Tunnel lining structure with health monitoring function

By installing strain gauges, water immersion sensors and piezoelectric sensors in the tunnel lining structure, the holes, cracks and leakage of the tunnel lining can be monitored in real time, solving the problem of monitoring hidden diseases of the tunnel lining structure and realizing the whole process health monitoring of the tunnel. Improved detection efficiency and safety.

CN221856729UActive Publication Date: 2024-10-18ANHUI TRANSPORTATION HLDG GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420195480.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2024-10-18
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively monitor hidden diseases in tunnel lining structures, such as cavities, cracks and water leakage, which threatens the safety of tunnel operations. Moreover, traditional detection methods are inefficient and have high safety hazards, and cannot meet the needs of modern detection workloads such as heavy workloads and large safety hazards. High timeliness requirements.

Method used

A tunnel lining structure with health monitoring function is designed. By setting initial support, waterproof layer and secondary lining on the inner wall of the surrounding rock of the tunnel, strain gauges, water immersion sensors and piezoelectric sensors are installed to monitor the voids in the lining in real time. , cracks and water leakage, and is connected to an external computer terminal to achieve automated detection.

Benefits of technology

It realizes health monitoring of the entire tunnel process from construction to operation and maintenance, ensuring construction quality and operation safety, reducing costs, easy installation, small impact, light weight, strong reliability, high sensitivity, high degree of automation, easy operation, and applicable Strong sex.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221856729U_ABST
    Figure CN221856729U_ABST
Patent Text Reader

Abstract

The utility model relates to a tunnel lining structure with a health monitoring function, which comprises a primary support, an outer wall of which is connected with an inner wall of a tunnel surrounding rock; the waterproof layer is distributed in the extending direction of the tunnel, the outer wall of the waterproof layer and the inner wall of the primary support are connected with the secondary lining, the secondary lining is distributed in the extending direction of the tunnel, and the outer wall of the secondary lining is connected with the inner wall of the waterproof layer; and the health detection assembly is arranged on the tunnel lining structure and connected with the external computer terminal, and the health detection assembly is used for monitoring lining cavities, lining cracks and lining water leakage. Compared with the prior art, the lining water leakage monitoring device can monitor lining cavities, lining cracks and lining water leakage conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of tunnel engineering and monitoring, and in particular relates to a tunnel lining structure with a health monitoring function. Background Art

[0002] Composite support structure is a basic support form commonly used in tunnel engineering at present, which is composed of primary support and secondary lining. Traditional design concepts usually design secondary lining as the main bearing structure and distribute it proportionally with the primary support bearing. In recent years, with the deepening of research, the primary support bearing has begun to receive widespread attention. When the durability of the primary support can be guaranteed, the control effect of the primary support on the stability of the surrounding rock should be fully considered when designing and checking the secondary lining. The deformation of the surrounding rock of the tunnel runs through the entire construction process, and the deformation of the surrounding rock is gradually released as the construction progresses. In this process, the primary support and secondary lining of the tunnel are constructed in stages, and they jointly bear the surrounding rock load through synergy. The essence of the synergy of the composite support structure of the tunnel is the coordination of deformation and the reasonable distribution of load. The performance of the two can be maximized through the coordination of the timing, structural stiffness and strength of the primary support and secondary lining.

[0003] Since most of the tunnels are buried underground, the environmental conditions are complex, the geotechnical conditions are vague, and the structure is sensitive to changes in the surrounding geological conditions, many tunnels will have different degrees of disease phenomena, such as lining cracks, tunnel water leakage, concrete strength degradation, steel corrosion, etc., which affect the life of the tunnel structure. Among them, the tunnel disease factors that need to be focused on are lining concrete cracks, cavities and water leakage, which ensure the stability of the tunnel's later operation. Therefore, in order to ensure the safety of tunnel operations in the later period, it is very important to carry out health monitoring of the tunnel structure.

[0004] At present, highway tunnels mainly use manual visual inspection supplemented by simple measuring instruments to conduct routine inspections on civil structures, and record disease data and images on site. This method has disadvantages such as time-consuming and labor-intensive, low efficiency, great safety hazards, strong subjectivity, the need for traffic control, and long information feedback cycles. It is increasingly difficult to meet the current requirements of highway tunnel inspections, such as large workloads and high timeliness of inspection results. Therefore, automated monitoring of tunnel diseases has become the current development direction.

[0005] Internal defects of tunnel linings are hidden diseases, such as lining voids, which require professional technology for disease detection. The regulations for nondestructive testing of railway tunnel lining quality point out that ground penetrating radar technology and impact elastic wave technology can be used for tunnel lining disease detection. The application of geological radar method and impact echo method can effectively improve the detection rate of defects in linings. Therefore, in actual lining detection, pressure sensors are embedded in the lining structure to judge whether there are voids in the lining during construction in real time through the pressure condition, which can quickly realize the automatic monitoring of lining diseases.

[0006] As for water leakage, due to its hidden nature, it is impossible to monitor and take measures at the first time when it occurs. It can only be detected after the water stains appear, which is not conducive to timely treatment. According to many existing case analyses, it can be found that many water leakage diseases are discovered by chance, and the water leakage situation is already quite serious when they are discovered. In addition, during the detection process, the location of the disease is determined based on the water leakage situation on the tunnel lining surface, which is extremely inconvenient in tunnels with limited visual range and light conditions.

[0007] CN202645584U discloses a composite tunnel lining structure, including initial support, connecting lining and secondary lining, wherein the initial support is located on the tunnel surface, the connecting lining is located inside the initial support, and the secondary lining is located inside the connecting lining. After long-term use, the application cannot timely monitor structural defects such as lining cavities, lining cracks, and lining water leakage, resulting in the need for tunnel maintenance. Utility Model Content

[0008] The purpose of the utility model is to overcome the defects of the above-mentioned prior art and provide a tunnel lining structure with a health monitoring function.

[0009] The purpose of the utility model can be achieved through the following technical solutions:

[0010] A tunnel lining structure with a health monitoring function, wherein an initial support waterproof layer and a secondary lining are sequentially connected in series along the inner wall of the tunnel surrounding rock, and the tunnel lining structure also includes a health detection component which is arranged on the tunnel lining structure and connected to an external computer terminal and monitors lining cavities, lining cracks, and lining water leakage.

[0011] Furthermore, the health detection component includes:

[0012] a plurality of strain gauges disposed on the inner wall of the secondary lining;

[0013] A plurality of water sensors disposed on the waterproof layer; and

[0014] A plurality of piezoelectric sensors are arranged on the initial support.

[0015] Furthermore, the strain gauges are distributed along the extension direction of the tunnel and at least four of them are arranged.

[0016] Furthermore, the water immersion sensors are distributed along the extension direction of the tunnel and at least four of them are arranged.

[0017] Furthermore, the piezoelectric sensors are distributed along the extension direction of the tunnel and at least four are provided.

[0018] Furthermore, a plurality of first reserved holes for installing water immersion sensors are arranged on the waterproof layer.

[0019] Furthermore, a plurality of second reserved cavities for installing piezoelectric sensors are arranged on the initial support.

[0020] Furthermore, the waterproof layer is composed of modified LDPE waterproof board and 450g / m2 geotextile.

[0021] Furthermore, the initial support includes:

[0022] An anchor rod, which is arranged inside the inner wall of the tunnel surrounding rock;

[0023] A steel frame mesh is arranged on the inner surface of the inner wall of the tunnel surrounding rock; and

[0024] The sprayed concrete layer has a concrete strength grade of not less than C25, and the sprayed concrete layer is arranged on the steel frame net.

[0025] Further, the secondary lining includes a reinforced concrete layer;

[0026] The reinforced concrete layer has a concrete strength grade of not less than C25 and is arranged on the inner wall of the waterproof layer. AEA anti-cracking waterproof concrete expansion agent is added to the reinforced concrete layer.

[0027] Compared with the prior art, the utility model has the following beneficial effects:

[0028] (1) The utility model realizes the coordination of surrounding rock deformation and the reasonable distribution of load by carrying out the initial tunnel support and secondary lining in stages, and maximizes the performance of the two, thus ensuring the durability and safety of the tunnel structure.

[0029] (2) The utility model monitors lining cavities through piezoelectric sensors, monitors lining water leakage through water immersion sensors, and monitors lining cracks through strain gauges. It can not only provide feedback on whether there are cavities and water leakage in the lining during construction to ensure construction quality, but can also be used in the later stage of tunnel operation and maintenance.

[0030] (3) The utility model can realize the health monitoring of the whole process of tunnel from construction to operation and maintenance. It has the advantages of low cost, easy installation, little impact on the mechanical properties of the lining structure, light weight, strong reliability, high sensitivity, high degree of automation, simple monitoring operation, strong practicality, etc., and is worthy of promotion. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 This is a schematic diagram of the structure of the tunnel lining structure in Example 1.

[0032] Figure 2 This is a schematic cross-sectional diagram of the tunnel lining structure in Example 1.

[0033] Figure 3 This is a schematic diagram of the arrangement of health detection components in the tunnel lining in Example 1.

[0034] Numbers in the figure:

[0035] 1-strain gauge, 2-water immersion sensor, 3-piezoelectric sensor, 4-second reserved cavity, 5-secondary lining, 6-waterproof layer, 7-initial support, 8-first reserved cavity, 9-health detection component. DETAILED DESCRIPTION

[0036] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and a specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0037] Features such as component models, material names, connection structures, control methods, etc. that are not clearly stated in this technical solution shall be deemed as common technical features disclosed in the prior art.

[0038] In the description of the present invention, it should be understood that the terms "upper", "lower", "vertical", "horizontal", "top", "bottom", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0039] In the description of the present invention, "multiple" means two or more than two, unless otherwise specifically defined. In addition, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a bolt connection or a welding connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0040] In order to monitor lining cavities, lining cracks, and lining water leakage, the utility model provides a tunnel lining structure with a health monitoring function. Along the inner wall of the tunnel surrounding rock, the initial support 7 waterproof layer 6 and the secondary lining 5 are sequentially connected in series. Figures 1 to 3 As shown, the tunnel lining structure also includes a health detection component 9 which is arranged on the tunnel lining structure and connected to an external computer terminal and monitors lining cavities, lining cracks, and lining water leakage.

[0041] In some specific implementations, please refer to Figure 1 and Figure 2 As shown, the health detection component 9 includes:

[0042] A plurality of strain gauges 1, which are arranged on the inner wall of the secondary lining 5;

[0043] A plurality of water sensors 2, which are arranged on the waterproof layer 6; and

[0044] A plurality of piezoelectric sensors 3 are arranged on the initial support 7 .

[0045] For more specific implementations, please refer to Figure 3 As shown, the strain gauges 1 are distributed along the extension direction of the tunnel and at least four are arranged.

[0046] For more specific implementations, please refer to Figure 3 As shown, the water immersion sensors 2 are distributed along the extension direction of the tunnel and at least four are provided.

[0047] For more specific implementations, please refer to Figure 3 As shown, the piezoelectric sensors 3 are distributed along the extension direction of the tunnel and at least four are provided.

[0048] For more specific implementations, please refer to Figure 1 and Figure 2 As shown, a plurality of first reserved holes 8 for installing the water immersion sensors 2 are arranged on the waterproof layer 6 .

[0049] For more specific implementations, please refer to Figure 1 and Figure 2 As shown, a plurality of second reserved cavities 4 for installing piezoelectric sensors 3 are arranged on the initial support 7 .

[0050] For more specific implementations, please refer to Figure 1 and Figure 2 As shown, the waterproof layer 6 is composed of modified LDPE waterproof board and 450g / m 2 Geotextile composition.

[0051] In some specific implementations, please refer to Figure 1 and Figure 2 As shown, the initial support 7 includes:

[0052] An anchor rod, which is arranged inside the inner wall of the tunnel surrounding rock;

[0053] A steel frame mesh is arranged on the inner surface of the inner wall of the tunnel surrounding rock; and

[0054] The sprayed concrete layer has a concrete strength grade of not less than C25, and the sprayed concrete layer is arranged on the steel frame net.

[0055] In some specific implementations, please refer to Figure 1 and Figure 2 As shown, the secondary lining 5 comprises a reinforced concrete layer;

[0056] The reinforced concrete layer has a concrete strength grade of not less than C25 and is arranged on the inner wall of the waterproof layer. AEA anti-cracking waterproof concrete expansion agent is added to the reinforced concrete layer.

[0057] The above embodiments may be implemented individually or in any combination of two or more.

[0058] The above implementation is described in more detail below in conjunction with specific examples.

[0059] Example 1

[0060] In order to monitor lining cavities, lining cracks, and lining water leakage, this embodiment provides a tunnel lining structure with a health monitoring function. Along the inner wall of the tunnel surrounding rock, the initial support 7 waterproof layer 6 and the secondary lining 5 are connected in series in sequence. Figures 1 to 3 As shown, the tunnel lining structure also includes a health detection component 9 which is arranged on the tunnel lining structure and connected to an external computer terminal and monitors lining cavities, lining cracks, and lining water leakage.

[0061] Please see again Figure 1 and Figure 2 As shown, the health detection component 9 includes:

[0062] A strain gauge 1, which is arranged on the inner wall of the secondary lining 5;

[0063] A water sensor 2, which is disposed on the waterproof layer 6; and

[0064] The piezoelectric sensor 3 is arranged on the initial support 7 .

[0065] Please see again Figure 3 As shown, the strain gauges 1 are distributed along the extension direction of the tunnel and at least four are provided.

[0066] Please see again Figure 3 As shown, four water immersion sensors 2 are distributed along the extension direction of the tunnel.

[0067] Please see again Figure 3 As shown, four piezoelectric sensors 3 are distributed along the extension direction of the tunnel.

[0068] Please see again Figure 1 and Figure 2 As shown, a plurality of first reserved holes 8 for installing the water immersion sensors 2 are arranged on the waterproof layer 6 .

[0069] Please see again Figure 1 and Figure 2 As shown, a plurality of second reserved cavities 4 for installing piezoelectric sensors 3 are arranged on the initial support 7 .

[0070] Please see again Figure 1 and Figure 2 As shown, the waterproof layer 6 is composed of a modified LDPE waterproof sheet and 450g / m 2 Geotextile composition.

[0071] Please see again Figure 1 and Figure 2 As shown, the initial support 7 includes:

[0072] Anchor rods are arranged inside the inner wall of the tunnel surrounding rock;

[0073] A steel mesh is arranged on the inner surface of the inner wall of the tunnel surrounding rock; and

[0074] The shotcrete layer has a concrete strength grade of C25 and is arranged on a steel frame.

[0075] Please see again Figure 1 and Figure 2 As shown, the secondary lining 5 comprises a reinforced concrete layer;

[0076] The reinforced concrete layer has a concrete strength grade of C25 and is arranged on the inner wall of the waterproof layer. AEA anti-cracking waterproof concrete expansion agent is added to the reinforced concrete layer.

[0077] The working principle of this embodiment is as follows:

[0078] See also Figures 1 to 3 The initial support 7 includes anchor rods set in the surrounding rock around the tunnel and a steel frame mesh and a shotcrete layer on the inner surface of the surrounding rock.

[0079] It should be noted that in this embodiment, the diameter of the anchor rod is 20 mm according to the surrounding rock grade of the tunnel. The concrete strength grade of the shotcrete layer is C25 and the thickness is 30 cm. The steel mesh uses ribbed threaded steel bars with a diameter of 8 mm.

[0080] During the initial support 7 construction, the steel arch frame can be used as the construction support and supplemented by the pre-grouting advance support around the conduit wall.

[0081] When constructing the initial support 7, the initial support 7 must be constructed in time according to the characteristics of the short stability time of the weak surrounding rock of the cavern. The anchor rod needs to be subjected to a pull-out test, and the pull-out force is not less than 50kN. According to the surrounding rock monitoring measurement results, the arch crown sinking and arch foot convergence are observed. If the deformation rate value suddenly increases, in addition to strengthening the initial support 7, the invert must be closed immediately. All system anchor rods use pressure hollow grouting anchor rods. Through pressure grouting, the unbonded surrounding rock forms an integral and certain thickness bearing ring to improve its own bearing capacity. Finally, according to the surrounding rock monitoring measurement results, under the condition that the initial support 7 tends to be stable, the full-section secondary reinforced concrete lining is cast.

[0082] The secondary lining 5 structure needs to be constructed under the condition that the initial support 7 is basically stable. The secondary lining 5 is a full-section cast secondary waterproof and crack-resistant reinforced concrete lining. AEA anti-cracking and waterproof concrete expansion agent is added to the concrete, and the concrete strength grade is C25.

[0083] Waterproof layer 6 is composed of modified LDPE waterproof sheet and 450g / m 2 The geotextile is composed of a waterproof layer 6, which is set between the initial support 7 and the secondary lining 5 along the entire length of the tunnel. The waterproof layer 6 must be laid separately according to the design requirements during the construction process to meet the requirements of no nails penetrating the waterproof board to ensure the waterproof performance of the entire tunnel composite lining structure. It should be noted that the thickness of the modified LDPE waterproof board in this embodiment is 1.5mm. All construction joints and deformation joints in the tunnel are equipped with embedded rubber waterstops.

[0084] The health monitoring component 9 is composed of a piezoelectric sensor 3 arranged in the initial support 7, a strain gauge 1 arranged on the surface of the secondary lining 5, and an upper water immersion sensor 2 arranged in the waterproof layer 6, and they are connected to a computer terminal to realize automatic data collection and processing.

[0085] The surrounding rock grade of the tunnel and the stress condition of the tunnel section can be obtained in advance through geological exploration and other means, and can be determined through structural stress finite element analysis or on-site measured data. For places with poor surrounding rock grade conditions and weak places with poor structural stress conditions, health monitoring components should be arranged more densely9.

[0086] For the piezoelectric sensor 3 set inside the initial support 7 and the water immersion sensor 2 on the waterproof layer 6, line holes should be reserved in advance on the lining structure. The number of piezoelectric sensors 3 should be determined according to the stress conditions of the tunnel section. In places with greater stress and weak structures, the number of piezoelectric sensors 3 should be increased.

[0087] The water immersion sensor 2 is a linear water immersion sensor 2, which is evenly distributed on the initial support 7 along the tunnel axis and covered by a waterproof plate. The number of water immersion sensors is 4 to ensure full cross-section coverage of the tunnel water leakage monitoring range.

[0088] The leads of the water immersion sensor 2 and the piezoelectric sensor 3 connected in parallel are led out through the reserved lining structure line hole, and after being led out, they are connected in parallel with the strain gauge 1 on the surface of the secondary lining 5, and finally connected to the computer terminal to realize the automatic collection and processing of monitoring data.

[0089] The overall settlement monitoring of the tunnel is a routine monitoring, which uses the strain gauge 11 pre-set on the surface of the secondary lining 5 as a target, combined with the total station for monitoring, so as to achieve the purpose of monitoring the tunnel settlement. Among them, the overall settlement monitoring frequency of the tunnel is once every two days, and the number of monitoring sections is determined according to the actual situation. Because the overall settlement of the tunnel is manually monitored, due to the discontinuity of monitoring, abnormal data is prone to occur. When the strain gauge 11 detects that the settlement is obvious or the data is abnormal, it sends information to the computer terminal. The staff should monitor and verify the overall settlement data of the tunnel multiple times, and the monitoring frequency is adjusted to once a day.

[0090] Tunnel lining strain monitoring is automated monitoring, which is achieved by pre-embedding fixed strain gauges 11 in the tunnel lining structure. For special tunnel structures, the buried position of the strain gauge 11 can be adjusted accordingly. At the same time, by adjusting the arrangement position of the strain gauge 11, the stress and deformation of the steel arch frame, anchor rod and lining can be monitored, and then the support effect can be tested and evaluated.

[0091] The lining voids are monitored by the piezoelectric sensor 3 installed in the initial support 7. The monitored tunnel vibration is converted into an electrical signal and output to the computer terminal, which processes the information. When it is different from the information preset in the computer, an alarm is issued to notify the staff to handle it.

[0092] Tunnel lining water leakage monitoring is carried out through a linear water immersion sensor 2 connected to a computer terminal. During the tunnel lining construction process and the subsequent operation and maintenance process, the water immersion sensor 2 can collect water leakage information in the first place and feed it back to the computer terminal, so that the operation and maintenance unit can take timely remedial measures to ensure the safety of tunnel operation.

[0093] The above description of the embodiments is to facilitate the understanding and use of the utility model by those skilled in the art. It is obvious that those familiar with the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the utility model is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the utility model without departing from the scope of the utility model should be within the scope of protection of the utility model.

Claims

1. A tunnel lining structure with health monitoring function, wherein along the inner wall of the tunnel surrounding rock, the primary support (7), the waterproof layer (6) and the secondary lining (5) are sequentially connected in series, characterized in that: The tunnel lining structure also includes a health detection component (9) which is arranged on the tunnel lining structure and connected to an external computer terminal and monitors lining cavities, lining cracks, and lining water leakage.

2. The tunnel lining structure with health monitoring function according to claim 1, characterized in that: The health detection component (9) comprises: A plurality of strain gauges (1) arranged on the inner wall of the secondary lining (5); A plurality of water sensors (2) disposed on the waterproof layer (6); and A plurality of piezoelectric sensors (3) are arranged on the initial support (7).

3. The tunnel lining structure with health monitoring function according to claim 2, characterized in that: The strain gauges (1) are distributed along the extension direction of the tunnel and at least four of them are arranged.

4. The tunnel lining structure with health monitoring function according to claim 2, characterized in that: The water immersion sensors (2) are distributed along the extension direction of the tunnel and at least four of them are arranged.

5. The tunnel lining structure with health monitoring function according to claim 2, characterized in that: The piezoelectric sensors (3) are distributed along the extension direction of the tunnel and at least four are provided.

6. The tunnel lining structure with health monitoring function according to claim 2, characterized in that: A plurality of first reserved holes (8) for installing water immersion sensors (2) are arranged on the waterproof layer (6).

7. The tunnel lining structure with health monitoring function according to claim 2, characterized in that: A plurality of second reserved cavities (4) for installing piezoelectric sensors (3) are arranged on the initial support (7).

8. The tunnel lining structure with health monitoring function according to claim 1, characterized in that: The waterproof layer (6) is composed of a modified LDPE waterproof sheet and a 450g / m 2 Geotextile composition.

9. The tunnel lining structure with health monitoring function according to claim 1, characterized in that: The initial support (7) comprises: An anchor rod, which is arranged inside the inner wall of the tunnel surrounding rock; A steel frame mesh is arranged on the inner surface of the inner wall of the tunnel surrounding rock; and The sprayed concrete layer has a concrete strength grade of not less than C25, and the sprayed concrete layer is arranged on the steel frame net.

10. The tunnel lining structure with health monitoring function according to claim 1, characterized in that: The secondary lining (5) comprises a reinforced concrete layer; The reinforced concrete layer has a concrete strength grade of not less than C25 and is arranged on the inner wall of the waterproof layer. AEA anti-cracking waterproof concrete expansion agent is added to the reinforced concrete layer.