Stress-strain test system for rocket maritime launching bench
By setting up multiple stress and strain sensors on the rocket sea launch platform to measure and analyze stress and strain changes in real time, the problem of the lack of stress and strain testing technology for the sea launch vehicle launch platform in the existing technology is solved, and the key to the launch platform is realized. Accurate measurement of stress and strain at the site.
Patent Information
- Application Number
- CN202420306398.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-19
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-02-19
AI Technical Summary
The existing technology lacks stress and strain testing technology for maritime launch vehicle launch platforms and cannot effectively measure the stress and strain conditions of the launch platform at the moment of launch.
A stress and strain testing system for a rocket sea launch platform was designed. By setting multiple stress and strain sensors on the rocket launch platform, including the base, steel column, vertical arm and hinge stress and strain sensors, strain cables and data return were used. Transmission center connection, real-time measurement and analysis of stress and strain changes.
It has realized the stress and strain measurement at multiple points such as the rocket launcher base, steel column, and vertical arm, accurately measured the stress and strain changes in key parts of the launch platform, and met the stress and strain testing requirements of the maritime launch vehicle launch platform.
Smart Images

Figure CN221826217U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of rocket launching, in particular to a stress and strain testing system for a rocket offshore launching platform. Background Art
[0002] The space launch of sea-based carrier rockets is an important manifestation of a country's space launch capability. The success of a sea-based carrier rocket launch is closely related to the ocean environment and the stability of the launch platform. The rocket boosters of the carrier rocket will release huge thrust during launch. The thrust of large-tonnage and high-capacity rockets will increase exponentially, and the recoil force will all act on the launch platform. How to test the stress and strain of the launch platform at the moment of launch has become an important challenge at present.
[0003] Currently, there is no stress and strain testing technology for the offshore launch platform of the offshore launch vehicle. Therefore, there is an urgent need for a stress and strain testing system for the offshore launch platform to meet the stress and strain testing needs of the offshore launch platform of the offshore launch vehicle. Utility Model Content
[0004] The utility model aims to provide a rocket sea launch platform stress and strain testing system to solve the problem that the prior art lacks stress and strain testing technology for sea launch platforms for sea-borne carrier rockets.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] The utility model provides a rocket offshore launch platform stress and strain testing system, comprising an offshore rocket launch platform, a rocket launch platform is arranged on the deck of the offshore rocket launch platform, a rocket launch platform steel column, a rocket erection arm, a rocket body and a winch are respectively arranged on the rocket launch platform, the rocket erection arm is used to fix the rocket body; the winch is connected to the rocket launch platform steel column and the rocket erection arm through a steel cable.
[0007] Optionally or preferably, a base stress strain sensor 1 and a base stress strain sensor 2 are respectively provided on the side of the rocket launch platform away from the rocket body; a base stress strain sensor 3, a base stress strain sensor 4 and a base stress strain sensor 5 are respectively provided on the side of the rocket launch platform close to the rocket body.
[0008] Optionally or preferably, a steel column stress and strain sensor 1 is arranged at the center of the top of the rocket launcher steel column; a steel column stress and strain sensor 2 is arranged at the center of the middle of the rocket launcher steel column; a steel column stress and strain sensor 3 is arranged on the side of the middle of the rocket launcher steel column close to the rocket body; and a steel column stress and strain sensor 4 and a steel column stress and strain sensor 5 are respectively arranged at the bottom of the rocket launcher steel column.
[0009] Optionally or preferably, the top of the rocket erection arm is symmetrically provided with an erection arm stress and strain sensor 1 and an erection arm stress and strain sensor 2; the middle of the rocket erection arm is symmetrically provided with an erection arm stress and strain sensor 3 and an erection arm stress and strain sensor 4; the bottom of the rocket erection arm is symmetrically provided with an erection arm stress and strain sensor 5 and an erection arm stress and strain sensor 6.
[0010] Optionally or preferably, the rocket erection arm is connected to the rocket launching platform via a hinge, and hinge stress strain sensor 1 and hinge stress strain sensor 2 are respectively provided on the hinge.
[0011] Optionally or preferably, the base stress strain sensor 1, the base stress strain sensor 2, the steel column stress strain sensor 1, the steel column stress strain sensor 2, the steel column stress strain sensor 3, the steel column stress strain sensor 4, the steel column stress strain sensor 5, the erecting arm stress strain sensor 1, the erecting arm stress strain sensor 2, the erecting arm stress strain sensor 3, the erecting arm stress strain sensor 4, the erecting arm stress strain sensor 5, the erecting arm stress strain sensor 6, the hinge stress strain sensor 1 and the hinge stress strain sensor 2 are respectively connected to the data return center through strain cables for communication.
[0012] Based on the above technical solution, the utility model can at least produce the following technical effects:
[0013] The utility model provides a rocket offshore launch platform stress and strain testing system, which realizes stress and strain measurement of multiple points such as the rocket launch platform base, rocket launch platform steel column, rocket erection arm, etc. through multiple stress and strain sensors. Through data analysis, the stress and strain changes of key parts of the launch platform can be accurately measured. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a flow chart of a test method for a stress-strain test system for a rocket sea launch platform of the utility model;
[0015] Figure 2 It is a top view of the arrangement of the stress and strain testing system of the rocket sea launch platform of the utility model;
[0016] Figure 3 This is a front view of the arrangement of the stress and strain testing system of the rocket sea launch platform of the utility model;
[0017] Figure 4 This is a side view of the arrangement of the stress and strain testing system of the rocket sea launch platform of the utility model;
[0018] Figure 5It is a schematic diagram of the rocket body erection state in the utility model rocket sea launch platform stress strain testing system;
[0019] Figure 6 This is an example diagram of the test results of the stress and strain test system of the rocket sea launch platform of the utility model.
[0020] In the figure: 1. Offshore rocket launching platform; 2. Winch; 3. Steel cable; 4. Rocket launching platform; 5. Rocket launching steel column; 6. Rocket erecting arm; 7. Rocket body; 8. Strain cable; 9. Data return center; 10. Base stress and strain sensor one; 11. Base stress and strain sensor two; 12. Steel column stress and strain sensor four; 13. Steel column stress and strain sensor two; 14. Steel column stress and strain sensor five; 15. Steel column stress and strain sensor one; 16. Steel column stress and strain sensor three; 17. Base stress and strain sensor three; 18. Base stress and strain sensor four; 19. Base stress and strain sensor five; 20. Erecting arm stress and strain sensor five; 21. Erecting arm stress and strain sensor six; 22. Erecting arm stress and strain sensor three; 23. Erecting arm stress and strain sensor four; 24. Erecting arm stress and strain sensor one; 25. Erecting arm stress and strain sensor two; 26. Hinge stress and strain sensor one; 27. Hinge stress and strain sensor two. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model; obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the utility model without making creative work belong to the scope of protection of the utility model.
[0022] Example
[0023] See also Figures 2 to 6 A rocket offshore launch platform stress and strain testing system comprises an offshore rocket launch platform 1, a rocket launch platform 4 is arranged on the deck of the offshore rocket launch platform 1, and a rocket launch platform steel column 5, a rocket erection arm 6, a rocket body 7 and a winch 2 are respectively arranged on the rocket launch platform 4, wherein the rocket body 7 is fixed on the above-mentioned rocket erection arm 6, the winch 2 is connected to the rocket launch steel column 5 and the rocket erection arm 6 through a steel cable 3, and the rocket erection arm 6 is pulled by the winch 2 to connect the steel cable 3 to realize the erection of the rocket body 7.
[0024] In this embodiment, the rocket launch platform 4 is firstly modeled by finite element through ANSYS structural stress response simulation, the mesh division is set to free mesh, the contact unit, the coupling and constraint equations of the degree of freedom are defined, the loading is simulated according to the maximum reverse thrust of the rocket, and the stress results of the overall model are solved. According to the stress simulation results, the measuring points are determined in the order of the simulated stress.
[0025] In this embodiment, corresponding stress and strain sensors are arranged at the above-mentioned measuring points. Specifically, according to the structure of the rocket launching platform 4, a base stress and strain sensor 10 and a base stress and strain sensor 2 11 are respectively arranged on the side of the rocket launching platform 4 away from the rocket body 7; a base stress and strain sensor 3 17, a base stress and strain sensor 4 18 and a base stress and strain sensor 5 19 are respectively arranged on the side of the rocket launching platform 4 close to the rocket body 7.
[0026] A steel column stress and strain sensor 15 is arranged at the center of the top of the rocket launcher steel column 5; a steel column stress and strain sensor 2 13 is arranged at the center of the middle of the rocket launcher steel column 5; a steel column stress and strain sensor 3 16 is arranged on one side of the middle of the rocket launcher steel column 5 close to the rocket body 7; and a steel column stress and strain sensor 4 12 and a steel column stress and strain sensor 5 14 are respectively arranged at the bottom of the rocket launcher steel column 5.
[0027] At the top of the rocket erection arm 6, an erection arm stress and strain sensor 1 24 and an erection arm stress and strain sensor 2 25 are symmetrically arranged; in the middle of the rocket erection arm 6, an erection arm stress and strain sensor 3 22 and an erection arm stress and strain sensor 4 23 are symmetrically arranged; at the bottom of the rocket erection arm 6, an erection arm stress and strain sensor 5 20 and an erection arm stress and strain sensor 6 21 are symmetrically arranged.
[0028] In this embodiment, the rocket erection arm 6 is connected to the rocket launching platform 4 via a hinge, and a hinge stress strain sensor 1 26 and a hinge stress strain sensor 2 27 are respectively provided on the hinge.
[0029] In this embodiment, all stress and strain sensors are connected to the data transmission center 9 via strain cables 8 .
[0030] After the connection is completed, the test parameters of the data transmission center 9 are first set according to the attribute parameters of each stress and strain sensor, and then the feasibility of each stress and strain sensor is tested. After the test of each stress and strain sensor is feasible, the system is calibrated and the system initialization is set.
[0031] During the test phase, the test system was started 20 minutes before the rocket launch. During the test, the stress and strain changes at each measuring point were transmitted in real time to the data return center 9.
[0032] 20 minutes after the rocket launch, the measurement is completed, the test system is shut down, the data is saved and exported, the stress-strain data is analyzed, and the data analysis graph is exported, such as Figure 6 shown.
[0033] This embodiment also provides a test method based on the above rocket sea launch platform stress strain test system, see Figure 1 , the specific process is as follows:
[0034] S1. Propose a test plan based on the general layout of the rocket launch platform 4 and the offshore rocket launch platform 1, and arrange multiple measuring points;
[0035] S2, installing a plurality of stress and strain sensors according to the above-mentioned measuring points, and connecting the plurality of stress and strain sensors to the data return center 9 by using strain cables 8;
[0036] S3, according to the performance parameters of the stress and strain sensor, set the corresponding acquisition parameters of the data acquisition system in the data transmission center 9, and check the initial state;
[0037] S4, real-time measurement and storage of data;
[0038] S5, close the test system and complete data collection;
[0039] S6. Export test data and perform data analysis.
[0040] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A rocket sea launch platform stress and strain testing system, characterized in that: The invention comprises an offshore rocket launch platform (1), wherein a rocket launch platform (4) is arranged on the deck of the offshore rocket launch platform (1), and a rocket launch platform steel column (5), a rocket erection arm (6), a rocket body (7) and a winch (2) are respectively arranged on the rocket launch platform (4), wherein the rocket erection arm (6) is used to fix the rocket body (7); and the winch (2) is connected to the rocket launch platform steel column (5) and the rocket erection arm (6) through a steel cable (3).
2. The rocket sea launch platform stress and strain testing system according to claim 1 is characterized in that: A base stress strain sensor 1 (10) and a base stress strain sensor 2 (11) are respectively arranged on the side of the rocket launch platform (4) away from the rocket body (7); a base stress strain sensor 3 (17), a base stress strain sensor 4 (18) and a base stress strain sensor 5 (19) are respectively arranged on the side of the rocket launch platform (4) close to the rocket body (7).
3. The rocket sea launch platform stress and strain testing system according to claim 2 is characterized in that: A steel column stress and strain sensor 1 (15) is arranged at the center of the top of the rocket launcher steel column (5); a steel column stress and strain sensor 2 (13) is arranged at the center of the middle of the rocket launcher steel column (5); a steel column stress and strain sensor 3 (16) is arranged on one side of the middle of the rocket launcher steel column (5) close to the rocket body (7); and a steel column stress and strain sensor 4 (12) and a steel column stress and strain sensor 5 (14) are respectively arranged at the bottom of the rocket launcher steel column (5).
4. The rocket sea launch platform stress and strain testing system according to claim 3 is characterized in that: The top of the rocket erection arm (6) is symmetrically provided with an erection arm stress and strain sensor 1 (24) and an erection arm stress and strain sensor 2 (25); the middle of the rocket erection arm (6) is symmetrically provided with an erection arm stress and strain sensor 3 (22) and an erection arm stress and strain sensor 4 (23); the bottom of the rocket erection arm (6) is symmetrically provided with an erection arm stress and strain sensor 5 (20) and an erection arm stress and strain sensor 6 (21).
5. The rocket sea launch platform stress and strain testing system according to claim 4, characterized in that: The rocket erection arm (6) is connected to the rocket launching platform (4) via a hinge, and hinge stress strain sensor 1 (26) and hinge stress strain sensor 2 (27) are respectively arranged on the hinge.
6. The rocket sea launch platform stress and strain testing system according to claim 5, characterized in that: The base stress strain sensor 1 (10), the base stress strain sensor 2 (11), the steel column stress strain sensor 1 (15), the steel column stress strain sensor 2 (13), the steel column stress strain sensor 3 (16), the steel column stress strain sensor 4 (12), the steel column stress strain sensor 5 (14), the erecting arm stress strain sensor 1 (24), the erecting arm stress strain sensor 2 (25), the erecting arm stress strain sensor 3 (22), the erecting arm stress strain sensor 4 (23), the erecting arm stress strain sensor 5 (20), the erecting arm stress strain sensor 6 (21), the hinge stress strain sensor 1 (26) and the hinge stress strain sensor 2 (27) are respectively connected to the data return center (9) through the strain cable (8).
