Joint plate erecting construction device for synchronous pouring of concrete adjacent bins
By designing a combination device of supporting structures and connectors during concrete construction, the stability problem of the splitting plate under concrete extrusion is solved, the splitting plate can be stably fixed and efficiently removed, and construction efficiency and safety are improved. sex.
Patent Information
- Application Number
- CN202323509229.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-21
AI Technical Summary
In concrete construction, the joint board is easily squeezed by the concrete during the simultaneous pouring of adjacent warehouses, making it difficult to remove. The support device is not enough to resist extrusion, which affects the stability of the joint space.
Design a construction device that includes a dividing board, a barrier wall and a supporting structure. The supporting boards and supporting columns are used to support the dividing board in the dividing space. The overhanging block and the positioning block are combined to ensure that the dividing board and the supporting structure are aligned with each other. Fixation and stabilization of the wall, and flexibility and reuse of the structure through removable connectors and cut-out through-holes.
It effectively offsets the extrusion force of the concrete on the split board, ensures the stability of the split space, simplifies the installation and removal process of the split board, and improves construction efficiency and safety.
Smart Images

Figure CN221878091U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of concrete construction, and in particular to a joint slab support construction device for synchronously pouring concrete in adjacent bins. Background Art
[0002] Due to the needs of urbanization, in recent years, the construction of sluice pump stations has risen to solve the problem of drainage, especially in coastal areas. In order to maximize the benefits of the project, many projects have set construction period node requirements, such as the requirement of water flow before the flood season, which makes the progress requirements higher. Conventional concrete construction is divided according to the design and poured in blocks. When pouring, the skipping method can be used to pour the interval positions first, and then pour the remaining positions, but hardening is required between the two pourings.
[0003] In order to meet the progress requirements, the construction unit adapted to local conditions and adopted technical measures of simultaneous pouring of adjacent warehouses during concrete construction to speed up the progress of concrete structure construction and shorten the construction period. Specifically, multiple warehouses were separated by dividing plates, and all warehouses were poured. After pouring, after a certain degree of hardening, the dividing plates were removed and the gaps were poured again.
[0004] The above-mentioned dividing plates are difficult to remove due to the squeezing of cement between the bins. Therefore, they are designed to form a dividing space between each adjacent bin by two dividing plates, thereby facilitating the removal of the dividing plates. However, since they have to resist the squeezing of concrete in the bin, the supporting device of the dividing plates has higher requirements, and it is necessary to design a new supporting device for the dividing plates. Utility Model Content
[0005] In order to enable the split plate to better resist the extrusion of concrete in adjacent bins and maintain the split space, the present application provides a split plate support construction device for synchronous pouring of concrete in adjacent bins.
[0006] The present application provides a construction device for supporting a split slab for synchronous pouring of adjacent concrete bins, which adopts the following technical solution:
[0007] A construction device for supporting a split plate for synchronous pouring of concrete adjacent bins, comprising a split plate, a wall and a supporting structure, wherein the wall encloses a total bin space, the split plate is located in the total bin space to divide the total bin space into a plurality of bins, two split plates are arranged between adjacent bins as a group, the space between each group of split plates is set as a split space, both sides of the split plate are respectively connected and fixed to the wall or the split plate, the supporting structure is arranged in the split space, the supporting structure comprises a supporting plate and a supporting column, there are two supporting plates, the two supporting plates are arranged at both ends of the supporting column, and the two supporting plates correspond one to one and respectively abut against the two split plates in the split space.
[0008] By adopting the above technical solution, two split plates are supported by a supporting structure, so that the force of the concrete in the bins on both sides of each split space on the split plates is relatively offset, and the connection and fixation between the split plates and the wall mainly plays a role in fixing the position of the split plates, thereby ensuring the stability of the split space and effectively resisting the extrusion of the split plates when the concrete in the adjacent bins is poured simultaneously.
[0009] Optionally, an overhanging block is provided on the slit plate, and the lower side of the supporting plate abuts against the overhanging block.
[0010] By adopting the above technical solution, the overhanging blocks are arranged to support the supporting plates, so that the supporting structure is stabilized at the corresponding position in the joint space, and the joint space is better supported.
[0011] Optionally, at least one of the supporting structures is arranged in the split space, and two overhanging blocks opposite to the split plate are arranged as a group, and there is only one group of the overhanging blocks in the split space, and the upper side wall of the overhanging blocks is provided with pre-installed holes for inserting the supporting plate.
[0012] By adopting the above technical solution, the setting of the pre-installed holes can, on the one hand, better stabilize the supporting structure, and on the other hand, when installing the slit plate, the position of the slit plate can be better determined by the supporting structure, which facilitates the positioning and installation of the slit plate.
[0013] Optionally, the supporting column is detachably connected to the supporting plate, and a cutting through hole is coaxially opened on the supporting column.
[0014] By adopting the above technical solution, cutting through holes are opened, so that the supporting columns can be cut and broken more easily. After the concrete pouring is completed, the supporting structure is convenient to remove, thereby facilitating the removal of the split plate. The supporting columns and the supporting plates are detachably connected, and the supporting structure can be reused by replacing the supporting columns.
[0015] Optionally, a positioning block is cantilevered on the barrier wall, the positioning block is located in the split space, and the split plate abuts against the positioning block.
[0016] By adopting the above technical solution, positioning blocks are arranged on the wall, so that the initial split plates can be pre-positioned, and then the positions of the remaining split plates can be determined in sequence in cooperation with the supporting structure.
[0017] Optionally, the positioning block is fixed to the wall at a single point.
[0018] By adopting the above technical solution, the positioning block is fixed at a single point, so that it is convenient to knock the positioning block down by hammering, and it is convenient to remove the split plate.
[0019] Optionally, a connecting member is further included, wherein the connecting member includes two connecting plates, one of which abuts against the slit plate and is fixed, and the other of which abuts against the slit plate or the wall and is fixed.
[0020] By adopting the above technical solution, the slit plates and the slit plates and the wall are fixed by connecting pieces.
[0021] Optionally, the connecting piece is located in the seam space.
[0022] By adopting the above technical solution, the connecting piece is arranged in the joint space, which facilitates the subsequent removal of the joint plate, and the connecting piece will not be cast and fixed into the concrete.
[0023] In summary, the two joint plates are supported by the supporting structure so that the force exerted on the joint plates by the concrete in the bins on both sides of each joint space is relatively offset. The connection and fixation between the joint plates and the wall mainly plays the role of fixing the position of the joint plates, thereby ensuring the stability of the joint space and effectively resisting the extrusion of the joint plates during the simultaneous pouring of concrete in adjacent bins. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 Schematic diagram of the distribution of the split plates in the embodiment of the present application;
[0025] Figure 2 This is a schematic diagram of the installation structure of the split plate in the embodiment of the present application. Figure 1 ;
[0026] Figure 3 This is a schematic diagram of the installation structure of the split plate in the embodiment of the present application. Figure 2 ;
[0027] Figure 4 It is the connection structure between the supporting plate and the supporting column in the embodiment of the present application.
[0028] Explanation of the reference numerals in the accompanying drawings: 1. Partition plate; 11. Connecting column; 2. Wall; 3. Support structure; 31. Support plate; 32. Support column; 33. Cut-out through hole; 34. Plug hole; 35. Plug column; 4. Connector; 41. Connecting part; 411. Connecting plate; 412. Connecting groove; 42. Associated part; 5. Storage position; 6. Partition space; 7. Overhang block; 71. Pre-installed hole; 8. Lifting ring; 9. Positioning block. DETAILED DESCRIPTION
[0029] The following is combined with Figure 1-4 This application is described in further detail.
[0030] The embodiment of the present application discloses a construction device for supporting a split slab for synchronous pouring of concrete adjacent bins. Figure 1-4A construction device for supporting a split plate for synchronous pouring of concrete adjacent warehouses includes a split plate 1, a wall 2, a supporting structure 3 and a connecting piece 4. The total warehouse space to be poured is enclosed by the wall 2. The split plate 1 is supported and fixed in the total warehouse space. A large number of warehouse spaces 5 are separated in the length and width directions of the total warehouse space by the split plate 1. Adjacent warehouse spaces 5 are separated by a group of two split plates 1. Each split plate 1 can be assembled and fixed by multiple sub-plates. The space between the two split plates 1 is set as a split space 6.
[0031] The supporting structure 3 and the connecting plate 411 are located in the split space 6. Specifically, at least one group of supporting structures 3 is arranged between two split plates 1 in the same group. The supporting structure 3 includes a supporting plate 31 and a supporting column 32. There are two supporting plates 31, and the two supporting plates 31 are respectively arranged at both ends of the supporting column 32. The two supporting plates 31 correspond one by one to the two split plates 1 in the split space 6 respectively. In this embodiment, the split plate 1 is an integral plate, and there are three supporting structures 3. One supporting structure 3 is located in the middle of the split plate 1, and the other two supporting structures 3 are located on both sides and are equidistant from the supporting structure 3 in the middle.
[0032] When the split plate 1 is composed of a plurality of sub-plates, the number of the supporting structures 3 may be consistent with the number of the sub-plates and correspond one to one.
[0033] The supporting column 32 is detachably connected to the supporting plate 31, and a cut-out through hole 33 is coaxially provided on the supporting column 32. Specifically, the supporting plate 31 is provided with a socket 34 for inserting the supporting column 32. The supporting column 32 can be directly inserted and fixed to the supporting plate 31, or the supporting column 32 can be screwed into the socket 34, or a plug column 35 protruding from the supporting plate 31 can be inserted into the cut-out through hole 33 for insertion and fixation, or the plug column 35 can be screwed into the cut-out through hole 33, or the two can be combined, that is, the plug column 35 is provided with a socket 34.
[0034] A rope can be installed on the supporting structure 3 and bound to the top of the split plate 1 to facilitate the subsequent removal of the supporting structure 3.
[0035] The opposite side walls of each group of seam plates 1 are integrally protruded with overhang blocks 7, and the overhang blocks 7 are located in the seam space 6. Two opposite overhang blocks 7 form a group. The number of overhang blocks 7 and the supporting structure 3 is the same, that is, three groups. The supporting plates 31 correspond one to one with the overhang blocks 7 on the lower side. In each seam space 6, there is only one group of overhang blocks 7 whose upper side walls are provided with pre-installed holes 71 for the supporting plates 31 to be inserted. In this embodiment, the overhang block 7 located in the middle is provided with pre-installed holes 71 for the supporting plates 31 to be inserted.
[0036] One side of the split plate 1 close to the rampart wall 2 is connected to the rampart wall 2 via a connector 4, and the other side is connected to another split plate 1 via a connector 4. One side wall of the split plate 1 close to the rampart wall 2 is a flat surface that fits the rampart wall 2, and the other side is a 45-degree slope that cooperates with another split plate 1. Both sides of the split plate 1 not close to the rampart wall 2 are 45-degree slopes.
[0037] The connecting member 4 includes a connecting portion 41 and an associated portion 42. The connecting portion 41 includes two connecting plates 411. The two connecting plates 411 are integrally arranged at 90 degrees. There are two connecting portions 41, and the two connecting portions 41 are respectively arranged up and down. The associated portion 42 is in the shape of an elongated strip. The two ends of the associated portion 42 correspond to the two connecting portions 41 in a one-to-one manner. There are two associated portions 42, and the two associated portions 42 correspond to two connecting plates 411, and the associated portion 42 is connected to the side of the two connecting plates 411 of each connecting portion 41 that are away from each other. A connecting groove 412 is opened on the connecting plate 411 along the extension direction of the associated portion 42. The connecting groove 412 penetrates the connecting plate 411 along the thickness direction of the connecting plate 411. The connecting groove 412 is in the shape of an elongated strip, and the connecting grooves 412 on the two connecting portions 41 open in the same direction.
[0038] Connecting columns 11 are protrudingly provided on both sides of the split plate 1, and the connecting columns 11 are adapted to the connecting grooves 412. The wall 2 is also correspondingly cantilevered with connecting columns 11. The connecting member 4 is slidingly connected to the connecting column 11 through the connecting groove 412 on the connecting portion 41, thereby limiting the separation of the split plates 1 from each other and also limiting the separation of the split plates 1 from the wall 2.
[0039] The end of the connecting member 4 away from the opening direction of the sliding groove is provided with a lifting ring 8, and a rope can be tied to the lifting ring 8, so as to facilitate the sliding of the connecting member 4 out of the slit space 6 and facilitate the demoulding process of the slit plate 1.
[0040] A positioning block 9 is also suspended on the wall 2. The positioning block 9 is located in the joint space 6, and there are two positioning blocks 9 in each joint space 6 close to the wall 2. The two positioning blocks 9 are located at an intermediate height and correspond one to one to abut against the two joint plates 1. The positioning block 9 is located between the associated parts 42 of the corresponding connecting parts 4, so that the positioning block 9 and the connecting parts 4 do not interfere with each other. At the same time, the positioning block 9 is fixed to the wall 2 at a single point. Specifically, a hole is opened in the positioning block 9. A cement column is suspended from the wall 2 and inserted into the hole on the positioning block 9. By knocking the positioning block 9, the positioning block 9 can be quickly detached from the wall 2.
[0041] A rope may also be installed on the positioning block 9 to facilitate the subsequent removal of the positioning block 9 from the joint space 6 without affecting the subsequent pouring.
[0042] At the same time, the connecting piece 4 connecting the two split plates 1 can have multiple connecting parts 41, and the multiple connecting parts 41 are arranged at intervals along the length direction of the associated part 42, so as to improve the connection strength. At the same time, the number of connecting parts 41 cannot affect the sliding of the connecting part 41 away from the connecting column 11.
[0043] The implementation principle of the joint plate support construction device for synchronously pouring concrete adjacent warehouses in the embodiment of the present application is: first install the corresponding positioning blocks 9 on the wall 2, then place a group of joint plates 1, complete the initial installation through the supporting structure 3, and then install the connecting parts 4, and complete the placement of other joint plates 1 at one time in the same way, and then pour each warehouse 5. After pouring, when the concrete in the warehouse 5 has hardened to a certain extent, remove the connecting parts 4, cut off the supporting columns 32, take out the supporting structure 3, knock the positioning blocks 9 and take them out, take out the joint plates 1, and then pour the joint space 6.
[0044] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A construction device for supporting joint plates for synchronous pouring of adjacent concrete bins, characterized in that: The invention comprises a split plate (1), a wall (2) and a supporting structure (3), wherein the wall (2) encloses a total warehouse space, the split plate (1) is located in the total warehouse space to divide the total warehouse space into a plurality of warehouse positions (5), two split plates (1) are arranged between adjacent warehouse positions (5) to form a group, the space between each group of split plates (1) is set as a split space (6), the two sides of the split plate (1) are respectively connected and fixed to the wall (2) or the split plate (1), the supporting structure (3) is arranged in the split space (6), the supporting structure (3) comprises a supporting plate (31) and a supporting column (32), there are two supporting plates (31), the two supporting plates (31) are respectively arranged at the two ends of the supporting column (32), and the two supporting plates (31) are respectively abutted against the two split plates (1) of the split space (6) in a one-to-one correspondence.
2. A construction device for supporting joint plates for synchronous pouring of adjacent concrete bins according to claim 1, characterized in that: An overhanging block (7) is provided on the split plate (1), and the lower side of the supporting plate (31) abuts against the overhanging block (7).
3. The construction device for supporting the split slab for synchronous pouring of concrete adjacent bins according to claim 2 is characterized by: At least one of the supporting structures (3) is arranged in the split space (6); two opposite overhanging blocks (7) of the split plate (1) are arranged as a group; and the upper side wall of one and only one group of the overhanging blocks (7) in the split space (6) is provided with a pre-installed hole (71) for inserting the supporting plate (31).
4. The construction device for supporting the split slab for synchronous pouring of concrete adjacent bins according to claim 1 is characterized by: The supporting column (32) is detachably connected to the supporting plate (31), and a cutting through hole (33) is coaxially formed on the supporting column (32).
5. The construction device for supporting the split slab for synchronous pouring of concrete adjacent bins according to claim 1 is characterized by: A positioning block (9) is cantilevered on the barrier wall (2), the positioning block (9) is located in the split space (6), and the split plate (1) abuts against the positioning block (9).
6. The construction device for supporting the split slab for synchronous pouring of concrete adjacent bins according to claim 5 is characterized by: The positioning block (9) is fixed to the barrier wall (2) at a single point.
7. The construction device for supporting the split slab for synchronous pouring of concrete adjacent bins according to claim 1 is characterized by: It also comprises a connecting member (4), wherein the connecting member (4) comprises two connecting plates (411), one of the connecting plates (411) abuts against the slit plate (1) and is fixed, and the other of the connecting plates (411) abuts against the slit plate (1) or the rampart (2) and is fixed.
8. The construction device for supporting the split slab for synchronous pouring of concrete adjacent bins according to claim 7 is characterized by: The connecting piece (4) is located in the split space (6).