Environment-friendly and standard-reaching skid-mounted efficient treatment equipment for discharged and extracted water of coal-bed gas well
By designing a skid-mounted high-efficiency treatment equipment that meets the environmental protection standards for coalbed methane well drainage water, integrating comprehensive treatment technology and automatic control systems, the problem of high unit price and huge treatment volume of coalbed methane well drainage water treatment has been solved, and efficient and stable water quality has been achieved. processing, reducing operation and maintenance costs and achieving strong adaptability.
Patent Information
- Application Number
- CN202420293078.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-18
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-02-18
AI Technical Summary
The unit price of coalbed methane well drainage water treatment is high and the treatment volume is huge, which results in great economic pressure on enterprises. Moreover, existing technology cannot meet the needs for efficient treatment under conditions of limited ground space and inconvenient transportation.
A skid-mounted high-efficiency treatment equipment that meets environmental standards for coalbed methane well drainage and production water is designed. It integrates a comprehensive treatment process, including a water distribution tank, a chemical treatment tank, a heavy sedimentation tank, a sludge sedimentation tank, a sand carbon filter, etc., and adopts a number of The physical and chemical methods of indicators realize automatic dosing and backwashing through PLC fully automatic control, reducing operation and maintenance costs.
It has improved treatment efficiency, reduced operation and maintenance costs, adapted to the treatment capacity of different well locations, met the water quality requirements of national and local standards, has strong adaptability, and solved the difficulty of unadjustable treatment capacity.
Smart Images

Figure CN221854417U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of coalbed methane well drainage water treatment, and specifically discloses a skid-mounted high-efficiency treatment equipment for coalbed methane well drainage water that meets environmental protection standards. Background Art
[0002] Along with the development and production of coalbed methane, a large amount of drainage water is also produced. The fracturing fluid in the drainage water contains a large number of pollutants such as heavy metals, and the formation water mineralization and related indicators exceed the standard, which will cause irreversible damage to human health and the land.
[0003] The coalbed methane well drainage water discharged into the river by coalbed methane enterprises must meet the surface water environmental quality Class III standard, and the chemical oxygen demand (COD) must be ≤20mg / L, ammonia nitrogen (NH3-N) must be ≤1.0mg / L, and total phosphorus (TP) must be ≤0.2mg / L.
[0004] At present, the coalbed methane well drainage water treatment method of coalbed methane related enterprises is to transport the water by vehicles to sewage treatment stations for centralized treatment. However, the coalbed methane drainage wells are scattered, mostly in mountainous areas, with harsh terrain and landform conditions, different water production of single wells, and a wide distribution range. The road conditions are complex, transportation is inconvenient, and the directly usable ground space is limited, resulting in a very high treatment unit price. In addition, the huge treatment volume has caused great economic pressure on the enterprises, seriously affecting their benefits. Utility Model Content
[0005] The utility model provides a skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production water that meets environmental protection standards, which effectively solves the problem that vehicles transport coalbed methane well drainage and production water to sewage treatment stations for centralized treatment, with high treatment unit prices and huge treatment volumes, causing great economic pressure on enterprises.
[0006] The above-mentioned skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production that meets environmental protection standards includes a water distribution tank, a chemical treatment tank, an overflow pipe, a heavy sedimentation tank, a honeycomb inclined plate, a sludge sedimentation tank, a chemical storage barrel, a chemical delivery pump, a chemical delivery pipe, a primary clean water tank, a water pipe I, a water pump I, a valve I, a sand-carbon filter, a water pipe II, a sludge storage tank, a water pipe III, a valve III, a secondary clean water tank, a water pipe IV, a valve IV, a water pipe V, a valve V, a water pump V, a chemical replenishment pipe, a chemical replenishment valve, a sludge pipeline, a sludge pump, a sludge valve, a sewage pipe and a sewage valve; The treatment tank includes a first chemical treatment tank, an intermediate chemical treatment tank and a final chemical treatment tank which are sequentially connected through an overflow pipe. The first chemical treatment tank is connected to the water distribution tank through an overflow pipe, and the final chemical treatment tank is connected to the heavy sedimentation tank through an overflow pipe. The multiple chemical treatment tanks are connected to the chemical storage barrel through chemical delivery pipes, and the chemical delivery pipes are equipped with chemical delivery pumps. A vertically arranged honeycomb inclined plate is installed in the heavy sedimentation tank, and a sludge sedimentation tank is installed at the bottom. The heavy sedimentation tank is connected to the primary clear water tank through an overflow hole. Water pipe I is connected from the primary clear water tank to the primary clear water tank. The water is drawn out from the water pool, and a water pump I and a valve I are installed on the water pipe I. A water pipe interface II and a water pipe interface III are arranged on the pipe body behind the water pump I and the valve I. The water pipe interface II is connected to the sand carbon filter through the water pipe II, and the water pipe interface III is connected to the sludge storage tank through the water pipe III, and a valve III is installed on the water pipe III; the sand carbon filter is connected to the secondary clean water tank through the water pipe IV, and a valve IV is installed on the water pipe IV. A water pipe interface V is arranged on the water pipe IV, and the water pipe interface V is connected to the secondary clean water tank through the water pipe V, and a valve is installed on the water pipe V Ⅴ and water pump Ⅴ, a medicine replenishment pipe interface is arranged on the pipe body between valve Ⅴ and water pump Ⅴ, the medicine replenishment pipe interface is connected with the medicine storage barrel through the medicine replenishment pipe, and the medicine replenishment pipe is installed with a medicine replenishment valve; the sludge storage tank and the sludge sedimentation tank are connected through the sludge pipeline, a sludge pump and a sludge valve are installed on the sludge pipeline, a sewage pipe is led out from the sludge pipeline between the sludge pump and the sludge valve, a sewage pipe is installed on the sewage pipe, the sludge pump is located between the sludge storage tank and the sewage pipe, and the sludge valve is located between the sludge sedimentation tank and the sewage pipe.
[0007] In the above equipment, a chemical treatment tank agitator is installed on the chemical treatment tank; and a chemical storage tank agitator is installed on the chemical storage tank.
[0008] In the above equipment, a toothed overflow trough is provided at the outlet of the heavy sedimentation tank, and the trough wall of the toothed overflow trough is a toothed structure.
[0009] The above equipment also includes a drainage water storage tank, a water pipe VI and a water pump VI; the drainage water storage tank is connected to the water distribution tank through a water pipe VI, and a water pump VI is installed on the water pipe VI.
[0010] In the above equipment, a water level meter is installed on the drainage and production water storage tank.
[0011] The above equipment also includes a PLC fully automatic control cabinet; the chemical delivery pump, water pump I, water pump V, chemical replenishment valve, sludge pump, chemical treatment tank agitator, chemical storage barrel agitator, water pump VI, and water level meter are all connected to the PLC fully automatic control cabinet; the chemical delivery pump adopts an adjustable electromagnetic peristaltic pump; the sludge pump adopts a screw pump.
[0012] In the above equipment, the number of reagent treatment pools is three, and the number of reagent storage barrels is five; the first reagent treatment pool is connected to one reagent storage barrel; the middle reagent treatment pool and the last reagent treatment pool are connected to two reagent storage barrels respectively.
[0013] Compared with the prior art, the utility model has the following beneficial effects:
[0014] The utility model provides a skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production water that meets environmental standards. This equipment is skid-mounted and miniaturized, easy to install and move, occupies a small area, can be moved whenever needed, and integrates comprehensive treatment processes. It integrates multiple functions such as pretreatment, combined chemical treatment, automatic dosing, heavy sedimentation separation, sludge discharge, sand carbon filtration and backwashing, and clean water reuse. The chemical storage barrel is filled with mixed flocculants, chemical oxygen demand COD reduction, ammonia nitrogen reduction, fluoride removal, phosphorus removal and other chemicals. The operation is stable, the treatment efficiency is greatly improved, and the operation and maintenance costs are greatly reduced. This equipment solves the biggest difficulty of the unadjustable processing volume, the processing volume is easily controllable, and the adaptability and scalability of a single well are strong. Combined with the water quality characteristics of coalbed methane well drainage and production water, a technical route of physical and chemical methods with highly targeted integrated treatment of multiple indicators is adopted to ensure that the treated coalbed methane well drainage and production water meets the requirements of relevant national and local standards. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 This is a schematic diagram of a skid-mounted, efficient treatment equipment that meets environmental standards for coalbed methane well drainage and production water;
[0017] Figure 2 for Figure 1 Schematic diagram of the other direction;
[0018] Figure 3 A top view of the skid-mounted high-efficiency treatment equipment that meets environmental standards for coalbed methane well drainage and production;
[0019] Figure 4Rear view of the skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production that meets environmental standards.
[0020] In the figure: 1-water distribution tank; 2-chemical treatment tank; 3-overflow pipe; 4-heavy sedimentation tank; 5-honeycomb inclined plate; 6-sludge sedimentation tank; 7-chemical storage barrel; 8-chemical delivery pump; 9-chemical delivery pipe; 10-primary clean water tank; 11-water pipe Ⅰ; 12-water pump Ⅰ; 13-valve Ⅰ; 14-sand carbon filter; 15-water pipe Ⅱ; 16-sludge storage tank; 17-water pipe Ⅲ; 18-valve Ⅲ; 19-secondary clean water tank; 20-water pipe Ⅳ; 21-valve Ⅳ ; 22-water pipe V; 23-valve V; 24-water pump V; 25-chemical refilling pipe; 26-chemical refilling valve; 27-sludge pipeline; 28-sludge pump; 29-sludge valve; 30-drain pipe; 31-drain valve; 32-overflow hole; 33-chemical treatment tank agitator; 34-chemical storage barrel agitator; 35-toothed overflow trough; 36-drainage and production water storage tank; 37-water pipe VI; 38-water pump VI; 39-water level meter; 40-PLC fully automatic control cabinet. DETAILED DESCRIPTION
[0021] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] The present embodiment provides a skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production water that meets environmental protection standards, including a water distribution tank 1, a chemical treatment tank 2, an overflow pipe 3, a heavy sedimentation tank 4, a honeycomb inclined plate 5, a sludge sedimentation tank 6, a chemical storage barrel 7, a chemical delivery pump 8, a chemical delivery pipe 9, a primary clean water tank 10, a water pipe I 11, a water pump I 12, a valve I 13, a sand carbon filter 14, a water pipe II 15, a sludge storage tank 16, a water pipe III 17, a valve III 18, a secondary clean water tank 19, a water pipe IV 20, a valve IV 21, a water pipe V 22, a valve V 23, a water pump V 24, a chemical replenishment pipe 25, a chemical replenishment valve 26, a sludge pipeline 27, a sludge pump 28, a sludge valve 29, A sewage pipe 30 and a sewage valve 31; the chemical treatment tank 2 includes a first chemical treatment tank, an intermediate chemical treatment tank and a final chemical treatment tank which are sequentially connected through an overflow pipe 3, the first chemical treatment tank is connected to the water distribution tank 1 through an overflow pipe 3, the final chemical treatment tank is connected to the heavy sedimentation tank 4 through an overflow pipe 3, and the multiple chemical treatment tanks 2 are respectively connected to the chemical storage barrel 7 through a chemical delivery pipe 9, and a chemical delivery pump 8 is installed on the chemical delivery pipe 9; a vertically arranged honeycomb inclined plate 5 is installed in the heavy sedimentation tank 4, and a funnel-shaped sludge sedimentation tank 6 is installed at the bottom, and the heavy sedimentation tank 4 is connected to the primary clean water tank 10 through an overflow hole 32; a water pipe Ⅰ11 is connected from the primary clean water tank 1 0, a water pump Ⅰ12 and a valve Ⅰ13 are installed on the water pipe Ⅰ11, and a water pipe interface Ⅱ and a water pipe interface Ⅲ are arranged on the pipe body behind the water pump Ⅰ12 and the valve Ⅰ13. The water pipe interface Ⅱ is connected to the sand carbon filter 14 through a water pipe Ⅱ15, and the water pipe interface Ⅲ is connected to the sludge storage tank 16 through a water pipe Ⅲ17, and a valve Ⅲ18 is installed on the water pipe Ⅲ17; the sand carbon filter 14 is connected to the secondary clean water tank 19 through a water pipe Ⅳ20, and a valve Ⅳ21 is installed on the water pipe Ⅳ20, and a water pipe interface Ⅴ is arranged on the water pipe Ⅳ20, and the water pipe interface Ⅴ is connected to the secondary clean water tank 19 through a water pipe Ⅴ22, and a valve Ⅴ23 and a water pipe Ⅴ22 are installed on the water pipe Ⅴ22. Pump V24, a medicine replenishment pipe interface is provided on the pipe body located between valve V23 and water pump V24, the medicine replenishment pipe interface is connected to the medicine storage barrel 7 through the medicine replenishment pipe 25, and the medicine replenishment pipe 25 is installed with a medicine replenishment valve 26; the sludge storage tank 16 and the sludge sedimentation tank 6 are connected through the sludge pipeline 27, and the sludge pipeline 27 is installed with a sludge pump 28 and a sludge valve 29, a sewage pipe 30 is led out from the sludge pipeline 27 between the sludge pump 28 and the sludge valve 29, and a sewage valve 31 is installed on the sewage pipe 30, the sludge pump 28 is located between the sludge storage tank 16 and the sewage pipe 30, and the sludge valve 29 is located between the sludge sedimentation tank 6 and the sewage pipe 30.
[0023] In the above equipment, a chemical treatment tank agitator 33 is installed on the chemical treatment tank 2 ; and a chemical storage tank agitator 34 is installed on the chemical storage tank 7 .
[0024] In the above equipment, a tooth-shaped overflow groove 35 is provided at the outlet of the heavy sedimentation tank 4, and the groove wall of the tooth-shaped overflow groove 35 is a tooth-shaped structure.
[0025] The above equipment also includes a drainage water storage tank 36, a water pipe VI37 and a water pump VI38; the drainage water storage tank 36 is connected to the water distribution tank 1 through the water pipe VI37, and a water pump VI38 is installed on the water pipe VI37.
[0026] In the above equipment, a water level meter 39 is installed on the drainage water storage tank 36.
[0027] The above equipment also includes a PLC fully automatic control cabinet 40; the drug delivery pump 8, water pump I 12, water pump V 24, drug refill valve 26, sludge pump 28, drug treatment tank agitator 33, drug storage barrel agitator 34, water pump VI 38, and water level meter 39 are all connected to the PLC fully automatic control cabinet 40; the drug delivery pump 8 adopts an adjustable electromagnetic peristaltic pump; the sludge pump 28 adopts a screw pump.
[0028] In the above equipment, there are three reagent processing pools 2 and five reagent storage barrels 7; the first reagent processing pool is connected to one reagent storage barrel 7; the middle reagent processing pool and the last reagent processing pool are connected to two reagent storage barrels 7 respectively.
[0029] After the skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production water that meets environmental standards is built around the coalbed methane well that needs to treat the coalbed methane well drainage and production water as shown in the diagram. After determining the index parameters that need to be treated, the required reagents are configured and placed in the reagent storage barrel 7, the water level gauge 39 is placed in the drainage and production water storage tank 36, the height of the water level gauge is set by yourself, and the water pipe VI37 is extended to the bottom of the drainage and production water storage tank 36, and the water pump VI38 is turned on. The drainage and production water to be treated enters the water distribution tank 1 through the water pipe VI37. When the water level reaches the height of the overflow pipe 3 connecting the water distribution tank 1 and the first reagent treatment tank, it overflows into the first reagent treatment tank. The reagents in the reagent storage barrel 7 corresponding to the first reagent treatment tank are filled by the reagents. The reagent delivery pump 8 pumps the reagent into the first reagent treatment tank. During this period, the reagent treatment tank agitator 33 corresponding to the first reagent treatment tank is in operation, and the coagulation and flocculation treatment is in progress. After the water level reaches the height of the overflow pipe 3 connecting the first reagent treatment tank and the intermediate reagent treatment tank, the reagent overflows into the intermediate reagent treatment tank. The reagent in the reagent storage barrel 7 corresponding to the intermediate reagent treatment tank is pumped into the intermediate reagent treatment tank by the reagent delivery pump 8. During this period, the reagent treatment tank agitator 33 corresponding to the intermediate reagent treatment tank is in operation. The processing of the two set indicators is in progress. When the water level reaches the height of the overflow pipe 3 connecting the intermediate reagent treatment tank and the last reagent treatment tank, it overflows into the last reagent treatment tank. The reagent in the reagent storage barrel 7 corresponding to the last reagent treatment tank is pumped into the last reagent treatment tank by the reagent delivery pump 8. During this period, the agitator 33 of the reagent treatment tank corresponding to the last reagent treatment tank is in operation. The processing of the other two set indicators is in progress. When the water level reaches the overflow pipe 3 connecting the last reagent treatment tank and the heavy sedimentation tank 4, the reagent in the reagent storage barrel 7 corresponding to the last reagent treatment tank is pumped into the last reagent treatment tank by the reagent delivery pump 8. After reaching the height of pipe 3, it overflows to heavy sedimentation tank 4, passes through honeycomb inclined plate 5, and settles into sludge sedimentation tank 6. When the water level reaches the height of toothed overflow groove 35, it overflows into primary clean water tank 10 under the action of overflow hole 32, and pump I12 is turned on, valve I13 and valve IV21 are opened, valve III18 and valve V23 are closed, and clean water in primary clean water tank 10 enters sand carbon filter 14 through water pipe I11 and water pipe II15, and enters secondary clean water tank 19 for storage through water pipe IV20 after filtration. The above steps require the debugging of reagent configuration concentration and adjustable electromagnetic peristaltic pump until the relevant treatment indicators of clean water entering secondary clean water tank 19 finally reach the state of environmental protection compliance.
[0030] The PLC automatic control cabinet 40 is provided with manual, automatic and stop operation functions for the pump and agitator, and is provided with an automatic power-off function when the water level in the drainage and production water storage tank 36 is lower than the set value of the water level gauge 39. When the water level is too low, the equipment is automatically powered off to avoid idling, and all components stop running. When the reagent storage barrel 7 needs to be supplemented with reagents, the clean water recycling pipeline and the agitators 34 of each reagent storage barrel can be controlled separately, and other processing units can operate normally, and there will be no processing gap period to affect the treatment effect of the drainage and production water of the coalbed methane well.
[0031] Clean water recycling pipeline: After the treatment agent configured in the agent storage barrel 7 is used up, add the agent into the barrel, close the valve V23, open the agent refilling valve 26, open the water pump V24 and the agitators 34 of each agent storage barrel, and pump the clean water in the secondary clean water tank 19 into each agent storage barrel 7, and fully dissolve the agent under the action of the agitator 34 of the agent storage barrel. After completion, close the water pump V24.
[0032] Sand-carbon filter backwash pipeline: After a certain treatment cycle, the sand-carbon filter 14 needs to be backwashed to ensure the treatment effect. At this time, close valve Ⅰ13, valve Ⅳ21, and reagent replenishing valve 26, open valve Ⅲ18 and valve Ⅴ23, start water pump Ⅴ24, and the clean water in the secondary clean water tank 19 enters the sand-carbon filter 14 through water pipe Ⅴ22 and water pipe Ⅳ20 under the action of water pump Ⅴ24. After backwashing, the sewage carrying mud and sand is finally discharged into the sludge storage tank 16 through water pipe Ⅲ17.
[0033] Sludge discharge pipeline: After a certain period of operation, the sludge in the sludge sedimentation tank 6 accumulates. In order to ensure the treatment effect of the heavy sedimentation tank 4, the sludge must be temporarily stored in the sludge storage tank 16. At this time, the sludge valve 29 is opened, the sewage valve 31 is closed, the sludge pump 28 is started, and the sludge enters the sludge storage tank 16 through the sludge pipeline 27. When the sludge in the sludge storage tank 16 is full, the sludge must be cleaned. At this time, the sludge valve 29 is closed, the sewage valve 31 is opened, the sludge pump 28 is started, and the sludge in the sludge storage tank 16 is discharged through the sewage pipe 30.
[0034] The amount of water produced by different blocks and production wells is different. This equipment is fully in line with the actual production. According to the adjustment of each pump and valve, it can easily deal with the problem of adjusting the hardware equipment process caused by the different drainage and processing volumes of each production well. A water level gauge 39 is installed in the drainage water storage tank 36. When the water volume is lower than the set value, the equipment is shut down to avoid no-load operation and reduce energy consumption.
[0035] This equipment can be moved between different coalbed methane wells and can be used by directly connecting the pipeline. This design greatly improves the utilization rate of integrated equipment and saves the investment cost of equipment promotion to a great extent. It can realize one set of equipment to serve multiple coalbed methane wells, and ultimately achieve cost reduction and efficiency improvement.
[0036] The above is only a preferred embodiment of the utility model, and does not limit the utility model in other forms. Any person skilled in the art can use the above disclosed technical content to change or modify it into an equivalent embodiment with equivalent changes. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the utility model without departing from the technical solution of the utility model still belongs to the protection scope of the technical solution of the utility model.
Claims
1. A skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production water that meets environmental standards, characterized in that: Including water distribution tank, chemical treatment tank, overflow pipe, heavy sedimentation tank, honeycomb inclined plate, sludge sedimentation tank, chemical storage barrel, chemical delivery pump, chemical delivery pipe, primary clean water tank, water pipe I, water pump I, valve I, sand carbon filter, water pipe II, sludge storage tank, water pipe III, valve III, secondary clean water tank, water pipe IV, valve IV, water pipe V, valve V, water pump V, chemical replenishment pipe, chemical replenishment valve, sludge pipeline, sludge pump, sludge valve, sewage pipe and sewage valve; The reagent treatment pool includes a first reagent treatment pool, an intermediate reagent treatment pool and a final reagent treatment pool which are sequentially connected through an overflow pipe. The first reagent treatment pool is connected to a water distribution pool through an overflow pipe, and the final reagent treatment pool is connected to a heavy sedimentation pool through an overflow pipe. The multiple reagent treatment pools are connected to a reagent storage barrel through a reagent delivery pipe, and a reagent delivery pump is installed on the reagent delivery pipe. A vertically arranged honeycomb inclined plate is installed in the heavy sedimentation tank, a sludge sedimentation tank is installed at the bottom, and the heavy sedimentation tank is connected to the primary clear water tank through an overflow hole; The water pipe I is led out from the primary clean water tank, a water pump I and a valve I are installed on the water pipe I, a water pipe interface II and a water pipe interface III are arranged on the pipe body behind the water pump I and the valve I, the water pipe interface II is connected to the sand carbon filter through the water pipe II, the water pipe interface III is connected to the sludge storage tank through the water pipe III, and a valve III is installed on the water pipe III; The sand carbon filter is connected to the secondary clean water tank through a water pipe IV, a valve IV is installed on the water pipe IV, a water pipe interface V is provided on the water pipe IV, the water pipe interface V is connected to the secondary clean water tank through the water pipe V, a valve V and a water pump V are installed on the water pipe V, a medicine replenishment pipe interface is provided on the pipe body between the valve V and the water pump V, the medicine replenishment pipe interface is connected to the medicine storage barrel through the medicine replenishment pipe, and a medicine replenishment valve is installed on the medicine replenishment pipe; The sludge storage tank and the sludge sedimentation tank are connected through a sludge pipeline, a sludge pump and a sludge valve are installed on the sludge pipeline, a sewage pipe is led out from the sludge pipeline between the sludge pump and the sludge valve, a sewage pipe is installed on the sewage pipe, the sludge pump is located between the sludge storage tank and the sewage pipe, and the sludge valve is located between the sludge sedimentation tank and the sewage pipe.
2. The skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production water that meets environmental standards according to claim 1 is characterized in that: A chemical treatment tank agitator is installed on the chemical treatment tank; A medicine storage barrel agitator is installed on the medicine storage barrel.
3. The skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production water that meets environmental standards according to claim 2 is characterized in that: A toothed overflow trough is arranged at the outlet of the heavy sedimentation tank, and the trough wall of the toothed overflow trough is a toothed structure.
4. The skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production water that meets environmental standards according to claim 3 is characterized in that: It also includes a drainage and production water storage tank, a water pipe VI and a water pump VI; The drainage water storage tank is connected to the water distribution tank through a water pipe VI, and a water pump VI is installed on the water pipe VI.
5. The skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production water that meets environmental standards according to claim 4 is characterized in that: A water level meter is installed on the drainage water storage tank.
6. The skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production water that meets environmental standards according to claim 5 is characterized in that: It also includes a PLC fully automatic control cabinet; The reagent delivery pump, water pump I, water pump V, reagent refilling valve, sludge pump, reagent treatment tank agitator, reagent storage tank agitator, water pump VI, and water level gauge are all connected to the PLC automatic control cabinet; The medicine delivery pump adopts an adjustable electromagnetic peristaltic pump; The sludge pump adopts a screw pump.
7. The skid-mounted high-efficiency treatment equipment for coalbed methane well drainage and production water that meets environmental standards according to claim 6 is characterized in that: The number of chemical treatment pools is three, and the number of chemical storage barrels is five; The first reagent treatment pool is connected to a reagent storage barrel; The intermediate reagent treatment pool and the final reagent treatment pool are respectively connected to two reagent storage barrels.
