Project cost progress management device

By designing the display mechanism and adjustment mechanism in the project cost progress management device, and using components such as support plates, connecting pipes, and automatic telescopic rods, the problem of difficult maintenance caused by the complex structure of the existing device is solved, and the convenience of rapid adjustment and maintenance is achieved. , improving the applicability of the device and the accuracy of the progress display.

CN221824988UInactive Publication Date: 2024-10-11韦红
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420594491.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing project cost progress management device has a complex structure when repairing and replacing parts, making it difficult to operate quickly, affecting usage efficiency.

Method used

A project cost progress management device including a display mechanism and an adjustment mechanism is designed. Through the combination of support plates, connecting pipes, automatic telescopic rods and screw rods, the height and angle of the display plate and fixed plate can be quickly adjusted. Simplifies the process of repairing and replacing parts.

Benefits of technology

It realizes the convenience of rapid adjustment and maintenance of the display mechanism during use, improves the applicability and practicality of the equipment, and facilitates the accurate display and management of project cost progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221824988U_ABST
    Figure CN221824988U_ABST
Patent Text Reader

Abstract

The utility model discloses a project cost progress management device, and relates to the technical field of building construction. Comprising a display mechanism, the display mechanism comprises a fixing plate, connecting strips are fixedly connected to the two sides of the fixing plate, an adjusting mechanism is arranged at the bottom of the display mechanism and comprises a bottom plate, a connecting plate is fixedly connected to the center of the top of the bottom plate, a through hole is formed in one side of the top of the connecting plate, and a supporting plate is rotationally connected into the through hole. Through the arrangement of the display mechanism and the adjusting mechanism, in the using process, the height of a connecting pipe is adjusted through a supporting plate and fixed through a bolt, when the angle of a fixing plate needs to be adjusted, a rotating disc is manually rotated to drive a lead screw to rotate to drive a sliding block to move, and therefore an automatic telescopic rod is driven to move; and the structure is simple, when parts need to be maintained and replaced, operation is convenient and rapid, practicability is high, and the device is suitable for popularization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a project cost progress management device. Background Art

[0002] Project cost refers to the total amount of construction costs estimated or actually incurred to complete a project. Therefore, in a certain sense, project cost is the fixed asset investment of the construction project. It is defined from the perspective of contracting. Since the project cost process is cumbersome, it is necessary to supervise and manage the cost progress of cost personnel, so it is necessary to use the project cost progress management device.

[0003] For example, the engineering cost progress management device with patent publication number 202023288800.8 includes a bracket and an exhibition board arranged on the bracket, the board surface of the exhibition board is provided with a plurality of placement cavities for placing materials and the placement cavity opening is arranged, the cavity wall of the placement cavity is adsorbed with a plurality of magnetic blocks for fixing materials, the exhibition board is slidably connected with a glass door for covering the materials, and the exhibition board is also provided with a locking assembly for locking the glass door. This application improves the applicability of the engineering cost progress management device.

[0004] However, during the use of the above-mentioned equipment, due to the setting of the internal placement cavity and locking assembly, and its internal structure is relatively complex, it is not convenient to operate quickly when repairs and replacement of parts are required. Therefore, in response to this situation, we propose a more convenient and practical engineering cost progress management device to meet the use needs. Utility Model Content

[0005] The purpose of the utility model is to provide a construction cost progress management device to solve the problems raised in the above background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solution: an engineering cost progress management device, including a display mechanism, the display mechanism includes a fixed plate, connecting strips are fixedly connected on both sides of the fixed plate, an adjustment mechanism is arranged at the bottom of the display mechanism, the adjustment mechanism includes a bottom plate, a connecting plate is fixedly connected to the center of the top of the bottom plate, a through hole is opened on one side of the top of the connecting plate, and a support plate is rotatably connected in the through hole.

[0007] Furthermore, in the engineering cost progress management device, one side of the fixed plate is fixedly connected to a linear slide rail, and the top of the linear slide rail is slidably connected to a display board.

[0008] Furthermore, in the engineering cost progress management device, a progress bar is fixedly connected to one side of the fixed plate, an indicator block is slidably connected to the outer wall of the progress bar, a through hole is opened on one side of the indicator block, and a locking column is rotatably connected in the through hole.

[0009] Furthermore, in the engineering cost progress management device, the top of the support plate is slidably connected to a connecting pipe, one side of the connecting pipe is penetrated by a through hole, a bolt is installed in the through hole, and one side of the connecting pipe is fixedly connected to a connecting block.

[0010] Furthermore, in the engineering cost progress management device, one side of the connecting block is rotatably connected to an automatic telescopic rod, one end of the automatic telescopic rod is rotatably connected to a sliding block, and the sliding block and the connecting plate are slidably connected.

[0011] Furthermore, in the engineering cost progress management device, a through hole is opened on one side of the sliding block, a screw rod is rotatably connected in the through hole, one end of the screw rod is rotatably connected to the inner wall of the connecting plate, and one end of the screw rod is fixedly connected to a rotating disk.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] The construction cost progress management device, through the setting of the display mechanism and the adjustment mechanism, during use, first adjusts the height of the connecting pipe through the support plate and fixes it with bolts. When it is necessary to adjust the angle of the fixed plate, first manually rotate the rotating disk to drive the screw to rotate and drive the sliding block to move, thereby driving the automatic telescopic rod to move. In this process, the automatic telescopic rod drives the connection to move through the connecting pipe, thereby adjusting the angle of the fixed plate. The structure is relatively simple, and when maintenance and replacement of parts are required, it is convenient and quick to operate. It is highly practical and suitable for promotion.

[0014] At the same time, the display mechanism can accurately display the progress of the project cost through the combination of display boards and indicator blocks, making it easier for people to understand the progress of the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0016] Figure 2 This is a schematic diagram of the structure of the display device of the utility model;

[0017] Figure 3 It is a schematic diagram of the structure of the regulating device of the utility model.

[0018] In the figure: 1. display mechanism; 101. fixed plate; 102. connecting strip; 103. linear slide rail; 104. display board; 105. progress bar; 106. indicator block; 107. locking column; 2. adjustment mechanism; 201. bottom plate; 202. connecting plate; 203. support plate; 204. connecting pipe; 205. bolt; 206. connecting block; 207. automatic telescopic rod; 208. sliding block; 209. screw rod; 210. rotating disk. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] In engineering projects, the company responsible for bidding will conduct engineering cost calculation for the undertaken projects before bidding. The current cost calculation process is that the staff calculates the cost of the undertaken projects at different stages according to the progress of the projects based on the information provided by the owner and the information obtained from the on-site investigation. Therefore, it is necessary to use the engineering cost progress management device. Before using this equipment, first of all, this equipment needs to be used in a relatively open area. Before use, it is necessary to check whether the connections between the parts of the equipment are tight to avoid affecting the use. At the same time, at least one staff member is required to operate during use.

[0021] like Figure 1-Figure 3 As shown, the utility model provides a technical solution: a construction cost progress management device, including a display mechanism 1, the display mechanism 1 includes a fixed plate 101, and connecting strips 102 are fixedly connected on both sides of the fixed plate 101. An adjustment mechanism 2 is arranged at the bottom of the display mechanism 1, and the adjustment mechanism 2 includes a bottom plate 201, and a connecting plate 202 is fixedly connected to the center of the top of the bottom plate 201. A through hole is opened on one side of the top of the connecting plate 202, and a support plate 203 is rotatably connected in the through hole.

[0022] It should be noted that during use, the fixing plate 101 and the adjusting mechanism 2 are first connected through the connecting strip 102 of the display mechanism 1. When the height and angle of the display mechanism 1 need to be adjusted, the supporting plate 203 moves through the connecting plate 202 under the cooperation between the components, thereby adjusting the height and angle of the display mechanism 1. The structure is relatively simple, and when maintenance and replacement of components are required, the operation is convenient and quick.

[0023] like Figure 2 As shown, a linear slide rail 103 is fixedly connected to one side of the fixed plate 101, a display board 104 is slidably connected to the top of the linear slide rail 103, a progress bar 105 is fixedly connected to one side of the fixed plate 101, an indicator block 106 is slidably connected to the outer wall of the progress bar 105, a through hole is opened on one side of the indicator block 106, and a locking column 107 is rotatably connected in the through hole.

[0024] It should be noted that during use, the fixing plate 101 and the adjusting mechanism 2 are first connected by the connecting strip 102, and then the position of the display board 104 is adjusted by the linear slide rail 103 as needed. At the same time, the position of the indicator block 106 on the progress bar 105 can also be manually adjusted and fixed by the locking column 107. The display mechanism 1 can accurately display the progress of the project cost through the combination of the display board 104 and the indicator block 106, so as to facilitate people's understanding of the progress of the project.

[0025] like Figure 3 As shown, a connecting tube 204 is slidably connected to the top of the support plate 203, a through hole is formed on one side of the connecting tube 204, a bolt 205 is installed in the through hole, a connecting block 206 is fixedly connected to one side of the connecting tube 204, an automatic telescopic rod 207 is rotatably connected to one side of the connecting block 206, one end of the automatic telescopic rod 207 is rotatably connected to a sliding block 208, the sliding block 208 and the connecting plate 202 are slidably connected, a through hole is formed on one side of the sliding block 208, a screw rod 209 is rotatably connected in the through hole, one end of the screw rod 209 is rotatably connected to the inner wall of the connecting plate 202, and one end of the screw rod 209 is fixedly connected to a rotating disk 210.

[0026] It should be noted that during use, when it is necessary to adjust the height and angle of the display board 104, first adjust the height of the connecting pipe 204 through the support plate 203 and fix it with the bolt 205. When it is necessary to adjust the angle of the fixed plate 101, first manually rotate the rotating disk 210 to drive the screw rod 209 to rotate and drive the sliding block 208 to move, thereby driving the automatic telescopic rod 207 to move. In this process, the automatic telescopic rod 207 drives the connecting pipe 204 to move through the connecting block 206, thereby adjusting the angle of the fixed plate 101. The operation of the adjustment mechanism 2 is relatively simple. The height of the display mechanism 1 can be changed by rotating or sliding. It can be adjusted quickly and conveniently, saving time and energy.

[0027] During use, first adjust the position of the display board 104 through the linear slide rail 103 as needed, and also manually adjust the position of the indicator block 106 on the progress bar 105 and fix it through the locking column 107, and then adjust the height of the connecting tube 204 through the support plate 203. When the angle of the fixed plate 101 needs to be adjusted, manually rotate the rotating disk 210 to drive the screw rod 209 to rotate and drive the sliding block 208 to move, thereby driving the automatic telescopic rod 207 to move. The automatic telescopic rod 207 drives the connecting tube 204 to move, thereby adjusting the angle of the fixed plate 101. The structure is relatively simple, and when maintenance and replacement of parts are required, it is convenient and quick to operate.

[0028] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is limited by the attached embodiments and their equivalents.

Claims

1. The project cost progress management device is characterized by: The display mechanism (1) comprises a fixing plate (101), connecting strips (102) are fixedly connected to both sides of the fixing plate (101), an adjustment mechanism (2) is arranged at the bottom of the display mechanism (1), the adjustment mechanism (2) comprises a bottom plate (201), a connecting plate (202) is fixedly connected to the center of the top of the bottom plate (201), a through hole is opened on one side of the top of the connecting plate (202), and a support plate (203) is rotatably connected in the through hole.

2. The construction cost progress management device according to claim 1, characterized in that: A linear slide rail (103) is fixedly connected to one side of the fixed plate (101), and a display board (104) is slidably connected to the top of the linear slide rail (103).

3. The construction cost progress management device according to claim 1, characterized in that: A progress bar (105) is fixedly connected to one side of the fixed plate (101), an indicator block (106) is slidably connected to the outer wall of the progress bar (105), a through hole is opened on one side of the indicator block (106), and a locking column (107) is rotatably connected in the through hole.

4. The construction cost progress management device according to claim 1 is characterized in that: The top of the support plate (203) is slidably connected to a connecting pipe (204), one side of the connecting pipe (204) is provided with a through hole, a bolt (205) is installed in the through hole, and one side of the connecting pipe (204) is fixedly connected to a connecting block (206).

5. The construction cost progress management device according to claim 4 is characterized in that: One side of the connection block (206) is rotatably connected to an automatic telescopic rod (207), one end of the automatic telescopic rod (207) is rotatably connected to a sliding block (208), and the sliding block (208) and the connection plate (202) are slidably connected.

6. The construction cost progress management device according to claim 5 is characterized in that: A through hole is provided on one side of the sliding block (208), a screw rod (209) is rotatably connected in the through hole, one end of the screw rod (209) is rotatably connected to the inner wall of the connecting plate (202), and one end of the screw rod (209) is fixedly connected to a rotating disk (210).