank 3 is about to reach a set amount, the float valve core control valve 8 transmits information to the control system, and the control system controls the float valve core control valve 8, the frequency conversion pump 4, the electric regulating valve 5 and the first control valve 7 to adjust the flow rate of the propellant in the main filling path 1.
[0035] Furthermore, it also includes: an emptying branch 9. One end of the emptying branch 9 is connected to the main filling path 1 between the electric regulating valve 5 and the arrow body tank 3, and the other end of the emptying branch 9 is connected to the emptying storage structure 10. The emptying branch 9 is provided with a second control valve 11, and the second control valve 11 is electrically connected to the control system.
[0036] Specifically, Figure 1 As shown, when the rocket body tank 3 needs to be emptied, the control system controls the first control valve 7 and the electric regulating valve 5 to close, and opens the second control valve 11 to allow the propellant in the rocket body tank 3 to enter the emptying branch 9, and enter the emptying storage structure 10 along the emptying branch 9.
[0037] Preferably, in this embodiment, the emptying storage structure 10 is an emptying tank.
[0038] Furthermore, it also includes: a reflux branch 12. One end of the reflux branch 12 is connected to the main filling path 1 between the electric regulating valve 5 and the arrow body tank 3, and the other end of the reflux branch 12 is connected to the storage structure 2. A third control valve 13 is provided on the reflux branch 12, and the third control valve 13 is electrically connected to the control system.
[0039] Specifically, Figure 1 As shown, when the rocket body tank 3 refluxes, the control system controls the first control valve 7, the electric regulating valve 5 and the second control valve 11 to close, and opens the third control valve 13 to allow the propellant in the rocket body tank 3 to enter the reflux branch 12 and enter the storage structure 2 along the reflux branch 12.
[0040] Further, such as Figure 1 As shown, the other end of the branch flow path 6 is communicated with the return flow path 12. The propellant in the branch flow path 6 can enter the storage structure 2 through the return flow path 12.
[0041] Furthermore, it also includes: a leakage return branch 14. One end of the leakage return branch 14 is connected to the main filling path 1 between the electric regulating valve 5 and the arrow body tank 3, and the other end of the leakage return branch 14 is connected to the storage structure 2 and / or the emptying storage structure 10. A fourth control valve 15 is provided on the leakage return branch 14, and the fourth control valve 15 is electrically connected to the control system.
[0042] Specifically, when the rocket tank 3 is discharged back, the control system controls the first control valve 7, the electric regulating valve 5, the second control valve 11 and the third control valve 13 to be closed, and opens the third control valve 13 to allow the propellant in the rocket tank 3 to enter the reflux branch 12. In this embodiment, the discharge branch 14 is connected with the storage structure 2, and the propellant enters the storage structure 2 along the discharge branch 14. In other optional embodiments, the discharge branch 14 can be connected with the empty storage structure 10, and the propellant enters the empty storage structure 10 along the discharge branch 14, or the discharge branch 14 is connected with the storage structure 2 and the empty storage structure 10 respectively. When the empty storage structure 10 is full, the propellant can enter the storage structure 2 along the discharge branch 14, and vice versa.
[0043] Further, the end of the reflux branch 12 connected to the storage structure 2 is provided with a fifth control valve 16, and the end of the venting branch 9 connected to the venting storage structure 10 is provided with a sixth control valve 17, and the fifth control valve 16 and the sixth control valve 17 are both electrically connected to the control system. The control system can control the fifth control valve 16 and the sixth control valve 17 to open or close to control the propellant to enter the venting branch 9 and the venting storage structure 10.
[0044] Preferably, in the present embodiment, the first control valve 7 , the second control valve 11 , the third control valve 13 , the fourth control valve 15 , the fifth control valve 16 and the sixth control valve 17 are all pneumatic valves.
[0045] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A filling flow control device, characterized in that: include: A main filling path (1), one end of the main filling path (1) being in communication with a material storage structure (2), and the other end of the main filling path (1) being in communication with a rocket body tank (3), a variable frequency pump (4) being provided on the main filling path (1), and the variable frequency pump (4) being located between the material storage structure (2) and the rocket body tank (3), and an electric regulating valve (5) being provided on the main filling path (1), and the electric regulating valve (5) being located between the variable frequency pump (4) and the rocket body tank (3); A shunt branch (6), one end of which is in communication with the main filling path (1) between the electric regulating valve (5) and the rocket body tank (3), and the other end of which is in communication with the storage structure (2). A first control valve (7) is provided on the shunt branch (6); A control system is electrically connected to the variable frequency pump (4), the electric regulating valve (5) and the first control valve (7) respectively.
2. The filling flow control device according to claim 1, characterized in that: The feed port of the arrow body tank (3) is provided with a float valve core control valve (8), and the float valve core control valve (8) is electrically connected to the control system.
3. The filling flow control device according to claim 1, characterized in that: Also includes: An emptying branch (9), one end of which is in communication with the main filling path (1) between the electric regulating valve (5) and the rocket body tank (3), and the other end of which is in communication with the emptying storage structure (10). A second control valve (11) is provided on the emptying branch (9), and the second control valve (11) is electrically connected to the control system.
4. The filling flow control device according to claim 3, characterized in that: Also includes: A reflux branch (12), one end of which is in communication with the main filling path (1) between the electric regulating valve (5) and the rocket body tank (3), and the other end of which is in communication with the storage structure (2). A third control valve (13) is provided on the reflux branch (12), and the third control valve (13) is electrically connected to the control system.
5. The filling flow control device according to claim 4, characterized in that: Also includes: A leakage return branch (14), one end of which is in communication with the main filling path (1) between the electric regulating valve (5) and the rocket body tank (3), and the other end of which is in communication with the storage structure (2) and / or the emptying storage structure (10). A fourth control valve (15) is provided on the leakage return branch (14), and the fourth control valve (15) is electrically connected to the control system.
6. The filling flow control device according to claim 4, characterized in that: The other end of the diversion branch (6) is in communication with the return branch (12).
7. The filling flow control device according to claim 5, characterized in that: The end of the reflux branch (12) connected to the material storage structure (2) is provided with a fifth control valve (16), and the end of the venting branch (9) connected to the venting storage structure (10) is provided with a sixth control valve (17). Both the fifth control valve (16) and the sixth control valve (17) are electrically connected to the control system.
8. The filling flow control device according to claim 7, characterized in that: The first control valve (7), the second control valve (11), the third control valve (13), the fourth control valve (15), the fifth control valve (16) and the sixth control valve (17) are all pneumatic valves.
9. The filling flow control device according to claim 1, 2, 3, 4, 5, 6 or 8, characterized in that: The material storage structure (2) is a filling tank.
10. The filling flow control device according to claim 3, 4, 5, 6 or 8, characterized in that: The emptying storage structure (10) is an emptying tank.
Citation Information
Cited By
Energy liquid conveying and distributing system
CN119491785A
Rocket conventional propellant filling training system and method
CN120968960A
A rocket conventional propellant loading training system and method
CN120968960B