Device capable of preventing falling in pipe jacking and pulling process
By designing the perforated roof plate and hydraulic jacking components in the pipe jacking process, combined with the well wall protection steel plate, the problems of pipe shedding and heavy rig load in traditional pipe jacking devices are solved, and the risk of pipe shedding and rig load is reduced. and improve construction efficiency.
Patent Information
- Application Number
- CN202420153736.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-22
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-22
AI Technical Summary
When the rear roof plate of the traditional pipe jacking device is not tightened, there may be gaps between the pipes, causing the pipes to fall off. It also places a heavy load on the drilling rig, causing problems in terms of construction safety and high equipment maintenance costs.
A device including an open-hole roof plate, a hydraulic jacking assembly and a well wall protection steel plate is designed. The hydraulic jacking assembly provides additional jacking power to prevent the pipe from falling off, and the well wall protection steel plate protects the well wall structure and reduces the drilling rig load. load.
It effectively reduces the risk of pipe falling off, reduces the load on the drilling rig, improves construction safety and efficiency, simplifies the maintenance process, and improves project quality and economic benefits.
Smart Images

Figure CN221857745U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of municipal rainwater and sewage pipe network transformation, in particular to a device capable of preventing falling off in a pipe jacking and pulling process. Background Art
[0002] Traditional pipe jacking devices usually use a drilling rig to drill the drill pipe from upstream to downstream, install a tunneling head in the downstream well, and use the tunneling head to expand the hole. The remaining force of the drilling rig is transmitted to the pipe tail through the rear transfer device and the force transmission rod of the rig head to achieve the purpose of jacking. However, if the rear top plate is not tightened, this method may cause gaps between the pipes, eventually causing the pipes to fall off, and at the same time, it will put a large load on the drilling rig. Utility Model Content
[0003] 1. Technical issues to be solved
[0004] In view of the shortcomings of the prior art, the utility model provides a device that can prevent pipes from falling off in the jacking and pulling process. It has the advantages of reduced risk of pipes falling off, reduced load on drilling rigs, strong adaptability, protection of well wall structure, improved construction efficiency and easy maintenance, and solves the problem of risk of pipes falling off due to heavy drilling rig load.
[0005] (II) Technical solution
[0006] In order to achieve the above-mentioned purpose, the utility model provides the following technical solution: a device capable of preventing falling off in a pipe pulling process, comprising:
[0007] The perforated top plate is arranged behind the original top pull tube top plate, and has a hole in the middle for placing the original force transmission rod and the top plate mounting device;
[0008] A hydraulic jacking assembly, the output end of which is butted against the right side surface of the opening top plate;
[0009] The well wall protection steel plate is installed between the well wall and the tail end of the hydraulic jacking assembly;
[0010] A hydraulic cylinder, the output end of which is connected to the inside of the input end of the hydraulic jacking assembly through an oil guide pipe;
[0011] The perforated top plate allows the original top plate to slide inward, but restricts it from sliding to the end of the force transmission rod.
[0012] Preferably, the hydraulic jacking assembly works in conjunction with a drilling rig.
[0013] Preferably, the perforated top plate is designed to be adjustable.
[0014] Preferably, the hydraulic jacking assembly comprises:
[0015] A jack connected to the output end of the hydraulic cylinder;
[0016] A jacking rod arranged at the output end of the jack;
[0017] A front end docking plate mounted on the left end of the jacking rod;
[0018] A plurality of docking posts are evenly distributed on the left end surface of the front end docking plate, and the left ends of the plurality of docking posts are docked on the right side surface of the perforated top plate.
[0019] Preferably, the left ends of the plurality of docking posts are equidistantly distributed around the center of the central hole of the perforated top plate as the center of the circle.
[0020] Preferably, the hydraulic jacking assembly also includes:
[0021] A plurality of reinforcing rib plates are evenly distributed at the butt corners between the jacking rod and the front butt plate.
[0022] Compared with the prior art, the utility model provides a device that can prevent falling off in the process of pulling the pipe, which has the following beneficial effects:
[0023] Reduced risk of pipe falling off: Through the design of the rear perforated top plate, even if the original top plate is not tightened, it can effectively prevent gaps between pipes, thereby avoiding the problem of pipe falling off and improving construction safety.
[0024] Reduced rig load: The hydraulic jacking assembly works in conjunction with the drill rig to provide additional jacking power, reduce the workload of the drill rig, extend the service life of the drill rig, and reduce equipment maintenance costs.
[0025] Strong adaptability: The perforated top plate is designed to be adjustable and can be adjusted according to different lengths of force transfer rods and top plate mounting devices, which improves the applicability of the device and enables it to adapt to different engineering needs.
[0026] Protect the well wall structure: The well wall protection steel plate has sufficient strength and rigidity to effectively protect the well wall of the downstream well chamber during the jacking pipe construction process, prevent the well wall from being damaged, and ensure the quality of the project.
[0027] Improved construction efficiency: Since this device can prevent pipes from falling off and reduce the load on the drilling rig, it can improve the efficiency of pipe jacking construction, shorten project time and reduce construction costs.
[0028] Easy maintenance: Since the device has a simple structure and is easy to install and disassemble, maintenance and adjustment work during the construction process also becomes simpler and faster.
[0029] Stability of pipe tightening: The design of the front-end docking plate and several docking columns in the hydraulic tightening assembly can effectively improve the connection strength between it and the open top plate on the front side, thereby ensuring the uniformity of force transmission during tightening and ensuring stability when tightening the pipe.
[0030] In summary, the utility model not only improves the safety and efficiency of the top-pull pipe process in the field of municipal rainwater and sewage pipe network reconstruction, but also has good economic and social benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 The utility model is a diagram showing the practical application of a device capable of preventing falling off in a pipe pulling process in the pipe pulling process.
[0032] Figure 2 The utility model is a device for preventing falling off in a pipe pulling process, and the corresponding perforated top plate and jack are shown.
[0033] Among them: 1. Opening top plate; 2. Jack; 3. Well wall protection steel plate; 4. Hydraulic cylinder. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0035] See also Figure 1-2 , a device for preventing falling off in a pipe pulling process, comprising:
[0036] The perforated top plate 1 is arranged behind the original top pull tube top plate, and has a hole in the middle for placing the original force transmission rod and the top plate mounting device;
[0037] A hydraulic jacking assembly 2, the output end of which is butted against the right side surface of the perforated top plate 1;
[0038] The well wall protection steel plate 3 is installed between the well wall and the tail end of the hydraulic jacking assembly 2;
[0039] The hydraulic cylinder 4, whose output end is connected to the input end of the hydraulic jacking assembly 2 through an oil guide pipe;
[0040] The perforated top plate 1 allows the original top plate to slide inward, but restricts it from sliding to the end of the force transmission rod.
[0041] The hydraulic jacking assembly 2 works in conjunction with the drilling rig to reduce the load on the drilling rig, and when the original top plate is not jacked, the rear hole top plate 1 prevents the pipe from falling off.
[0042] The perforated top plate 1 is designed to be adjustable to accommodate dowel rods and top plate mounting devices of different lengths.
[0043] The shaft wall protection steel plate 3 has sufficient strength and rigidity to withstand the pressure and impact during the pipe jacking construction process.
[0044] The hydraulic jacking assembly 2 comprises:
[0045] A jack 21 connected to the output end of the hydraulic cylinder 4;
[0046] A jacking rod 22 arranged at the output end of the jack 21;
[0047] A front end docking plate 23 mounted on the left end of the jacking rod 22;
[0048] A plurality of docking posts 24 are evenly distributed on the left end surface of the front docking plate 23 , and the left ends of the plurality of docking posts 24 are docked on the right side surface of the perforated top plate 1 .
[0049] The left ends of the plurality of docking posts 24 are equidistantly distributed around the center of the central hole of the perforated top plate 1 as the center of the circle;
[0050] The jack 21 drives the jacking rod 22 to push forward, and then drives the opening top plate 1 to push forward and tighten the front end pipe through the front end docking plate 23 and a plurality of docking columns 24;
[0051] The design of the front docking plate 23 and the plurality of docking posts 24 can effectively enhance the connection strength between the front docking plate 23 and the front perforated top plate 1, thereby ensuring uniform force transmission during tightening and ensuring stability during tightening of the pipe.
[0052] The hydraulic jacking assembly 2 also includes:
[0053] A plurality of reinforcing rib plates 25 are evenly distributed at the corner where the jacking rod 22 and the front end docking plate 23 are docked.
[0054] The design of the reinforcing rib plate 25 can enhance the connection strength between the jacking rod 22 and the front end docking plate 23 .
[0055] A method for constructing a pipe-pull-type device capable of preventing a pipe from falling off in a pipe-pull-type process comprises the following steps:
[0056] Place the perforated top plate 1 behind the original top plate of the top pull tube, and install the original force transmission rod and the top plate installation device through the middle opening;
[0057] A hydraulic jacking assembly 2 and a hydraulic cylinder 4 are used to provide jacking power, while the well wall protection steel plate 3 protecting the downstream well chamber is fixed in an appropriate position;
[0058] During the jacking and pulling of the pipe, the hydraulic jacking assembly 2 works in conjunction with the drilling rig to prevent the pipe from falling off and reduce the load on the drilling rig.
[0059] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A device for preventing the pipe from falling off during the pipe pulling process. It is characterized in that include: A perforated top plate (1) is arranged behind the original top pull tube top plate, and has a hole in the middle for placing the original force transmission rod and the top plate mounting device; A hydraulic jacking assembly (2), the output end of which is butted against the right side surface of the perforated top plate (1); The well wall protection steel plate (3) is installed between the well wall and the tail end of the hydraulic jacking assembly (2); A hydraulic oil cylinder (4), the output end of which is connected to the inside of the input end of the hydraulic jacking assembly (2) through an oil guide pipe; The perforated top plate (1) allows the original top plate to slide inwards, but restricts it from sliding to the end of the force transmission rod.
2. A device for preventing falling off in a pipe pulling process according to claim 1, Features: The hydraulic jacking assembly (2) works in coordination with the drilling rig.
3. The device for preventing falling off in the pipe pulling process according to claim 1, Features: The perforated top plate (1) is designed to be adjustable.
4. The device for preventing falling off in the pipe pulling process according to claim 1, Features: The hydraulic jacking assembly (2) comprises: a jack (21) connected to the output end of the hydraulic cylinder (4); A jacking rod (22) arranged as an output end of the jack (21); A front end docking plate (23) mounted on the left end of the jacking rod (22); A plurality of docking posts (24) are evenly distributed on the left end surface of the front docking plate (23), and the left ends of the plurality of docking posts (24) are docked on the right side surface of the perforated top plate (1).
5. The device for preventing falling off in the pipe pulling process according to claim 4, Features: The left ends of a plurality of docking posts (24) are equidistantly distributed around the center of the central hole of the perforated top plate (1) as the center of the circle.
6. The device for preventing falling off in the pipe pulling process according to claim 4, Features: The hydraulic jacking assembly (2) also includes: A plurality of reinforcing rib plates (25) are evenly distributed at the butt corners between the jacking rod (22) and the front butt plate (23).