Pipeline rack device for tunnel construction
By using a pipeline rack device in tunnel construction, and using a combined structure of vertical and horizontal plates, anchors, and bolts to fix the pipelines, the problems of unstable pipeline fixing and damage during removal in the existing technology are solved, and the stable fixation of the pipelines is achieved. and flexible installation.
Patent Information
- Application Number
- CN202420982312.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-08
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-05-08
AI Technical Summary
In the existing tunnel construction, the pipeline fixation method lacks limit and is easy to loosen. When the fixing frame is removed, the tunnel structure may be damaged, affecting the construction progress.
Design a pipeline rack device, which includes a vertical plate, a first horizontal plate, a second horizontal plate and a third horizontal plate. It is fixed to the side wall of the tunnel through upper and lower anchor rods, and uses bolt holes and fixing screws to limit the pipeline. The position is fixed to ensure pipeline stability and flexibility.
It achieves standardized layout and stable fixation of pipelines to avoid falling off, and the device can be removed without damaging the tunnel structure. It is suitable for different working conditions and pipeline sizes.
Smart Images

Figure CN221857802U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of tunnel engineering, in particular to a pipeline rack device for tunnel construction. Background Art
[0002] Tunnels are a common form of water conservancy projects, especially in the process of long-distance water diversion and water delivery. Tunnels can be divided into pressurized tunnels and non-pressurized tunnels according to whether the tunnel wall is under pressure. During tunnel excavation and construction, in order to meet construction requirements, corresponding pipelines generally need to be laid. The layout of these pipelines must not only meet the necessary power supply, network and ventilation requirements for construction, but also consider that the layout of the pipelines should not affect the construction as much as possible, and have a certain stability to avoid affecting the construction progress due to the falling of the pipelines.
[0003] In the prior art, most of the pipeline layouts are arranged by setting a fixing frame and letting the pipeline pass through the fixing frame. This arrangement lacks position limitation for the pipeline, and the pipeline is easy to loosen. Moreover, if the fixing method of the fixing frame adopts a fixed connection, after the construction is completed, the removal will cause certain damage to the tunnel structure. If a temporary fixation is adopted, the fixing frame may loosen, thereby affecting the normal operation of the pipeline. Summary of the invention
[0004] The utility model aims at solving the problems of the prior art and provides a pipeline rack device for tunnel construction. The reasonable fixing and limiting of the pipeline is achieved by reasonably designing the pipeline rack device.
[0005] The utility model provides a pipeline rack device for tunnel construction, the pipeline rack device is used to fix the pipeline in the tunnel during tunnel construction, the tunnel comprises a left side wall, a right side wall, a bottom wall and an arch, the arch is respectively connected to the upper part of the left side wall and the right side wall, the bottom wall is respectively connected to the lower part of the left side wall and the right side wall, the pipeline rack device is arranged on the left side wall, and is characterized in that: the pipeline rack device comprises a vertical plate, a first horizontal plate, a second horizontal plate and a third horizontal plate, the first horizontal plate, the second horizontal plate and the third horizontal plate are arranged in parallel and are fixedly connected to the vertical plate, the pipeline is respectively located in the space formed by the vertical plate, the first horizontal plate, the second horizontal plate and the third horizontal plate, Through holes are provided at both ends of the vertical plate, and the through holes are respectively located on the outer sides of the first horizontal plate and the third horizontal plate; an upper anchor rod and a lower anchor rod are provided on the left side wall, and the upper anchor rod and the lower anchor rod both pass through the through holes on the vertical plate, and the vertical plate is fixed to the left side wall by a fixing member; bolt holes are provided at the ends of the first horizontal plate, the second horizontal plate and the third horizontal plate away from the vertical plate, and the bolt holes on the first horizontal plate, the second horizontal plate and the third horizontal plate are aligned; a fixing screw is provided to pass through the bolt holes of the first horizontal plate, the second horizontal plate and the third horizontal plate in sequence, and fixing bolts are provided at both ends of the fixing screw, and the fixing bolts are respectively located on the outer sides of the first horizontal plate and the third horizontal plate.
[0006] Preferably, a plurality of the pipeline rack devices are arranged on the left side wall along the axial direction of the tunnel, and the pipeline rack devices are arranged at intervals with equal intervals.
[0007] Preferably, along the axial direction of the tunnel, a plurality of bolt holes are arranged at intervals on the ends of the first horizontal plate, the second horizontal plate and the third horizontal plate away from the vertical plate, and a plurality of fixing screws are arranged in sequence and correspond one to one to the bolt holes.
[0008] Preferably, during construction, one end of the upper anchor rod and the lower anchor rod penetrates into the left side wall, and the other end extends out of the left side wall, and a through hole is reserved on the vertical plate. During installation, the upper anchor rod and the lower anchor rod are aligned with the through holes on the vertical plate, and the fixing parts are installed to achieve the installation and fixation of the pipeline rack device.
[0009] The working principle of the utility model is as follows:
[0010] During tunnel construction, an upper anchor rod and a lower anchor rod are arranged on the left side wall, which can not only realize the fixed connection between the left side wall of the tunnel and the tunnel rock mass, but also serve as a fixed fulcrum for the pipeline rack device. The pipeline rack adopts a setting method of a vertical plate in conjunction with a first horizontal plate, a second horizontal plate, and a third horizontal plate. The pipelines are respectively located in the space formed by the vertical plate, the first horizontal plate, the second horizontal plate, and the third horizontal plate. In this way, the direction of the pipeline can be standardized to avoid the disorderly arrangement of the pipeline. According to the specific size of the pipeline, the position and size of the vertical plate, the first horizontal plate, the second horizontal plate, and the third horizontal plate can be adjusted. The space of the pipeline rack device can constrain the pipeline and support and fix the pipeline.
[0011] Bolt holes are provided at one end of the first horizontal plate, the second horizontal plate and the third horizontal plate away from the vertical plate. Fixing screws are provided to pass through the bolt holes to limit the position of the pipeline. A plurality of fixing screws are provided to prevent the pipeline from falling off the pipeline rack device. The setting position of the bolt holes can be adjusted according to the size of the pipeline. The device is easy to install and fix, and its size structure can be adjusted to be suitable for different working conditions.
[0012] Tunnel pipelines can be structures such as pipes, wires, and cables, which can be temporarily fixed. When the pipeline structure is not needed, it can be directly dismantled, which is convenient for construction and has good fixing and installation performance.
[0013] The advantages of the utility model are:
[0014] The utility model provides a pipeline rack device for tunnel construction, which is used to fix pipelines in a tunnel during tunnel construction. The pipeline rack device comprises a vertical plate, a first horizontal plate, a second horizontal plate and a third horizontal plate. The vertical plate is connected with an upper anchor rod and a lower anchor rod to achieve fixed connection between the pipeline rack device and a side wall of the tunnel. Bolt holes are arranged at one end of the first horizontal plate, the second horizontal plate and the third horizontal plate away from the vertical plate, and fixing screws are arranged to pass through the bolt holes to achieve limited fixation of the pipeline, thereby improving the fixing performance of the pipeline. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural schematic diagram of the utility model;
[0016] Figure 2 It is a schematic diagram of the structure of the pipeline rack device;
[0017] Figure 3 This is a top view of the first horizontal plate along the main line of the tunnel. DETAILED DESCRIPTION
[0018] The following is a detailed explanation of the contents defined in the present utility model.
[0019] The utility model provides a pipeline rack device for tunnel construction, the pipeline rack device is used to fix the pipeline in the tunnel during tunnel construction, the tunnel comprises a left side wall 1, a right side wall 2, a bottom wall 31 and an arch 32, the arch 32 is respectively connected to the upper part of the left side wall 1 and the right side wall 2, the bottom wall 31 is respectively connected to the lower part of the left side wall 1 and the right side wall 2, the pipeline rack device is arranged on the left side wall 1, and is characterized in that: the pipeline rack device comprises a vertical plate 4, a first horizontal plate 5, a second horizontal plate 6 and a third horizontal plate 7, the first horizontal plate 5, the second horizontal plate 6 and the third horizontal plate 7 are arranged in parallel, and are all fixedly connected to the vertical plate 4, the pipelines are respectively located in the space formed by the vertical plate 4, the first horizontal plate 5, the second horizontal plate 6 and the third horizontal plate 7, the vertical Through holes are provided at both ends of the plate 4, and the through holes are respectively located on the outer sides of the first horizontal plate 5 and the third horizontal plate 7. An upper anchor rod 81 and a lower anchor rod 82 are provided on the left side wall 1, and the upper anchor rod 81 and the lower anchor rod 82 both pass through the through holes on the vertical plate 4, and the vertical plate 4 is fixed to the left side wall 1 through a fixing member. Bolt holes 10 are provided at the ends of the first horizontal plate 5, the second horizontal plate 6 and the third horizontal plate 7 away from the vertical plate 4, and the bolt holes 10 on the first horizontal plate 5, the second horizontal plate 6 and the third horizontal plate 7 are aligned, and a fixing screw 9 is provided to pass through the bolt holes 10 of the first horizontal plate 5, the second horizontal plate 6 and the third horizontal plate 7 in sequence, and fixing bolts are provided at both ends of the fixing screw 9, and the fixing bolts are respectively located on the outer sides of the first horizontal plate 5 and the third horizontal plate 7.
[0020] Preferably, along the axial direction of the tunnel, a plurality of pipeline rack devices are arranged on the left side wall 1, and the pipeline rack devices are arranged at intervals and at equal intervals. During tunnel construction, pipelines are sequentially placed in the pipeline rack devices, and the interval distance depends on the pipeline layout requirements.
[0021] Preferably, along the axis direction of the tunnel, a plurality of bolt holes 10 are arranged at intervals on the ends of the first horizontal plate 5, the second horizontal plate 6 and the third horizontal plate 7 away from the vertical plate 4, and a plurality of fixing screws 9 are arranged in sequence, and are arranged one by one corresponding to the bolt holes 10. That is, the plurality of fixing screws 9 are arranged along the axis direction of the tunnel, and this arrangement can limit the pipelines in the pipeline rack to prevent the pipelines in the pipeline rack from moving and falling off, and the position of the bolt hole 10 can be selected, so that for different pipeline sizes, only the position of the bolt hole 10 needs to be changed during processing.
[0022] Preferably, during construction, one end of the upper anchor rod 81 and the lower anchor rod 82 penetrate into the left side wall 1, and the other end extends out of the left side wall 1, and a through hole is reserved on the vertical plate 4. During installation, the upper anchor rod 81 and the lower anchor rod 82 are aligned with the through holes on the vertical plate 4, and the fixing parts are installed to achieve the installation and fixation of the pipeline rack device.
[0023] As another fixing method, when the left side wall 1 is constructed, embedded bolts are provided, and the embedded bolts are matched with the through holes on the vertical plate 4. When installing, the vertical plate 4 can be directly fixed on the embedded bolts.
[0024] The through holes on the vertical plate 4 are arranged up and down, respectively corresponding to the upper anchor rod 81 and the lower anchor rod 82. Along the tunnel axis direction, the through holes can be arranged in two, and the corresponding upper anchor rod 81 and the lower anchor rod 82 are also arranged in two, so as to achieve fixation. After the construction is completed, the vertical plate 4 is directly removed, and the upper anchor rod 81 and the lower anchor rod 82 extending out of the left side wall 1 of the tunnel can be cut.
[0025] For the attached pictures, Figure 1 This is a schematic diagram of the pipeline rack installation. Figure 2 This is a schematic diagram of the pipeline rack lying flat. Figure 3 FIG. 5 is a top view of the first horizontal plate 5 of the pipeline rack along the axis of the tunnel.
[0026] The above-mentioned embodiments are only preferred embodiments of the present invention. The protection scope of the present invention should not be regarded as limited to the specific forms described in the embodiments. The protection scope of the present invention also includes equivalent technical means that can be thought of by those skilled in the art based on the concept of the present invention.
Claims
1. A pipeline rack device for tunnel construction, the pipeline rack device is used to fix pipelines in the tunnel during tunnel construction, the tunnel comprises a left side wall, a right side wall, a bottom wall and an arch, the arch is connected to the upper part of the left side wall and the right side wall respectively, the bottom wall is connected to the lower part of the left side wall and the right side wall respectively, the pipeline rack device is arranged on the left side wall, and is characterized in that: The pipeline rack device includes a vertical plate, a first horizontal plate, a second horizontal plate and a third horizontal plate, the first horizontal plate, the second horizontal plate and the third horizontal plate are arranged in parallel and are fixedly connected to the vertical plate, the pipelines are respectively located in the space formed by the vertical plate, the first horizontal plate, the second horizontal plate and the third horizontal plate, through holes are arranged at both ends of the vertical plate, the through holes are respectively located on the outer sides of the first horizontal plate and the third horizontal plate, an upper anchor rod and a lower anchor rod are arranged on the left side wall, the upper anchor rod and the lower anchor rod both pass through the through holes on the vertical plate, and the vertical plate is fixed to the left side wall by a fixing member, a bolt hole is arranged at one end of the first horizontal plate, the second horizontal plate and the third horizontal plate away from the vertical plate, the bolt holes on the first horizontal plate, the second horizontal plate and the third horizontal plate are aligned, a fixing screw is arranged to pass through the bolt holes of the first horizontal plate, the second horizontal plate and the third horizontal plate in sequence, fixing bolts are arranged at both ends of the fixing screw, and the fixing bolts are respectively located on the outer sides of the first horizontal plate and the third horizontal plate.
2. The pipeline rack device for tunnel construction according to claim 1, characterized in that: Along the axial direction of the tunnel, a plurality of pipeline rack devices are arranged on the left side wall, and the pipeline rack devices are arranged at intervals and at equal intervals.
3. The pipeline rack device for tunnel construction according to claim 2, characterized in that: Along the axial direction of the tunnel, a plurality of bolt holes are arranged at intervals on the ends of the first horizontal plate, the second horizontal plate and the third horizontal plate away from the vertical plate, and a plurality of fixing screws are arranged in sequence and correspond one to one to the bolt holes.
4. The pipeline rack device for tunnel construction according to claim 1, characterized in that: During construction, one end of the upper anchor rod and the lower anchor rod penetrates into the left side wall, and the other end extends out of the left side wall, and a through hole is reserved on the vertical plate. During installation, the upper anchor rod and the lower anchor rod are aligned with the through holes on the vertical plate, and the fixing parts are installed to achieve the installation and fixation of the pipeline rack device.
