Construction engineering project progress display device

By using the rotating handle and motor gear system in the construction project progress display device, the rapid clamping of construction drawings of different sizes is achieved, which solves the problem of low modification efficiency in the existing technology and improves the convenience and efficiency of modifying construction drawings. .

CN221861237UActive Publication Date: 2024-10-18SHENZHEN SHENSHAN SPECIAL COOP ZONE ZHONGJIN LINGNAN NEW
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323053743.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-10
Publication Date
2024-10-18
Estimated Expiration
2033-11-10

AI Technical Summary

Technical Problem

The existing project progress display device has low modification efficiency and difficulty in cleaning because the construction drawings are pasted on the display board, which affects the subsequent pasting of construction drawings.

Method used

A construction project progress display device is designed, which uses a rotating handle to drive the two-way screw and adjustment plate to move, and combines the motor and gear system to achieve rapid clamping and adjustment of construction drawings of different sizes.

Benefits of technology

It improves the convenience and efficiency of modifying construction drawings, can quickly adapt to drawings of different specifications, and reduces the time consumption in the modification and pasting process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221861237U_ABST
    Figure CN221861237U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of constructional engineering, and discloses a constructional engineering project progress display device which comprises an installation box, a stabilizing device is arranged in the installation box, a supporting column is fixedly installed on the top of the installation box, and a display frame is fixedly installed on the top of the supporting column. The inner side wall of the display frame is provided with two mounting grooves, the inner side wall of the mounting groove on the left side is rotatably connected with a guide rod, the inner side wall of the mounting groove on the right side is rotatably connected with a bidirectional screw rod, and the outer side of the bidirectional screw rod is in threaded connection with two connecting plates; the front surface of the connecting plate is fixedly provided with an adjusting plate located on the outer side of the guide rod in a sliding connection mode. According to the construction engineering project progress display device, the display device is quickly moved through the universal wheels, and construction drawings of different specifications can be clamped, so that workers can modify the construction drawings more conveniently and quickly, and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a construction engineering project progress display device. Background Art

[0002] The construction industry is an important pillar industry of the national economy. It is closely related to the development of the entire national economy and the improvement of people's lives. The construction tasks of construction projects in the construction industry are often carried out in conjunction with some project progress display devices. The project progress display devices can provide users with intuitive information to facilitate planning and enable construction work to proceed in an orderly manner.

[0003] Existing project progress display boards usually paste construction drawings on the display boards, and display the work progress by marking the construction drawings on the construction drawings. When the construction drawings are modified in this work progress display device, because the drawings are pasted on the display board, it is necessary to reprint the construction drawings, and then paste the modified construction drawings on the display board. This makes the modification efficiency of the construction drawings slow, and the drawings pasted on the display board are not easy to clean, which affects the pasting of subsequent construction drawings. Therefore, the present application proposes an adjustable construction project progress display device to solve the above technical problems. Utility Model Content

[0004] 1. Technical issues to be resolved

[0005] In view of the shortcomings of the prior art, the utility model provides a construction project progress display device, which has the advantages of being more convenient to use and solves the problem that the existing method of pasting construction drawings on display boards by pasting is inefficient and will affect the subsequent pasting of construction drawings if used for too long.

[0006] (II) Technical solution

[0007] In order to achieve the above-mentioned purpose of more convenient use, the utility model provides the following technical solutions: a construction project progress display device, comprising an installation box, a stabilizing device is arranged inside the installation box, a support column is fixedly installed on the top of the installation box, a display frame is fixedly installed on the top of the support column, two installation slots are opened on the inner side wall of the display frame, and a guide rod is rotatably connected to the inner side wall of the installation slot on the left side;

[0008] The inner wall of the mounting groove on the right is rotatably connected with a bidirectional screw rod, and the outer side of the bidirectional screw rod is threadedly connected with two fixing plates. The front surface of the fixing plate is fixedly installed with an adjustment plate slidably connected to the outer side of the guide rod, and the outer side of the adjustment plate is installed with an adjustment mechanism.

[0009] Preferably, the stabilizing device includes a transmission rod which is transmission-connected to the inner wall of the installation box, two transmission bevel gears are fixedly installed on the outer side of the transmission rod, two support plates are fixedly installed on the inner wall of the installation box, a first threaded rod is rotatably connected to the inner side of the support plate, a driven bevel gear meshing with the transmission bevel gear is fixedly installed on the top of the first threaded rod, a lifting plate is threadedly connected between the outer sides of the two first threaded rods, two adjustment holes are opened at the bottom of the installation box, and four universal wheels are fixedly installed at the bottom of the lifting plate.

[0010] Preferably, a hand wheel fixedly connected to the transmission rod is rotatably connected to the right side of the installation box, and four cushion blocks are fixedly installed on the bottom of the installation box.

[0011] Preferably, the universal wheel is located at the top of the adjustment hole, and the bottom of the display frame is rotatably connected to a handle fixedly connected to the bidirectional screw rod.

[0012] Preferably, the adjustment mechanism includes a sliding sleeve slidably connected to the outside of the adjustment plate, a fixing groove is provided on a side of the adjustment plate close to the inner wall of the display frame, a rack is fixedly installed on the inner wall of the fixing groove, a motor is fixedly installed on the side of the sliding sleeve close to the inner wall of the display frame, a gear meshing with the rack is fixedly installed on the output shaft end of the motor, a connecting plate is fixedly installed on the front surface of the sliding sleeve, a second threaded rod is threadedly connected to the inner side of the connecting plate, and a clamping plate is fixedly installed on one end of the second threaded rod close to the sliding sleeve.

[0013] Preferably, the connecting plate is a U-shaped plate, and the clamping plate is located on the inner side of the connecting plate.

[0014] Preferably, a rotating block is fixedly mounted on the other end of the second threaded rod, and a number of rubber strips are fixedly mounted on the outer side of the rotating block.

[0015] (III) Beneficial effects

[0016] Compared with the prior art, the utility model provides a construction project progress display device, which has the following beneficial effects:

[0017] The construction project progress display device, by turning the handle, the handle will drive the bidirectional screw to rotate, the screw drives the outer adjustment plate to move up and down, so that the distance between the two adjustment plates can be adjusted, the motor drives the gear to rotate, the gear is engaged with the rack, so that the gear drives the sliding sleeve to move left and right, so that the spacing between the two sliding sleeves can be adjusted, the construction drawings are placed in the connecting plate, the second threaded rod is rotated, and the second threaded rod drives the clamping plate to clamp the construction drawings, so that the clamping plate can clamp construction drawings of different sizes by adjusting the spacing between the sliding sleeve and the adjustment plate, so that construction drawings of different specifications can be clamped quickly, so that when the staff modifies the construction drawings, it is more convenient and quick, thereby improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a schematic diagram of the cross-sectional structure of the utility model;

[0019] Figure 2 It is a right sectional view schematic diagram of the utility model;

[0020] Figure 3 For this utility model Figure 2 Enlarged schematic diagram at point A in the middle.

[0021] In the figure: 1 installation box, 2 stabilizing device, 21 transmission rod, 22 transmission bevel gear, 23 support plate, 24 first threaded rod, 25 driven bevel gear, 26 lifting plate, 27 adjustment hole, 28 universal wheel, 3 support column, 4 display frame, 5 installation groove, 6 guide rod, 7 two-way screw rod, 8 fixing plate, 9 adjustment plate, 10 adjustment mechanism, 101 sliding sleeve, 102 fixing groove, 103 rack, 104 motor, 105 gear, 106 connecting plate, 107 second threaded rod, 108 clamping plate. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-3, a construction project progress display device, including an installation box 1, the right side of the installation box 1 is rotatably connected with a hand wheel fixedly connected to a transmission rod 21, so that the rotation of the transmission rod 21 is more convenient, and four pads are fixedly installed at the bottom of the installation box 1, and a stabilizing device 2 is arranged inside the installation box 1, and the stabilizing device 2 includes a transmission rod 21 connected to the inner wall of the installation box 1, and two transmission bevel gears 22 are fixedly installed on the outer side of the transmission rod 21, and two support plates 23 are fixedly installed on the inner side wall of the installation box 1, and a first threaded rod 24 is rotatably connected to the inner side of the support plate 23, and a driven bevel gear 25 meshing with the transmission bevel gear 22 is fixedly installed on the top of the first threaded rod 24, and a lifting plate 26 is threadedly connected between the outer sides of the two first threaded rods 24, and two adjusting holes 27 are opened at the bottom of the installation box 1, and four universal wheels 28 are fixedly installed at the bottom of the lifting plate 26, and the universal wheels 28 are located at the top of the adjusting holes 27;

[0024] A support column 3 is fixedly installed on the top of the installation box 1, and a display frame 4 is fixedly installed on the top of the support column 3. The bottom of the display frame 4 is rotatably connected to a handle fixedly connected to a bidirectional screw rod 7, which makes it more convenient to rotate the bidirectional screw rod 7. Two mounting grooves 5 are opened on the inner side wall of the display frame 4, and a guide rod 6 is rotatably connected to the inner side wall of the left mounting groove 5;

[0025] The inner wall of the right mounting groove 5 is rotatably connected with a bidirectional screw rod 7, and the outer side of the bidirectional screw rod 7 is threadedly connected with two fixing plates 8. The front surface of the fixing plate 8 is fixedly installed with an adjustment plate 9 that is slidably connected to the outer side of the guide rod 6. The outer side of the adjustment plate 9 is installed with an adjustment mechanism 10. The adjustment mechanism 10 includes a sliding sleeve 101 that is slidably connected to the outer side of the adjustment plate 9. A fixing groove 102 is opened on the side of the adjustment plate 9 close to the inner wall of the display frame 4, and a rack 103 is fixedly installed on the inner wall of the fixing groove 102. A motor 104 is fixedly installed on the side of the sliding sleeve 101 close to the inner wall of the display frame 4. The motor A gear 105 meshing with the rack 103 is fixedly mounted on the output shaft end of 104, and a connecting plate 106 is fixedly mounted on the front surface of the sliding sleeve 101. The connecting plate 106 is a U-shaped plate, and a clamping plate 108 is located on the inner side of the connecting plate 106. A second threaded rod 107 is threadedly connected to the inner side of the connecting plate 106, and a rotating block is fixedly mounted on the other end of the second threaded rod 107, and a number of rubber strips are fixedly mounted on the outer side of the rotating block, so that the second threaded rod 107 can be better rotated by the rotating block. A clamping plate 108 is fixedly mounted on the end of the second threaded rod 107 close to the sliding sleeve 101.

[0026] In summary, the construction project progress display device, by turning the handle, the handle will drive the bidirectional screw rod 7 to rotate, the screw rod 7 drives the outer adjustment plate 9 to move up and down, so that the distance between the two adjustment plates 9 can be adjusted, the motor 104 drives the gear 105 to rotate, the gear 105 is engaged with the rack 103, so that the gear 105 drives the sliding sleeve 101 to move left and right, so that the spacing between the two sliding sleeves 101 can be adjusted, the construction drawing is placed in the connecting plate 106, the second threaded rod 107 is rotated, and the second threaded rod 107 drives the clamping plate 108 to clamp the construction drawing, so that the distance between the sliding sleeve 101 and the adjustment plate 9 can be adjusted, so that the clamping plate 108 can adjust the different sizes. The construction drawings of different specifications can be clamped in this way, so that the construction drawings of different specifications can be clamped quickly, so that when the staff modifies the construction drawings, it is more convenient and quick, thereby improving work efficiency. By turning the hand wheel, the hand wheel drives the transmission bevel gear 22 on the outside of the transmission rod 21 to rotate, and the transmission bevel gear 22 drives the first threaded rod 24 at the bottom of the driven bevel gear 25 to rotate, and the first threaded rod 24 drives the lifting plate 26 connected by the outer thread to move up and down. When the sleeve lifting plate 26 drives the universal wheel 28 to move downward, the universal wheel 28 will pass through the adjustment hole 27, and when the bottom of the universal wheel 28 contacts the ground, the pad will be pushed off the ground. In this way, the display device can be quickly moved by the universal wheel 28, making it more convenient to use.

[0027] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0028] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction project progress display device, comprising an installation box (1), characterized in that: The installation box (1) is provided with a stabilizing device (2) inside, a support column (3) is fixedly installed on the top of the installation box (1), a display frame (4) is fixedly installed on the top of the support column (3), two installation slots (5) are opened on the inner side wall of the display frame (4), and a guide rod (6) is rotatably connected to the inner side wall of the installation slot (5) on the left side; The inner wall of the right-side mounting groove (5) is rotatably connected to a bidirectional screw rod (7), the outer side of the bidirectional screw rod (7) is threadedly connected to two fixing plates (8), the front surface of the fixing plate (8) is fixedly mounted with an adjustment plate (9) slidably connected to the outer side of the guide rod (6), and the outer side of the adjustment plate (9) is mounted with an adjustment mechanism (10).

2. A construction project progress display device according to claim 1, characterized in that: The stabilizing device (2) comprises a transmission rod (21) which is transmission-connected to the inner wall of the installation box (1); two transmission bevel gears (22) are fixedly mounted on the outer side of the transmission rod (21); two support plates (23) are fixedly mounted on the inner wall of the installation box (1); a first threaded rod (24) is rotationally connected to the inner side of the support plate (23); a driven bevel gear (25) meshing with the transmission bevel gear (22) is fixedly mounted on the top of the first threaded rod (24); a lifting plate (26) is threadedly connected between the outer sides of the two first threaded rods (24); two adjustment holes (27) are opened at the bottom of the installation box (1); and four universal wheels (28) are fixedly mounted on the bottom of the lifting plate (26).

3. A construction project progress display device according to claim 2, characterized in that: The right side of the installation box (1) is rotatably connected to a hand wheel fixedly connected to the transmission rod (21), and four cushion blocks are fixedly installed on the bottom of the installation box (1).

4. A construction project progress display device according to claim 2, characterized in that: The universal wheel (28) is located at the top of the adjustment hole (27), and the bottom of the display frame (4) is rotatably connected to a handle fixedly connected to the bidirectional screw rod (7).

5. A construction project progress display device according to claim 1, characterized in that: The adjustment mechanism (10) comprises a sliding sleeve (101) slidably connected to the outside of the adjustment plate (9); a fixing groove (102) is provided on a side of the adjustment plate (9) close to the inner side wall of the display frame (4); a rack (103) is fixedly installed on the inner side wall of the fixing groove (102); a motor (104) is fixedly installed on a side of the sliding sleeve (101) close to the inner side wall of the display frame (4); a gear (105) meshing with the rack (103) is fixedly installed on the output shaft end of the motor (104); a connecting plate (106) is fixedly installed on the front surface of the sliding sleeve (101); a second threaded rod (107) is threadedly connected to the inner side of the connecting plate (106); and a clamping plate (108) is fixedly installed on one end of the second threaded rod (107) close to the sliding sleeve (101).

6. A construction project progress display device according to claim 5, characterized in that: The connecting plate (106) is a U-shaped plate, and the clamping plate (108) is located on the inner side of the connecting plate (106).

7. A construction project progress display device according to claim 5, characterized in that: A rotating block is fixedly mounted on the other end of the second threaded rod (107), and a number of rubber strips are fixedly mounted on the outer side of the rotating block.