Roadbed settlement monitoring device

By designing a combined device of a compressed sealed water bag and a monitoring bottom plate, the subgrade settlement amplitude is amplified and deep settlement is monitored in advance, which solves the problem in the existing technology of insufficiently precise monitoring of subgrades with small settlement amplitudes, and achieves high-efficiency and low-cost monitoring results. .

CN221859544UActive Publication Date: 2024-10-18SHANDONG LUTAI HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420396963.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2024-10-18
Estimated Expiration
2034-03-01

AI Technical Summary

Technical Problem

The existing roadbed settlement monitoring device is not precise enough for monitoring roadbeds with small settlement amplitudes, is costly, and is not suitable for large-scale promotion and use.

Method used

A roadbed settlement monitoring device is designed. By compressing and sealing the water bag, the telescopic part moves greatly, driving the measuring rod to move three times, enlarging the settlement amplitude display, and combining with the monitoring base plate to monitor deep settlement in advance to ensure monitoring accuracy and low cost.

Benefits of technology

It achieves efficient monitoring of roadbeds with small settlement amplitudes, prevents omissions, reduces monitoring costs, and is suitable for large-scale promotion and use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221859544U_ABST
    Figure CN221859544U_ABST
Patent Text Reader

Abstract

The utility model provides a roadbed settlement monitoring device, which relates to the technical field of roadbed settlement monitoring and comprises a monitoring carrier plate, the monitoring carrier plate is of a rectangular plate structure, four horizontal rulers in different directions are arranged at the top of the monitoring carrier plate, and a positioning outer cylinder is arranged above the middle of the top of the monitoring carrier plate; the positioning outer barrel is of a cylindrical structure, a positioning frame is arranged on the outer side of the positioning outer barrel, a penetrating type opening hole is formed in the side wall of the positioning outer barrel, and a threaded hole is formed in one side of the top of the positioning outer barrel; a sealing water bag is mounted on the inner side of the positioning outer cylinder; the sealing water bag is of an arc-shaped structure made of rubber. The telescopic piece is made to move greatly by compressing the sealing water bag to amplify and display the sedimentation amplitude, the sedimentation amplitude is amplified and displayed in time, the device is worthy of wide-range application and popularization, and the problems that a subgrade possibly small in sedimentation amplitude needs to be monitored through a precise monitoring device, and the cost is high are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of roadbed settlement monitoring, in particular to a roadbed settlement monitoring device. Background Art

[0002] Roadbed settlement refers to the sinking of the foundation surface caused by the compaction of the roadbed soil layer under the action of additional stress. Excessive settlement will cause the road surface to tilt and crack, making it impossible to use normally. Therefore, during the construction of the road surface, a roadbed settlement monitoring device needs to be used to regularly inspect the roadbed to ensure the normal use of the road surface. When the roadbed settlement monitoring device in the prior art monitors the roadbed settlement of the highway, a relatively precise monitoring device needs to be used to monitor the roadbed that may have a smaller settlement. Precision equipment has a high cost and is not suitable for large-scale promotion and use. For this reason, the utility model improves the roadbed settlement monitoring device that can monitor the roadbed with a smaller settlement. Summary of the invention

[0003] The disclosed embodiment relates to a roadbed settlement monitoring device. The amplitude of the roadbed settlement causes the pressure plate to press the sealing water bag to contract, and then water flows into the telescopic part. The water flow drives the telescopic part to move upward, causing the telescopic part to move greatly, which causes the measuring rod to move greatly. The sedimentation amplitude causes the telescopic part to move three times as much. The roadbed with a smaller settlement amplitude can be monitored, and the monitoring effect is obvious. The settlement amplitude can be magnified and displayed in time to prevent the omission of roadbed settlement and ensure the accuracy of monitoring. It does not require precise monitoring devices and is worthy of large-scale promotion and use.

[0004] According to a first aspect of the present disclosure, a roadbed settlement monitoring device is provided, which specifically includes: a monitoring carrier plate, which is a rectangular plate structure, and the top of the monitoring carrier plate is provided with four levels in different directions, and a positioning outer cylinder is provided above the middle of the top of the monitoring carrier plate; the positioning outer cylinder is a cylindrical structure, and a positioning frame is provided on the outside of the positioning outer cylinder, and a through opening is provided in the side wall of the positioning outer cylinder, and a threaded hole is provided on one side of the top of the positioning outer cylinder; a sealing water bag is installed on the inner side of the positioning outer cylinder; the sealing water bag is an arc-shaped structure made of rubber material.

[0005] In at least some embodiments, a monitoring rod is installed in the middle position of the top of the monitoring carrier plate; the monitoring rod is a cylindrical structure, and a circular pressure plate is provided on the top of the monitoring rod; the monitoring rod and the pressure plate are located inside the positioning outer cylinder, and the monitoring rod is also located in the middle position of the sealed water bag, and the pressure plate is installed on the top of the sealed water bag.

[0006] In at least some embodiments, a bottom rod is installed in the middle of the bottom of the monitoring carrier plate; the bottom rod is a cylindrical structure, and a monitoring bottom plate is installed on the outer side and the bottom end of the bottom rod respectively, and the monitoring bottom plate is a rectangular structure.

[0007] In at least some embodiments, a rotating drive rod is rotatably installed in a bolt hole on one side of the top of the positioning outer cylinder; a socket is provided on the top of the rotating drive rod, and the top of the rotating drive rod is also installed in the side wall of the traction plate of the annular structure.

[0008] In at least some embodiments, two sealing plates are installed at opposite positions on the top of the traction plate through a rotating shaft; the sealing plate is a semicircular structure, and the two sealing plates are closed in the middle position of the top of the traction plate; two positioning rods are installed at the bottom of the traction plate; the positioning rods are a cylindrical structure, and the positioning rods are inserted into the openings on the side wall of the positioning outer cylinder; two card slots are also provided on the top of the monitoring carrier; the bottom of the positioning rod is installed inside the card slot.

[0009] In at least some embodiments, a guide tube is connected to the outer bottom of the sealed water bag; the guide tube is installed in the side wall of the positioning outer tube, and the top of the guide tube is connected to the bottom of the telescopic member; the bottom of the telescopic member is connected to the inner side of the positioning outer tube through a connecting plate.

[0010] In at least some embodiments, a mounting plate is installed on the top of the telescopic member; the mounting plate is a circular structure, and a measuring rod is installed on the top of the mounting plate.

[0011] The utility model provides a roadbed settlement monitoring device, which has the following beneficial effects:

[0012] When the utility model is in use, the sealing water bag is compressed to make the telescopic part move greatly to amplify and display the amplitude of sedimentation. When the roadbed of the highway is monitored for settlement, the amplitude of the roadbed settlement is such that the pressure plate presses the sealing water bag to contract, and then water flows into the telescopic part. The water flow drives the telescopic part to move upward, causing the telescopic part to move greatly, which causes the measuring rod to move greatly, so that the settlement amplitude causes the telescopic part to move three times as much. The roadbed with a smaller settlement amplitude can be monitored, and the monitoring effect is obvious. The settlement amplitude can be amplified and displayed in time to prevent the existence of missed areas of roadbed settlement, thereby ensuring the accuracy of monitoring. No precise monitoring device is required, the cost is low, and it is worthy of large-scale promotion and use.

[0013] In addition, by using two monitoring base plates, the settlement of deeper layers of the roadbed can be monitored in advance. When monitoring the settlement of the roadbed of a highway, the two monitoring base plates are buried in the deeper soil layer of the roadbed. When the deeper soil layer below the roadbed settles, the monitoring base plate at a deeper position moves accordingly, causing the monitoring carrier plate to drive the sealed water bag to change, preventing omissions after monitoring, and timely monitoring possible settlement situations to ensure the normal use of the road surface. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solution of the embodiment of the utility model, the drawings of the embodiment will be briefly introduced below.

[0015] The drawings described below only relate to some embodiments of the present invention, but are not intended to limit the present invention.

[0016] In the attached picture:

[0017] Figure 1 A schematic diagram showing the overall structure of the present application;

[0018] Figure 2 A schematic diagram of the three-dimensional structure of the monitoring carrier board of the present application is shown;

[0019] Figure 3 A schematic diagram of the cross-sectional structure of the positioning outer cylinder of the present application is shown;

[0020] Figure 4 The schematic diagram of the exploded structure of the positioning outer cylinder, the traction plate and the positioning rod of the present application is shown;

[0021] Figure 5 A schematic diagram of the three-dimensional structure of the sealed water bag of the present application is shown;

[0022] Figure 6 A schematic diagram of the cross-sectional structure of the flow guide tube of the present application is shown;

[0023] Reference numerals list

[0024] 1. Monitoring carrier plate; 101. Monitoring rod; 102. Pressing plate; 103. Bottom rod; 104. Monitoring bottom plate;

[0025] 2. Positioning outer cylinder; 201. Positioning frame; 202. Rotating driving rod; 203. Pulling plate; 204. Sealing plate; 205. Positioning rod; 206. Card slot;

[0026] 3. Sealing water bag; 301. Guide tube; 302. Telescopic member; 303. Mounting support plate; 304. Measuring rod. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution of the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings of the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the described embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0028] Please refer to Figures 1 to 6 :

[0029] Embodiment 1:

[0030] The utility model proposes a roadbed settlement monitoring device, comprising: a monitoring carrier plate 1, the monitoring carrier plate 1 is a rectangular plate structure, and the top of the monitoring carrier plate 1 is provided with four horizontal rulers in different directions; a monitoring rod 101 is installed at the middle position of the top of the monitoring carrier plate 1; the monitoring rod 101 is a cylindrical structure, and a pressing plate 102 with a circular structure is provided on the top of the monitoring rod 101; the monitoring rod 101 and the pressing plate 102 are located inside a positioning outer cylinder 2, and the monitoring rod 101 is also located in the middle position of a sealing water bag 3, and the pressing plate 102 is installed on the top of the sealing water bag 3; a bottom rod 103 is installed at the middle position of the bottom of the monitoring carrier plate 1; the bottom rod 103 is a cylindrical structure, and the outer side and the bottom end of the bottom rod 103 are respectively provided with a monitoring bottom plate 104, and the monitoring bottom plate 104 is a rectangular structure.

[0031] In the disclosed embodiment, when the settlement of the roadbed of the highway is monitored, the monitoring carrier plate 1 is placed on the roadbed, and the bottom rod 103 at the middle position of the bottom of the monitoring carrier plate 1 drives the two monitoring bottom plates 104 to be located in the deeper soil of the roadbed, and the positioning outer cylinder 2 is located on the paved road surface. When the roadbed settles, the monitoring carrier plate 1 drives the pressure plate 102 at the top of the monitoring rod 101 in the positioning outer cylinder 2 to monitor the changes in the roadbed. When the soil layer at a deeper position of the roadbed settles, the monitoring bottom plate 104 is driven to move downward. The top of the monitoring bottom plate 104 can store soil. Therefore, the monitoring bottom plate 104 drives the monitoring carrier plate 1 to move to cause sedimentation changes, thereby monitoring possible settlement changes in advance.

[0032] Embodiment 2, on the basis of embodiment 1, a positioning outer cylinder 2 is provided above the middle of the top of the monitoring carrier plate 1; the positioning outer cylinder 2 is a cylindrical structure, and a positioning frame 201 is provided on the outer side of the positioning outer cylinder 2, and a through-type opening is provided in the side wall of the positioning outer cylinder 2, and a threaded hole is provided on one side of the top of the positioning outer cylinder 2; a rotating drive rod 202 is rotatably installed in the bolt hole on one side of the top of the positioning outer cylinder 2; a plug hole is provided on the top of the rotating drive rod 202, and the top of the rotating drive rod 202 is also installed in the side wall of the traction plate 203 of the annular structure; two sealing plates 204 at opposite positions are installed on the top of the traction plate 203 through a rotating shaft; the sealing plate 204 is a semicircular structure, and the two sealing plates 204 are closed in the middle position of the top of the traction plate 203; two positioning rods 205 are installed at the bottom of the traction plate 203; the positioning rod 205 is a cylindrical structure, and the positioning rod 205 is inserted in the opening of the side wall of the positioning outer cylinder 2; the top of the monitoring carrier plate 1 is also provided with two The bottom of the positioning rod 205 is installed inside the positioning groove 206. When the roadbed of the highway is monitored for settlement, the positioning outer cylinder 2 is buried in the road surface, and the positioning frame 201 increases the stability of the road surface contact. The two positioning rods 205 at the bottom of the traction plate 203 pass through the openings on the side walls of the positioning outer cylinder 2 and are inserted into the inside of the positioning groove 206, so that the monitoring rod 101 is in the middle position inside the positioning outer cylinder 2, and there will be no contact with the inner side of the positioning outer cylinder 2, ensuring a certain smoothness of the monitoring rod 101, fixing the position movement of the monitoring carrier plate 1 and the positioning outer cylinder 2, and using a tool to rotate the top of the rotating drive rod 202, so that the top of the rotating drive rod 202 moves downward and leaves the traction plate 203, and the traction plate 203 drives the positioning rod 205 to leave the slot 206, then the sealing plate 204 is opened at the top of the traction plate 203 to detect the settlement amplitude. When in use, the sealing plate 204 is closed to prevent the entry of debris.

[0033] Embodiment 3, on the basis of embodiment 1, a sealed water bag 3 is installed on the inner side of the positioning outer cylinder 2; the sealed water bag 3 is an arc-shaped structure made of rubber material; the outer bottom of the sealed water bag 3 is connected with a guide tube 301; the guide tube 301 is installed in the side wall of the positioning outer cylinder 2, and the top of the guide tube 301 is connected to the bottom of the telescopic member 302; the bottom of the telescopic member 302 is connected to the inner side of the positioning outer cylinder 2 through a connecting plate; a mounting support plate 303 is installed on the top of the telescopic member 302; the mounting support plate 303 is a circular structure, and a measuring rod 304 is installed on the top of the mounting support plate 303 to monitor the settlement of the roadbed During measurement, the monitoring carrier 1 drives the pressure plate 102 on the top of the monitoring rod 101 to apply pressure to the top of the sealed water bag 3. After the pressure plate 102 presses the sealed water bag 3, the water in the sealed water bag 3 enters the interior of the telescopic part 302 through the guide tube 301. The water flow pushes the telescopic part 302 to move significantly. The movement amplitude of the telescopic part 302 is three times the settlement amplitude. The bottom of the measuring rod 304 of the telescopic part 302 is installed on the mounting bracket 303 to monitor the movement amplitude, timely monitor the changes in roadbed settlement, and monitor the settlement changes with smaller changes at the same time, so as to improve the accuracy of roadbed monitoring.

[0034] The working principle of this embodiment is as follows: the monitoring carrier plate 1 is placed on the roadbed, the bottom rod 103 drives the two monitoring bottom plates 104 to be in the deeper soil of the roadbed, the positioning outer cylinder 2 is buried in the road surface, and the two positioning rods 205 at the bottom of the traction plate 203 penetrate the openings on the side wall of the positioning outer cylinder 2 and are inserted into the inside of the card slot 206, so that the monitoring rod 101 is in the middle position inside the positioning outer cylinder 2, and there will be no contact with the inner side of the positioning outer cylinder 2, ensuring a certain smoothness of the monitoring rod 101. When the roadbed settles, the monitoring carrier plate 1 drives the pressure plate 102 on the top of the monitoring rod 101 in the positioning outer cylinder 2 to respond to changes in the roadbed. Monitoring: When the soil layer at a deeper position of the roadbed settles, the monitoring bottom plate 104 is driven to move downward. The monitoring bottom plate 104 drives the monitoring carrier 1 to monitor the possible settlement changes in advance. The monitoring carrier 1 drives the pressure plate 102 on the top of the monitoring rod 101 to apply pressure to the top of the sealed water bag 3. The pressure plate 102 presses the sealed water bag 3 and the water flows through the guide pipe 301 into the telescopic part 302. The water flow pushes the telescopic part 302 to move significantly. The movement amplitude of the telescopic part 302 is three times the settlement amplitude. The bottom of the measuring rod 304 of the telescopic part 302 is installed on the mounting bracket 303 to monitor the movement amplitude.

[0035] In this article, there are a few points to note:

[0036] 1. The drawings of the embodiments of the present disclosure only involve structures related to the embodiments of the present disclosure, and other structures may refer to general designs.

[0037] 2. In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.

[0038] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.

Claims

1. A roadbed settlement monitoring device, comprising: A monitoring carrier (1), wherein the top of the monitoring carrier (1) is provided with four horizontal rulers in different directions, and a positioning outer cylinder (2) is provided above the middle of the top of the monitoring carrier (1); characterized in that a positioning frame (201) is provided on the outside of the positioning outer cylinder (2), and a through-type opening is provided in the side wall of the positioning outer cylinder (2), and a threaded hole is provided on one side of the top of the positioning outer cylinder (2); a sealing water bag (3) is installed on the inside of the positioning outer cylinder (2).

2. A roadbed settlement monitoring device according to claim 1, characterized in that: A monitoring rod (101) is installed in the middle position of the top of the monitoring carrier plate (1); a circular pressure plate (102) is provided on the top of the monitoring rod (101); the monitoring rod (101) and the pressure plate (102) are located inside the positioning outer cylinder (2), and the monitoring rod (101) is also located in the middle position of the sealing water bag (3), and the pressure plate (102) is installed on the top of the sealing water bag (3).

3. A roadbed settlement monitoring device according to claim 2, characterized in that: A bottom rod (103) is installed at the middle position of the bottom of the monitoring carrier plate (1); and a monitoring bottom plate (104) is installed on the outer side and the bottom end of the bottom rod (103) respectively.

4. A roadbed settlement monitoring device according to claim 3, characterized in that: A rotating drive rod (202) is rotatably mounted in a bolt hole on one side of the top of the positioning outer cylinder (2); a plug hole is provided on the top of the rotating drive rod (202), and the top of the rotating drive rod (202) is also mounted in the side wall of a traction plate (203) of an annular structure.

5. A roadbed settlement monitoring device according to claim 4, characterized in that: The top of the traction plate (203) is provided with two sealing plates (204) at opposite positions via a rotating shaft; the two sealing plates (204) are closed at the middle position of the top of the traction plate (203); the bottom of the traction plate (203) is provided with two positioning rods (205); the positioning rods (205) are inserted into the openings on the side wall of the positioning outer cylinder (2); the top of the monitoring carrier plate (1) is also provided with two slots (206); the bottom of the positioning rod (205) is installed inside the slots (206).

6. A roadbed settlement monitoring device according to claim 5, characterized in that: The outer bottom of the sealed water bag (3) is connected to a guide tube (301); the guide tube (301) is installed in the side wall of the positioning outer cylinder (2), and the top of the guide tube (301) is connected to the bottom of the telescopic member (302); the bottom of the telescopic member (302) is connected to the inner side of the positioning outer cylinder (2) via a connecting plate.

7. A roadbed settlement monitoring device according to claim 6, characterized in that: A mounting support plate (303) is installed on the top of the telescopic member (302); and a measuring rod (304) is installed on the top of the mounting support plate (303).