Device for increasing oil and yield of oil and gas well in oil field

By introducing a combined device of conversion nipple, gamma magnetic positioning and transducer into the combined acoustic and electric (U-TEM) technology, time-sharing operation of the equipment and auxiliary push of the crawler are realized, solving the problems in the existing technology. The problem of increased time and inability to operate horizontal wells has improved efficiency and accuracy, achieving efficient, environmentally friendly oil and production increases.

CN221856695UActive Publication Date: 2024-10-18SICHUAN HUAHUI SHENGSHI DETECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420036307.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-08
Publication Date
2024-10-18
Estimated Expiration
2034-01-08

AI Technical Summary

Technical Problem

In the existing combined acoustic and electric (U-TEM) oil-increasing and efficiency-increasing technology, due to the inability to run the depth calibration and transducer down the well at the same time during the operation process, the operation time is increased and the well control risk is increased. Moreover, it cannot operate in horizontal wells, and there are depth errors and The problem of low efficiency.

Method used

A device including a conversion sub-section, gamma magnetic positioning and transducer is designed. The time-sharing operation of the equipment is realized through the control unit. The crawler assists the transducer in pushing to the target layer in the horizontal well and assists the gamma magnetic positioning. Positioning and depth correction enable one-time downhole operations, improving operating efficiency and accuracy.

Benefits of technology

It improves operating production efficiency, reduces well control risks, reduces depth errors, and realizes oil and production increase operations in horizontal wells, meeting the needs for efficient and environmentally friendly production increase.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221856695U_ABST
    Figure CN221856695U_ABST
Patent Text Reader

Abstract

The utility model discloses a device for increasing oil and yield of an oil and gas well in an oil field, which comprises a control unit and a device main body, and a conversion nipple control box on the ground is used for controlling the conversion nipple to switch different power supply channels underground, so that the conversion nipple transmits corresponding power supplied by the ground to corresponding equipment, and different underground equipment realizes time-sharing operation. Gamma magnetic positioning searches for an operation target layer in the operation process, depth verification is completed, and the transducer can accurately operate on the target layer. The crawl device enables the transducer to operate in the horizontal well, the crawl device can push the transducer to an operation target layer at the horizontal section of the horizontal well, and the gamma magnet is assisted to be positioned in the horizontal well for depth correction. The device and the equipment are integrally connected, so that the operation production efficiency is improved, the time is saved, and the operation well control risk to a certain extent is reduced; the depth error in the operation process is reduced; and oil and yield increasing operation can be carried out in the horizontal well.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of petroleum development, in particular to a device for increasing oil and gas wells in oil fields. Background Art

[0002] Oil and gas fields are affected by multiple factors during the process of drilling, well repair, water injection and polymer injection, which causes varying degrees of damage to the reservoir and seriously affects the development effect of the oil field. Although a variety of comprehensive management measures such as improving water injection compatibility, repeated fracturing, acidification, etc. have been taken, the effect continues to deteriorate and the effective period becomes shorter after repeated use, and new damage is also caused to the reservoir and the environment. Since 2007, Huahui Detection Company has been conducting research on reservoir permeability improvement technology using pure physical methods. The combined acoustic and electrical (U-TEM) oil and efficiency enhancement technology developed by the company has helped the oil field achieve green and efficient development.

[0003] However, the operation process of the U-TEM oil and efficiency enhancement technology is to connect the gamma magnetic positioning instrument to the well, lower the lifting instrument at a specified speed, perform depth calibration, retract the cable after the depth calibration is completed, and then reconnect the transducer (oil and production enhancement instrument) to perform the downhole operation. In this operation process, the depth calibration and the transducer (oil and production enhancement instrument) cannot be lowered into the well at the same time, which increases the operation time during the operation and causes a corresponding increase in the well control risk. In addition, there will be a certain depth error when the cable is lowered into the well for the second time, and it is impossible to operate in horizontal wells. Utility Model Content

[0004] The purpose of the utility model is to provide a device for increasing oil and gas production in oil fields, so as to solve the problems existing in the above-mentioned prior art and to increase the production of wells with declining production in an efficient and environmentally friendly manner.

[0005] To achieve the above-mentioned purpose, the utility model provides the following scheme: The utility model provides a device for increasing oil and gas production in oil fields, comprising:

[0006] A device body, the device body comprising a conversion short section, a gamma magnetic positioning and a transducer connected in sequence; and

[0007] A control unit, wherein the conversion sub is connected to a cable in the control unit through a faucet; a conversion sub control box, a transducer control cabinet and a magnetic positioning ground portable operation box are provided in the control unit; the conversion sub control box is used to control the conversion sub to switch different power supply channels underground, and the magnetic positioning ground portable operation box is used to control the gamma magnetic positioning to find the target layer and complete the depth verification during the operation; the transducer control cabinet is used to control the transducer to convert electrical energy into vibration energy and radiate ultrasonic waves to propagate to the formation.

[0008] Preferably, it also includes a crawler, which is arranged between the conversion short section and the gamma magnetic positioning device, and is used to push the transducer to the operating target layer in the horizontal section of the horizontal well and assist the gamma magnetic positioning device in depth calibration in the horizontal well.

[0009] Preferably, the crawler comprises an upper centralizer, a CCL, an electronic circuit, an intermediate centralizer, a hydraulic oil tank, a driving mechanism, a stabilizing nipple and a lower centralizer connected in sequence.

[0010] Preferably, the number of the hydraulic oil tanks and driving mechanisms can be selected and adjusted according to the depth of the horizontal section of the horizontal well.

[0011] Preferably, the crawler, gamma magnetic positioning and transducer operate separately on the single-core cable, and the cable core controller in the conversion short section is used to adjust the single-core cable to switch between the crawler, gamma magnetic positioning and transducer.

[0012] Compared with the prior art, the utility model has achieved the following beneficial technical effects:

[0013] The device for increasing oil and gas production in oilfields in the utility model includes a control unit and a device body. The conversion short section control box on the ground controls the conversion short section to switch different power supply channels underground, so that the corresponding power supplied by the ground is transmitted to the corresponding equipment, so that different equipment underground can realize time-sharing operation. The gamma magnetic positioning searches for the target layer of the operation during the operation, completes the depth verification, and enables the transducer to accurately operate in the target layer. The crawler enables the transducer to operate in a horizontal well. In the horizontal section of the horizontal well, the crawler can push the transducer to the target layer of the operation, and assist the gamma magnetic positioning in depth calibration in the horizontal well. In the device of the utility model, the integrated connection of the equipment improves the operation production efficiency, saves time, reduces the operation well control risk to a certain extent, reduces the depth error during the operation, and can perform oil and production increase operations in horizontal wells. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0015] Figure 1 It is the cable connection distribution diagram at the conversion short section;

[0016] Figure 2 It is the overall structural connection diagram of the device used for increasing oil and gas wells in oil fields;

[0017] Among them, 1. Malvern head; 2. Conversion short section; 3. Crawler; 31. Upper centralizer; 32. CCL (coupling logging instrument); 33. Electronic circuit; 34. Intermediate centralizer; 35. Hydraulic oil tank; 36. Driving mechanism one; 37. Driving mechanism two; 38. Driving mechanism three; 39. Voltage stabilizing short section; 310. Lower centralizer; 4. Gamma magnetic positioning; 5. Transducer; 6. Single-core cable. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0019] The purpose of the utility model is to provide a device for increasing oil and gas production in oil fields, so as to solve the problems existing in the above-mentioned prior art and to increase the production of wells with declining production in an efficient and environmentally friendly manner.

[0020] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0021] like Figure 1-Figure 2 As shown, the utility model provides a device for increasing oil and gas wells in oil fields, and is particularly suitable for oil and gas wells in oil fields whose production decreases over time. It can increase the production of wells with declining production in an efficient and environmentally friendly manner. The device of the present invention includes a conversion short section control box (CABL SWITCH) / transducer control cabinet / crawler control box / magnetic positioning ground portable operation box+cable+malachite 1+conversion short section 2 (power channel conversion instrument)+crawler 3+gamma magnetic positioning 4 (depth calibration instrument)+transducer 5 (oil and gas production increase instrument).

[0022] In one embodiment, if Figure 2As shown, the crawler 3 includes an upper centralizer 31, a CCL (coupling logging instrument) 32, an electronic circuit 33, an intermediate centralizer 34, a hydraulic oil tank 35 (the number of oil tanks can be adjusted appropriately according to actual conditions), a drive mechanism 1 36, a drive mechanism 2 37, a drive mechanism 3 38, a voltage stabilizing nipple 39 and a lower centralizer 310, which are connected in sequence. The working principle of the drive mechanism is the same, and the hydraulic oil tank is used to provide hydraulic power to the support arm of the instrument, so that the support arm is opened and the driving wheel is close to the inner wall of the casing. Regarding the drive mechanism part, there are relatively mature technical records in the prior art, which will not be repeated here; the connection and assembly methods between the various components in the crawler are also relatively mature technologies in the prior art, which will not be repeated here. When the instrument opens the hydraulic support arm, the motor in the driving nipple drives the driving wheel to rotate, so that the instrument crawls and moves in the casing downhole. The various components of the crawler 3 are relatively mature solutions in the prior art, so they will not be described in detail. The main function of the crawler 3 is to push the transducer 5 to the target layer in the horizontal section of the horizontal well, and to assist the gamma magnetic positioning 4 in depth calibration in the horizontal well.

[0023] The transducer 5 (oil production increase instrument) is a device that generates a high-frequency oscillation signal with an intermittent period and transmits it to the well through a cable. The transducer 5 converts electrical energy into vibration energy and radiates ultrasonic waves to propagate to the formation. The high-frequency vibration energy acts on the reservoir, causing relative movement and cavitation between the pore fluid and the formation skeleton, increasing the permeability of the reservoir and accelerating the penetration of crude oil in the formation, ultimately achieving the purpose of increasing crude oil production and oil well recovery. Mechanical vibration can reduce the cohesion between the blocked particles and the formation pores, and reduce the interfacial tension between the oil and water in the formation; ultrasonic vibration causes the friction of the oil-water interface to locally increase the temperature and generate thermal effects, which is a comprehensive effect: (1) ultrasonic energy is absorbed by the fluid medium and converted into thermal energy; (2) the friction between the crude oil and the rock interface in the pores increases the temperature of the crude oil; (3) under the cavitation effect, a large amount of heat energy will be released in the process of rapid collapse of the bubbles. Thermal effects can reduce the viscosity of crude oil, improve the seepage characteristics of crude oil, and increase the seepage rate of crude oil; cavitation can change the molecular structure of crude oil and reduce its relative molecular mass. In addition, the increase or decrease of sound pressure can eliminate air resistance, enhance the fluidity of the fluid, and significantly lift the liquid column of the oil well, thereby promoting oil well blowout and increasing production.

[0024] The auxiliary equipment is connected to the transducer 5 through a mechanical structure and a wired connection, and is used to assist the transducer 5 in completing the operation. The function of the Malone 1 is to connect the cable and the equipment. The function of the conversion short section 2 (power channel conversion instrument) is to control it to switch different power supply channels underground through the conversion short section control box (CABL SWITCH) on the ground, so that it can transmit the corresponding power supplied by the ground to the corresponding equipment, so that different equipment underground can achieve time-sharing operation. The function of the gamma magnetic positioning 4 (depth calibration instrument) is to find the target layer of the operation during the operation process, complete the depth calibration, and enable the transducer 5 to operate accurately in the target layer. The function of the crawler 3 is to enable the transducer 5 to operate in the horizontal well. In the horizontal section of the horizontal well, the crawler can push the transducer 5 to the target layer of the operation, and assist the gamma magnetic positioning 4 in depth calibration in the horizontal well.

[0025] The core technology of the integrated high-power oil and production increase technology for oil fields is the ability to connect all instruments of the combined acoustic-electric (U-TEM) oil increase and efficiency enhancement technology, so that it can achieve one-trip downhole operation and meet the needs of horizontal well operations.

[0026] The connection sequence of the equipment in vertical well operation is: conversion sub control box (CABL SWITCH) / transducer control cabinet / crawler control box / magnetic positioning ground portable operation box + cable + Malvern 1 + conversion sub 2 (power channel conversion instrument) + gamma magnetic positioning 4 (depth calibration instrument) + transducer 5 (oil and production increase instrument).

[0027] The connection sequence of equipment for horizontal well operation: conversion sub control box (CABL SWITCH) / transducer control cabinet / crawler control box / magnetic positioning ground portable operation box + cable + Malvern 1 + conversion sub 2 (power channel conversion instrument) + crawler 3 + gamma magnetic positioning 4 (depth calibration instrument) + transducer 5 (oil and production increase instrument).

[0028] The specific operation process is as follows:

[0029] 1. Vehicle placement: After the vehicle enters the well site, negotiate with the well repair operation team on the vehicle placement position, and the placement position meets the operation requirements;

[0030] 2. Install the overhead pulley: The workover team shall cooperate with the unblocking team in accordance with the safety operation procedures to carefully lift and lower the enlarged hook, insert the T-shaped iron into the elevator, put on the overhead pulley bumper, lock the elevator, insert the elevator safety pin, and use the safety belt to provide secondary protection for the T-shaped iron;

[0031] 3. Install the ground pulley: Wrap the ground chain around the lower end of the bottom flange one or two times, leaving both ends of the chain for connecting to the ground pulley. The two ends are the same length, and connect the two ends of the chain to the ground pulley with a U-shaped ring;

[0032] 4. Power connection of the acoustic and electrical combined instrument: The certified electrician of the unblocking operation team shall connect the power supply of the acoustic and electrical combined instrument according to safety regulations. The power supply requirements are three-phase five-wire, AC380V, 50Hz, 35kW;

[0033] 5. Equipment matching: If the operation is in a horizontal well, the equipment matching sequence in the horizontal well shall be followed; if the operation is in a vertical well, the equipment matching sequence in the vertical well shall be followed;

[0034] 6. Instrument cable depth calibration:

[0035] ① The steps for depth calibration in horizontal wells are as follows:

[0036] Step 1: Use a cable to lower the equipment to the horizontal section, connect the ground cable input end to the output line of the conversion short section control box (CABLSWITCH), and switch the power supply channel of the conversion short section 2 to the power supply channel of the downhole crawler 3.

[0037] Step 2: Connect the ground cable input end to the crawler control box output line, and control the crawler 3 to crawl through the target layer (the crawling distance is generally about 50m to 100m after the perforation section).

[0038] Step 3: Connect the input end of the ground cable to the output line of the conversion short section control box (CABL SWITCH) to switch the power supply channel of the conversion short section 2 to the power supply channel of the downhole gamma magnetic positioning 4.

[0039] Step 4: Connect the input end of the ground cable to the output line of the magnetic positioning ground portable operation box, pull the cable through the winch system of the operating vehicle to move the equipment toward the wellhead, and measure the magnetic positioning curve and gamma curve of the well through the computer connected to the magnetic positioning ground portable operation box during movement. The measurement distance is about 200m of the perforation section (operation target layer). Compare the measured curve with the gamma curve and magnetic positioning curve in the original combined logging curve to perform depth correction; repeat steps 1 to 4 for re-measurement, and compare with the gamma curve and magnetic positioning curve in the original combined logging curve again. The depth error is required to be 0.

[0040] ② The steps for depth calibration in horizontal wells are as follows:

[0041] Step 1: Use a cable to lower the equipment to about 200 meters below the target layer, connect the input end of the ground cable to the output line of the conversion short section control box (CABL SWITCH), and switch the power supply channel of the conversion short section 2 to the power supply channel of the downhole crawler 3.

[0042] Step 2: Connect the input end of the ground cable to the output line of the magnetic positioning ground portable operation box, pull the cable through the winch system of the operation vehicle to move the equipment toward the wellhead, and measure the magnetic positioning curve and gamma curve of the well through the computer connected to the magnetic positioning ground portable operation box during movement. The measurement distance is about 200m above the perforation section (operation target layer). Compare the measured curve with the gamma curve and magnetic positioning curve in the original combined logging curve for depth correction. The cable can be repeatedly lifted and lowered to measure the new curve and compare it with the gamma curve and magnetic positioning curve in the original combined logging curve, and the depth error is required to be 0.

[0043] 7. Unblocking operation: Connect the input end of the ground cable to the output line of the conversion short section control box (CABL SWITCH), so that the power supply channel of the conversion short section 2 is switched to the power supply channel of the downhole transducer 5. Then connect the input end of the ground cable to the output line of the transducer control cabinet, and perform unblocking operations on the perforation layer section of the target layer. Use the vehicle-mounted control box to output high-frequency, AC high-current and high-voltage to the transducer 5, so that the instrument can emit ultrasonic and electromagnetic waves that can penetrate the formation to act on the target layer.

[0044] 8. Lift the instrument: After the unblocking operation is completed, lift the cable. When the acoustic and electrical combined instrument is lifted to the wellhead, the wellhead instrument operator should pay attention to ensure that the ground pulley does not tilt and cause the cable to jump out of the wellhead, lift the instrument out of the wellhead, and disassemble the instrument;

[0045] 9. Recover the cable and downhole instruments: The winch operator slowly retracts the cable and cooperates with the wellhead operator of the unblocking team to lower the enlarged hook. After reaching the appropriate position, the cable is withdrawn from the top and bottom pulleys, the ground pulley and the ground chain are disassembled, and the ground pulley and the ground chain are loaded onto the truck. After the top pulley lands, the pin at the connection between the top pulley and the T-shaped iron is disassembled, the safety belt is removed, the T-shaped iron is taken out from the elevator, and the top pulley is recovered and loaded onto the truck;

[0046] 10. Hand over the empty wellbore to the well repair team;

[0047] 11. Start the acoustic and electrical combined instrument vehicle and evacuate the well site safely and orderly along the prescribed route.

[0048] like Figure 1As shown, the crawler 3, GR / CCL (gamma magnetic positioning 4), and oil extraction device (transducer 5) operate separately on the single-core cable 6. The cable core control conversion short section is designed to switch the single-core cable 6 between the three instruments. The cable core controller uses the communication command control method to switch the single-core cable 6 and which instrument to connect according to the command (the single-core cable 6 is converted to a 28-core cable and connected to the corresponding instrument at the conversion short section 2). It can return to the switched state and observe which instrument the cable core is currently connected to on the ground. Two sets of through-wires need to be arranged in the crawler 4, one set is used for the GR / CCL (gamma magnetic positioning 4), and the other set is used for the oil extraction device (transducer 5).

[0049] At the beginning of the operation, in the vertical well section, the single-core cable 6 is switched to GR / CCL (gamma magnetic positioning 4). During the lowering process of the vertical well section instrument, the GR / CCL (gamma magnetic positioning 4) instrument signal can be collected. After reaching the horizontal section, the cable core control is switched to the crawler 3. At this time, the crawler 3 can work and push the instrument to the target horizontal section. After reaching the target section, the cable core is switched to GR / CCL (gamma magnetic positioning 4), the instrument is pulled back, the downhole depth is corrected and positioned, the oil extraction device (transducer 5) is dragged to the operating position with a cable, and the cable core is switched to the oil extraction device (transducer 5), and the oil extraction device (transducer 5) can start working.

[0050] The characteristics of the device for increasing oil production and production in oil and gas wells of oil fields of the present invention are as follows:

[0051] 1. Improved operational production efficiency, saved time, and reduced operational well control risks to a certain extent.

[0052] 2. Reduce the depth error during operation.

[0053] 3. Oil and gas production enhancement operations can be carried out in horizontal wells.

[0054] In the original U-TEM oil and production enhancement technology, the transducer 5 (oil and production enhancement instrument) and the gamma magnetic positioning 4 (depth calibration instrument) cannot be lowered into the well synchronously. In each operation, the gamma magnetic positioning 4 (depth calibration instrument) must be used to calibrate the depth before the cable is pulled out of the wellhead and the transducer 5 (oil and production enhancement instrument) is replaced for downhole operation. This results in a waste of time in the process of cable lifting and lowering, and the longer the equipment stays in the wellbore, the greater the well control risk. At the same time, the second downhole of the cable will have a certain degree of depth error, which will cause an error between the actual operation position and the target layer of the operation, and cannot meet the needs of operating in horizontal wells. The integrated high-power oil and production enhancement technology for oil fields adopts a one-time downhole operation technology without the need for a second downhole cable, thereby improving the operation production efficiency, saving time, reducing a certain degree of operation well control risk, reducing the operation depth error, and meeting the needs of operating in horizontal wells.

[0055] It should be noted that, for those skilled in the art, it is obvious that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to include all changes within the meaning and scope of the equivalent elements of the claims in the present invention, and any figure mark in the claims should not be regarded as limiting the claims involved.

[0056] The present invention uses specific examples to illustrate the principle and implementation of the present invention. The above examples are only used to help understand the method and core idea of ​​the present invention. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A device for increasing oil production and production in oil and gas wells in oil fields, characterized by: include A device body, the device body comprising a conversion short section, a gamma magnetic positioning and a transducer connected in sequence; as well as A control unit, wherein the conversion sub is connected to a cable in the control unit through a faucet; a conversion sub control box, a transducer control cabinet and a magnetic positioning ground portable operation box are provided in the control unit; the conversion sub control box is used to control the conversion sub to switch different power supply channels underground, and the magnetic positioning ground portable operation box is used to control the gamma magnetic positioning to find the target layer and complete the depth verification during the operation; the transducer control cabinet is used to control the transducer to convert electrical energy into vibration energy and radiate ultrasonic waves to propagate to the formation.

2. The device for increasing oil production in oil and gas wells in oil fields according to claim 1, characterized in that: It also includes a crawler, which is arranged between the conversion short section and the gamma magnetic positioning device. The crawler is used to push the transducer to the target layer in the horizontal section of the horizontal well and assist the gamma magnetic positioning device in depth calibration in the horizontal well.

3. The device for increasing oil production and production in oil and gas wells in oil fields according to claim 2, characterized in that: The crawler comprises an upper centralizer, a CCL, an electronic circuit, an intermediate centralizer, a hydraulic oil tank, a driving mechanism, a voltage stabilizing nipple and a lower centralizer which are connected in sequence.

4. The device for increasing oil production in oil and gas wells in oil fields according to claim 3, characterized in that: The number of the hydraulic oil tanks and the driving mechanisms can be selected and adjusted according to the depth of the horizontal section of the horizontal well.

5. The device for increasing oil production and production in oil and gas wells in oil fields according to claim 2, characterized in that: The crawler, gamma magnetic positioning and transducer operate separately on the single-core cable, and the cable core controller in the conversion short section is used to adjust the single-core cable to switch among the crawler, gamma magnetic positioning and transducer.