Ventilation device for tunnel construction

By adopting the design of retractable air ducts and air quality sensors in the tunnel construction ventilation system, the problem of polluted air recirculation in the traditional system is solved, high-purity air introduction is achieved, and the ventilation effect and safety of the construction site are improved. .

CN221856781UActive Publication Date: 2024-10-18CHINA RAILWAY 11TH BUREAU GRP CORP LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420567803.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-10-18
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

In traditional tunnel construction ventilation systems, fans can easily inhale the dirty air discharged from the tunnel entrance, causing the air quality to fail to meet standards and affecting the ventilation effect of the construction site and the health of construction workers.

Method used

A tunnel construction ventilation device including a fan, a retractable air duct and a guide rod is designed. The input end of the fan is connected to the retractable air duct, the upper guide rod and the lower guide rod. Real-time air quality monitoring is achieved through the air quality sensor and driving mechanism. Monitor and adjust to avoid recirculation of dirty air.

Benefits of technology

It effectively improves the air quality at the construction site, protects the health and safety of construction workers, and improves the flexibility and intelligence of the ventilation system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221856781U_ABST
    Figure CN221856781U_ABST
Patent Text Reader

Abstract

The utility model relates to a tunnel construction ventilation device which comprises a fan and an air supply pipe, the fan is arranged on the upper side of a hole outside a tunnel, the input end of the fan is communicated with air outside the tunnel, the output end of the fan is connected with the inlet end of the air supply pipe, the air supply pipe is arranged at the top in an excavated section of the tunnel, and the trend of the air supply pipe is consistent with that of the tunnel. The inlet end is located at a tunnel portal, and the outlet end is located at a tunnel face; the input end of the fan is connected with a telescopic air pipe, an upper guide rod and a lower guide rod, the telescopic air pipe comprises a pipe body and a supporting ring, the two ends of the supporting ring are provided with hanging rings which are arranged on the upper guide rod and the lower guide rod in a sleeving mode respectively, and the hanging rings can slide along the upper guide rod and the lower guide rod to drive the telescopic air pipe to stretch out and draw back. The input end of the fan is connected with the telescopic air pipe, so that air sucked by the fan has high cleanliness, the fan is prevented from sucking vitiated air discharged from a tunnel portal, and the air quality of a construction site is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of tunnel construction, in particular to a ventilation device for tunnel construction. Background Art

[0002] Tunnel construction ventilation is an important factor in ensuring construction site safety and work efficiency. Especially in the construction of small-section tunnels, ventilation is more difficult due to the narrow space. The special environment of the construction site will produce dust, smoke, etc. From the perspective of environmental protection, the quality requirements for air supply are getting higher and higher. The current tunnel construction ventilation system usually adopts a traditional ventilation method, that is, the external clean air is transported to the inside of the tunnel through the ventilation duct, and the dirty air inside the tunnel is discharged from the tunnel opening.

[0003] This ventilation method can partially solve the ventilation problem of the construction site, but there is a problem in this traditional ventilation method, that is, the fan installed at the tunnel entrance often sucks in the dirty air discharged from the tunnel entrance, causing the dirty air to be recirculated into the ventilation system. In this case, the air quality may not meet the standard requirements. Especially in occasions with high air quality requirements, the introduction of dirty air will affect the ventilation effect of the construction site and the health of construction workers. The traditional ventilation system lacks an effective solution to this problem, and the limitations of the fan setting make it difficult to avoid the dirty air being sucked in again. Utility Model Content

[0004] In view of the above defects of the existing technical solutions, the main purpose of the utility model is to develop an improved tunnel construction ventilation system that can effectively solve the problem of polluted air recirculation, thereby ensuring the best ventilation effect at the construction site and protecting the health and safety of construction workers.

[0005] To achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a tunnel construction ventilation device, comprising a fan and an air supply duct, wherein the fan is arranged on the upper side of the tunnel entrance, the input end of the fan is connected to the air outside the tunnel, and the output end is connected to the inlet end of the air supply duct, the air supply duct is arranged at the top of the excavated section of the tunnel, and its direction is consistent with the direction of the tunnel, the inlet end is located at the tunnel entrance, and the outlet end is located at the tunnel face; the input end of the fan is connected to a telescopic air duct, an upper guide rod and a lower guide rod, the telescopic air duct comprises a tube body and a support ring, and both ends of the support ring are provided with hanging rings respectively mounted on the upper guide rod and the lower guide rod, and the hanging rings can slide along the upper guide rod and the lower guide rod to drive the telescopic air duct to be telescopic.

[0006] Preferably, a plurality of the support rings are fixedly sleeved on the outer periphery of the telescopic air duct, and the support rings are evenly arranged.

[0007] Preferably, stoppers are provided at the ends of the upper guide rod and the lower guide rod away from the fan.

[0008] Preferably, a groove is provided near the stop portion, and the stop pin can be inserted into the groove.

[0009] Preferably, it also includes a driving mechanism for driving the telescopic air duct to perform telescopic movement.

[0010] Preferably, an air quality sensor is provided at the input end of the fan, and the air quality sensor is electrically connected to the driving mechanism.

[0011] Preferably, an air guide plate is provided at the bottom of the fan.

[0012] Preferably, the air guiding plate is arranged to be inclined toward the outside of the tunnel opening.

[0013] Preferably, the upper guide rod and the lower guide rod are composed of multiple sections of telescopic rods.

[0014] Preferably, the telescopic air duct, the upper guide rod, the lower guide rod and the fan are detachably connected.

[0015] To sum up, the beneficial effects of the utility model are as follows: the tunnel construction ventilation device can flexibly adjust the length of the retractable air duct by connecting the input end of the fan with a retractable air duct, an upper guide rod and a lower guide rod, so that the air inhaled by the fan has a higher degree of cleanliness. By adjusting the length of the retractable air duct, the fan can be prevented from inhaling dirty air discharged from the tunnel entrance, thereby effectively improving the air quality at the construction site. The upper guide rod and the lower guide rod are composed of multiple sections of retractable rods, and their lengths can be adjusted according to actual needs to adapt to retractable air ducts of different lengths, making the device more flexible and applicable. In addition, an air quality sensor is provided at the input end of the fan and is electrically connected to the drive mechanism, thereby realizing real-time monitoring and adjustment of air quality, and further ensuring the health and safety of construction workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 This is a schematic diagram of the overall structure of a tunnel construction ventilation device according to an embodiment of the utility model;

[0018] Figure 2 A partial schematic diagram of a tunnel opening section of a tunnel construction ventilation device according to an embodiment of the utility model;

[0019] Figure 3 A schematic diagram of a retractable air duct in a retracted state of a tunnel construction ventilation device according to an embodiment of the utility model;

[0020] Explanation of the reference numerals: 1-fan, 2-air supply pipe, 3-retractable air duct, 4-upper guide rod, 5-lower guide rod, 6-tube body, 7-support ring, 8-hanging ring, 9-stop part, 10-stop pin, 11-air quality sensor, 12-air guide plate. DETAILED DESCRIPTION

[0021] The following will clearly and completely describe the technical solutions in the embodiments of the utility model in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the utility model belong to the utility model.

[0022] In addition, described feature, structure or characteristic can be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present application. However, those skilled in the art will appreciate that the technical scheme of the present application can be put into practice without one or more of the specific details, or other methods, components, devices, steps, etc. can be adopted. In other cases, known methods, devices, realizations or operations are not shown or described in detail to avoid blurring the various aspects of the application.

[0023] See also Figure 1-3 The present embodiment provides a tunnel construction ventilation device, comprising a fan 1 and an air supply pipe 2. The fan 1 is arranged on the upper side of the tunnel opening outside the tunnel, and its input end is connected to the air outside the tunnel, and its output end is connected to the inlet end of the air supply pipe 2. The air supply pipe 2 is arranged at the top of the excavated section of the tunnel, and its direction is consistent with the direction of the tunnel. Its inlet end is located at the tunnel opening, and its outlet end is located at the tunnel face. The air supply pipe 2 can adopt a multi-section rigid pipe, and the multi-section rigid pipe is connected in sequence by angle steel flanges in the axial direction; the input end of the fan 1 is connected with a telescopic air duct 3, an upper guide rod 4 and a lower guide rod 5. The telescopic air duct 3 includes a tube body 6 and a support ring 7. Both ends of the support ring 7 are provided with hanging rings 8 respectively sleeved on the upper guide rod 4 and the lower guide rod 5. The hanging ring 8 can slide along the upper guide rod 4 and the lower guide rod 5 to drive the telescopic air duct 3 to be telescopic. The design of the retractable air duct 3 is intended to ensure that the tunnel construction ventilation device can inhale air from a farther distance from the tunnel entrance to avoid the introduction of polluted air. Especially when the air quality is unqualified, the retractable air duct 3 can be extended to a farther position to inhale cleaner air, thereby improving the air quality and ventilation effect of the ventilation system and ensuring ventilation safety at the construction site.

[0024] See also Figure 2 and Figure 3 The telescopic air duct 3 is in the extended state and the contracted state respectively. A plurality of support rings 7 are fixedly sleeved on the outer periphery of the telescopic air duct 3. The support rings 7 are evenly arranged, which can enhance the stability and support capacity of the telescopic air duct 3 structure, ensure that the telescopic air duct 3 remains stable during the telescopic process, and effectively prevent the telescopic air duct 3 from deforming or vibrating during use. The ends of the upper guide rod 4 and the lower guide rod 5 away from the fan 1 are provided with a stopper 9 to limit the maximum length of the telescopic air duct 3 during the telescopic process, so as to ensure that the telescopic air duct 3 will not be over-extended during telescopic operation, thereby protecting the telescopic air duct 3 and related connecting parts, extending their service life, and improving the reliability of the ventilation system. In addition, a groove is provided near the stopper 9, and a stopper pin 10 can be inserted. The end of the telescopic air duct 3 is limited between the stopper 9 and the stopper pin 10, thereby fixing the telescopic length of the telescopic air duct 3, preventing the telescopic air duct 3 from accidentally contracting during use, and ensuring that the air duct remains stable during use.

[0025] In some embodiments, the retractable air duct 3 can be stretched and retracted manually, and in other embodiments, an automated method can be used, including a driving mechanism for driving the retractable air duct 3 to retract and retract. The input end of the fan 1 is provided with an air quality sensor 11, and the air quality sensor 11 is electrically connected to the driving mechanism. The driving mechanism can automatically control the retractable movement of the retractable air duct 3 according to the feedback information of the air quality sensor 11 to ensure that the air inhaled by the fan always maintains a high degree of cleanliness, thereby improving the intelligence and operational convenience of the ventilation system. Furthermore, the driving mechanism is composed of a motor, a winch, a pull rope, etc. The pull rope is fixed to the support ring 7. By controlling the rotation direction of the motor, the winch rotates forward or reversely, so that the end of the retractable air duct 3 can be extended or retracted with the extension and retraction of the pull rope.

[0026] The air quality sensor 11 monitors the air quality at the input end of the fan 1 in real time, and transmits these data to the control system of the drive mechanism by being electrically connected to the drive mechanism. The control system automatically adjusts the working state of the drive mechanism according to the received air quality information. When the air quality reaches the preset standard, the drive mechanism remains stationary; when the air quality does not meet the standard, the drive mechanism starts and adjusts the telescopic state of the telescopic air duct 3 according to the specific situation to ensure that the air inhaled by the fan 1 always maintains a high degree of cleanliness.

[0027] See also Figure 2 Furthermore, an air guide plate 12 is provided at the bottom of the fan 1, and the air guide plate 12 is arranged obliquely toward the outside of the tunnel entrance. The setting of the air guide plate 12 is intended to guide the flow direction of the polluted air to the suction port away from the retractable air duct 3 to prevent the polluted air from being sucked into the ventilation system.

[0028] Furthermore, the upper guide rod 4 and the lower guide rod 5 are composed of multiple sections of telescopic rods. At this time, the upper guide rod and the lower guide rod can be telescoped together with the telescopic air duct 3, which can further save space. The telescopic air duct 3, the upper guide rod 4, the lower guide rod 5 and the fan 1 are detachably connected, which facilitates installation and maintenance and improves the reliability and operability of the ventilation device.

[0029] In summary, the utility model provides a tunnel construction ventilation device, which can conveniently introduce fresh air from an area far away from the tunnel entrance through the design of a retractable air duct, and realizes intelligent adjustment of the ventilation system by combining an air quality sensor and a drive mechanism, so that the air inhaled by the fan always maintains a high degree of cleanliness. At the same time, the air guide plate at the bottom of the fan and the upper and lower guide rods composed of retractable rods and other designs further improve the flexibility and stability of the ventilation system. This innovative technical solution not only improves the ventilation effect of the construction site and the health and safety of construction workers, but also brings new solutions to ventilation equipment in the field of tunnel construction.

[0030] Obviously, the above embodiments are merely examples for the purpose of clear explanation and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention of the utility model.

Claims

1. A tunnel construction ventilation device, comprising a fan (1) and an air supply pipe (2), wherein the fan (1) is arranged on the upper side of the tunnel opening, the input end of the fan (1) is connected to the air outside the tunnel, and the output end of the fan (1) is connected to the inlet end of the air supply pipe (2), the air supply pipe (2) is arranged at the top of the excavated section of the tunnel, and its direction is consistent with the direction of the tunnel, the inlet end of the air supply pipe (2) is located at the tunnel opening, and the outlet end of the air supply pipe (2) is located at the tunnel face; characterized in that: The input end of the fan (1) is connected to a telescopic air duct (3), an upper guide rod (4) and a lower guide rod (5); the telescopic air duct (3) comprises a tube body (6) and a support ring (7); both ends of the support ring (7) are provided with hanging rings (8) respectively sleeved on the upper guide rod (4) and the lower guide rod (5); the hanging rings (8) can slide along the upper guide rod (4) and the lower guide rod (5) to drive the telescopic air duct to extend and retract.

2. The tunnel construction ventilation device according to claim 1, characterized in that: A plurality of support rings (7) are fixedly sleeved on the outer circumference of the telescopic air duct (3), and the support rings (7) are evenly arranged.

3. The tunnel construction ventilation device according to claim 2, characterized in that: Stopping parts (9) are provided at the ends of the upper guide rod (4) and the lower guide rod (5) away from the fan (1).

4. The tunnel construction ventilation device according to claim 3, characterized in that: A groove is arranged near the stop portion (9), and the stop pin (10) can be inserted into the groove.

5. The tunnel construction ventilation device according to claim 2, characterized in that: It also includes a driving mechanism for driving the telescopic air duct (3) to perform telescopic movement.

6. The tunnel construction ventilation device according to claim 5, characterized in that: An air quality sensor (11) is provided at the input end of the fan (1), and the air quality sensor (11) is electrically connected to the driving mechanism.

7. The tunnel construction ventilation device according to claim 1, characterized in that: An air guide plate (12) is provided at the bottom of the fan (1).

8. The tunnel construction ventilation device according to claim 7, characterized in that: The air guide plate (12) is arranged tilted toward the outside of the tunnel opening.

9. The tunnel construction ventilation device according to claim 1, characterized in that: The upper guide rod (4) and the lower guide rod (5) are composed of multiple sections of telescopic rods.

10. The tunnel construction ventilation device according to claim 1, characterized in that: The telescopic air duct (3), the upper guide rod (4), the lower guide rod (5) and the fan (1) are detachably connected.