By designing a comprehensive test bench that includes a backplane, line connection box and PLC touch screen, the problems of high maintenance difficulty and low detection efficiency of traditional test benches are solved, and autonomous maintenance and system function testing of PLC programmable controllers are realized, reducing faults. rates and costs.
Patent Information
- Application Number
- CN202420245027.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-01-31
AI Technical Summary
The traditional passenger train network equipment comprehensive test bench is difficult to maintain, has a high failure rate, and has a long parts procurement cycle, which leads to an increased equipment failure rate, cost overruns, low detection efficiency, and difficulty in system functional testing.
A comprehensive test bench including test bench backplane, line connection box, power circuit board, display screen, alarm, gateway and PLC touch screen was designed. Through circuit design and PLC programming, the test, maintenance and repair of train network equipment were realized. The independent maintenance of PLC programmable controller expands the testing functions of insulation detection and fire alarms, and builds a cost-effective test bench.
It realizes the independent maintenance of PLC programmable controller, reduces the failure rate of accessories, saves production costs, and solves the problem of being unable to detect the function of the train network system in the traditional detection method through dynamic testing.
Smart Images

Figure CN221826995U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of equipment comprehensive test benches, in particular to a comprehensive test bench for passenger car and train network equipment. Background Art
[0002] With the rapid development of rail transit, on-site network equipment is constantly being updated. Many common tests performed by common testing instruments are gradually unable to meet work needs. For example, some types of network equipment are more difficult to detect or inconvenient to detect, and the detection efficiency is reduced.
[0003] Authorization announcement number CN218850791U network equipment comprehensive test bench, involving the field of test equipment. It can effectively improve test accuracy, detection efficiency and reduce labor intensity while performing functional verification on network equipment. The power inlet terminal of the test bench, its L end is electrically connected to the first input end of the first contactor through the first power control main switch and the L end of the first internal power socket; its N end is electrically connected to the second input end of the first contactor through the N end of the first internal power socket of the switch; the first output end of the isolation transformer is electrically connected to the L end of the second internal power socket, the second power control main switch and the L end of the third internal power socket; the second output end of the isolation transformer is electrically connected to the N end of the second internal power socket and the N end of the third internal power socket; the output end of the first internal power socket is used to provide power; the output end of the second internal power socket is used to provide power.
[0004] However, the above and other typical existing technologies still have certain problems when used:
[0005] 1. The traditional comprehensive test bench for passenger train network equipment is difficult to maintain. In addition, because the train network involves multiple fields such as communications and electronics, the technical difficulty is high and it is difficult to carry out independent maintenance. At the same time, failures are frequent and the spare parts procurement cycle is long. As the service life increases, the equipment failure rate increases. In addition, there are many types of network equipment. Due to inventory and cost pressures, there are few materials and a long procurement cycle. In case of emergencies, it is easy to wait for materials, causing the passenger car to run with problems.
[0006] 2. The traditional passenger train network equipment comprehensive test bench has high component costs. Most of the train network components are high-priced parts, which can easily lead to cost overruns and make installation tests difficult. Since the on-board installation test needs to wait for the operation node and contact the on-site power supply, it is difficult to carry out "on-site repairs" and the testing is troublesome. Utility Model Content
[0007] The purpose of the utility model is to provide a comprehensive test bench for passenger car train network equipment to solve the problems raised in the above background technology.
[0008] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0009] A comprehensive test bench for passenger train network equipment comprises a test bench back panel and a line connection box, wherein the line connection box is installed on the inner surface wall of the test bench back panel, and a preset groove is provided on the inner surface wall of the test bench back panel, a power circuit board is installed on the side of the test bench back panel, and the power circuit board is electrically connected to the line connection box, a test bench flat panel is fixedly connected to the side of the test bench back panel, a local control display screen is installed on the side of the test bench back panel, and the local control display screen is electrically connected to the line connection box, a smoke alarm is installed on the side of the test bench back panel, and the smoke alarm is electrically connected to the line connection box, an axle stability alarm is installed on the side of the test bench back panel, and the axle The stability alarm is electrically connected to the line connection box, a centralized control display screen is installed on the side of the test bench back panel, and the centralized control display screen is electrically connected to the line connection box, a KAXI display is installed on the side of the test bench back panel, and the KAXI display is electrically connected to the line connection box, a numerical display screen is installed on the side of the test bench back panel, and the numerical display screen is electrically connected to the line connection box, a first PLC touch screen is installed on the side of the test bench back panel, and the first PLC touch screen is electrically connected to the line connection box, a second PLC touch screen is installed on the side of the test bench back panel, and the second PLC touch screen is electrically connected to the line connection box.
[0010] As a preferred solution of the utility model, a first proxy node is installed on the side of the test bench backplane, and the first proxy node is electrically connected to the line connection box. A first PLC gateway is installed on the side of the test bench backplane, and the first PLC gateway is electrically connected to the line connection box. An axis alarm gateway is installed on the side of the test bench backplane, and the axis alarm gateway is electrically connected to the line connection box. A fireworks gateway is installed on the side of the test bench backplane, and the fireworks gateway is electrically connected to the line connection box.
[0011] As a preferred solution of the utility model, a door gateway is installed on the side of the back plate of the test bench, and the door gateway is electrically connected to the line connection box.
[0012] As a preferred solution of the utility model, an anti-skid gateway is installed on the side of the back plate of the test bench, and the anti-skid gateway is electrically connected to the line connection box.
[0013] As a preferred solution of the utility model, an inverter gateway is installed on the side of the back panel of the test bench, and the inverter gateway is electrically connected to the line connection box.
[0014] As a preferred solution of the utility model, an insulating gateway is installed on the side of the back plate of the test bench, and the insulating gateway is electrically connected to the line connection box.
[0015] As a preferred solution of the present invention, a second proxy node is installed on the side of the back panel of the test bench, and the second proxy node is electrically connected to the line connection box.
[0016] As a preferred solution of the present invention, a second PLC gateway is installed on the side of the back panel of the test bench, and the second PLC gateway is electrically connected to the line connection box.
[0017] Compared with the prior art, the beneficial effects of the utility model are:
[0018] 1. In the utility model, the functions of train network test, train network equipment maintenance, PLC programmable controller test, etc. are realized through circuit design and PLC programming design. After the subsequent expansion of insulation detection sound and light alarm test function and smoke alarm host test function, a railway passenger car train network equipment test bench is built in a cost-effective manner. After being put into use, it has achieved the results of realizing independent maintenance of accessories such as gateways and PLC programmable controllers, reducing the failure rate of accessories, and saving production costs.
[0019] 2. In the utility model, dynamic tests are carried out by restoring the operating environment of the train network system, which solves the problem that the traditional detection method only performs functional detection on a certain device and cannot perform functional detection on the train network system, and the maintenance of the PLC programmable controller is realized through the controller. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0021] Figure 2 This is a schematic diagram of the back plate structure of the utility model test bench;
[0022] Figure 3 This is a schematic diagram of the structure of the power circuit board of the utility model;
[0023] Figure 4 This is a schematic diagram of the flat plate structure of the test bench of the utility model.
[0024] In the figure: 1. Test bench back panel; 2. Test bench flat panel; 3. Local control display screen; 4. Firework alarm; 5. Axle stability alarm; 6. Centralized control display screen; 7. Line connection box; 8. KAXI display; 9. Numerical display screen; 10. First PLC touch screen; 11. Second PLC touch screen; 12. Power circuit board; 13. First proxy node; 14. First PLC gateway; 15. Axle alarm gateway; 16. Firework gateway; 17. Door gateway; 18. Anti-skid gateway; 19. Inverter gateway; 20. Insulation gateway; 21. Second proxy node; 22. Second PLC gateway; 23. Preset slot. DETAILED DESCRIPTION
[0025] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0026] For examples, see Figure 1-4 , the utility model provides a technical solution:
[0027] The comprehensive test bench for passenger train network equipment comprises a test bench back panel 1 and a line connection box 7. The line connection box 7 is installed on the inner surface wall of the test bench back panel 1. The inner surface wall of the test bench back panel 1 is provided with a preset groove 23. A power circuit board 12 is installed on the side of the test bench back panel 1. The power circuit board 12 is electrically connected to the line connection box 7. A test bench flat panel 2 is fixedly connected to the side of the test bench back panel 1. A local control display screen 3 is installed on the side of the test bench back panel 1. The local control display screen 3 is electrically connected to the line connection box 7. A smoke alarm 4 is installed on the side of the test bench back panel 1. The smoke alarm 4 is electrically connected to the line connection box 7. An axle stability alarm 5 is installed on the side of the test bench back panel 1. The alarm 5 is electrically connected to the line connection box 7. A centralized control display screen 6 is installed on the side of the test bench back panel 1, and the centralized control display screen 6 is electrically connected to the line connection box 7. A KAXI display 8 is installed on the side of the test bench back panel 1, and the KAXI display 8 is electrically connected to the line connection box 7. A numerical display screen 9 is installed on the side of the test bench back panel 1, and the numerical display screen 9 is electrically connected to the line connection box 7. A first PLC touch screen 10 is installed on the side of the test bench back panel 1, and the first PLC touch screen 10 is electrically connected to the line connection box 7. A second PLC touch screen 11 is installed on the side of the test bench back panel 1, and the second PLC touch screen 11 is electrically connected to the line connection box 7.
[0028] Among them, the working state of the PLC programmable controller is simulated by outputting signals to realize the PLC programmable control simulation test.
[0029] In this embodiment, Figure 1As shown, a first proxy node 13 is installed on the side of the test bench backplane 1, and the first proxy node 13 is electrically connected to the line connection box 7. A first PLC gateway 14 is installed on the side of the test bench backplane 1, and the first PLC gateway 14 is electrically connected to the line connection box 7. An axle alarm gateway 15 is installed on the side of the test bench backplane 1, and the axle alarm gateway 15 is electrically connected to the line connection box 7. A pyrotechnics gateway 16 is installed on the side of the test bench backplane 1, and the pyrotechnics gateway 16 is electrically connected to the line connection box 7. A door gateway 17 is installed on the side of the test bench backplane 1, and the door gateway 17 is electrically connected to the line connection box 7. Then, an anti-slip gateway 18 is installed on the side of the test bench backplane 1, and the anti-slip gateway 18 is electrically connected to the line connection box 7. An inverter gateway 19 is installed on the side of the test bench backplane 1, and the inverter gateway 19 is electrically connected to the line connection box 7. An insulating gateway 20 is installed on the side of the test bench backplane 1, and the insulating gateway 20 is electrically connected to the line connection box 7. A second proxy node 21 is installed on the side of the test bench backplane 1, and the second proxy node 21 is electrically connected to the line connection box 7. A second PLC gateway 22 is installed on the side of the test bench backplane 1, and the second PLC gateway 22 is electrically connected to the line connection box 7.
[0030] Among them, through PLC programming, fully automatic dynamic simulation tests are realized, and hundreds of dynamic tests and result recordings are completed independently without human operation.
[0031] The working process of the utility model: when the comprehensive test bench for passenger train network equipment designed by this scheme is in operation, the working principle of the train network equipment is first analyzed, the working principle and detection method of each device are mastered, and the common faults are statistically summarized. Starting from the simulation of the train operation network communication situation, the function of the test bench is designed, and the circuit diagram is drawn using CAD; then the circuit diagram is tested using PLC configuration software and programming software to verify the feasibility, and the PLC controller and touch screen are programmed to enable it to have two-car network communication connection, full-automatic test, manual test, parameter setting, insulation monitoring system setting, air conditioning PLC control, PLC working status monitoring, 600V leakage alarm test and other functions; then design the test bench framework, and assemble the main control screen, PLC controller, touch screen, various gateways, PLC integrated machine and various accessories. The test bench is designed with an RS232 serial port protocol conversion connector to connect to the TCDS monitoring host, and the test data of the test bench is transmitted back to the TCDS operation interface after secure encryption; the test bench is subsequently upgraded and expanded, and the smoke alarm test function 4 is added. It uses twisted pair cables and is characterized by the use of peer-to-peer networks. The failure of any node will not cause the system to crash, and the damage and shutdown of an information collection node will not affect the operation of other information collection nodes. Each gateway collects the signals of various types of vehicle electrical safety monitoring equipment and transmits them to the agent node through the Lonworks car bus. The agent node transmits them to the main control gateway through the Lonworks train bus and displays the information of various types of vehicle electrical safety monitoring equipment on the main control display. The agent node transmits them to the safety gateway through the Lonworks train bus and transmits them back to the ground TCDS interface through the TCDS host.
[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A comprehensive test bench for passenger train network equipment, comprising a test bench back panel (1) and a line connection box (7), Features: The circuit connection box (7) is installed on the inner surface wall of the test bench back panel (1), and the inner surface wall of the test bench back panel (1) is provided with a preset groove (23). A power circuit board (12) is installed on the side of the test bench back panel (1), and the power circuit board (12) is electrically connected to the circuit connection box (7). A test bench flat panel (2) is fixedly connected to the side of the test bench back panel (1). A local control display screen (3) is installed on the side of the test bench back panel (1), and the local control display screen (3) is electrically connected to the circuit connection box (7). A smoke alarm (4) is installed on the side of the test bench back panel (1), and the smoke alarm (4) is electrically connected to the circuit connection box (7). A shaft stability alarm (5) is installed on the side of the test bench back panel (1), and the shaft stability alarm (5) is electrically connected to the circuit connection box (7). A centralized control display screen (6) is installed on the side of the test bench back panel (1), and the centralized control display screen (6) is electrically connected to the line connection box (7). A KAXI display (8) is installed on the side of the test bench back panel (1), and the KAXI display (8) is electrically connected to the line connection box (7). A numerical display screen (9) is installed on the side of the test bench back panel (1), and the numerical display screen (9) is electrically connected to the line connection box (7). A first PLC touch screen (10) is installed on the side of the test bench back panel (1), and the first PLC touch screen (10) is electrically connected to the line connection box (7). A second PLC touch screen (11) is installed on the side of the test bench back panel (1), and the second PLC touch screen (11) is electrically connected to the line connection box (7).
2. The comprehensive test bench for passenger train network equipment according to claim 1, Features: A first proxy node (13) is installed on the side of the test bench back panel (1), and the first proxy node (13) is electrically connected to the line connection box (7). A first PLC gateway (14) is installed on the side of the test bench back panel (1), and the first PLC gateway (14) is electrically connected to the line connection box (7). An axis alarm gateway (15) is installed on the side of the test bench back panel (1), and the axis alarm gateway (15) is electrically connected to the line connection box (7). A pyrotechnics gateway (16) is installed on the side of the test bench back panel (1), and the pyrotechnics gateway (16) is electrically connected to the line connection box (7).
3. The comprehensive test bench for passenger train network equipment according to claim 2, Features: A vehicle door gateway (17) is installed on the side of the test bench back panel (1), and the vehicle door gateway (17) is electrically connected to the line connection box (7).
4. The comprehensive test bench for passenger train network equipment according to claim 3, Features: An anti-slip gateway (18) is installed on the side of the test bench back plate (1), and the anti-slip gateway (18) is electrically connected to the line connection box (7).
5. The comprehensive test bench for passenger train network equipment according to claim 4, Features: An inverter gateway (19) is installed on the side of the test bench back panel (1), and the inverter gateway (19) is electrically connected to the line connection box (7).
6. The comprehensive test bench for passenger train network equipment according to claim 5, Features: An insulating gateway (20) is installed on the side of the test bench back plate (1), and the insulating gateway (20) is electrically connected to the line connection box (7).
7. The comprehensive test bench for passenger train network equipment according to claim 6, Features: A second proxy node (21) is installed on the side of the test bench backplane (1), and the second proxy node (21) is electrically connected to the line connection box (7).
8. The comprehensive test bench for passenger train network equipment according to claim 7, Features: A second PLC gateway (22) is installed on the side of the test bench back panel (1), and the second PLC gateway (22) is electrically connected to the line connection box (7).