Hydraulic structure for temporary river breaking
By designing a temporary river-breaking hydraulic structure with a buffer support frame in the rail transit project, the risk of river water backflow into the tunnel and the wear and tear of water pipes were solved, and the construction was safe and smooth.
Patent Information
- Application Number
- CN202420446988.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2024-10-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In rail transit projects, when constructing under rivers, there is a greater risk of river water backflowing into the tunnel. Existing technologies such as advanced geological forecasting and grouting reinforcement in the tunnel are not satisfactory, and the water pipes come into hard contact with the brackets when shaking, resulting in wear or damaged.
Design a hydraulic structure to temporarily cut off the river, by setting up water pipes between the upstream and downstream earth cofferdams, and installing buffer support frames on the left and right sides. The buffer support frames consist of a fixed shell, a movable clamping plate, and a set of rods. , sleeve and buffer spring to prevent hard contact between the water pipe and the bracket and slow down the impact and vibration of the water flow.
It effectively avoids the risk of river water flowing back into the tunnel, reduces the wear and damage of water pipes, ensures the safety and smoothness of construction, and protects the earth cofferdam and waterproof layer through the waterproof layer and buffer layer.
Smart Images

Figure CN221878138U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of underpass river construction, in particular to a hydraulic structure for temporarily cutting off a river. Background Art
[0002] The construction risk of rail transit projects under rivers is relatively high, especially when the buried depth is shallow or the cracks in the upper cover soil are well developed. It is very easy for river water to flow back into the tunnel during construction. The current practice is to conduct advanced geological forecasting and grouting reinforcement inside the tunnel, but the results are not ideal, and the risk of river water backflow is still very high;
[0003] The utility model patent with patent application publication number CN 208309526 U discloses a hydraulic structure for temporarily blocking the river, which uses an upstream earth cofferdam and a downstream earth cofferdam to block the river on both sides of the tunnel, and sets a horizontal water pipe between the upstream earth cofferdam and the downstream earth cofferdam to restore the water flow function of the river channel, effectively preventing the river water from backflowing into the tunnel;
[0004] However, when water flows through the water pipe, the water pipe will shake. In the above application, the water pipe and the bracket are fixedly connected. The water pipe comes into hard contact with the bracket when shaking. Long-term operation may cause wear or damage to the pipe. Utility Model Content
[0005] The utility model aims to provide a hydraulic structure for temporarily cutting off a river, so as to solve the problems raised in the above-mentioned background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A hydraulic structure for temporarily cutting off a river, comprising an upstream earth cofferdam and a downstream earth cofferdam, a water pipe is arranged between the upstream earth cofferdam and the downstream earth cofferdam, and buffer support frames are arranged on the left and right sides of the surface of the water pipe;
[0008] The buffer support frame includes a fixed shell arranged on the upper and lower sides of the water pipe, the two fixed shells are symmetrically arranged with the center line of the water pipe as the symmetry axis, the front and rear ends of the two fixed shells are welded with connecting plates, the four connecting plates are grouped in pairs, and the two groups of connecting plates are connected by fastening bolts, the bottom of the lower fixed shell is fixedly connected with a support rod, and two movable clamping plates are symmetrically arranged on the inner sides of the two fixed shells, sleeve rods are equidistantly arranged on the side of the two movable clamping plates close to the fixed shells, and sleeves are equidistantly arranged on the opposite sides of the two fixed shells.
[0009] As a preferred solution of the utility model, the total number of the sleeve rods is six, the total number of the sleeves is also six, the six sleeve rods are grouped into three at a time, the ends of the two groups of sleeve rods away from the movable clamping plate extend to the interior of the six sleeves respectively and are fixedly connected to the movable plate, and the inner cavities of the six sleeves are all provided with buffer springs.
[0010] As a preferred solution of the utility model, the two fixed shells are arranged in an arc shape, the two movable clamping plates are also arranged in an arc shape, the two movable clamping plates are in contact with the surface of the water pipe, and the two buffer support frames are arranged in the same structure.
[0011] As a preferred solution of the utility model, the upstream earth cofferdam and the downstream earth cofferdam are arranged opposite to each other, and the side of the upstream earth cofferdam away from the downstream earth cofferdam is stepped.
[0012] As a preferred solution of the utility model, both ends of the water pipe pass through the upper part of the upstream earth cofferdam and the downstream earth cofferdam respectively.
[0013] As a preferred solution of the utility model, the outer wall of the upstream earth cofferdam is provided with a waterproof layer, and the outer wall of the waterproof layer is provided with a buffer layer.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] 1. In the utility model, the waterproof layer is composed of a non-woven fabric layer and a geomembrane layer, which can prevent water penetration. The buffer layer is composed of a mixture of gravel, clay, and adhesive, which can reduce the pressure of water pressure on the upstream earth cofferdam and protect the waterproof layer from being scratched.
[0016] 2. In the utility model, the sleeve rod and the movable plate can squeeze the buffer spring inside the sleeve to generate elastic force, thereby preventing the movable clamping plates on both sides from making hard contact with the surface of the water pipe, thereby buffering the shaking of the water pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure of the utility model;
[0018] Figure 2 It is a schematic diagram of the cross-sectional structure of the upstream earth cofferdam of the utility model;
[0019] Figure 3 It is a right side structural schematic diagram of the buffer support frame of the utility model;
[0020] Figure 4 It is an enlarged structural schematic diagram of point A of the utility model.
[0021] In the figure: 1. upstream earth cofferdam; 2. downstream earth cofferdam; 3. water pipe; 4. buffer support frame; 401. fixed shell; 402. support rod; 403. connecting plate; 404. movable clamping plate; 405. sleeve rod; 406. sleeve; 407. movable plate; 408. buffer spring; 5. waterproof layer; 6. buffer layer. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0023] To facilitate the understanding of the present invention, the present invention will be described more comprehensively below with reference to the relevant drawings, and several embodiments of the present invention are given. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.
[0024] For examples, see Figure 1 , Figure 3 , Figure 4 , the utility model provides a technical solution:
[0025] A hydraulic structure for temporarily blocking a river comprises an upstream earth cofferdam 1 and a downstream earth cofferdam 2, wherein a water pipe 3 is arranged between the upstream earth cofferdam 1 and the downstream earth cofferdam 2, and a buffer support frame 4 is arranged on the left and right sides of the surface of the water pipe 3, and the buffer support frame 4 comprises a fixed shell 401 arranged on the upper and lower sides of the water pipe 3, the two fixed shells 401 are symmetrically arranged with the center line of the water pipe 3 as the symmetry axis, the front and rear ends of the two fixed shells 401 are welded with connecting plates 403, four connecting plates 403 are grouped in pairs, and the two groups of connecting plates 403 are connected by fastening bolts, a support rod 402 is fixedly connected to the bottom of the lower fixed shell 401, two movable clamping plates 404 are symmetrically arranged on the inner sides of the two fixed shells 401, sleeve rods 405 are equidistantly arranged on the side of the two movable clamping plates 404 close to the fixed shell 401, and sleeves 406 are equidistantly arranged on the opposite sides of the two fixed shells 401.
[0026] like Figure 3 , Figure 4As shown, the total number of sleeve rods 405 is six, the total number of sleeves 406 is also six, the six sleeve rods 405 are grouped into three each, one end of two groups of sleeve rods 405 away from the movable clamping plate 404 respectively extends to the interior of the six sleeves 406 and is fixedly connected with a movable plate 407, the inner cavities of the six sleeves 406 are all provided with buffer springs 408, the two fixed shells 401 are arc-shaped, the two movable clamping plates 404 are also arc-shaped, the two movable clamping plates 404 are in contact with the surface of the water pipe 3, and the two buffer support frames 4 have the same structural arrangement.
[0027] like Figure 1 , Figure 2 As shown, the upstream earth cofferdam 1 and the downstream earth cofferdam 2 are arranged opposite to each other, and the side of the upstream earth cofferdam 1 away from the downstream earth cofferdam 2 is stepped. The two ends of the water pipe 3 respectively pass through the top of the upstream earth cofferdam 1 and the downstream earth cofferdam 2. The outer wall of the upstream earth cofferdam 1 is provided with a waterproof layer 5, and the outer wall of the waterproof layer 5 is provided with a buffer layer 6.
[0028] The working process of the utility model is as follows: when in use, the water flow of the river channel is blocked by the upstream earth cofferdam 1, and the side of the upstream earth cofferdam 1 in contact with the water flow is stepped. This structure can reduce the drop of the water flow and mitigate the impact force. The water flow enters the interior of the water pipe 3, which can not only fulfill the function of water passing through the river channel, but also ensure the safe and smooth construction of the tunnel under the river. The waterproof layer 5 is composed of a non-woven fabric layer and a geomembrane composite, which can prevent water penetration. The buffer layer 6 is composed of a mixture of gravel, clay, and an adhesive, which mitigates the pressure of water pressure on the upstream earth cofferdam 1 and protects the waterproof layer 5 from being scratched. The water flow will shake when passing through the water pipe 3, and the water pipe 3 pushes the movable clamping plate 404 to move up and down, and the sleeve rod 405 moves toward the inside of the sleeve 406 to squeeze the buffer spring 408, so as to buffer the shaking and vibration generated by the water pipe 3.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A hydraulic structure for temporarily blocking a river, comprising an upstream earth cofferdam (1) and a downstream earth cofferdam (2), characterized in that: A water pipe (3) is provided between the upstream earth cofferdam (1) and the downstream earth cofferdam (2), and buffer support frames (4) are provided on the left and right sides of the surface of the water pipe (3); The buffer support frame (4) comprises a fixed shell (401) arranged on the upper and lower sides of the water pipe (3), the two fixed shells (401) are symmetrically arranged with the center line of the water pipe (3) as the symmetry axis, the front and rear ends of the two fixed shells (401) are welded with connecting plates (403), four connecting plates (403) form a group of two, and the two groups of connecting plates (403) are connected by fastening bolts, the bottom of the lower fixed shell (401) is fixedly connected with a support rod (402), two movable clamping plates (404) are symmetrically arranged on the inner sides of the two fixed shells (401), sleeve rods (405) are equidistantly arranged on the side of the two movable clamping plates (404) close to the fixed shell (401), and sleeves (406) are equidistantly arranged on the opposite side of the two fixed shells (401).
2. A hydraulic structure for temporarily cutting off a river according to claim 1, characterized in that: The total number of the sleeve rods (405) is six, and the total number of the sleeves (406) is also six. The six sleeve rods (405) are grouped into three at a time. One end of two groups of sleeve rods (405) away from the movable clamping plate (404) respectively extends to the interior of the six sleeves (406) and is fixedly connected to a movable plate (407). The inner cavities of the six sleeves (406) are all provided with buffer springs (408).
3. A hydraulic structure for temporarily cutting off a river according to claim 1, characterized in that: The two fixed shells (401) are arranged in an arc shape, the two movable clamping plates (404) are also arranged in an arc shape, the two movable clamping plates (404) are in contact with the surface of the water pipe (3), and the two buffer support frames (4) have the same structural arrangement.
4. A hydraulic structure for temporarily cutting off a river according to claim 1, characterized in that: The upstream earth cofferdam (1) and the downstream earth cofferdam (2) are arranged opposite to each other, and the side of the upstream earth cofferdam (1) away from the downstream earth cofferdam (2) is in a stepped shape.
5. The hydraulic structure for temporarily cutting off a river according to claim 1, characterized in that: The two ends of the water pipe (3) respectively penetrate above the upstream earth cofferdam (1) and the downstream earth cofferdam (2).
6. The hydraulic structure for temporarily cutting off a river according to claim 1, characterized in that: The outer wall of the upstream earth cofferdam (1) is provided with a waterproof layer (5), and the outer wall of the waterproof layer (5) is provided with a buffer layer (6).