Lifeline cantilever support constructed based on long roof purlin steel structure
By designing a cantilever bracket for the purlin of a steel structure longhouse, staggering the installation positions of the lifeline and the main steel beam solves the problem of overlapping positions in traditional technology and improves construction efficiency and safety.
Patent Information
- Application Number
- CN202420368260.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-02-28
AI Technical Summary
During the overlapping installation of steel structure longhouse purlins, the traditional lifelines overlap with the main beams of the steel structure in the vertical direction, which makes it inconvenient for operators to operate at high altitudes, reduces work efficiency and increases safety risks.
Design a cantilever bracket based on the longhouse purlin steel structure, including a bottom plate with a front-end elbow, friction steel plate, vertical pole, cantilever bracket, diagonal support, bolts and secondary hanging plate. By adjusting the position of the friction steel plate and cantilever bracket, stagger The installation position of the lifeline and the main steel beam reduces overlap and improves installation efficiency and safety.
It effectively reduces the phenomenon of high-hanging and low-use caused by overlapping positions, improves the safety of workers, and significantly improves construction efficiency.
Smart Images

Figure CN221856316U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a lifeline cantilever bracket based on the construction of a long house purlin steel structure, which is applied to the lifeline suspension in the process of overlapping and installing the long house purlin of the steel structure. Background Art
[0002] The technical feature of the steel structure long house purlin is that each end of the purlin is 600-750mm longer than the center line of the purlin support plate. During the installation process, if the traditional lifeline bracket is used, the lifeline and the main beam of the steel structure are in the same vertical plane. When the purlin is hoisted into place, it will overlap with the lifeline in the vertical direction. The lifeline is in a tensioned state, and the operator needs to straighten the purlin to pass through the lifeline, which reduces the work efficiency and increases the steps for the operator to work at high altitudes, which is very likely to cause unsafe behavior. Therefore, a cantilever bracket is developed that staggers the installation position of the main steel beam and the long house purlin after the lifeline is laid. The cantilever bracket is easy to install and disassemble, has good safety guarantees, and is simple to make. Summary of the invention
[0003] The purpose of the utility model is to overcome the problems existing in the above-mentioned prior art and to provide a cantilever bracket for the construction of a lifeline based on a long purlin steel structure. The utility model solves the problem of vertical overlap between the long purlin and the traditional lifeline during the lap installation process, greatly reduces the situation in which the principle of high hanging and low use is violated due to overlap with the lifeline during the installation of the roof purlin, improves the safety of the workers, and also improves the construction efficiency.
[0004] The technical solution of the utility model is:
[0005] The cantilever bracket, which is a lifeline for the construction of a long purlin steel structure, comprises a base plate with a front end elbow, a friction steel plate, a vertical pole, a cantilever bracket, an oblique support, bolts and a secondary hanging plate, and is characterized in that: the friction steel plate is fixed to the bottom of the rear end of the base plate with a front end elbow by bolts, the vertical pole is fixed to the base plate with a front end elbow, the rear end of the cantilever bracket is fixed to the top of the vertical pole, the oblique support is installed between the cantilever bracket and the vertical pole, the secondary hanging plate is installed on the vertical pole, and hanging holes are provided on the front end of the cantilever bracket, the secondary hanging plate and the oblique support.
[0006] The utility model further comprises 2-4 stiffening plates, each of which is mounted on the vertical pole and the bottom plate with the front end elbow.
[0007] When in use, the setting spacing between the lifeline cantilever brackets based on the long purlin steel structure construction should be less than 8m according to the specifications. First, loosen the connecting bolts of the friction steel plate at the rear end of the cantilever bracket of the utility model and the base plate with the front end elbow, and rotate the longer front end of the friction steel plate outward to make the front end elbow of the base plate extend into the main steel beam wing plate position and clamp it backward, and then rotate the front end of the friction steel plate toward the web of the main steel beam, and finally tighten the friction steel plate and the base plate bolts, pass the lifeline through the front end of the cantilever bracket on the cantilever bracket, the secondary hanging plate and the hanging hole on the inclined support, and fix it with a rope clip to complete the lifeline installation.
[0008] The dimensions of the various components of the utility model can be selected according to actual conditions, which solves the problem of overlapping positions of long roof purlins with traditional lifelines in the vertical direction during the lap installation process, greatly reduces the situation in which the principle of high hanging and low use is violated due to overlapping positions with lifelines during the installation of roof purlins, improves the safety of workers, and also improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 It is a front structural schematic diagram of the utility model.
[0010] Figure 2 It is a schematic diagram of the structure of the utility model when viewed from above. DETAILED DESCRIPTION
[0011] The utility model is further described in conjunction with the accompanying drawings.
[0012] like Figure 1 , Figure 2 As shown, the utility model is a cantilever bracket for the construction of a lifeline based on a long purlin steel structure, comprising a base plate 1 with a front end elbow, a friction steel plate 2, a vertical pole 3, a cantilever bracket 4, an oblique support 5, a bolt 7, a stiffening plate 6, and a secondary hanging plate 8, characterized in that: the friction steel plate 2 is fixed to the bottom of the rear end of the base plate 1 with a front end elbow by bolts 7, the vertical pole 3 is fixed to the base plate 1 with a front end elbow by two stiffening plates 6, the rear end of the cantilever bracket 4 is fixed to the top of the vertical pole 3, the oblique support 5 is installed between the cantilever bracket 4 and the vertical pole 3, the secondary hanging plate 8 is installed on the vertical pole 3, and hanging holes 9 are provided on the front end of the cantilever bracket 4, the secondary hanging plate 8 and the oblique support 5.
[0013] like Figure 1 , Figure 2 As shown, the specific production steps of the utility model are as follows:
[0014] Step 1: The bottom plate with front elbow 1, the vertical pole 3, the cantilever bracket 4, the inclined support 5, the stiffening plate 6, and the secondary hanging plate 8 are connected by cutting and welding to form the main bracket;
[0015] Step 2: The friction steel plate 2 and the nut of the bolt 7 are welded and connected to form a rear end limit device;
[0016] Step 3: The main bracket is connected to the rear end limit device through bolts 7 to form an integral cantilever bracket.
[0017] When in use, the setting spacing between the lifeline cantilever brackets based on the long purlin steel structure construction should be less than 8m according to the specifications. First, loosen the rear end limit device of the cantilever bracket and the main bracket connecting bolts 7, rotate the longer front end of the friction steel plate 2 outward, so that the front end elbow of the cantilever bracket extends into the main steel beam wing plate position and clamps backward, and then rotate the front end of the friction steel plate 2 toward the web of the main steel beam, and finally tighten the rear end limit device and the main bracket bolts 7 to complete the erection of the cantilever bracket, pass the lifeline through the front end of the cantilever bracket 4 on the cantilever bracket, the secondary hanging plate 8 and the hanging hole 9 on the inclined support 5, and fix it with a rope clip to complete the installation of the lifeline.
[0018] The dimensions of the various components of the utility model can be selected according to actual conditions, which solves the problem of overlapping positions of long roof purlins with traditional lifelines in the vertical direction during the lap installation process, greatly reduces the situation in which the principle of high hanging and low use is violated due to overlapping positions with lifelines during the installation of roof purlins, improves the safety of workers, and also improves construction efficiency.
Claims
1. A cantilever support for constructing a lifeline based on a long purlin steel structure, comprising a base plate (1) with a front elbow, a friction steel plate (2), a vertical pole (3), a cantilever support (4), an inclined support (5), a bolt (7), and a secondary hanging plate (8), characterized in that: The friction steel plate (2) is fixed to the bottom of the rear end of the base plate (1) with a front end elbow by means of bolts (7); the vertical pole (3) is fixed to the base plate (1) with a front end elbow; the rear end of the cantilever bracket (4) is fixed to the top of the vertical pole (3); an oblique support (5) is installed between the cantilever bracket (4) and the vertical pole (3); a secondary hanging plate (8) is installed on the vertical pole (3); and hanging holes (9) are provided on the front end of the cantilever bracket (4), the secondary hanging plate (8) and the oblique support (5).
2. The cantilever support for constructing a lifeline based on a long purlin steel structure according to claim 1 is characterized by: It also comprises 2 to 4 stiffening plates (6), each stiffening plate (6) being mounted on the vertical pole (3) and the bottom plate (1) with a front end elbow.