Efficient anti-corrosion bridge steel structure assembly

By designing automated anti-corrosion bridge steel structure components and using timer-controlled timing and quantitative output of anti-corrosion agents, the problems of manual dependence, uneven coating and high maintenance costs in the existing technology have been solved, and the continued effectiveness of the bridge steel structure has been achieved. Anti-corrosion protection and extended service life.

CN221855273UActive Publication Date: 2024-10-18TANGSHAN YIDE STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420403250.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-04
Publication Date
2024-10-18
Estimated Expiration
2034-03-04

AI Technical Summary

Technical Problem

Existing bridge anti-corrosion technology relies on manual operation. It suffers from uneven coating, cumbersome physical coating, high regular maintenance costs, and the inability to respond in real time to depletion of anti-corrosion agents or local corrosion. This results in limited anti-corrosion effects and the inability to ensure long-term structural safety. and stability.

Method used

Design a high-efficiency anti-corrosion bridge steel structure component. Through the collaborative work of connecting parts, output components, fixed components and driving components, a timer is used to control the timing and quantitative output of anti-corrosion agents to achieve automated and precise anti-corrosion protection and reduce the need for manual maintenance.

Benefits of technology

It achieves continuous and effective anti-corrosion protection for key connecting parts of the bridge, improves anti-corrosion efficiency and service life, reduces maintenance costs, reduces metal-to-metal contact and prevents leakage, and extends the life of steel structure components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855273U_ABST
    Figure CN221855273U_ABST
Patent Text Reader

Abstract

The utility model discloses an efficient anti-corrosion bridge steel structure assembly which comprises a first connecting piece, a second connecting piece, a third connecting piece and a fourth connecting piece. The second connecting piece is arranged at the end part of the other bridge main body and is mounted on the first connecting piece through a plurality of bolts; the output assembly is arranged in the first connecting piece; the efficient anti-corrosion bridge steel structure assembly relates to the technical field of bridges. The efficient anti-corrosion bridge steel structure assembly achieves continuous and effective anti-corrosion protection on key connecting parts of the bridge. Through cooperative work of the connecting piece and the driving assembly, the preservative is applied to the joint of the bridge steel structure in a timed and quantitative mode. The piston plate is precisely driven to move in the storage cavity through control of the timer, and the preservative is pushed to the output assembly. And the cambered surface design of the piston plate is tightly attached to the wall surface of the mounting cavity, so that the conveying efficiency of the preservative is improved, leakage is prevented, and accurate and uniform output of the preservative is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridges, in particular to a high-efficiency anti-corrosion bridge steel structure component. Background Art

[0002] Among existing bridge anti-corrosion technologies, commonly used methods include applying anti-corrosion paint, covering with anti-corrosion materials, and regular maintenance and replacement of damaged parts. These methods mainly rely on manual operations to ensure the durability and stability of bridge steel structure components in harsh environments. Applying anti-corrosion paint is a widely used method that forms a protective layer on the surface of the steel structure to block the invasion of moisture and corrosive chemicals. Covering with anti-corrosion materials directly protects the steel structure through physical means, while regular maintenance and replacement focus on detecting problems through inspection and timely intervention to extend the service life of the bridge.

[0003] Although existing technologies can provide anti-corrosion protection to a certain extent, they have some obvious shortcomings. For example, anti-corrosion coatings that rely on manual application may reduce their anti-corrosion effect due to uneven application or incomplete coverage. Although the physical coating method can provide strong physical protection, the installation and replacement process is cumbersome, and it is difficult to achieve effective protection for all parts of the bridge. Regular maintenance and replacement are not only labor-intensive and costly, but also unable to respond in real time to the depletion of preservatives or the intensification of local corrosion of steel structures, resulting in limited anti-corrosion effects and an inability to guarantee long-term structural safety and stability. These shortcomings indicate that there is still much room for improvement in the efficiency, economy and real-time anti-corrosion capabilities of existing technologies. Utility Model Content

[0004] The purpose of the utility model is to provide a high-efficiency anti-corrosion bridge steel structure component to solve the problems raised in the background technology.

[0005] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: an efficient anti-corrosion bridge steel structure component, comprising: a first connecting member, the first connecting member is arranged at the end of one of the bridge bodies; a second connecting member, the second connecting member is arranged at the end of the other bridge body, and is installed on the first connecting member by a plurality of bolts; an output component, the output component is opened inside the first connecting member; an outer shell, the outer shell is arranged on the bridge body through a fixing component, and is matched with the output component; a partition, the partition is arranged inside the outer shell, dividing the interior of the outer shell into a storage chamber and an installation chamber, the interior of the storage chamber is filled with a preservative; a drive component, the drive component is arranged inside the installation chamber.

[0006] In a feasible embodiment, the driving assembly includes: a driving member, the bottom end of which is fixedly arranged at the bottom of the installation cavity, and the driving member is also connected to a timer; a driving gear, which is fixedly sleeved on the driving end of the driving member; a threaded rod, which is screwed to the middle part of the partition; a driven gear, which is rotatably arranged on the partition, and the middle part is screwed to the thread of the threaded rod through an internal thread, and the driven gear and the driving gear are engaged with each other.

[0007] In a feasible implementation manner, a limiting rod is provided on the inner wall of the installation cavity, and the limiting rod is movably plugged into the end of the threaded rod.

[0008] In a feasible embodiment, the output component includes: a piston plate, the middle part of which is fixedly connected to the end of the threaded rod and is located in the storage chamber; a delivery port, which is arranged on the wall of the shell and is connected to the storage chamber, and a rubber pad is provided on the delivery port; a passage, one end of two of the passages are connected, and are respectively opened obliquely inside the first connecting member, and the connection forms an entrance matching the delivery port; the outlet is several in number, and is respectively arranged in an array and obliquely on the first connecting plate.

[0009] In a feasible embodiment, the fixing assembly includes: a slide groove, several of the slide grooves are respectively arranged at the bottom end of the outer shell; a screw, several of the screws are fixedly installed on the top of the bridge body; a gasket, several of the gaskets are respectively installed on the top end of several of the slide grooves; a nut, several of the nuts are respectively screwed on several of the screws, and the bottom ends are in contact with several of the gaskets.

[0010] In a feasible embodiment, one side of the piston plate is configured as an arc surface, and is in contact with the wall surface of the installation cavity.

[0011] Compared with the existing technology, the beneficial effects of the present invention are: the high-efficiency anti-corrosion bridge steel structure component realizes continuous and effective anti-corrosion protection for the key connection parts of the bridge, and the anti-corrosion agent is applied to the joints of the bridge steel structure in a timely and quantitative manner through the coordinated work of the connecting parts, output components, fixing components and driving components. Through the control of the timer, the piston plate is precisely driven to move in the storage chamber to push the anti-corrosion agent to the output component. The device realizes the automatic, timely and quantitative output of the anti-corrosion agent, thereby maximizing the anti-corrosion efficiency and the service life of the bridge, improving the use efficiency and coating accuracy of the anti-corrosion agent, reducing direct contact between metals and preventing leakage, extending the life of the steel structure component itself and the bridge structure, and the automated control reduces the need for manual maintenance, further reducing maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1This is a schematic diagram of the structure of the utility model;

[0013] Figure 2 This is a schematic diagram of the limit rod structure of the utility model;

[0014] Figure 3 This is a schematic diagram of the passage structure of the utility model;

[0015] Figure 4 It is a partial enlarged structural schematic diagram of the utility model.

[0016] In the figure: 1. first connecting member, 2. second connecting member, 3. housing, 4. partition, 5. driving member, 6. driving gear, 7. threaded rod, 8. driven gear, 9. limiting rod, 10. piston plate, 11. delivery port, 12. passage, 13. outlet, 14. slide, 15. screw, 16. gasket, 17. nut. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0018] See also Figures 1 to 4 The utility model provides a technical solution: an efficient anti-corrosion bridge steel structure component, including: a first connecting member 1, a second connecting member 2, an output component, a shell 3 and a driving component. The first connecting member 1 is arranged at the end of one of the bridge bodies; the second connecting member 2 is arranged at the end of the other bridge body and is installed on the first connecting member 1 through a plurality of bolts; the output component is opened inside the first connecting member 1; the shell 3 is arranged on the bridge body through a fixing component and matches the output component; a partition 4, the partition 4 is arranged inside the shell 3, dividing the interior of the shell 3 into a storage cavity and an installation cavity, the storage cavity is filled with a preservative; the driving component is arranged inside the installation cavity.

[0019] During the specific implementation process, it should be noted that the first connector 1 is installed at the end of one bridge body, while the second connector 2 is installed at the end of the other bridge body, and is fastened together by a number of bolts to ensure a stable connection between the two main parts of the bridge. The output component is used to transport the preservative. The outer shell 3 is installed on the bridge body through a fixing component and is designed to match the output component to ensure that the preservative can be effectively transmitted through the output component. Inside the outer shell 3, a partition 4 is provided to separate the interior of the outer shell 3 into two independent cavities: one is a storage chamber for filling the preservative, and the other is an installation chamber containing a drive component. The drive component has a driving function and a timing function, and is responsible for timing control of the preservative from the storage chamber through the output component to be applied between the first connector 1 and the second connector 2, that is, the connection between the two bridge bodies. Therefore, continuous anti-corrosion protection at key connection points is achieved, effectively extending the service life of the bridge structure.

[0020] In some examples, further, the driving assembly includes: a driving member 5, a driving gear 6, a threaded rod 7 and a driven gear 8, the bottom end of the driving member 5 is fixedly set at the bottom of the mounting cavity, and the driving member 5 is also connected to the timer; the driving gear 6 is fixedly sleeved on the driving end of the driving member 5; the threaded rod 7 is screwed to the middle part of the partition 4; the driven gear 8 is rotatably set on the partition 4, and the middle part is screwed to the thread of the threaded rod 7 through an internal thread, and the driven gear 8 and the driving gear 6 are engaged with each other.

[0021] During the specific implementation process, it should be noted that the driving member 5 is the power source of the driving component. For example, the driving member can be a motor and is connected to a timer so that the output of the preservative can be automatically controlled according to a preset time interval, ensuring the timed and quantitative output of the preservative. The driving gear 6 on the driving member 5 is driven to rotate by the driving member 5, and the threaded rod 7 can rotate and move under the action of the driving component. The middle part of the driven gear 8 is screwed to the thread of the threaded rod 7 through an internal thread, ensuring that the threaded rod 7 rotates and moves on the partition 4. The driven gear 8 is engaged with the driving gear 6. When the driving gear 6 rotates under the action of the driving member 5, it will drive the driven gear 8 to rotate, thereby causing the threaded rod 7 to rotate and move. Through the push of the threaded rod 7, the preservative can be coated on the key connection parts of the bridge steel structure through the output component in a timely and quantitative manner, thereby effectively performing the anti-corrosion task. The driving component ensures the effective coating of the preservative, and through the use of the timer, the automatic control of the preservative output is realized, which greatly improves the anti-corrosion efficiency and durability of the bridge steel structure.

[0022] In some examples, further, a limiting rod 9 is provided on the inner wall of the installation cavity, and the limiting rod 9 is movably connected to the end of the threaded rod 7. The limiting rod 9 is used to increase the stability of the thread during movement and to guide and limit the movement of the screw rod.

[0023] In some examples, further, the output component includes: a piston plate 10, a delivery port 11, a passage 12 and an outlet 13, the middle part of the piston plate 10 is fixedly connected to the end of the threaded rod 7 and is located in the storage chamber; the delivery port 11 is arranged on the wall of the outer shell 3 and is connected to the storage chamber, and a rubber pad is provided on the delivery port 11; one end of the two passages 12 are connected, and are respectively opened at an angle inside the first connecting member 1, and the connection forms an entrance matching the delivery port 11; the number of outlets 13 is several, and they are respectively arranged in an array and tilted on the first connecting plate.

[0024] During the specific implementation process, it should be noted that the middle part of the piston plate 10 is fixedly connected to the end of the threaded rod 7 and is located in the storage chamber, directly contacting the environment where the preservative is stored. When the driving assembly rotates and moves the threaded rod 7 through the coordinated action of the driving member 5 and the driving gear 6 and the driven gear 8, the piston plate 10 is pushed to move horizontally in the storage chamber, thereby generating pressure on the preservative in the storage chamber, forcing the preservative to move toward the delivery port 11. The delivery port 11 is provided on the wall surface of the outer shell 3 and is connected to the storage chamber through a rubber pad to ensure smooth delivery of the preservative while preventing leakage. The preservative comes out of the delivery port 11 and enters the preset passage 12. The passage 12 is designed with an inclined structure inside the first connector 1, and one end of the two passages 12 is connected, and the connection forms an entrance matching the delivery port 11, ensuring that the preservative can smoothly enter the passage 12 from the delivery port 11, and the preservative is guided to several outlets 13 through the passage 12. The outlets 13 are respectively arranged in a certain array and inclined manner on the first connecting plate, so that the preservative can be evenly and accurately coated on the connection part of the bridge steel structure between the first connector 1 and the second connector 2, the output component, and the effective and uniform distribution of the preservative is achieved. By precisely controlling the coating position and quantity, the anti-corrosion ability and durability of the bridge steel structure at the connection are greatly enhanced.

[0025] In some examples, further, the fixing components include: slides 14, screws 15, washers 16 and nuts 17, several slides 14 are respectively arranged at the bottom end of the shell 3; several screws 15 are fixedly installed on the top of the bridge body; several washers 16 are respectively installed on the top of several slides 14; several nuts 17 are respectively screwed on several screws 15, and the bottom ends are fitted with several washers 16.

[0026] In the specific implementation process, it should be noted that the fixing component installs the shell 3 on the bridge body to ensure the stability of the anti-corrosion component and the effective coating of the anti-corrosion agent. The setting of the slide 14 provides physical support and positioning basis for the connection between the shell 3 and the bridge body. Several screws 15 are fixedly installed on the top of the bridge body. The screws 15 pass through the slide 14 at the bottom of the shell 3. The fastening step is ready. In order to increase the stability of the connection and reduce the direct contact between the metals, thereby avoiding possible wear and corrosion, several gaskets 16 are respectively installed on the top of the slide 14, located between the screws 15 and the outer Between the shells 3, the nut 17 is screwed onto the screw 15, and its bottom end is in contact with the gasket 16. By tightening the nut 17, the outer shell 3 is firmly fixed to the bridge body. The fixing assembly can also adjust the position of the outer shell 3, thereby achieving a tight connection between the delivery port 11 and the passage 12. This fixing method ensures the stability and flexibility of the outer shell 3, and through the use of the gasket 16, the direct contact between the metals is reduced, further improving the durability and reliability of the entire anti-corrosion assembly. The fixing assembly effectively achieves a stable connection between the outer shell 3 and the bridge body, providing a solid foundation for the effective coating of the preservative.

[0027] In some examples, further, one side of the piston plate 10 is configured as a curved surface, and fits in contact with the wall surface of the installation cavity.

[0028] During the specific implementation process, it should be noted that the curved surface design of the piston plate 10 enables the piston plate 10 to fit tightly with the wall of the installation cavity during its movement, ensuring that the piston plate 10 can effectively compress and push the preservative forward in the process of pushing the preservative from the storage cavity through the delivery port 11 to the output component, reducing the dead corners of the preservative in the storage cavity, thereby improving the utilization rate of the preservative. In actual operation, when the driving component is activated, the piston plate 10 is driven by driving the movement of the threaded rod 7. Since the curved surface of the piston plate 10 fits tightly with the wall of the installation cavity, each movement of the piston plate 10 efficiently presses the preservative in the storage cavity to the delivery port 11, ensuring continuous and uniform output of the preservative, and also realizing precise control of the output amount of the preservative, thereby effectively coating the key connection parts of the bridge steel structure, achieving efficient anti-corrosion effect, and providing a more reliable and efficient anti-corrosion protection solution for the bridge steel structure.

[0029] In the description of the present invention, it should be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "the other end", "upper", "one side", "top", "inside", "front", "two ends" and the like to indicate orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed and operate in a specific orientation; at the same time, unless otherwise clearly specified and limited, the terms "setting", "installation", "connection", "fixed installation" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be internal communication between two elements or an interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the present invention according to specific circumstances.

[0030] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A highly efficient anti-corrosion bridge steel structure component, characterized in that: include: A first connecting member, the first connecting member being arranged at an end of one of the bridge bodies; A second connecting member, which is disposed at an end of the other bridge body and is mounted on the first connecting member by a plurality of bolts; An output component, the output component is arranged inside the first connecting member; A housing, wherein the housing is arranged on the bridge body through a fixing assembly and matches the output assembly; a partition, the partition being arranged inside the housing to divide the interior of the housing into a storage cavity and an installation cavity, the interior of the storage cavity being filled with a preservative; A drive assembly is arranged inside the installation cavity.

2. The high-efficiency anti-corrosion bridge steel structure component according to claim 1 is characterized by: The drive assembly comprises: A driving member, the bottom end of which is fixedly arranged at the bottom of the installation cavity, and the driving member is also connected to a timer; A driving gear, wherein the driving gear is fixedly sleeved on the driving end of the driving member; A threaded rod, wherein the threaded rod is screwed to a middle portion of the partition; The driven gear is rotatably arranged on the partition plate, and the middle part of the driven gear is screwed to the thread of the threaded rod through an internal thread, and the driven gear is meshed with the driving gear.

3. The high-efficiency anti-corrosion bridge steel structure component according to claim 2 is characterized by: The inner wall of the installation cavity is provided with a limiting rod, and the limiting rod is movably plugged with the end of the threaded rod.

4. The high-efficiency anti-corrosion bridge steel structure component according to claim 2 is characterized by: The output component comprises: A piston plate, the middle portion of which is fixedly connected to the end of the threaded rod and is located in the storage cavity; A delivery port, the delivery port is arranged on the wall surface of the shell and is communicated with the storage cavity, and a rubber pad is arranged on the delivery port; Passages, one end of the two passages is connected, and the two passages are respectively opened obliquely inside the first connection piece, and the connection forms an entrance matching the delivery port; The outlets are multiple in number and are arranged in an array and tilted on the first connection plate.

5. The high-efficiency anti-corrosion bridge steel structure component according to claim 1 is characterized by: The fixing assembly comprises: A plurality of slide grooves are respectively arranged at the bottom end of the shell; Screws, a plurality of the screws are fixedly installed on the top of the bridge body; Gaskets, a plurality of the gaskets are respectively installed on the top ends of a plurality of the slide grooves; Nuts, a plurality of the nuts are respectively threaded on a plurality of the screws, and the bottom ends thereof are fitted with a plurality of the washers.

6. The high-efficiency anti-corrosion bridge steel structure component according to claim 4 is characterized by: One side of the piston plate is configured as a curved surface and fits in with the wall surface of the mounting cavity.