Ton bag loading equipment
By designing the support structure and loading structure of the ton bag loading equipment, including lifting support columns, feeding hoppers, feeding cylinders, dust extraction pipes and clamping parts, the problem of dust overflow during the loading process is solved and the loading process is realized. Complete sealing and dust removal effect of the material process.
Patent Information
- Application Number
- CN202420423261.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-03-05
AI Technical Summary
The existing ton bag loading equipment is not completely sealed during the loading process, causing dust to overflow and causing harm to the health of operators.
A ton bag loading equipment including a support structure and a loading structure is designed. The support structure consists of a support frame and a lifting support column. The loading structure includes a feed hopper, a feed barrel, a dust extraction pipe and a clamping part. The barrel is connected to the dust extraction pipe, and the clamping part can clamp or loosen the ton bag to ensure sealing. The dust extraction pipe is connected to an external exhaust fan for dust removal.
It effectively solves the problem of incomplete sealing between ton bags and loading equipment, ensures that dust does not easily escape during the loading process, and improves the health and safety of operators.
Smart Images

Figure CN221852358U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of ton bag filling, and in particular to a ton bag filling device. Background Art
[0002] In the process of glass batching, ton bags are often used to hold raw materials or broken glass. When loading the ton bags, external materials need to be poured into the inside of the ton bags through loading equipment. Since a large amount of dust will be generated during the loading process, it will cause harm to the health of the operators.
[0003] In the existing anti-dust loading equipment (for example: the authorization announcement number is: CN216806630U, the name is: a dust-proof ton bag), a circular opening is opened on the top of the ton bag body, and a feeding dust collecting structure is connected to the circular opening, so that when loading, the air in the bag is extracted by vacuuming, and the dust collecting cloth traps the dust in the bag. However, the circular opening of this equipment is not completely sealed with the feeding dust collecting structure. Even if there is vacuum extraction, some dust will still overflow during loading, which will have an adverse effect on the operator's body. Utility Model Content
[0004] The present application provides a ton bag loading device to solve the problem in the prior art that the ton bag and the loading device are not completely sealed and dust is easily generated during loading.
[0005] According to the present application, a ton bag loading device is provided, comprising: a support structure and a loading structure. The support structure comprises a support frame and a plurality of support columns, the support frame is square, and the plurality of support columns can be lifted and lowered below the support frame. The loading structure comprises a feed hopper, a feed barrel, a dust extraction pipe and a clamping part, the maximum diameter of the feed hopper is greater than the length of the support frame, the feed barrel is connected to the feed hopper, the feed barrel faces the direction close to the ton bag, the dust extraction pipe is connected to the feed barrel, and the clamping part has a loading state of clamping the ton bag, or a non-loading state of loosening the ton bag.
[0006] In some embodiments, the clamping portion includes a first connecting plate, a second connecting plate and a third connecting plate, the first end of the first connecting plate is connected to the support frame, and the second end of the first connecting plate is rotatably connected to the second connecting plate and the third connecting plate.
[0007] In some embodiments, the clamping portion further includes a first clamping member and a second clamping member, the first clamping member is connected to the second connecting plate, the second clamping member is connected to the third connecting plate, and both the first clamping member and the second clamping member have an arc.
[0008] In some embodiments, the clamping portion further includes a buckle, the buckle includes a lock body and a lock hook, the lock body is arranged on the first clamping member, and the lock hook is arranged on the second clamping member.
[0009] In some embodiments, multiple layers of filter screens are arranged in the dust extraction pipe.
[0010] In some embodiments, the support column may be a hydraulic lifting support column, a pneumatic lifting support column, or an electric push rod support column.
[0011] In some embodiments, triangle irons are welded at the connection positions of the plurality of support columns and the support frame.
[0012] In some embodiments, hooks are provided on the plurality of support columns, and the hooks correspond one to one with the slings on the ton bag.
[0013] In some embodiments, the ton bag loading equipment also includes a transfer structure, which is arranged below the loading structure.
[0014] In some embodiments, the transfer structure includes a transfer platform, multiple rollers and a handle. The transfer platform is a rectangular parallelepiped. The width of the transfer platform is smaller than the distance between adjacent support columns. Multiple rollers are arranged under the transfer platform, and the handle is connected to the transfer platform.
[0015] The technical solution of the present application is applied to a ton bag loading device, including: a support structure and a loading structure. The support structure includes a support frame and a plurality of support columns. The support frame is square, and the plurality of support columns can be lifted and lowered below the support frame. The loading structure includes a feed hopper, a feed barrel, a dust extraction pipe and a clamping part. The maximum diameter of the feed hopper is greater than the length of the support frame. This arrangement enables the feed hopper to be inserted into the support frame. The feed barrel is connected to the feed hopper. The feed barrel faces the direction close to the ton bag. The raw material falls from the feed hopper to the feed barrel and then falls into the ton bag. The dust extraction pipe is connected to the feed barrel. When loading, the dust extraction pipe is connected to an external exhaust fan to remove dust. The clamping part has a loading state of clamping the ton bag, or a non-loading state of loosening the ton bag. In the loading state, the ton bag is completely sealed with the loading equipment. At this time, when loading into the ton bag, dust is not easy to fly out from the connection between the feed barrel and the ton bag. In the non-loading state, the clamping part is loosened after loading is completed to remove the ton bag. The technical solution of the present application effectively solves the problem in the prior art that the ton bag and the loading equipment are not completely sealed and dust is easily generated during loading. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.
[0017] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0018] Figure 1 A schematic diagram of the structure of the ton bag filling equipment in a non-filling state according to an embodiment of the present application is shown;
[0019] Figure 2 It shows a schematic structural diagram of the ton bag filling equipment in the filling state according to the embodiment of the present application;
[0020] Figure 3 A schematic structural diagram of a clamping portion of an embodiment of the present application is shown;
[0021] Figure 4 A schematic structural diagram showing another angle of the clamping portion of an embodiment of the present application;
[0022] Figure 5 A schematic structural diagram of a buckle according to an embodiment of the present application is shown.
[0023] The above drawings include the following reference numerals:
[0024] 10. Support structure; 11. Support frame; 12. Support column; 121. Hook; 20. Loading structure; 21. Feed hopper; 22. Feed barrel; 23. Dust extraction pipe; 24. Clamping part; 241. First connecting plate; 242. Second connecting plate; 243. Third connecting plate; 244. First clamping piece; 245. Second clamping piece; 246. Buckle; 2461. Lock body; 2462. Lock hook; 30. Transfer structure; 31. Transfer platform; 32. Roller; 33. Handle; 100. Ton bag. DETAILED DESCRIPTION
[0025] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0026] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.
[0027] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used herein to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" may include both "above" and "below". The device may also be positioned in other different ways, rotated 90 degrees or in other orientations, and the spatially relative descriptions used herein are interpreted accordingly.
[0028] like Figure 1 and Figure 2 As shown, the embodiment relates to a ton bag loading equipment, including: a support structure 10 and a loading structure 20. The support structure 10 includes a support frame 11 and a plurality of support columns 12, the support frame 11 is square, and the plurality of support columns 12 can be lifted and lowered below the support frame 11. The loading structure 20 includes a feed hopper 21, a feed barrel 22, a dust extraction pipe 23 and a clamping portion 24, the maximum diameter of the feed hopper 21 is greater than the length of the support frame 11, the feed barrel 22 is connected to the feed hopper 21, the feed barrel 22 faces the direction close to the ton bag 100, the dust extraction pipe 23 is connected to the feed barrel 22, and the clamping portion 24 has a loading state of clamping the ton bag 100, or a non-loading state of loosening the ton bag 100.
[0029] The technical solution of this embodiment is applied to the ton bag loading equipment, including: a support structure 10 and a loading structure 20. The support structure 10 includes a support frame 11 and a plurality of support columns 12. The support frame 11 is square, and the plurality of support columns 12 can be lifted and lowered below the support frame 11. The loading structure 20 includes a feed hopper 21, a feed barrel 22, a dust extraction pipe 23 and a clamping portion 24. The maximum diameter of the feed hopper 21 is greater than the length of the support frame 11. This arrangement allows the feed hopper 21 to be inserted into the support frame 11, and the outer wall of the feed hopper 21 can also be welded and fixed to the support frame 11. The feed barrel 22 is connected to the feed hopper 21, and the feed barrel 22 faces the direction close to the ton bag 100. The raw materials fall from the feed hopper 21 to the feed barrel 22 and then fall into the ton bag 100. The dust extraction pipe 23 is connected to the feed barrel 22. When loading, the dust extraction pipe 23 is connected to an external exhaust fan to remove dust. The clamping part 24 has a loading state of clamping the ton bag 100, or a non-loading state of loosening the ton bag 100. In the loading state, the ton bag 100 is completely sealed with the loading equipment. At this time, when loading into the ton bag 100, dust is not easy to fly out from the connection between the feed barrel 22 and the ton bag 100. In the non-loading state, after the loading is completed, the clamping part 24 is loosened to remove the ton bag 100. The technical solution of this embodiment effectively solves the problem that the ton bag 100 is not completely sealed with the loading equipment in the prior art, and dust is easily generated during loading.
[0030] like Figure 3 and Figure 4 As shown, in some embodiments, the clamping portion 24 includes a first connecting plate 241, a second connecting plate 242 and a third connecting plate 243, the first end of the first connecting plate 241 is connected to the support frame 11, the first connecting plate 241 extends downward, and the second end of the first connecting plate 241 is rotatably connected to the second connecting plate 242 and the third connecting plate 243, and the second connecting plate 242 and the third connecting plate 243 are rotated around the first connecting plate 241 through a rotating shaft.
[0031] like Figure 3 and Figure 4As shown, in some embodiments, the clamping portion 24 further includes a first clamping member 244 and a second clamping member 245. The first clamping member 244 is connected to the second connecting plate 242, and the first clamping member 244 can rotate synchronously with the second connecting plate 242. The second clamping member 245 is connected to the third connecting plate 243, and the second clamping member 245 can rotate synchronously with the third connecting plate 243. The first clamping member 244 and the second clamping member 245 both have an arc. When in a clamped state, the first clamping member The curvature of the first clamping member 244 and the second clamping member 245 is the same as that of the feed barrel 22, and the first clamping member 244 and the second clamping member 245 are spaced apart from the feed barrel 22. This arrangement allows the inner side of the feed port of the ton bag 100 to fit together with the outer wall of the feed barrel 22 when the ton bag 100 is loaded, and then the clamping part 24 is used to clamp the ton bag 100. The first clamping member 244 and the second clamping member 245 can fit together with the outer side of the feed port of the ton bag 100 to achieve complete sealing and prevent dust.
[0032] like Figures 3 to 5 As shown, in some embodiments, the clamping portion 24 further includes a buckle 246, the buckle 246 includes a lock body 2461 and a lock hook 2462, the lock body 2461 is arranged on the first clamping member 244, the lock hook 2462 is arranged on the second clamping member 245, the lock body 2461 includes a lock body seat, a connecting rod, an operating handle and a lock ring, the first end of the connecting rod is fixedly connected to the lock body seat, the second end of the connecting rod is rotatably connected to the operating handle, and the lock ring is rotatably connected to the operating handle. The operator drives the lock ring and the lock hook 2462 to achieve hooking by rotating the operating handle.
[0033] In some embodiments, a multi-layer filter screen is arranged in the dust extraction pipe 23, and the multi-layer filter screen can be a metal mesh. The multi-layer filter screen is arranged in the dust extraction pipe near the feed barrel 22. The first end of the dust extraction pipe is connected to the feed barrel 22, and the second end is connected to an external exhaust fan. When the raw materials are fed into the feed hopper 21, the raw materials fall into the ton bag 100 through the feed barrel 22 under the action of gravity, and the dust is sucked away by the exhaust fan. The multi-layer filter screen can prevent part of the raw materials from being sucked away due to excessive suction force.
[0034] In some embodiments, the support column 12 may be a hydraulic lifting support column, a pneumatic lifting support column or an electric push rod support column. The support column 12 is configured as a liftable support column 12. This configuration enables the support column to not only adapt to ton bags 100 of different sizes and heights, but also prevent the ton bag 100 from folding by lifting, thereby affecting the loading amount.
[0035] When the support column 12 is a hydraulic lifting support column, the support column 12 includes a hydraulic cylinder, a piston, a piston rod and an oil pump. The hydraulic cylinder has an oil pipe, which is connected to the oil pump. Under the action of the oil pump, high-pressure oil enters the hydraulic cylinder through the oil pipe. The piston is movably arranged in the hydraulic cylinder. The piston is connected to the first end of the piston rod, and the second end of the piston rod is connected to the support frame 11. With the introduction of high-pressure oil, the piston moves in the hydraulic cylinder, and the piston rod moves synchronously with the piston to adjust the height. The support column has four groups, which are respectively arranged at the four corners of the support frame 11. The loading equipment also includes a control module. The control module can select a PLC controller. Solenoid valves are arranged on the oil pipes. The solenoid valves are electrically connected to the control module. The opening of the solenoid valve is controlled by the control module to control the amount of high-pressure oil, thereby realizing the control of the lifting height.
[0036] When the support column 12 is a pneumatic lifting support column, the support column 12 includes a pneumatic cylinder, a piston, a piston rod and an air pump. The pneumatic cylinder has an air pipe, which is connected to the air pump. Under the action of the air pump, high-pressure gas enters the pneumatic cylinder through the air pipe. The piston is movably arranged in the pneumatic cylinder. The piston is connected to the first end of the piston rod, and the second end of the piston rod is connected to the support frame 11. With the introduction of high-pressure gas, the piston moves in the pneumatic cylinder, and the piston rod moves synchronously with the piston to adjust the height. The support column has four groups, which are respectively arranged at the four corners of the support frame 11. A solenoid valve is arranged on the air pipe, and the solenoid valve is electrically connected to the control module. The opening of the solenoid valve is controlled by the control module to control the amount of high-pressure gas introduced, thereby realizing the control of the lifting height.
[0037] When the support column 12 is an electric push rod support column, the support column 12 includes a driving motor, a screw, a nut, an inner tube and an outer sleeve. The driving motor is connected to the screw in a transmission manner, and the nut is matched with the screw thread. The nut is movably arranged on the circumferential outer side of the screw. The screw and the nut are both arranged inside the outer sleeve. The first end of the inner tube is connected to the nut, and the second end of the inner tube is connected to the support frame 11. Driven by the driving motor, the screw rotates, thereby driving the nut to move along the axial direction of the screw, and the inner tube moves with the movement of the nut. The rotation of the screw is converted into a linear movement of the inner tube, thereby driving the support frame 11 to adjust its height. The support column 12 has four groups, which are respectively arranged at the four corners of the support frame 11.
[0038] like Figure 1 and Figure 2As shown, in some embodiments, a triangle iron is welded at the connection position of the plurality of support columns 12 and the support frame 11. The triangle iron can strengthen the connection strength between the support column 12 and the support frame 11. Hooks 121 are provided on the plurality of support columns 12, and the hooks 121 correspond to the slings on the ton bag 100 one by one. The slings on the ton bag 100 are located at the four corners of the ton bag 100. The hooks 121 are provided to open the ton bag 100. When loading, the ton bag 100 is not easy to fold, resulting in a reduction in the loading amount. At the same time, the cooperation between the hooks 121 and the slings can compensate for the clamping force of the clamping part 24, so as to prevent the feed port of the ton bag from escaping from the clamping part 24 due to the increase of gravity as the ton bag 100 is loaded.
[0039] like Figure 1 and Figure 2 As shown, in some embodiments, the ton bag loading equipment further includes a transfer structure 30, which is arranged below the loading structure 20. The transfer structure 30 facilitates the removal of the loaded ton bag 100. The transfer structure 30 includes a transfer platform 31, a plurality of rollers 32 and a handle 33. The transfer platform 31 is a rectangular parallelepiped, and the width of the transfer platform 31 is less than the distance between adjacent support columns 12. The transfer platform 31 will not interfere with the support column 12 when moving. A plurality of rollers 32 are arranged below the transfer platform 31, and the handle 33 is connected to the transfer platform 31. The ton bag 100 is placed on the transfer platform 31 for loading. A first abutting plate, a second abutting plate and a third abutting plate can be set on the transfer platform 31. The first abutting plate, the second abutting plate and the third abutting plate respectively abut against three sides of the ton bag 100 to prevent the ton bag 100 from tipping over during the movement. To move the ton bag 100, you only need to pull it out from the other side (the side without the abutting plate).
[0040] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0041] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein, for example. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0042] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A ton bag filling equipment, characterized in that: include: A support structure (10), the support structure (10) comprising a support frame (11) and a plurality of support columns (12), the support frame (11) being square, and the plurality of support columns (12) being liftably arranged below the support frame (11); A loading structure (20), the loading structure (20) comprising a feeding hopper (21), a feeding cylinder (22), a dust extraction pipe (23) and a clamping portion (24), the maximum diameter of the feeding hopper (21) being greater than the length of the supporting frame (11), the feeding cylinder (22) being connected to the feeding hopper (21), the feeding cylinder (22) being oriented toward a direction close to a ton bag (100), the dust extraction pipe (23) being connected to the feeding cylinder (22), and the clamping portion (24) having a loading state of clamping the ton bag (100), or a non-loading state of releasing the ton bag (100).
2. The ton bag filling equipment according to claim 1 is characterized in that: The clamping portion (24) comprises a first connecting plate (241), a second connecting plate (242) and a third connecting plate (243); the first end of the first connecting plate (241) is connected to the support frame (11); and the second end of the first connecting plate (241) is rotatably connected to the second connecting plate (242) and the third connecting plate (243).
3. The ton bag filling equipment according to claim 2 is characterized in that: The clamping portion (24) further comprises a first clamping member (244) and a second clamping member (245), wherein the first clamping member (244) is connected to the second connecting plate (242), and the second clamping member (245) is connected to the third connecting plate (243), and the first clamping member (244) and the second clamping member (245) both have an arc.
4. The ton bag filling equipment according to claim 3 is characterized in that: The clamping portion (24) further comprises a buckle (246), wherein the buckle (246) comprises a lock body (2461) and a lock hook (2462), wherein the lock body (2461) is arranged on the first clamping member (244), and the lock hook (2462) is arranged on the second clamping member (245).
5. The ton bag filling equipment according to claim 1 is characterized in that: The dust extraction pipe (23) is provided with multiple layers of filter screens.
6. The ton bag filling equipment according to claim 1 is characterized in that: The support column (12) may be a hydraulic lifting support column, a pneumatic lifting support column or an electric push rod support column.
7. The ton bag filling equipment according to claim 6 is characterized in that: A plurality of triangle irons are welded at the connection positions between the support columns (12) and the support frame (11).
8. The ton bag filling equipment according to claim 7 is characterized in that: A hook (121) is provided on each of the plurality of support columns (12), and the hook (121) corresponds one-to-one to the slings on the ton bag (100).
9. The ton bag filling equipment according to any one of claims 1 to 8, characterized in that: The ton bag loading equipment further comprises a transfer structure (30), and the transfer structure (30) is arranged below the loading structure (20).
10. The ton bag filling equipment according to claim 9, characterized in that: The transfer structure (30) comprises a transfer platform (31), a plurality of rollers (32) and a handle (33); the transfer platform (31) is a rectangular parallelepiped; the width of the transfer platform (31) is smaller than the distance between adjacent support columns (12); the plurality of rollers (32) are arranged below the transfer platform (31); and the handle (33) is connected to the transfer platform (31).
