Electromagnetic flowmeter testing device

By introducing a protection and shock-absorbing mechanism into the electromagnetic flowmeter test device to prevent foreign objects from falling in and shaking, the problem of rust and loosening caused by foreign objects falling into the existing device is solved, and the test accuracy and stability are improved.

CN221826273UActive Publication Date: 2024-10-11HEBEI QIANJI TESTING TECH SERVICE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420456565.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2024-10-11
Estimated Expiration
2034-03-11

AI Technical Summary

Technical Problem

When the existing electromagnetic flowmeter test device is in use, due to external dust or rain and foreign matter falling on the connection, the bolt structure becomes rusty or inflexible, affecting the test accuracy and stability.

Method used

An electromagnetic flowmeter test device is designed that includes a shock-absorbing mechanism and a protective mechanism. The protective mechanism prevents foreign matter and rainwater from falling in through protective plates, side panels and water channels. The shock-absorbing mechanism uses shock-absorbing springs and damping to reduce vibration and prevent Bolts are loose.

Benefits of technology

It effectively prevents corrosion and loosening of connections, improves test accuracy and flexibility of use, and ensures the stability and safety of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221826273U_ABST
    Figure CN221826273U_ABST
Patent Text Reader

Abstract

The utility model provides an electromagnetic flowmeter testing device, which relates to the technical field of electric measurement flowmeter protection and comprises a damping mechanism, and a protection mechanism is fixedly mounted at the top of the damping mechanism. According to the utility model, firstly, the insertion blocks mounted on one sides of the two protection plates are inserted into the two insertion holes, the strip-shaped holes are formed in the two insertion blocks and correspond to the fixing holes formed in the two fixing sleeve plates at the moment, then the two L-shaped limiting plates are inserted into the two strip-shaped holes and the two fixing holes at the same time, and the two L-shaped limiting plates are inserted into the two L-shaped limiting plates and the two fixing sleeve plates at the same time; the two protection plates are installed on the two fixing sleeve plates, and the connection part of the testing device is protected through the effect of the four side edge plates, so that the situation that external foreign matters or rainwater directly fall on the bolt connection part of the testing device, so that structures such as bolts are rusted or are not flexible to use is effectively prevented, and the reliability of the testing device is improved. Therefore, the use effect of the electromagnetic flowmeter testing device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of electromagnetic flowmeter protection, in particular to an electromagnetic flowmeter testing device. Background Art

[0002] The electromagnetic flowmeter test device is a device used to test the electromagnetic flowmeter. The electromagnetic flowmeter test device evaluates the accuracy of the flowmeter by using a standard fluid to flow through the electromagnetic flowmeter and the difference between the flowmeter output and the actual flow rate. The test device usually includes a flowmeter calibrator and a control system. The flowmeter calibrator adjusts the flow rate and pressure so that the standard fluid passes through the electromagnetic flowmeter at different flow rates. The control system records and analyzes the output of the flowmeter and compares it with the standard flow rate to ultimately evaluate the accuracy and stability of the flowmeter.

[0003] When the existing electromagnetic flowmeter test device is in use, foreign objects such as dust or rain may fall on the connection and be adsorbed thereon for a long time, which may easily cause the bolts and other structures at the connection to rust or become inflexible, thereby affecting the accuracy of the electromagnetic flowmeter test and reducing its use effect. Utility Model Content

[0004] The utility model aims to solve the problem that when the existing equipment is in use, foreign objects such as dust or rain water may fall on the connection, which may easily cause rust on structures such as bolts at the connection, and thus proposes an electromagnetic flowmeter testing device.

[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions: an electromagnetic flowmeter test device, comprising a shock absorbing mechanism, a protective mechanism is fixedly installed on the top of the shock absorbing mechanism;

[0006] The protective mechanism includes a test device body, the outer wall of the test device body is fixedly sleeved with two fixed sleeves, one side of the outer wall of the two fixed sleeves is provided with a socket, the inner wall of the two sockets is movably provided with a plug block, the top of the two plug blocks is provided with a strip hole, one side of the outer wall of the two plug blocks is fixedly installed with a protective plate, the top of the two protective plates is provided with a plurality of water diversion grooves, and the outer walls of the two protective plates are fixedly installed with two side panels.

[0007] Preferably, the tops of the two fixing sleeves are each provided with a fixing hole, the inner surfaces of the two fixing holes are each movably inserted with an L-shaped limiting plate, and the outer surfaces of the two L-shaped limiting plates are each movably inserted inside the two strip holes.

[0008] Preferably, the shock absorbing mechanism comprises a shock absorbing base, and the inner surface wall of the shock absorbing base is provided with four limiting grooves.

[0009] Preferably, L-shaped sliding blocks are movably embedded in the inner surface walls of the four limiting grooves, and a supporting plate is fixedly installed between the tops of the four L-shaped sliding blocks.

[0010] Preferably, a plurality of shock-absorbing springs are fixedly mounted on the bottom of the support plate, and the bottoms of the plurality of shock-absorbing springs are fixedly connected to the top of the inner wall of the shock-absorbing base.

[0011] Preferably, a plurality of shock-absorbing dampers are fixedly mounted on the top of the inner wall of the shock-absorbing base, and the tops of the plurality of shock-absorbing dampers are fixedly connected to the bottom of the supporting plate.

[0012] Preferably, the top of the support plate is fixedly connected to the bottoms of the two fixed sleeve plates.

[0013] Compared with the prior art, the advantages and positive effects of the utility model are:

[0014] In the utility model, when in use, two protective plates and two side plates can effectively prevent foreign objects from falling on the connection of the test device, and multiple water diversion grooves can prevent rainwater from directly falling on the bolt connection, effectively preventing the bolts and other structures at the connection from rusting or being inflexible to use, thereby improving the accuracy of the electromagnetic flowmeter test. Secondly, the two protective plates are inserted into the inside of the socket through two plug blocks. At this time, the bar holes on the plug blocks correspond to the fixing holes on the fixing sleeve, and then the L-shaped limit plates are inserted into the bar holes and the fixing holes at the same time, and then the two protective plates are fixed on the two fixing sleeves, which is convenient for staff to disassemble and assemble, improves the flexibility of use, and thus improves the use effect of the electromagnetic flowmeter test device.

[0015] In the utility model, when the electromagnetic flowmeter test device is used, the bolts may become loose due to the vibration of the equipment. At this time, under the action of four limit slots and four L-shaped sliding blocks, the vibration generated during the operation of the equipment is reduced through the action of multiple shock-absorbing springs and multiple shock-absorbing dampers, thereby effectively preventing the bolts from becoming loose due to the vibration generated during the operation of the equipment, thereby ensuring the stability and safety of the test device. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A subjective structural stereogram of an electromagnetic flowmeter testing device is proposed for the utility model;

[0017] Figure 2 A three-dimensional diagram of a protection mechanism of an electromagnetic flowmeter test device is proposed for the utility model;

[0018] Figure 3 A partial disassembly diagram of a protection mechanism of an electromagnetic flowmeter test device is proposed for the utility model;

[0019] Figure 4 The utility model provides a disassembled diagram of a shock absorbing mechanism of an electromagnetic flowmeter testing device.

[0020] Legend:

[0021] Protection mechanism; 101, test device body; 102, fixed sleeve; 103, plug hole; 104, plug block; 105, strip hole; 106, protection plate; 107, water diversion trough; 108, side plate; 109, fixing hole; 110, L-shaped limit plate;

[0022] Shock absorbing mechanism; 201, shock absorbing base; 202, limiting groove; 203, L-shaped sliding block; 204, supporting plate; 205, shock absorbing spring; 206, shock absorbing damping. DETAILED DESCRIPTION

[0023] In order to more clearly understand the above-mentioned purposes, features and advantages of the utility model, the utility model is further described below in conjunction with the drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0024] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0025] Embodiment 1, as Figure 1-Figure 4 As shown, the utility model provides an electromagnetic flowmeter testing device, including a shock absorbing mechanism 2, and a protective mechanism 1 is fixedly installed on the top of the shock absorbing mechanism 2;

[0026] The protection mechanism 1 includes a test device body 101, and the outer wall of the test device body 101 is fixedly sleeved with two fixed sleeves 102, and one side of the outer wall of the two fixed sleeves 102 is provided with a plug hole 103, and the inner wall of the two plug holes 103 is movably inserted with a plug block 104, and the top of the two plug blocks 104 is provided with a strip hole 105, and one side of the outer wall of the two plug blocks 104 is fixedly installed with a protection plate 106, and the top of the two protection plates 106 is provided with a plurality of water diversion grooves 107, and the outer walls of the two protection plates 106 are fixedly installed with two side plates 108, and the tops of the two fixed sleeves 102 are provided with a fixing hole 109, and the inner walls of the two fixing holes 109 are movably inserted with an L-shaped limiting plate 110, and the outer walls of the two L-shaped limiting plates 110 are movably inserted inside the two strip holes 105.

[0027] The effect achieved by the entire embodiment 1 is that, first, the plug block 104 installed on one side of the two protective plates 106 is inserted into the inside of the two plug holes 103. Since the two plug blocks 104 are provided with strip holes 105, and at this time the two strip holes 105 correspond to the fixing holes 109 provided on the two fixing sleeves 102, then the two L-shaped limit plates 110 are simultaneously inserted into the two strip holes 105 and the two fixing holes 109, and the two protective plates 106 are installed on the two fixing sleeves 102. Then, through the action of the four side plates 108, the connection of the test device is protected, and foreign objects or rainwater are effectively prevented from falling directly on the bolt connection of the test device, which causes the bolts and other structures to rust or become inflexible in use, thereby improving the use effect of the electromagnetic flowmeter test device, and facilitating the disassembly and assembly of the staff, thereby improving the flexibility of use.

[0028] Embodiment 2, as Figure 2-Figure 4 As shown, the shock absorbing mechanism 2 includes a shock absorbing base 201, the inner wall of the shock absorbing base 201 is provided with four limiting grooves 202, the inner walls of the four limiting grooves 202 are movably embedded with L-shaped sliding blocks 203, a support plate 204 is fixedly installed between the tops of the four L-shaped sliding blocks 203, a plurality of shock absorbing springs 205 are fixedly installed at the bottom of the support plate 204, and the bottoms of the plurality of shock absorbing springs 205 are fixedly connected to the top of the inner wall of the shock absorbing base 201, a plurality of shock absorbing dampers 206 are fixedly installed at the top of the inner wall of the shock absorbing base 201, and the tops of the plurality of shock absorbing dampers 206 are fixedly connected to the bottom of the support plate 204, and the top of the support plate 204 is fixedly connected to the bottom of the two fixed sleeves 102.

[0029] The effect achieved by the entire embodiment 2 is that since the entire device is installed on the support plate 204, and the four L-shaped sliding blocks 203 installed on both sides of the support plate 204 are movably embedded in the four limit grooves 202, and multiple shock-absorbing springs 205 and multiple shock-absorbing dampers 206 are installed between the bottom of the support plate 204 and the top of the inner wall of the shock-absorbing base 201, and the multiple shock-absorbing dampers 206 are all inside the multiple shock-absorbing springs 205, when the electromagnetic flowmeter test device is in use, the vibration generated by the equipment during operation will be reduced, and the bolts and other structures at the connection of the test device will be effectively prevented from loosening, thereby further improving the use effect of the test device.

[0030] Working principle: First, since the two fixing sleeves 102 are provided with insertion holes 103, the plug blocks 104 on one side of the outer wall of the two protective plates 106 are inserted into the two insertion holes 103, and then the two L-shaped limit plates 110 are inserted into the two fixing holes 109 at the same time, and also pass through the strip holes 105 provided on the two plug blocks 104 at the same time, and then the two protective plates 106 are installed on one side of the two fixing sleeves 102, and side panels 108 are installed on both sides of the two protective plates 106, and then the two protective plates 106 and the four side panels 108 are used to effectively prevent foreign objects or rainwater from falling directly on the bolted joints on the test device, and The multiple water diversion grooves 107 have a protective effect on the bolts and other structures at the connection points to prevent them from rusting and reducing their flexibility in use. Secondly, a support plate 204 is installed between the tops of the L-shaped sliding blocks 203 movably embedded in the four limit grooves 202, and the entire test device is installed on the support plate 204. In addition, the multiple shock-absorbing springs 205 and multiple shock-absorbing dampers 206 installed between the support plate 204 and the shock-absorbing base 201 reduce the vibration generated during the operation of the test device, and further prevent the bolts at the connection points from loosening. In general, the protective mechanism 1 and the shock-absorbing mechanism 2 greatly improve the use effect of the electromagnetic flowmeter test device.

[0031] The above are only preferred embodiments of the present invention, and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. An electromagnetic flowmeter testing device, characterized in that: It comprises a shock absorbing mechanism (2), a protective mechanism (1) being fixedly mounted on the top of the shock absorbing mechanism (2); The protection mechanism (1) comprises a test device body (101), the outer wall of the test device body (101) being fixedly sleeved with two fixed sleeves (102), one side of the outer wall of the two fixed sleeves (102) being provided with a plug hole (103), the inner wall of the two plug holes (103) being movably inserted with an insert block (104), the top of the two insert blocks (104) being provided with a strip hole (105), one side of the outer wall of the two insert blocks (104) being fixedly mounted with a protection plate (106), the top of the two protection plates (106) being provided with a plurality of water diversion grooves (107), and the outer wall of the two protection plates (106) being fixedly mounted with two side panels (108).

2. An electromagnetic flowmeter testing device according to claim 1, characterized in that: The tops of the two fixing sleeves (102) are each provided with a fixing hole (109), the inner surfaces of the two fixing holes (109) are each movably inserted with an L-shaped limiting plate (110), and the outer surfaces of the two L-shaped limiting plates (110) are each movably inserted inside the two strip holes (105).

3. The electromagnetic flowmeter testing device according to claim 1, characterized in that: The shock absorbing mechanism (2) comprises a shock absorbing base (201), and the inner surface wall of the shock absorbing base (201) is provided with four limiting grooves (202).

4. The electromagnetic flowmeter testing device according to claim 3, characterized in that: An L-shaped sliding block (203) is movably embedded in the inner surface walls of the four limiting grooves (202), and a supporting plate (204) is fixedly installed between the tops of the four L-shaped sliding blocks (203).

5. The electromagnetic flowmeter testing device according to claim 4, characterized in that: A plurality of shock-absorbing springs (205) are fixedly mounted on the bottom of the support plate (204), and the bottoms of the plurality of shock-absorbing springs (205) are fixedly connected to the top of the inner wall of the shock-absorbing base (201).

6. The electromagnetic flowmeter testing device according to claim 5, characterized in that: A plurality of shock absorbing dampers (206) are fixedly mounted on the top of the inner wall of the shock absorbing base (201), and the tops of the plurality of shock absorbing dampers (206) are fixedly connected to the bottom of the supporting plate (204).

7. The electromagnetic flowmeter testing device according to claim 6, characterized in that: The top of the support plate (204) is fixedly connected to the bottoms of the two fixed sleeve plates (102).