Lifting type support for deslagging in pipe-jacking tunneling construction

By designing a lifting support for pipe jacking construction, using a well-shaped lifting support and a jack to realize rapid lifting and transportation of the slag bucket, the problem of slow slag discharging speed in the existing technology is solved, and the construction efficiency and transportation speed are improved. , reducing cost and construction period.

CN221854087UActive Publication Date: 2024-10-18CHINA HYDROPOWER ELEVENTH ENG BUREAU (ZHENGZHOU) CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323427542.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-15
Publication Date
2024-10-18
Estimated Expiration
2033-12-15

AI Technical Summary

Technical Problem

In the existing technology, the slag discharge speed during pipe jacking excavation construction is slow, resulting in low construction efficiency and long downtime, which cannot meet the efficient slag discharge requirements of the ultra-large rectangular pipe jacking mechanical underground excavation station.

Method used

A lifting support for pipe jacking construction is designed, including a track, a mobile trolley, a separate slag bucket, a tic-tac-toe lifting support and a jack. The bracket supports the slag bucket for lifting movement, using dual rails and remote control The system realizes rapid slag transportation.

Benefits of technology

It improves the slag transportation speed, shortens the transportation time, reduces the downtime of the pipe jacking machine, improves the construction efficiency, and reduces the construction cost and construction period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221854087U_ABST
    Figure CN221854087U_ABST
Patent Text Reader

Abstract

A lifting type support for deslagging in pipe-jacking tunneling construction comprises a rail, a movable trolley is arranged on the rail in a reciprocating mode, a slag hopper is detachably arranged on the top of the movable trolley, a lifting support is arranged at the end of the rail, a support capable of supporting the bottom of the slag hopper is arranged on the lifting support, and the slag hopper is arranged on the support. And the lifting support can support the slag hopper to do lifting motion through the bracket. Compared with the prior art, the integral structure is simple, the two groups of slag buckets can roll to discharge slag, the problem of long downtime of the tube push bench caused by low slag discharge speed is avoided, the slag discharge and transportation are convenient, the slag transportation time is greatly shortened, the slag discharge efficiency is improved, the downtime of the tube push bench is reduced, the construction tunneling efficiency is improved, and the construction cost is reduced. The construction cost is reduced, and the construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of slag discharge in super-large-section rectangular jacking pipe excavation construction, in particular to a lifting support used for slag discharge in jacking pipe excavation construction. Background Art

[0002] At present, urban rail transit is developing rapidly at home and abroad. An ultra-large rectangular pipe jacking mechanical underground excavation station is being implemented at the Shenzhen Line Sha 3 Station. The underground excavation section of the project is extremely large, and the amount of slag discharged during the excavation construction is huge.

[0003] At the construction site, a mobile trolley is used to carry the slag bucket along the track to transport the slag from the tunnel to the tunnel entrance, and then the gantry crane lifts the slag bucket from the underground to the ground, and then lifts it to the slag pool to dump the slag; after the slag is dumped, the gantry crane lifts the slag bucket to the underground mobile trolley, and the mobile trolley carries the slag bucket into the tunnel, and the jacking pipe continues to dig. This process takes about 40 minutes, and the slag discharge speed is slow and the construction efficiency is low. Therefore, how to make a lifting support for slag discharge in jacking pipe excavation construction that can solve the existing technical problems has become a technical problem to be solved. Utility Model Content

[0004] The utility model is based on the above technical problems and proposes a lifting support for slag discharge in pipe jacking construction to solve the problems existing in the above background technology.

[0005] In view of this, the utility model proposes a lifting support for slag discharge in jacking pipe excavation construction, which comprises: a track, a mobile trolley is reciprocatingly provided on the track, a slag bucket is detachably provided on the top of the mobile trolley, a lifting support is provided at the end of the track, a bracket that can support the bottom of the slag bucket is provided on the lifting support, and the lifting support can support the slag bucket for lifting and lowering movement through the bracket.

[0006] Furthermore, the slag buckets are in two groups, and the two groups of slag buckets are respectively and sequentially arranged on the moving trolley and the lifting support in different time periods.

[0007] Furthermore, the lifting supports are arranged in a criss-cross shape in four groups on both sides of the track, and the inner spacing of the lifting supports is matched with the diameter of the slag bucket.

[0008] Furthermore, the bracket is a triangular bracket, and the brackets are respectively arranged in parallel on the relatively inner sides of the lifting support.

[0009] Furthermore, the lifting support includes a column and a jack arranged inside the column, and the bracket is arranged on the inner side of the upper part of the jack.

[0010] Furthermore, the jack and the mobile trolley are both provided with controllers, and the controller is matched with a remote controller.

[0011] Furthermore, the track is a double track, and the columns are welded from steel plates into hollow columns.

[0012] The utility model proposes a lifting support for slag discharge in pipe jacking excavation construction. Compared with the prior art, the utility model has a simple overall structure and can enable two groups of slag buckets to roll and discharge slag, thereby avoiding the problem of long downtime of the pipe jacking machine caused by slow slag discharge speed. The slag discharge and transportation are convenient, which greatly shortens the slag transportation time, improves the slag discharge efficiency, reduces the downtime of the pipe jacking machine, improves the construction excavation efficiency, reduces the construction cost, and saves the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 A top view of the structure of the utility model is shown;

[0014] Figure 2 Shows a structural sectional view of the utility model;

[0015] Figure 3 The utility model shows a schematic diagram of the slag bucket lifting structure;

[0016] In the figure: 1 track, 2 flatbed car, 3 slag bucket, 4 lifting support, 5 bracket, 6 frame, 7 jack. DETAILED DESCRIPTION

[0017] In order to more clearly understand the above-mentioned objects, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0018] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the contents disclosed below.

[0019] The following combination Figures 1 to 3 The technical solution of the utility model is further explained.

[0020] The first embodiment, as Figures 1 to 3 As shown: a lifting support for slag discharge in pipe jacking construction, which includes: a track 1, a mobile trolley 2 is reciprocatingly arranged on the track 1, a slag bucket 3 is detachably arranged on the top of the mobile trolley 2, a lifting support 4 is arranged at the end of the track 1, and a bracket 5 that can support the bottom of the slag bucket 3 is arranged on the lifting support 4, and the lifting support 4 can support the slag bucket 3 to perform lifting and lowering movements through the bracket 5.

[0021] The slag bucket 3 is divided into two groups, and the two groups of slag buckets 3 are respectively and sequentially arranged on the mobile trolley 2 and the lifting support 4 in different time periods. The lifting support 4 is arranged in a criss-cross shape and is arranged in four groups at intervals on both sides of the track 1. The inner spacing of the lifting support 4 is matched with the diameter of the slag bucket 3. The bracket 5 is a triangular bracket 5, and the bracket 5 is respectively arranged in parallel on the relatively inner sides of the lifting support 4.

[0022] The lifting support 4 includes a column 6 and a jack 7 disposed inside the column 6, and the bracket 5 is disposed on the inner side of the upper part of the jack 7. The jack 7 and the mobile trolley 2 are both provided with a controller, and the controller is matched with a remote controller. The track 1 is a double track 1, and the column 6 is welded from steel plates into a hollow column 6.

[0023] The utility model aims at the construction process of transporting slag from a tunnel to the ground in super-large rectangular jacking construction, adds a lifting support 4 for lifting and storing a slag bucket 3 at the tunnel opening of a track 1, increases the number of slag buckets 3 from the original one to two and transports them through the track in the tunnel, thereby greatly improving the transportation speed of the slag.

[0024] The construction steps are as follows: 1. First, the lifting support 4 is arranged on both sides of the end of the hole track 1, and the column 6 is welded or fixed to the ground at its root by bolts according to the site conditions.

[0025] 2. Hang the first hopper 3 onto the lifting support 4, start the jack 7 by remote control, and adjust the hopper 3 to a height that the mobile trolley 2 can pass through;

[0026] 3. After the second slag bucket 3 is filled with slag by jacking, the mobile trolley 2 is remotely controlled to carry the slag bucket 3 from the tunnel to the tunnel entrance;

[0027] 4. The gantry crane lifts the second slag bucket 3 to the ground and dumps the slag;

[0028] 5. The remote-controlled mobile trolley 2 moves backward to the bottom of the first hopper 3;

[0029] 6. Start the jack 7 by remote control, control the hydraulic cylinder to retract and lower the first slag bucket 3, place the first slag bucket 3 on the mobile trolley 2, and after the jack 7 continues to descend and separates from the first slag bucket 3, close the jack 7;

[0030] 7. The remote-controlled mobile trolley 2 carries the first slag bucket 3 into the cave and continues to hold the slag;

[0031] 8. After the gantry crane lifts the second hopper 3 that has been emptied of the slag to the liftable support 4, the above operation is repeated to transport and dump the slag back and forth.

[0032] The utility model discloses the overall structure is simple, can make two groups of slag buckets roll to discharge slag, avoid the problem of long downtime of pipe jacking machine caused by slow slag discharging speed, its slag discharging and transportation are convenient, greatly shortens the slag transportation time, improves slag discharging efficiency, reduces the downtime of pipe jacking machine, improves construction excavation efficiency, reduces construction cost, and saves construction period.

[0033] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A lifting support for slag removal in pipe jacking construction, comprising a track, characterized in that: A movable trolley is arranged on the track for reciprocating movement, a slag bucket is detachably arranged on the top of the movable trolley, a lifting support is arranged at the end of the track, a bracket that can support the bottom of the slag bucket is arranged on the lifting support, and the lifting support can support the slag bucket to perform lifting movement through the bracket.

2. The lifting support for slag removal in pipe jacking construction according to claim 1 is characterized in that: The slag buckets are in two groups, and the two groups of slag buckets are arranged on the moving trolley and the lifting support in sequence at different time periods.

3. The lifting support for slag removal in pipe jacking construction according to claim 2 is characterized in that: The lifting supports are in a criss-cross shape and are arranged in four groups at intervals on both sides of the track. The inner spacing of the lifting supports is matched with the diameter of the slag bucket.

4. The lifting support for slag removal in pipe jacking construction according to claim 3 is characterized in that: The brackets are triangular brackets, and the brackets are respectively arranged in parallel on the relatively inner sides of the lifting support.

5. The lifting support for slag removal in pipe jacking construction according to claim 4 is characterized in that: The lifting support comprises a column and a jack arranged inside the column, and the bracket is arranged on the inner side of the upper part of the jack.

6. The lifting support for slag removal in pipe jacking construction according to claim 5 is characterized in that: The jack and the mobile trolley are both provided with controllers, and the controller is matched with a remote controller.

7. The lifting support for slag removal in pipe jacking construction according to claim 6 is characterized in that: The track is a double track, and the columns are welded from steel plates into hollow columns.