Measuring tool for constructional engineering management
By introducing fixed components and snap-fit components into the measurement tools for construction project management, the problem of inconvenient assembly is solved, a stable connection between body A and body B is achieved, and bolt penetration is facilitated, improving the convenience of assembly.
Patent Information
- Application Number
- CN202420818200.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the assembly process of existing measuring tools for construction project management, the lack of a connecting structure between body A and body B makes assembly inconvenient and affects the fixity of bolt penetration.
A measuring tool for construction engineering management including fixed components is designed. By arranging fixed grooves, mounting blocks and connecting components at the connection between main body A and main body B, the position of main body A and main body B is realized by using torsion springs and limiting rods. Fix it, and perform preliminary limiting through the snap-in component to ensure that the bolt can penetrate smoothly.
It improves the ease of assembly of the measuring tool, ensures that main body A and main body B can be stably connected after assembly, facilitates subsequent bolt penetration, and solves the problem of inconvenient assembly.
Smart Images

Figure CN221859388U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building measurement, and in particular relates to a measuring tool for building engineering management. Background Art
[0002] In the process of construction project management, multiple parameters such as the height, length, verticality, etc. of the building are measured by using measuring tools.
[0003] In the existing construction project management process, when the measuring tool is used, a main body A and a main body B constituting the measuring tool are fixed by multiple bolts. During the operation, the main body A is fitted with the mounting surfaces of the main body B and the main body B is aligned, and then the subsequent bolt penetration operation is performed. After the main body A and the main body B are aligned, there is no connection structure between the two, causing the main body A and the main body B to separate, affecting the subsequent bolt penetration fixation. For this reason, the utility model proposes a measuring tool for construction project management. Utility Model Content
[0004] The utility model aims to provide a measuring tool for construction engineering management, so as to solve the problem that the measuring tool proposed in the above background technology is inconvenient to assemble when in use.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a measuring tool for construction engineering management, comprising a main body A, a main body B arranged on the front side of the main body A, and a measuring tape arranged on the inner sides of the main body A and the main body B, wherein fixing components are arranged at the connection points on both sides of the main body A and the main body B, and the fixing components are composed of a fixing groove A, a fixing groove B, a mounting block, and a connecting component, wherein the fixing groove A is arranged on the side of the main body A, the fixing groove B is arranged on the side of the main body B, the mounting block is arranged on the inner sides of the fixing groove A and the fixing groove B, and the connecting component is arranged at the connection point between the mounting block and the fixing groove A.
[0006] Preferably, the cross-section of the top end of the mounting block is L-shaped, and the surface of the mounting block is in contact with the inner wall of the fixing groove B and the inner wall of the fixing groove A.
[0007] Preferably, the connecting assembly consists of a torsion spring and a limiting rod, the limiting rod passes through the inner side of one end of the mounting block, the two ends of the limiting rod are fixed to the inner walls of the fixing groove A, the torsion spring is sleeved on the surface of the limiting rod, and the two ends of the torsion spring are fixed to the inner side of the mounting block.
[0008] Preferably, a snap-fit assembly is provided between the main body A and the main body B, and the snap-fit assembly consists of a snap block and a snap slot. The snap slot is opened on the inner side of the main body A, and the snap block is fixed on the inner side of the main body B, and the snap block and the snap slot are in a snap-fit state.
[0009] Preferably, the surface of the card block is in contact with the inner wall of the card slot.
[0010] Preferably, a mounting hole is provided on the inner side of the connection between the main body A and the main body B, and a bolt passes through the inner side of the mounting hole.
[0011] Preferably, a rocker is provided on the surface of the main body B, and vertebral bodies are provided at the bottom ends of the main body A and the main body B.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] Through the designed fixing components, the problem of the original measuring tools for construction engineering management, that during the assembly process of the main body A and the main body B, the main body A and the main body B cannot be fixed in position after being engaged, making subsequent installation inconvenient, is improved. By arranging the fixing components at the connection points on both sides of the main body A and the main body B, when the two are assembled, the fixing components are used to form a connection between the main body A and the main body B, which is convenient for subsequent bolt penetration, thereby increasing the convenience of assembly. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural schematic diagram of the utility model;
[0015] Figure 2 For this utility model Figure 1 A schematic diagram of the enlarged area of the A part;
[0016] Figure 3 It is a side cross-sectional schematic diagram of the fixing assembly of the utility model;
[0017] In the figure: 1. main body A; 2. main body B; 21. clamping block; 22. clamping slot; 3. measuring tape; 4. fixing assembly; 41. fixing slot A; 42. fixing slot B; 43. mounting block; 44. connecting assembly; 441. torsion spring; 442. limiting rod. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] See also Figures 1 to 3The utility model provides a technical solution: a measuring tool for construction engineering management, comprising a main body A1, a main body B2 arranged at the front side of the main body A1, and a measuring tape 3 arranged at the inner sides of the main body A1 and the main body B2. The connecting parts on both sides of the main body A1 and the main body B2 are provided with fixing components 4, and the fixing components 4 are composed of a fixing groove A41, a fixing groove B42, a mounting block 43, and a connecting component 44. The main body A1 and the main body B2 are fixed in position during assembly by the fixing components 4. The fixing groove A41 is arranged on the side of the main body A1, and the fixing groove B42 is arranged on the side of the main body B2. The mounting block 43 is arranged on the inner sides of the fixing groove A41 and the fixing groove B42, and the connecting component 44 is arranged at the connection between the mounting block 43 and the fixing groove A41. The designed fixing components 4 are used to improve the problem that the main body A1 and the main body B2 cannot be fixed in position after being engaged during the assembly process of the original construction engineering management measuring tool, which is inconvenient for subsequent installation. A fixing assembly 4 is provided at the connection between the main body A1 and the main body B2 on both sides, so that when the two are assembled, the main body A1 and the main body B2 are connected through the fixing assembly 4, which is convenient for subsequent bolt penetration, thereby increasing the convenience of assembly. The top cross-section of the mounting block 43 is an L-shaped structure, and the surface of the mounting block 43 is in a state of being in contact with the inner wall of the fixing groove B42 and the inner wall of the fixing groove A41. A snap-fit assembly is provided between the main body A1 and the main body B2, and the main body A1 and the main body B2 are snap-fitted through the snap-fit assembly. Preliminary limiting is performed during assembly. The locking assembly consists of a locking block 21 and a locking slot 22. The locking slot 22 is opened on the inner side of the main body A1, and the locking block 21 is fixed to the inner side of the main body B2. The locking block 21 and the locking slot 22 are in a locking state, and the surface of the locking block 21 is in a fit with the inner wall of the locking slot 22. A mounting hole is opened on the inner side of the connection between the main body A1 and the main body B2, and bolts penetrate the inner side of the mounting hole. A rocker is set on the surface of the main body B2, and a cone is set at the bottom end of the main body A1 and the main body B2.
[0020] In this embodiment, preferably, the connecting component 44 is composed of a torsion spring 441 and a limiting rod 442. The limiting rod 442 passes through the inner side of one end of the mounting block 43. When the fixing component 4 is in use, the unfolded mounting block 43 rebounds through the connecting component 44. The two ends of the limiting rod 442 are fixed to the inner walls of the fixing groove A41. The torsion spring 441 is sleeved on the surface of the limiting rod 442, and the two ends of the torsion spring 441 are fixed to the inner side of the mounting block 43.
[0021] The working principle and use process of the utility model are as follows: in the process of construction project management, when measuring a building by using a measuring tool, the hook at the end of the measuring tape 3 is connected to the starting point, and then the measuring tool is moved as a whole to the required position, and during the overall movement of the measuring tool, the measuring tape 3 is unfolded to measure the building. When the measurement is completed, the unfolded measuring tape 3 is stored by operating the rocker; when the main body A1 and the main body B2 of the measuring tool need to be assembled, the main body A1 and the main body B2 are firstly attached, and during the attaching process, the mounting block 43 is moved to the desired position. Pull from the outside to make the mounting block 43 rotate outward with the limiting rod 442 passing through it as the center, then fit the main body A1 and the main body B2 together, and make the clamping block 21 fixed on the inner side of the main body B2 fit into the inner side of the clamping groove 22 opened on the inner side of the main body A1, and simultaneously release the mounting block 43. Under the torsion force of the torsion spring 441, the mounting block 43 rebounds, so that the surface of the mounting block 43 fits with the inside of the fixing groove A41 and the inside of the fixing groove B42, so that the position of the main body A1 and the main body B2 is fixed, and then the bolts are passed through the mounting holes to complete the assembly operation of the main body A1 and the main body B2.
[0022] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A measuring tool for construction engineering management, comprising a main body A (1), a main body B (2) arranged in front of the main body A (1), and a measuring tape (3) arranged inside the main body A (1) and the main body B (2), characterized in that: A fixing assembly (4) is provided at the connection points on both sides of the main body A (1) and the main body B (2), and the fixing assembly (4) is composed of a fixing groove A (41), a fixing groove B (42), a mounting block (43), and a connecting assembly (44). The fixing groove A (41) is provided on the side of the main body A (1), the fixing groove B (42) is provided on the side of the main body B (2), the mounting block (43) is provided on the inner sides of the fixing groove A (41) and the fixing groove B (42), and the connecting assembly (44) is provided at the connection point between the mounting block (43) and the fixing groove A (41).
2. A construction engineering management measuring tool according to claim 1, characterized in that: The cross section of the top end of the mounting block (43) is in an L-shaped structure, and the surface of the mounting block (43) is in a state of being in contact with the inner wall of the fixing groove B (42) and the inner wall of the fixing groove A (41).
3. A construction engineering management measuring tool according to claim 1, characterized in that: The connecting assembly (44) is composed of a torsion spring (441) and a limiting rod (442). The limiting rod (442) passes through the inner side of one end of the mounting block (43). The two ends of the limiting rod (442) are fixed to the inner walls of the fixing groove A (41). The torsion spring (441) is sleeved on the surface of the limiting rod (442). The two ends of the torsion spring (441) are fixed to the inner side of the mounting block (43).
4. A construction engineering management measuring tool according to claim 1, characterized in that: A snap-fit assembly is provided between the main body A (1) and the main body B (2), and the snap-fit assembly consists of a snap-fit block (21) and a snap-fit slot (22). The snap-fit slot (22) is provided on the inner side of the main body A (1), and the snap-fit block (21) is fixed on the inner side of the main body B (2). The snap-fit block (21) and the snap-fit slot (22) are in a snap-fit state.
5. A construction engineering management measuring tool according to claim 4, characterized in that: The surface of the card block (21) is in contact with the inner wall of the card slot (22).
6. A construction engineering management measuring tool according to claim 1, characterized in that: The connection between the main body A (1) and the main body B (2) is provided with a mounting hole on the inner side, and a bolt passes through the inner side of the mounting hole.
7. A construction engineering management measuring tool according to claim 1, characterized in that: A rocker is arranged on the surface of the main body B (2), and cones are arranged at the bottom ends of the main body A (1) and the main body B (2).