Rapid binding device for mining material transportation

By installing a quick binding device on the mining material transport trolley and using rotating lashing net components and locking components to fix the materials, the problem of material throwing during transportation is solved, and LED lamp beads are used to provide lighting, improving transportation efficiency and safety. sex.

CN221852288UActive Publication Date: 2024-10-18TANGSHAN KAILUAN CONSTR CABLE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420472906.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-12
Publication Date
2024-10-18
Estimated Expiration
2034-03-12

AI Technical Summary

Technical Problem

The shaking of mining material transport trolleys during the transportation process causes material to be thrown and lost, which is especially difficult to detect in dim underground mine environments, resulting in a waste of resources.

Method used

A quick tying device is designed, including a hanging frame, a lashing net component and a locking component. Dust-proof mesh bag materials are used to cover and fix the materials. The hanging frame is stably installed on the trolley through hooks. The bracket component rotates to unfold the lashing net. , the locking component automatically locks the length of the geonet, and the LED lamp beads provide auxiliary lighting.

Benefits of technology

It effectively prevents materials from being thrown and left behind during transportation, improves transportation efficiency and safety, provides fast bundling and good lighting effects, and reduces material losses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221852288U_ABST
    Figure CN221852288U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of material transportation, in particular to a quick binding device for mining material transportation, and aims to solve the technical problem that when a mining material transportation trolley loads more materials, the materials are easy to throw and lose due to the shaking of the trolley in the transportation process. According to the technical scheme, the rapid binding device for mining material transportation comprises a mineral aggregate transportation trolley, a hanging frame, a hook, a shaft seat, a support assembly, a binding net assembly and a locking assembly; the hanging frame installed on the mineral aggregate transportation trolley serves as a carrying platform of the support assembly and the binding net assembly, the hanging frame covers the mineral aggregate transportation trolley, scattered mineral aggregate exposed out of the top face of the mineral aggregate transportation trolley is bound and fixed, the scattered mineral aggregate is prevented from being thrown and left in the transportation process, and compared with temporary binding nets and ropes, the hanging frame has the advantages of being simple in structure and convenient to use. According to the scheme, the binding operation is faster, and the problem that when the mining material conveying trolley loads a large number of materials, the materials are prone to being thrown and lost due to shaking of the trolley in the conveying process is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of material transportation, in particular to a quick bundling device for mining material transportation. Background Art

[0002] Mining material transportation equipment is generally set up in mines and mine tunnels. Common ones include belt conveyors and transport carts, which are mainly used to transport tools and materials for underground operations. Because the space underground is small and conventional materials are generally in bulk, especially mined ore, the use of larger belt conveyors has limitations, while small-sized transport carts are more flexible and have a wider range of applications.

[0003] The material transport carts currently used in mines are mostly used to transport scattered materials and tools. In order to increase the transportation capacity of a single cart, workers often load a large amount of materials so that the materials pop out of the top of the transport cart. However, this loading method can easily cause the materials to be spilled or dropped due to slight shaking when the cart is moved underground, which is not easy to detect in the dim mine, resulting in material loss.

[0004] Therefore, in view of the situation that when the above-mentioned mining material transport cart is loaded with a large amount of materials, it is easy for the cart to shake during transportation, resulting in material spillage and loss. An auxiliary bundling device for underground material carts can be designed. Dust-proof mesh bag materials are used as the main bundling material to cover, wrap and bundle the loaded and transported materials to avoid spillage and loss during transportation. Utility Model Content

[0005] In order to overcome the problem that when the mining material transport cart is loaded with a large amount of materials, the material may be easily spilled and lost due to the shaking of the cart during transportation.

[0006] The technical solution of the utility model is: a quick binding device for mining material transportation, comprising a mining material transport trolley, a hanging frame, a hook, an axle seat, a bracket assembly, a tying net assembly, and a locking assembly; a handrail is installed at one end of the bucket of the mining material transport trolley, and an anti-collision beam is installed at the other end, the hanging frame is sleeved on the outside of the bucket of the mining material transport trolley and is located under the handrail and the anti-collision beam, the left and right sides of the upper end of the hanging frame are fixedly connected with hooks stuck on the upper edge of the bucket of the mining material transport trolley, the left and right ends of the hanging frame are fixedly connected with axle seats, a rotatable bracket assembly is installed in the axle seat, a tying net assembly with a retractable and retractable winding structure is installed on the bracket assembly, and a locking assembly is installed on the end of the bracket assembly close to the anti-collision beam.

[0007] Preferably, the mounting frame is stably mounted on the mineral transport trolley by means of a hook. When the mineral transport trolley is loaded with a large amount of minerals and tools and the top surface of the vehicle bed is exposed, the bracket assembly on one side is flipped over and the tying net assembly on that side is extended and opened to cover the top of the mineral transport trolley. The opened tying net assembly is fixed by means of the bracket assembly on the other side, and the scattered minerals exposed on the top surface of the mineral transport trolley are tied and fixed.

[0008] Preferably, a number of LED lamp beads with external power supply are installed on the outer wall of the hanging frame. The four corners of the hanging frame are arc-shaped chamfers. The hanging frame is made of aluminum alloy or stainless steel. The four corners are made into arcs to prevent injuries to operators. During transportation, turn on the LED lamp beads to provide auxiliary lighting for the transportation path and the mineral transport cart.

[0009] Preferably, the bracket assembly includes an axle rod, an end plate No. 1, an end plate No. 2, and a slot; the axle rod is movably connected to the inner side of the axle seat, one end of the axle rod facing the handrail of the mineral material transport trolley is fixedly connected to the end plate No. 1, and the other end is fixedly connected to the end plate No. 2. A slot is provided on the surface of the end plate No. 2, and the axle rod is flipped 180 degrees in the axle seat. When the binding net assembly is used, the end plate No. 1 and the end plate No. 2 are flipped upwards. When not in use, the end plate No. 1 and the end plate No. 2 are flipped downwards to avoid the binding net assembly occupying the upper space of the mineral material transport trolley, which is inconvenient for loading materials.

[0010] Preferably, the binding net assembly includes a winding roller, a geonet and a rope hook; the two ends of the winding roller are respectively inserted into the holes on the No. 1 end plate and the No. 2 end plate, the geonet is wound on the winding roller, and the edge of the geonet is fixedly connected with a rope hook. The geonet is pulled out from the winding roller and extended to a suitable length, and then covers the mineral transport cart, and the rope hook is hung on the bracket assembly on the other side to fix it.

[0011] Preferably, the binding net assembly also includes gears and a handle; a gear is fixedly connected to one end of the winding roller facing the anti-collision beam of the mineral material transport trolley, and a Z-rod-shaped handle is installed on the surface of the gear. The rotating handle is used to reel in and unroll the geonet, and the gear is driven to rotate together when rotating, and the tooth grooves on the handle continuously change positions.

[0012] Preferably, the locking assembly includes a slider and a spring; the slider is slidably connected to the inner side of the slot, and a spring is installed between the side wall of the slider and the inner wall of one end of the slot. The slider slides along the slot toward one side of the gear, and the spring has elastic elongation properties, pushing the slider to move in the slot, causing it to automatically approach one side of the gear.

[0013] Preferably, the locking assembly also includes a handle and a positioning pin; the slider is fixedly connected to a handle and a positioning pin that pass through the slot, the positioning pin is close to one side of the gear and is matched with the tooth groove of the gear, and after the slider is pushed to the end of the slot by the spring, the positioning pin is pushed into the corresponding gear tooth groove to lock the gear and limit the rotation of the winding roller to retract and unwind the geonet.

[0014] Beneficial effects of the utility model:

[0015] 1. The hanging frame installed on the material transport trolley is used as a loading platform for the bracket assembly and the lashing net assembly. When in use, the lashing net assembly can be quickly opened and covered on the top of the material transport trolley to tie up and fix the scattered materials exposed on the top of the material transport trolley to prevent them from being scattered or dropped during transportation. Compared with the use of temporary lashing nets and ropes, the lashing operation of this solution is faster;

[0016] 2. The LED lamp beads installed around the hanging frame provide auxiliary lighting for the transportation path in the dim underground mine environment, making it easy to observe whether there is material spillage and the conditions of the underground transportation path;

[0017] 3. The locking component can be used to expand the geonet to different lengths and lock it according to the needs of use, which has a good effect on bundling materials. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 The first three-dimensional structure schematic diagram of the quick binding device for mining material transportation of the utility model is shown;

[0019] Figure 2 The second three-dimensional structure schematic diagram of the quick binding device for mining material transportation of the utility model is shown;

[0020] Figure 3 The third three-dimensional structure schematic diagram of the quick binding device for mining material transportation of the utility model is shown;

[0021] Figure 4 The fourth three-dimensional structure schematic diagram of the quick binding device for mining material transportation of the utility model is shown;

[0022] Figure 5 The three-dimensional structure schematic diagram of the mounting frame of the quick binding device for mining material transportation of the utility model is shown;

[0023] Figure 6 The three-dimensional structure diagram of the bracket assembly of the quick binding device for mining material transportation of the utility model is shown;

[0024] Figure 7 The three-dimensional structure diagram of the lashing net assembly of the quick lashing device for mining material transportation of the utility model is shown;

[0025] Figure 8 What is shown is a schematic diagram of the three-dimensional structure of the locking assembly of the quick binding device for mining material transportation of the utility model.

[0026] Explanation of the reference numerals in the accompanying drawings: 1. Mineral material transport trolley; 2. Hanging frame; 3. Hook; 4. Axle seat; 5. Bracket assembly; 6. Binding net assembly; 7. Locking assembly; 501. Axle rod; 502. End plate No. 1; 503. End plate No. 2; 504. Slot; 601. Winding roller; 602. Geonet; 603. Rope hook; 604. Gear; 605. Turning handle; 701. Slider; 702. Spring; 703. Handle; 704. Locating pin. DETAILED DESCRIPTION

[0027] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0028] See also Figure 1-5 The utility model provides an embodiment: a quick binding device for mining material transportation, including a mining material transport trolley 1, a hanging frame 2, a hook 3, an axle seat 4, a bracket assembly 5, a tying net assembly 6, and a locking assembly 7; a handrail is installed at one end of the bucket of the mining material transport trolley 1, and an anti-collision beam is installed at the other end. The hanging frame 2 is sleeved on the outside of the bucket of the mining material transport trolley 1 and is located under the handrail and the anti-collision beam. The left and right sides of the upper end of the hanging frame 2 are fixedly connected with hooks 3 stuck on the upper edge of the bucket of the mining material transport trolley 1. The left and right ends of the hanging frame 2 are fixedly connected with axle seats 4, and the axle seats 4 are installed inside A rotatable bracket assembly 5 is provided, on which a tying net assembly 6 with a retractable and retractable winding structure is installed. A locking assembly 7 is installed on one end of the bracket assembly 5 close to the anti-collision beam. The mounting frame 2 is stably installed on the mineral transport trolley 1 through the hook 3. When the mineral transport trolley 1 is loaded with a large amount of mineral materials and tools and exposed to the top surface of the bucket, the bracket assembly 5 on one side is flipped over and the tying net assembly 6 on that side is extended and opened to cover the top of the mineral transport trolley 1. The opened tying net assembly 6 is fixed by the bracket assembly 5 on the other side, and the scattered mineral materials exposed on the top surface of the mineral transport trolley 1 are tied and fixed.

[0029] See also Figure 5-8In this embodiment, a plurality of LED lamp beads with external power supply are installed on the outer wall of the mounting frame 2, and the four corners of the mounting frame 2 are arc-shaped chamfers. The bracket assembly 5 includes an axle rod 501, a first end plate 502, a second end plate 503, and a slot 504; the axle rod 501 is movably connected to the inner side of the axle seat 4, and one end of the axle rod 501 facing the handrail of the mineral material transport trolley 1 is fixedly connected to the first end plate 502, and the other end is fixedly connected to the second end plate 503, and a slot 504 is provided on the surface of the second end plate 503. 2 is made of aluminum alloy or stainless steel, and the four corners are made into arcs to prevent injuries to operators. During transportation, turn on the LED lamp beads to provide auxiliary lighting for the transportation path and the mineral transport trolley 1. The shaft rod 501 is flipped 180 degrees in the shaft seat 4. When using the lashing net assembly 6, the No. 1 end plate 502 and the No. 2 end plate 503 are flipped upward. When not in use, the No. 1 end plate 502 and the No. 2 end plate 503 are flipped downward to avoid the lashing net assembly 6 occupying the upper space of the mineral transport trolley 1, which is inconvenient for loading materials.

[0030] See also Figure 7 In this embodiment, the binding net assembly 6 includes a winding roller 601, a geonet 602, and a rope hook 603; the two ends of the winding roller 601 are respectively inserted into the holes on the No. 1 end plate 502 and the No. 2 end plate 503, the geonet 602 is wound on the winding roller 601, and the edge of the geonet 602 is fixedly connected to the rope hook 603, and the binding net assembly 6 also includes a gear 604 and a handle 605; the end of the winding roller 601 facing the anti-collision beam of the mineral material transport trolley 1 is fixedly connected to the gear 604, and a Z-shaped rod-shaped handle 605 is installed on the surface of the gear 604. The geonet 602 is pulled out from the winding roller 601 and extended to a suitable length, and then covers the mineral material transport trolley 1, so that the rope hook 603 is hung on the bracket assembly 5 on the other side and fixed, and the rotating handle 605 is used to retract and unwind the geonet 602, and the gear 604 is driven to rotate together when rotating, and the tooth groove thereon changes position continuously.

[0031] See also Figure 8In this embodiment, the locking assembly 7 includes a slider 701 and a spring 702; the slider 701 is slidably connected to the inner side of the slot 504, and a spring 702 is installed between the side wall of the slider 701 and the inner wall of one end of the slot 504. The slider 701 slides along the slot 504 toward the side of the gear 604, and the locking assembly 7 also includes a handle 703 and a positioning pin 704; the slider 701 is fixedly connected with a handle 703 and a positioning pin 704 that pass through the slot 504, the positioning pin 704 is close to one side of the gear 604 and is adapted to the tooth groove of the gear 604, and the spring 702 has elastic elongation performance, which pushes the slider 701 to move in the slot 504, so that it automatically approaches one side of the gear 604, and after the slider 701 is pushed to the end of the slot 504 by the spring 702, the positioning pin 704 pushes into the corresponding tooth groove of the gear 604, locks the gear 604, and restricts the winding roller 601 from rotating to rewind and unwind the geonet 602.

[0032] During the work, the user loads the ore into the ore transport trolley 1, stabilizes the bucket, and then grabs the bracket assembly 5 on one side of the bucket, so that the shaft rod 501 is turned upward by 180 degrees in the shaft seat 4, with the first end plate 502 and the second end plate 503 facing upward, and brings the lashing net assembly 6 to the top of the bucket;

[0033] Then, pull open the locking assembly 7 on this side to disengage the positioning pin 704 from the gear 604, grab the outer end of the geonet 602 on the lashing net assembly 6 on this side and pull it outward to cover the mineral material transport trolley 1, until the rope hook 603 reaches the bracket assembly 5 on the other side, and hook the rope hook 603 on the shaft 501 on the bracket assembly 5;

[0034] Next, hold the handle 605 and rotate it to tighten the geonet 602, release the locking assembly 7, and under the elastic deformation and push-pull action of the spring 702, the slider 701 moves and resets in the slot 504, so that the positioning pin 704 pushes into the corresponding tooth groove of the gear 604, locking the gear 604 to prevent the geonet 602 from loosening.

[0035] Through the above steps, the hanging frame 2 installed on the mineral material transport trolley 1 serves as a carrying platform for the bracket assembly 5 and the tying net assembly 6. When in use, the tying net assembly 6 can be quickly opened and covered on the top of the mineral material transport trolley 1, and the scattered mineral materials exposed on the top surface of the mineral material transport trolley 1 are tied and fixed to prevent them from being scattered and dropped during transportation. Compared with the use of temporary tying nets and ropes, the bundling operation of this scheme is faster, so as to solve the problem that when the mining material transport trolley is loaded with a large amount of materials, it is easy to cause material spillage and loss due to the shaking of the trolley during transportation.

Claims

1. A quick tying device for transporting mining materials, comprising a mining material transport trolley (1); Features: The invention also comprises a hanging frame (2), a hook (3), an axle seat (4), a bracket assembly (5), a lashing net assembly (6), and a locking assembly (7); a handrail is installed at one end of the bucket of the ore transport trolley (1), and an anti-collision beam is installed at the other end; the hanging frame (2) is sleeved on the outer side of the bucket of the ore transport trolley (1) and is located below the handrail and the anti-collision beam; the left and right sides of the upper end of the hanging frame (2) are fixedly connected with hooks (3) stuck on the upper edge of the bucket of the ore transport trolley (1); the left and right ends of the hanging frame (2) are fixedly connected with axle seats (4); a rotatable bracket assembly (5) is installed in the axle seat (4); a lashing net assembly (6) with a retractable and retractable winding structure is installed on the bracket assembly (5); and a locking assembly (7) is installed on the end of the bracket assembly (5) close to the anti-collision beam.

2. A quick tying device for mining material transportation according to claim 1, Features: A plurality of LED lamp beads connected to an external power source are installed on the outer side wall of the hanging frame (2), and the four corners of the hanging frame (2) are arc-shaped chamfers.

3. A quick tying device for mining material transportation according to claim 1, Features: The support assembly (5) comprises an axle rod (501), a first end plate (502), a second end plate (503), and a slot (504); the axle rod (501) is movably connected to the inner side of the axle seat (4); one end of the axle rod (501) facing the handrail of the mineral material transport trolley (1) is fixedly connected to the first end plate (502), and the other end is fixedly connected to the second end plate (503); and a slot (504) is provided on the surface of the second end plate (503).

4. A quick tying device for mining material transportation according to claim 3, Features: The binding net assembly (6) comprises a winding roller (601), a geonet (602), and a rope hook (603); the two ends of the winding roller (601) are respectively inserted into holes on a first end plate (502) and a second end plate (503); the geonet (602) is wound on the winding roller (601), and the edge of the geonet (602) is fixedly connected to the rope hook (603).

5. A quick tying device for mining material transportation according to claim 4, Features: The lashing net assembly (6) also includes a gear (604) and a handle (605); one end of the winding roller (601) facing the anti-collision beam of the mineral material transport trolley (1) is fixedly connected with the gear (604), and a Z-shaped rod-shaped handle (605) is installed on the surface of the gear (604).

6. A quick tying device for mining material transportation according to claim 5, Features: The locking assembly (7) comprises a slider (701) and a spring (702); the slider (701) is slidably connected to the inner side of the slot (504); a spring (702) is installed between the side wall of the slider (701) and the inner wall of one end of the slot (504); the slider (701) slides along the slot (504) toward one side of the gear (604).

7. A quick tying device for mining material transportation according to claim 6, Features: The locking assembly (7) further comprises a handle (703) and a positioning pin (704); the slider (701) is fixedly connected with the handle (703) and the positioning pin (704) which pass through the slot (504); the positioning pin (704) is close to one side of the gear (604) and is matched with the tooth groove of the gear (604).