Construction trolley for replacing and overhauling slide wire supporting cable of crown block and electric hoist

By designing a construction trolley for the replacement and maintenance of cranes and electric hoist slide wires and cables, the problems of low efficiency and high labor intensity caused by the erection of scaffolding have been solved, and an efficient and safe slide wire replacement and maintenance process has been realized.

CN221853983UActive Publication Date: 2024-10-18BEIJING SHOU CONSTRUCT BEI MAINTAIN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420646972.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-30
Publication Date
2024-10-18
Estimated Expiration
2034-03-30

AI Technical Summary

Technical Problem

The existing technology requires the erection of scaffolding when replacing the overhead crane and the electric hoist slide cable support cable, resulting in a large amount of waste of manpower and material resources, low efficiency, and high labor intensity.

Method used

A construction trolley for replacement and maintenance of overhead cranes and electric hoists and trolley cables is designed, including a hand-pulled monorail trolley, a balanced hanging wheel, a snap ring, a beam, a hanging frame and a bottom plate. The device formed by connecting these components can be used on the sky. The trolley and electric hoist are installed on the lower flange plate of the track beam, allowing construction workers to enter the hanging frame and use a hand-operated monorail trolley to move the slide line for replacement and maintenance.

Benefits of technology

It greatly improves the maintenance efficiency of slide line and cable replacement, reduces labor and labor intensity, and realizes a safe and efficient maintenance process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221853983U_ABST
    Figure CN221853983U_ABST
Patent Text Reader

Abstract

The utility model discloses a crown block and electric hoist slide wire supporting cable replacing and overhauling construction trolley, and belongs to the technical field of crown block and electric hoist slide wire overhauling. Comprising a hand-pulled monorail trolley (1), a balance hanging wheel (2), a clamping ring (3), a cross beam (4), a hanging frame (5) and a bottom plate (6), the hand-pulled monorail trolley (1) is connected with the hanging frame (5) through the clamping ring (3), the balance hanging wheels (2) are welded to angle steel on the two sides of the hanging frame (5), the cross beam (4) is welded to angle steel on the two sides of the upper portion of the hanging frame (5), and the bottom plate (6) is welded to the inner bottom of the hanging frame (5). The device has the advantages of simple structure and convenience in manufacturing; the problem of waste of manpower and material resources caused by the fact that a scaffold needs to be erected for replacing the slide wire supporting cable in the prior art is solved, and the overhauling efficiency of replacing the slide wire supporting cable of a crown block and an electric hoist is greatly improved; safety and high efficiency are achieved, labor is reduced, difficulty is lowered, and labor intensity is lowered.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model device belongs to the technical field of overhead crane and electric hoist sliding wire maintenance, and in particular provides an overhead crane and electric hoist sliding wire cable replacement and maintenance construction trolley, which is suitable for sliding wire replacement and maintenance work. Background Art

[0002] As the main maintenance and construction machinery in steel plants, lifting equipment such as overhead cranes and electric hoists are crucial in daily production and maintenance operations. Our unit is responsible for maintaining a total of 316 overhead cranes, electric hoists and other lifting equipment in the Ironmaking Department of Jingtang Company. Moreover, due to long-term operation, the overhead crane sliding wires and towing cables often need to be replaced and repaired. Originally, scaffolding was required to be set up for construction when replacing the sliding wires and towing cables for maintenance. Summary of the invention

[0003] The purpose of the utility model is to provide a trolley for replacing and repairing the overhead crane and electric hoist cable, which solves the problem of a large amount of manpower and material waste caused by the need to set up scaffolding for the original replacement and repair of the cable, and greatly improves the maintenance efficiency of the overhead crane and electric hoist cable replacement, achieving safety and efficiency, reducing labor, reducing difficulty, and reducing labor intensity.

[0004] The utility model comprises: a hand-pulled monorail trolley 1 (1 piece), a balancing hanging wheel 2 (4 pieces), a clamp ring 3 (1 piece), a crossbeam 4 (1 piece), a hanging frame 5 (1 piece), and a bottom plate 6 (1 piece); the hand-pulled monorail trolley 1 is connected to the hanging frame 5 by using the clamp ring 3. The balancing hanging wheel 2 is welded to the angle steels on both sides of the hanging frame 5, and the crossbeam 4 is welded to the angle steels on both sides above the hanging frame 5. The bottom plate 6 is welded to the inner bottom of the hanging frame 5.

[0005] The utility model comprises a replacement and maintenance construction trolley of a total of one piece, which is installed on the lower flange plate of the overhead crane and electric hoist track beam that need to be repaired and replaced with supporting cables. The maintenance construction personnel enter the hanging frame and use the hand-pulled monorail trolley to move the overhead crane and electric hoist sliding wire to perform replacement and maintenance operations.

[0006] The hand-pulled monorail trolley 1 is a 2-ton hand-pulled monorail trolley.

[0007] The balancing hanging wheel 2 is made of a nylon wheel and an angle steel bracket, with 4 pieces in total.

[0008] The clasp 3 model is a U-type 2-ton shackle, 1 piece in total.

[0009] The crossbeam 4 is made of two 100*10mm angle steels welded back to back and with an 18mm round hole in the middle, a total of 1 piece.

[0010] The hanging frame 5 is made of 50*5mm angle steel welded together.

[0011] The bottom plate 6 is made of a δ=6 mm patterned plate.

[0012] The utility model device is suitable for the maintenance construction of lifting equipment such as overhead cranes and electric hoists in steel and chemical enterprises.

[0013] The advantages of the utility model device are:

[0014] 1. The device of the utility model has a simple structure and is easy to manufacture.

[0015] 2. The utility model device is easy to operate and is installed on the lower flange plate of the overhead crane and electric hoist rail beam that need to be repaired and replaced. The maintenance construction personnel enter the hanging frame and use a hand-pulled monorail trolley to move the overhead crane and electric hoist sliding wire to replace and repair it.

[0016] 3. In the future, the utility model device can be manufactured into devices of different specifications according to the actual needs of the maintenance site to expand the scope of use. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a front view of the device of the utility model.

[0018] Figure 2 It is a side view of the device of the utility model.

[0019] In the figure, there are a hand-pulled monorail trolley 1 (1 piece), a balancing hanging wheel 2 (4 pieces), a retaining ring 3 (1 piece), a crossbeam 4 (1 piece), a hanging frame 5 (1 piece), a base plate 6 (1 piece), an overhead crane that needs to be overhauled, and an electric hoist rail crossbeam 7. DETAILED DESCRIPTION

[0020] The utility model comprises: a hand-pulled monorail trolley 1 (1 piece), a balancing hanging wheel 2 (4 pieces), a clamp ring 3 (1 piece), a crossbeam 4 (1 piece), a hanging frame 5 (1 piece), and a bottom plate 6 (1 piece); the hand-pulled monorail trolley 1 is connected to the hanging frame 5 by using the clamp ring 3. The balancing hanging wheel 2 is welded to the angle steels on both sides of the hanging frame 5, and the crossbeam 4 is welded to the angle steels on both sides above the hanging frame 5. The bottom plate 6 is welded to the inner bottom of the hanging frame 5.

[0021] The utility model comprises a replacement and maintenance construction trolley of a total of one piece, which is installed on the lower flange plate of the overhead crane and electric hoist track beam that need to be repaired and replaced with supporting cables. The maintenance construction personnel enter the hanging frame and use the hand-pulled monorail trolley to move the overhead crane and electric hoist sliding wire to perform replacement and maintenance operations.

[0022] Hand-pulled monorail trolley 1 is a 2-ton hand-pulled monorail trolley, a total of 1 piece.

[0023] The balancing hanging wheel 2 is made of a nylon wheel and an angle steel bracket, with 4 pieces in total.

[0024] The clasp 3 model is a U-type 2-ton shackle, 1 piece in total.

[0025] The crossbeam 4 is made of two 100*10mm angle steels welded back to back and with an 18mm round hole in the middle, a total of 1 piece.

[0026] The hanging frame 5 is made of 50*5mm angle steel welded together.

[0027] The bottom plate 6 is made of a δ=6 mm patterned plate.

[0028] The utility model comprises a replacement and maintenance construction trolley of a total of one piece, which is installed on the lower flange plate of the overhead crane and electric hoist track beam that need to be repaired and replaced with supporting cables. The maintenance construction personnel enter the hanging frame and use the hand-pulled monorail trolley to move the overhead crane and electric hoist sliding wire to perform replacement and maintenance operations.

Claims

1. A construction trolley for replacing and repairing a crane and an electric hoist cable, characterized in that: include: A hand-pulled monorail trolley (1), a balancing hanging wheel (2), a clamping ring (3), a crossbeam (4), a hanging frame (5), and a bottom plate (6); the hand-pulled monorail trolley (1) is connected to the hanging frame (5) by using the clamping ring (3), the balancing hanging wheel (2) is welded to the angle steels on both sides of the hanging frame (5), the crossbeam (4) is welded to the angle steels on both sides above the hanging frame (5), and the bottom plate (6) is welded to the inner bottom of the hanging frame (5).

2. The overhead crane, electric hoist cable replacement and maintenance construction vehicle according to claim 1 is characterized in that: The hand-pulled monorail trolley (1) is a 2-ton hand-pulled monorail trolley.

3. The overhead crane, electric hoist cable replacement and maintenance construction vehicle according to claim 1 is characterized in that: The balance hanging wheel (2) is made of a nylon wheel and an angle steel bracket, and has 4 parts in total.

4. The overhead crane, electric hoist cable replacement and maintenance construction vehicle according to claim 1 is characterized in that: The model of the snap ring (3) is a U-shaped 2-ton shackle.

5. The overhead crane, electric hoist cable replacement and maintenance construction vehicle according to claim 1 is characterized in that: The crossbeam (4) is made of two 100*10mm angle steels welded back to back and with a 18mm round hole in the middle.

6. The overhead crane, electric hoist cable replacement and maintenance construction vehicle according to claim 1, characterized in that: The hanging frame (5) is made by welding 50*5mm angle steel.

7. The overhead crane, electric hoist cable replacement and maintenance construction vehicle according to claim 1 is characterized in that: The bottom plate (6) is made of a δ=6mm patterned plate.