Non-standard chute for uniform-speed spiral movement of bulk materials

By designing a non-standard chute for bulk materials, using support rods, connecting frames, spiral grooves and rubber segment structures, combined with springs and magnetic suction plates, the problem of impact force when lump coal is transported on the chute is solved and reduced Dust is raised and conveying stability is improved, enabling efficient material conveying.

CN221875245UActive Publication Date: 2024-10-22ZHONGMEI HANDAN MINE MASCH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323579555.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-10-22
Estimated Expiration
2033-12-27

AI Technical Summary

Technical Problem

When the existing lump coal is transported on the chute, the impact force causes it to break and dust rises, causing air pollution.

Method used

Design a non-standard chute, which uses a support rod, connecting frame, spiral groove and rubber segment structure, combined with springs and magnetic suction plates, and calculates the material movement path through programming to achieve buffering and force relief, and reduce impact force.

Benefits of technology

It effectively slows down the impact of bulk materials, reduces dust rise, improves conveying stability and safety, and improves design efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221875245U_ABST
    Figure CN221875245U_ABST
Patent Text Reader

Abstract

The utility model discloses a non-standard chute for uniform spiral motion of bulk materials, which relates to the field of chute design, and comprises a plurality of support rods, a plurality of connecting frames are fixed among the support rods, the connecting frames are vertically distributed, chutes are arranged in the connecting frames, and the chutes are fixed on the support rods. The chute comprises a bottom plate and a side plate, the side plate is fixed to one side of the bottom plate, when bulk materials slide along the chute, the spiral grooves are pressed, so that the corresponding rubber sections are compressed, the buffering and force unloading effects are achieved, and the chute is prevented from falling off. The impact force generated by the bulk materials instantly is relieved, so that the bulk materials are not prone to generating the dust raising phenomenon, the buffering capacity of the rubber section to the bulk materials is improved through the spring, the rubber section has the resettable capacity, and the rubber section can continuously conduct buffering and force unloading on the bulk materials.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of chute design, in particular to a non-standard chute used for uniform spiral motion of bulk materials. Background Art

[0002] For high-drop links such as coal bunkers, spiral chutes are often installed to prevent the block coal from breaking. The spiral chute is a three-dimensional spiral line space curved surface structure arranged along the bunker wall. When the existing block coal is transported on the chute, the impact force generated will also cause the block coal to break, and the instantaneous impact force will cause the dust in the block coal to rise, causing air pollution.

[0003] Therefore, it is necessary to propose a non-standard chute for uniform spiral motion of bulk materials to solve the above problems. Utility Model Content

[0004] The utility model aims to provide a non-standard chute for uniform spiral motion of bulk materials, so as to solve the problem that when existing lump coal is transported on the chute, the impact force generated will also cause the lump coal to be broken, and the momentary impact force will cause the dust in the lump coal to be raised, causing air pollution.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a non-standard chute for uniform spiral motion of bulk materials, comprising support rods, wherein a plurality of support rods are provided, a plurality of connecting frames are fixed between the plurality of support rods, the plurality of connecting frames are vertically distributed, chutes are provided in the plurality of connecting frames, and a through opening for the chute to pass through is provided in the middle of the connecting frames, the chute comprises a bottom plate and a side plate, the side plate is fixed to one side of the bottom plate, the bottom plate and the side plates are both spirally distributed, the inner sides of the plurality of support rods are connected to triangular support columns for fixing the chute, the chute is composed of a plurality of spiral grooves spliced ​​together, and rubber segments are fixedly connected between the plurality of spiral grooves.

[0006] Preferably, a hollow area is provided in the rubber segment, a spring is provided in the hollow area, the upper end of the spring is fixedly connected to the inner wall of the upper end of the hollow area, and the lower end of the spring is fixedly connected to the inner wall of the lower end of the hollow area.

[0007] Preferably, a magnetic suction plate is further provided in the hollow area, and a plurality of the magnetic suction plates are provided, and the plurality of magnetic suction plates are evenly distributed on the upper and lower inner walls of the hollow area, and the upper and lower corresponding magnetic suction plates repel each other and move away from each other.

[0008] A supporting vertical plate is fixed to the top end of the triangular supporting column, and the top end of the supporting vertical plate is fixed to the bottom end of the bottom plate.

[0009] A plurality of triangular support columns are distributed on the spiral track of the chute.

[0010] The utility model also discloses a non-standard chute for uniform spiral motion of bulk materials, comprising the following steps: the first step is to convert the motion equation of the bulk material on the three-dimensional surface of space into an Excel calculation program, and the motion equation of the bulk material on the chute can be expressed by the following formula:

[0011] sinγ·cosβ-fcosγ-f(v 2 / gR·cos 2 α-sinγ·sinβ)=α / g;

[0012] In the formula, α is the external helix angle of the chute, γ is the composite angle of the external helix angle α of the chute and the bottom plate oblique angle φ, referred to as the composite angle of the chute, which is only related to the values ​​of α and φ, β is the angle between the composite angle of the chute and the tangent direction of the external helix angle of the chute, which is also only related to the values ​​of α and φ, f is the dynamic friction coefficient of the bulk material relative to the chute surface, R is the external spiral radius of the chute, v is the movement speed of the bulk material, a is the acceleration of the bulk material, and g is the acceleration of gravity. If the calculation of the speed of the bulk material is to be realized, the angle θ that the chute rotates in the projection direction is also required. The movement path length s of the chute can be calculated through the value of θ and the external helix angle α of the spiral chute;

[0013] s = θ·R / cosα;

[0014] Divide the movement path of the chute into 500 straight segments, and calculate the inlet and outlet velocities of the bulk material in each straight segment. The velocity calculation formula is as follows:

[0015] v t 2 -v0 2 =2a·ds;

[0016] Among them, v t is the outlet velocity of bulk material in each straight line segment, ds is the length of the straight line segment, v o is the inlet velocity of the bulk material at each straight line segment, which is known;

[0017] The second step is to input the known conditions into the calculation program. The known conditions include the type of chute section, the surface parameters of the chute, the initial velocity of the bulk material, v o , f data, use the calculation program to get the movement speed of the bulk material, the third step, through the comprehensive application of Excel function and VBA programming, realize the input of the chute design parameters, can accurately calculate the coordinate data group to be drawn, finally convert the data into the drawing command recognized by Autocad, batch display points in Autocad, so as to quickly draw the chute processing diagram.

[0018] Preferably, the chute segments are divided into straight segments and spiral segments, and a plurality of spiral segments are provided.

[0019] Preferably, the known conditions also include bulk material particle size, maximum transport volume and dynamic friction angle.

[0020] Preferably, the movement speed of the bulk material includes the speed of the straight section and the speed of the spiral section.

[0021] Technical effects and advantages of the utility model:

[0022] 1. When the bulk material slides along the chute, the spiral groove will be pressed, so that the corresponding rubber section will be compressed, which has a buffering and unloading effect, slowing down the impact force generated by the bulk material in an instant, making it less likely for the bulk material to generate dust.

[0023] 2. The spring increases the rubber segment's buffering capacity for bulk materials and makes the rubber segment resetting, so that the rubber segment can continuously buffer and unload the bulk materials, which is particularly suitable for conveying and buffering fast coal. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic structural diagram of a non-standard chute for uniform spiral motion of bulk materials according to the utility model.

[0025] Figure 2 It is a schematic diagram of the chute structure of the utility model.

[0026] Figure 3 This is a schematic diagram of the rubber segment structure of the utility model.

[0027] Figure 4 The utility model is a schematic diagram of the steps and structure of a non-standard chute design method for uniform spiral motion of bulk materials.

[0028] Figure 5 The utility model is a structural schematic diagram of the top view drawing of the spiral chute and the process of determining the coordinates of the equally divided points.

[0029] Figure 6 It is a structural schematic diagram of the process of determining the shape of the inner and outer spiral expansion lines of the spiral chute of the utility model.

[0030] Figure 7 It is a structural schematic diagram of the process of drawing the main view of the inner and outer spiral lines of the spiral chute of the utility model.

[0031] Figure 8 It is a structural schematic diagram of the process of drawing the left view of the inner and outer spiral lines of the utility model.

[0032] In the figure: 1. support rod; 2. connecting frame; 3. triangular support column; 4. supporting vertical plate; 5. bottom plate; 6. side plate; 7. chute; 13. rubber segment; 14. hollow area; 15. magnetic suction plate; 16. spring. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the utility model to clarify the technical solutions in the embodiments of the utility model; it is completely described. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0034] The utility model provides Figure 1-Figure 8 A non-standard chute for uniform spiral motion of bulk materials shown in the figure includes a support rod 1, a plurality of support rods 1 are provided, a plurality of connecting frames 2 are fixed between the plurality of support rods 1, the plurality of connecting frames 2 are vertically distributed, a chute 7 is provided in the plurality of connecting frames 2, and a through opening for the chute 7 to pass through is opened in the middle of the connecting frames 2, the chute 7 includes a bottom plate 5 and a side plate 6, the side plate 6 is fixed to one side of the bottom plate 5, the bottom plate 5 and the side plate 6 are both spirally distributed, the inner sides of the plurality of support rods 1 are connected with triangular support columns 3 for fixing the chute 7, the chute 7 is composed of a plurality of spiral grooves, and rubber segments 13 are fixedly connected between the plurality of spiral grooves, when the bulk material slides along the chute 7, the spiral grooves are pressed together, so that the corresponding rubber segments 13 are compressed, which has a buffering and unloading effect, reduces the impact force generated by the bulk material in an instant, and makes it difficult for the bulk material to generate dust.

[0035] Furthermore, a hollow area 14 is provided in the rubber segment 13, and a spring 16 is provided in the hollow area 14. The upper end of the spring 16 is fixedly connected to the inner wall of the upper end of the hollow area 14, and the lower end of the spring 16 is fixedly connected to the inner wall of the lower end of the hollow area 14. The spring 16 increases the buffering capacity of the rubber segment 13 for bulk materials and enables the rubber segment 13 to have a resettable ability, so that the rubber segment 13 can continuously buffer and unload the bulk materials, which is particularly suitable for conveying and buffering fast coal.

[0036] Furthermore, a magnetic suction plate 15 is also provided in the hollow area 14, and a plurality of magnetic suction plates 15 are provided. The plurality of magnetic suction plates 15 are evenly distributed on the inner walls of the upper and lower ends of the hollow area 14, and the upper and lower corresponding magnetic suction plates 15 repel each other. The spring 16 is prone to rust and damage after long-term use. Therefore, in order to ensure that the chute 7 can be used for a long time, a magnetic suction plate 15 is also provided in the hollow area 14 in the utility model. When the rubber segment 13 is compressed, the interaction between the corresponding magnetic suction plates 15 can reset the rubber segment 13.

[0037] A supporting upright plate 4 is fixed to the top end of the triangular supporting column 3 , and the top end of the supporting upright plate 4 is fixed to the bottom end of the bottom plate 5 .

[0038] A plurality of triangular support columns 3 are distributed on the spiral track of the chute 7 , and the coal can be input from the top of the chute 7 , and finally descend along the track of the chute 7 by its own gravity.

[0039] The utility model also discloses a non-standard chute for uniform spiral motion of bulk materials, comprising the following steps:

[0040] S1. Convert the motion equation of bulk material on the three-dimensional surface into an Excel calculation program. The motion equation of bulk material on the chute can be expressed as follows:

[0041] sinγ·cosβ-fcosγ-f(v 2 / gR·cos 2 α-sinγ·sinβ)=a / g;

[0042] In the formula, α is the external helix angle of the chute, γ is the composite angle of the external helix angle α of the chute and the bottom plate oblique angle φ, referred to as the composite angle of the chute, which is only related to the values ​​of α and φ, β is the angle between the composite angle of the chute and the tangent direction of the external helix angle of the chute, which is also only related to the values ​​of α and φ, f is the dynamic friction coefficient of the bulk material relative to the chute surface, R is the external spiral radius of the chute, v is the movement speed of the bulk material, a is the acceleration of the bulk material, and g is the acceleration of gravity. If the speed of the bulk material is to be calculated, the angle θ that the chute rotates in the projection direction is also required. The movement path length of the chute is calculated by the value of θ and the external helix angle α of the spiral chute;

[0043] s = θ·R / cosα;

[0044] Divide the movement path of the chute into 500 straight segments, and calculate the inlet and outlet velocities of the bulk material in each straight segment. The velocity calculation formula is as follows:

[0045] v t 2 -v0 2 =2a·ds;

[0046] Among them, v t is the outlet velocity of bulk material in each straight line segment, ds is the length of the straight line segment, v o is the inlet velocity of the bulk material at each straight line segment, which is known;

[0047] S2. Input known conditions into the calculation program. The known conditions include the type of chute section, the surface parameters of the chute, the initial velocity of the bulk material, vo The data of , f, and the calculation program are used to obtain the movement speed of bulk materials. The material movement speed is one of the important parameters to measure the design level of the chute and the anti-crushing effect of the chute. In the scheme design stage, the chute parameters need to be adjusted repeatedly to calculate the speed. As long as the parameters are input correctly, this design method can complete the calculation instantly, effectively avoiding the shortcomings of manual calculation of calculus equations, which are complicated, tedious and have a high error rate.

[0048] S3. Through the comprehensive application of Excel's function and VBA programming, the design parameters of the chute can be input to accurately calculate the coordinate data set for drawing the graphics; finally, the data is converted into drawing commands recognized by Autocad, and points are displayed in batches in Autocad, so as to quickly draw the chute processing diagram.

[0049] This method can hand over the basic work of manually drawing the three-view of the chute, flattening the three-dimensional surface, drawing the chute flange, and reinforcing ribs to the computer, and can complete most of the drawing work of a section of chute in a few seconds. According to the manual drawing method, it takes about 15 to 18 working days to design a set of drawings of a spatial surface chute, but using the parametric design method, it only takes less than 3 working days to complete, and the work efficiency is increased by more than 5 times.

[0050] The types of chute sections are divided into straight sections and spiral sections, and there are multiple spiral sections.

[0051] Known conditions also include bulk material particle size, maximum transport capacity and dynamic friction angle.

[0052] The movement speed of bulk materials includes the speed of the straight section and the speed of the spiral section.

[0053] Example 2

[0054] The parameters set in the material speed calculation program interface are as follows:

[0055] 1. Fill in the known condition parameters: the name of the bulk material is lump coal, the maximum transport capacity is 900t / h, the dynamic friction angle is 25°, the material particle size is 0-150mm, the feeding speed is 0m / s, the friction coefficient f=0.46308, the first segment is a straight segment, and the second, third and fourth segments are spiral segments;

[0056] 2. Determine the design parameters: According to the characteristics of bulk materials, the friction angle is 25°.

[0057] 3. Calculation of key point speed and verification of throughput: In the first straight line segment, the feed speed V0 = 0m / s, and the cross-sectional area = 0.64m 2, filling coefficient ψ=Q / (3600AVP)=0.24 (where Q is the material transport volume in tons / hour, A is the cross-sectional area of ​​the chute in square meters, v is the material movement speed in m / s, ρ is the material bulk density, which is usually 0.9t / m for coal. 3 The value calculated by this formula is the ratio of the cross-sectional area of ​​the material flow to the cross-sectional area of ​​the chute. If this value is less than 0.3, there is no risk of blockage) and the filling coefficient meets the requirements.

[0058] The outer helix angle of the chute of the first straight section is α=35°, and the oblique length is L=0.9m.

[0059] Where, acceleration a = g sinα-fg cosα = 1.88m / s 2 ;

[0060] v1=[2aL+v o 2 ]=1.84m / s. According to the above calculation, v1=1.84m / s.

[0061] 4. In the second spiral section, the feed speed v1 = 1.84m / s, the cross-sectional area = 0.64m 2 , the filling coefficient ψ=Q / (3600AVP)=0.18, the filling coefficient meets the requirements.

[0062] The outer spiral radius of the second spiral section is R = 1.5m, the outer spiral angle of the chute at the entrance is α = 35° (the outer spiral angle is the angle between the tangent direction of the outer spiral line of the chute and the horizontal plane), ψin = 0°, and the composite angle of the chute is 35°;

[0063] The angle θ of the chute (7) in the projection direction is 60°, the outer helix angle α of the chute at the outlet is 30°, ψout is 12°, and the composite angle is 31.6°. The speed v2 of the material outlet is 2.44 m / s, the speed v of the centrifugal force and the centripetal force being balanced is 1.75 m / s, and the speed v of the uniform motion is reached. U =2.72m / s, and from the above calculation we get v2=2.44m / s.

[0064] 5. In the third spiral section, the feed speed v1 = 2.44 m / s, the cross-sectional area = 0.49 m 2 , the filling coefficient ψ=0.17, the filling coefficient meets the requirements.

[0065] The radius of the third spiral section is R = 2.5m, αin = 30°, ψin = 12°, composite angle = 31.6°, angle θ = 60°, αout = 30°, ψout = 20°, composite angle = 34.31°. Substituting it into the program, the outlet speed v2 = 3.31m / s, the speed at which the centrifugal force and the centripetal force are balanced v = 2.92m / s, and the speed v at which uniform motion is achievedU =4.07m / s, and from the above calculation we get v2=3.31m / s.

[0066] 6. In the fourth spiral section, the feed speed v1 = 3.31 m / s, the cross-sectional area = 0.28 m 2 , filling coefficient ψ=0.24 (meets the requirements), radius R=2.5m, αin=30°, ψin=12°, composite angle=31.6°, angle θ=60°, αout=30°, ψout=20°, composite angle=34.31°, put it into the program to get the inlet speed v2=4.07m / s, the speed v=2.92m / s at which the centrifugal force and the centripetal force are balanced, and the speed v at which uniform motion is achieved U =4.07m / s, from the above calculation, V2=4.07m / s.

[0067] The key to drawing the three views of a spiral chute in Autocad is to obtain the X, Y coordinates of each point in the three views to be drawn. Since the spiral chute is a three-dimensional surface structure, its three views are mainly composed of curves, so the curve is divided into 10 parts, and the equally divided points are connected one by one for drawing.

[0068] In the three-view drawing, the X coordinate is mainly determined by the top view of the spiral chute, and the Y coordinate is mainly determined by the spiral expansion line diagram of the spiral chute. Therefore, before obtaining the X and Y coordinates, it is necessary to draw the top view and the inner and outer spiral expansion line diagrams of the spiral chute. The top view of the spiral chute can be drawn by determining the outer spiral radius R, the inner spiral radius r, and the spiral projection angle θ, and then the inner and outer spirals are divided into 10 equal parts, and the base point (0,0) is established. The X coordinate of each equally divided point is calculated by analytical method. (For example Figure 5 (shown)

[0069] The shape of the outer spiral expansion line is determined by the arc length of the outer spiral projection of the spiral chute and the outer spiral angle. The shape of the inner spiral expansion line is based on the shape of the outer spiral expansion line and is determined by the arc length of the inner spiral projection of the spiral chute. (e.g. Figure 6 (shown)

[0070] The height difference between the start and end of the inner spiral expansion line in the figure is usually designed to be the same as the height difference of the outer spiral expansion line, which is θR / cosα. Due to the existence of the inclined angle φ of the bottom plate of the spiral chute, Y 1外 The value of is usually greater than Y 1内 .Y 1外 -Y 1内 =(Rr)·tanφ. At this time, the main view of the inner and outer spiral lines of the spiral chute can be obtained by connecting all the obtained coordinates. Figure 7 (shown)

[0071] After drawing the inner and outer spiral lines, the shape of the outer plate of the spiral chute can be directly copied and translated from the drawn outer spiral line. The translation distance is determined according to the design parameters input into the program. After the three curves are drawn, the starting and end points of the three curves are connected with straight lines to obtain the complete main view of the spiral chute.

[0072] The same is true for the drawing of the side view of the spiral chute. If you draw the left view, rotate the top view of the spiral chute 90° counterclockwise and recalculate the X coordinates of the points dividing the inner and outer spirals. The Y coordinates of the inner and outer spiral expansion lines remain unchanged. Figure 8 shown).

Claims

1. A non-standard chute for uniform spiral motion of bulk materials, comprising a support rod (1), characterized in that: A plurality of support rods (1) are provided, a plurality of connection frames (2) are fixed between the plurality of support rods (1), the plurality of connection frames (2) are vertically distributed, a chute (7) is provided in the plurality of connection frames (2), and a through opening for the chute (7) to pass through is opened in the middle of the connection frame (2), the chute (7) comprises a bottom plate (5) and a side plate (6), the side plate (6) is fixed to one side of the bottom plate (5), the bottom plate (5) and the side plate (6) are both spirally distributed, the inner sides of the plurality of support rods (1) are connected to triangular support columns (3) for fixing the chute (7), the chute (7) is composed of a plurality of spiral grooves spliced ​​together, and a rubber segment (13) is fixedly connected between the plurality of spiral grooves.

2. A non-standard chute for uniform spiral motion of bulk materials according to claim 1, characterized in that: The rubber segment (13) is provided with a hollow area (14), and the hollow area (14) is provided with a spring (16). The upper end of the spring (16) is fixedly connected to the inner wall of the upper end of the hollow area (14), and the lower end of the spring (16) is fixedly connected to the inner wall of the lower end of the hollow area (14).

3. The non-standard chute for uniform spiral motion of bulk materials according to claim 2, characterized in that: A magnetic suction plate (15) is also provided in the hollow area (14), and a plurality of the magnetic suction plates (15) are provided. The plurality of magnetic suction plates (15) are evenly distributed on the inner walls of the upper and lower ends of the hollow area (14), and the upper and lower corresponding magnetic suction plates (15) repel each other and move away from each other.

4. The non-standard chute for uniform spiral motion of bulk materials according to claim 1, characterized in that: A supporting upright plate (4) is fixed to the top end of the triangular supporting column (3), and the top end of the supporting upright plate (4) is fixed to the bottom end of the bottom plate (5).

5. The non-standard chute for uniform spiral motion of bulk materials according to claim 1, characterized in that: A plurality of triangular support columns (3) are distributed on the spiral track of the chute (7).