Raft anti-floating bag type anchor rod

By designing raft anti-buoyancy bladder anchors and using bladder structure and high-pressure injection technology, the problems of limited anchoring force growth and creep of traditional anchors are solved, achieving high pull-out bearing capacity and cost savings.

CN221855510UActive Publication Date: 2024-10-18SHANDONG TIANQI REAL ESTATE GRP INC CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323285424.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-04
Publication Date
2024-10-18
Estimated Expiration
2033-12-04

AI Technical Summary

Technical Problem

When the length of the anchoring section exceeds a certain length, traditional anchors are prone to shear failure or slippage when the anchoring force increases to the frictional limit, resulting in an inability to increase the total anchoring force and prone to creep, cracking of the cement stone body, and corrosion of the reinforcement.

Method used

Design a raft anti-floating bladder anchor, which uses threaded steel bars, carriers, spiral stirrups, water-stop rubber rings, pressure-bearing casings, sealing openings, expansion bladders and high-pressure jet spray enlarged heads. Structural and high-pressure jet reaming technology improves the pull-out bearing capacity of anchor rods, reduces the number and length of anchor rods, and reduces construction costs.

Benefits of technology

The anchor has high buoyancy resistance in solid soil layers, high safety, and advanced construction equipment and technology. It reduces the number of anchors and infrastructure requirements, meets the requirements of anti-floating design specifications for anchor crack control, and significantly saves costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855510U_ABST
    Figure CN221855510U_ABST
Patent Text Reader

Abstract

The utility model discloses a raft anti-floating bag type anchor rod, which relates to the technical field of anchor rods, and comprises a twisted steel bar, a bearing body, a spiral stirrup, a water stop rubber ring and a pressure-bearing sleeve, and the main body structure of the anchor rod consists of the twisted steel bar and the bearing body; the bearing body is fixedly arranged outside the twisted steel in a sleeving mode, a spiral stirrup is installed at the position, above the twisted steel, of a foundation, and a water stop rubber ring is further installed at the top end of the upper portion of the twisted steel. And the bottom of the twisted steel is connected with a pressure-bearing sleeve. According to the expanded-head anchor rod technology, high anchoring force is provided by improving the stress characteristic and the force transmission path of the anchor rod, the problems of corrosion and poor anti-floating force of a traditional anchor rod are solved, and therefore the stability of a raft foundation anti-floating system is improved, and the purpose of improving the construction quality of a building foundation is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of anchor rods, in particular to a raft anti-floating bag type anchor rod. Background Art

[0002] With the development of engineering construction and social economy in my country, urban ground buildings can no longer meet the needs, and engineering construction has begun to turn to underground. The project faces engineering problems such as deep foundation pit management and underground anti-buoyancy. Traditional anchor technology was once an important measure to solve these problems. Its fixing force is mainly provided by the friction resistance between the anchor section and the soil. The development of anchor force gradually develops from the top to the bottom.

[0003] An anchor rod with publication number CN107120132A is characterized in that it comprises a first rod body, a second rod body, a link nut and a disassembly nut, one end of the first rod body and the second rod body is provided with an external thread matching the link nut, and the first rod body and the second rod body are connected as a whole through the link nut; the other end of the second rod body is provided with an external thread corresponding to a locking washer, a locking nut and a disassembly nut, and the locking washer, the disassembly nut and the locking nut are sequentially installed on the end; the present invention changes an existing anchor rod into two that can be linked together, has a simple structure, is convenient for workers to operate, has high efficiency, outstanding economic benefits, is recyclable, reduces the cost by more than 60% compared with the existing anchor rod, and most importantly, the work safety is guaranteed; the anchor rod adopts the method of upper and lower splicing to improve the assembly anchoring force, but the effect of the increase is relatively limited;

[0004] When the length of the anchoring section exceeds a certain length, its anchoring force increases to a certain extent, and the upper anchoring section is prone to exceed the friction limit and shear failure or slippage, thereby transferring the remaining anchoring force to the next anchoring section. However, the total anchoring force cannot increase, and traditional tension anchors are prone to creep and large deformation, and the cement stone body is prone to cracking, causing the reinforcement to rust.

[0005] Therefore, it is necessary to design a raft anti-floating bag anchor to address the above problems. Utility Model Content

[0006] The purpose of the utility model is to provide a raft anti-floating bag anchor rod to solve the problem in the above background technology that after the length of the anchoring section exceeds a certain length, its anchoring force increases to a certain extent, and the upper anchoring section is prone to exceed the friction resistance limit to shear failure or slippage, thereby transferring the remaining anchoring force to the next anchoring section, but the total anchoring force cannot be increased, and the traditional tension anchor rod is prone to creep, large deformation, and the cement stone body is prone to cracking, causing the reinforcement to rust.

[0007] To achieve the above purpose, the utility model provides the following technical solutions: a raft anti-floating bag anchor, comprising threaded steel bars, a bearing body, spiral stirrups, a water-stop rubber ring, a pressure-bearing casing, a sealing lock, an expansion bag and a high-pressure rotary spray expansion head, wherein the main structure of the anchor is composed of threaded steel bars and a bearing body;

[0008] The bearing body is sleeved and fixed on the outside of the threaded steel bar, and a spiral stirrup is installed at the upper base of the threaded steel bar, and a water-stop rubber ring is also installed at the upper top of the threaded steel bar;

[0009] The bottom of the threaded steel bar is connected with a pressure-bearing sleeve.

[0010] Preferably, the bearing bodies are arranged at equal intervals outside the threaded steel bars, and the upper part of the bearing bodies is in a conical structure; the bearing bodies can improve the stability of anchor rod embedding.

[0011] Preferably, the outside of the pressure-bearing sleeve is also provided with a sealing lock and an expansion bag;

[0012] The sealing lock sleeve is installed on the outside of the pressure-bearing casing, and the expansion bag is installed on the outside of the pressure-bearing casing;

[0013] This part of the structure can improve the pull-out bearing capacity of the anchor rod, reduce the total length or number of anchor rods, shorten the air supply, and reduce construction costs.

[0014] Preferably, the sealing lock is installed through and embedded in the upper and lower positions of the expansion bag, and the expansion bag is internally grouted after the anchor body is fully sunk into place; the expansion bag after grouting is formed and buried in the soil layer to improve the pull-out bearing capacity of the anchor assembly.

[0015] Preferably, the pressure-bearing sleeve is inserted into the bottom surface of the expansion bladder to form a sealing structure so as to perform grouting treatment into the interior of the expansion bladder.

[0016] Preferably, the outside of the expansion bladder is a high-pressure rotary jet expansion head, and the high-pressure rotary jet expansion head is formed by high-pressure jet expansion of an anchor drilling rig; the high-pressure rotary jet expansion head can provide conditions for the installation of the anchor and the expansion bladder.

[0017] Compared with the prior art, the utility model has the following beneficial effects: the raft anti-floating bag anchor rod has the following specific contents:

[0018] 1. The raft anti-floating bladder anchor adopts a bladder anchor, with a large anchoring depth, set in the solid soil layer, with large anti-buoyancy, high safety, advanced construction equipment and technology, controllable and reliable construction quality, and greatly reduces the number of anchors compared to traditional anchors, while reducing the thickness of the pile cap, bottom plate and the amount of bottom plate reinforcement, greatly saving costs;

[0019] 2. The raft anti-floating bladder anchor is produced by standardized chemical processing and can be used after installation on site. The construction is convenient. The pressure-bearing bladder-type expanded anchor is prestressed and belongs to the pressure-type and tension-compression composite anchor. It can meet the requirements of the anti-floating design specifications for the control of anchor cracks and solve the problems in the anchor anti-crack verification. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the overall facade structure of the utility model;

[0021] Figure 2 This is a schematic diagram of the vertical structure of the spiral stirrup of the utility model;

[0022] Figure 3 This is a schematic diagram of the vertical structure of the carrier of the utility model;

[0023] Figure 4 This is a schematic diagram of the cross-sectional structure of the high-pressure rotary spray enlarger head of the utility model;

[0024] Figure 5 This is a schematic diagram of the vertical structure of the expansion bladder of the utility model.

[0025] In the figure: 1. Threaded steel bar; 2. Bearing body; 3. Spiral stirrup; 4. Water-stop rubber ring; 5. Pressure-bearing casing; 6. Sealing lock; 7. Expansion bladder; 8. High-pressure rotary jet expansion head. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] See also Figure 1-Figure 5 The utility model provides a technical solution: a raft anti-floating bag anchor, comprising a threaded steel bar 1, a bearing body 2, a spiral stirrup 3, a water-stop rubber ring 4 and a pressure-bearing casing 5, wherein the main structure of the anchor is composed of the threaded steel bar 1 and the bearing body 2;

[0028] The bearing body 2 is sleeved and fixed on the outside of the threaded steel bar 1, and the upper base of the threaded steel bar 1 is installed with a spiral stirrup 3, and the upper top of the threaded steel bar 1 is also installed with a water-stop rubber ring 4;

[0029] A pressure-bearing casing 5 is connected below the threaded steel bar 1 .

[0030] In this example, the bearing bodies 2 are arranged at equal intervals outside the threaded steel bars 1, and the upper part of the bearing bodies 2 is a conical structure;

[0031] First, locate the hole according to the construction location, use a level to measure and place, determine the hole position according to the elevation and the anchor hole position, make a mark, and use a long-arm anchor drill to drill the hole. After the anchor is positioned, the jet grouting machine is put in place. Before drilling, check the point position and the verticality of the drill tool. After confirming that it meets the requirements, proceed with the drilling construction;

[0032] The anchor drilling rig is used for drilling. During drilling, clean water flows from the drill pipe to the bottom of the pipe. Under a certain pressure head, the clean water wraps the debris cut off by the drill bit and discharges it out of the hole, and the hole is completed.

[0033] The pressure-bearing casing 5 is inserted into the bottom surface of the expansion bag 7. A high-pressure rotary jet expansion head 8 is arranged outside the expansion bag 7. The high-pressure rotary jet expansion head 8 is formed by high-pressure jet expansion of an anchor drilling rig;

[0034] In the jet jet hole expansion construction, the anchor drilling rig uses cement slurry with a water-cement ratio of 1.2 at a high pressure of 30MP to perform high-pressure jet hole expansion. The mud generated during the hole expansion construction process is pumped into the slurry-slag separator using a mud pump. The waste mud is separated into slag and water using the slurry-slag separator. The slag is transported out in a centralized manner, and the water is discharged through the foundation pit drainage system and organized for recycling to ensure the cleanliness and environmental protection of the site.

[0035] The outside of the pressure-bearing casing 5 is also provided with a sealing lock 6 and an expansion bag 7; the sealing lock 6 is sleeved and installed on the outside of the pressure-bearing casing 5, and the expansion bag 7 is installed on the outside of the pressure-bearing casing 5; the sealing lock 6 is penetrated and embedded in the middle position above the expansion bag 7, and the expansion bag 7 is grouted inside after the anchor body is completely sunk into place;

[0036] The anchor drill is manually assisted to lower the bolt. Before the threaded steel bar 1 is put into the hole, the quality of the rod body is checked. After the hole is drilled to the required depth and accepted, the anchor is lowered. The depth of the anchor rod body inserted into the hole is no more than 0.10m from the bottom of the hole. After the anchor rod is placed, it shall not be lifted at will;

[0037] After the hole is formed and expanded, the threaded steel bar 1 is inserted into the anchor rod position, the steel bar and the bladder grouting pipe are connected, and after the threaded steel bar 1 is completely sunk into place, the medium-pressure pump is connected to the bladder grouting pipe, and grouting is performed in the expansion bladder 7. After the grouting in the expansion bladder 7 is completed, the top of the bladder is continuously grouted with cement slurry, and the grouting is stopped when the color of the grout at the hole mouth becomes obviously darker;

[0038] Static curing of the grouting anchor rods is carried out until the strength meets the requirements;

[0039] An expansion bag 7 is arranged at the lower part of the threaded steel bar 1, and the high-pressure cement slurry or high-pressure water generated by a high-pressure pump is used to implement high-pressure jet expansion on the hole wall of the anchor hole to form a high-pressure rotary jet expansion head 8, and a bladder-type anchor rod with exhaust and anti-slurry backflow functions is placed in it. Sufficient cement slurry is injected into the bladder body through a grouting pipe, thereby increasing its corrosion resistance, safety and stability. The end of the bladder-type anchor rod increases the stress point of the anchor rod end and improves the compressive strength by adjusting the fixed angle. Compared with anchor rods of equal diameter, the pull-out bearing capacity of a single anchor rod can be improved, the total anchor rod length or number can be reduced, the construction period can be shortened, and the construction cost can be reduced. Compared with pull-out piles, through reasonable arrangement, the foundation bottom plate bending moment can be reduced, thereby reducing the amount of bottom plate steel bars and concrete, controlling the construction cost, and being green and environmentally friendly.

[0040] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A raft anti-floating bag anchor, comprising a threaded steel bar (1), a bearing body (2), a spiral hoop (3), a water-stop rubber ring (4) and a pressure-bearing casing (5), wherein the main structure of the anchor is composed of the threaded steel bar (1) and the bearing body (2); Features: The carrier (2) is sleeved and fixed on the outside of the threaded steel bar (1), and a spiral stirrup (3) is installed at the upper base of the threaded steel bar (1), and a water-stop rubber ring (4) is also installed at the upper top of the threaded steel bar (1); The bottom of the threaded steel bar (1) is connected to a pressure-bearing sleeve (5).

2. The raft anti-floating bag anchor according to claim 1, characterized in that: The bearing bodies (2) are arranged at equal intervals outside the threaded steel bars (1), and the top of the bearing bodies (2) is in a conical structure.

3. The raft anti-floating bag anchor according to claim 1, characterized in that: The outside of the pressure-bearing sleeve (5) is also provided with a sealing lock (6) and an expansion bag (7); The sealing lock (6) is sleeved and installed on the outside of the pressure-bearing sleeve (5), and the expansion bag (7) is installed on the outside of the pressure-bearing sleeve (5).

4. The raft anti-floating bag anchor according to claim 3, characterized in that: The sealing lock port (6) is installed through and embedded in the upper and lower positions of the expansion bag (7), and the expansion bag (7) is grouting-treated inside after the anchor rod body is completely sunk into place.

5. The raft anti-floating bag anchor according to claim 3, characterized in that: The pressure-bearing sleeve (5) is inserted into the bottom surface of the expansion bag (7).

6. The raft anti-floating bag anchor according to claim 5, characterized in that: The outside of the expansion bag (7) is a high-pressure rotary jet expansion head (8), and the high-pressure rotary jet expansion head (8) is formed by high-pressure jet expansion of an anchor drilling machine.