U-shaped beam reserved pre-embedded positioning device

By designing a pre-embedded positioning device for U-shaped beams and using lifting components and scraper technology, the problem of smooth concrete surface after positioning the U-shaped beam embedded sleeves was solved, achieving construction efficiency and cost savings without the need to re-pouring concrete.

CN221878911UActive Publication Date: 2024-10-22CCCC THIRD HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323530509.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-10-22
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

The existing U-shaped beam embedded sleeve positioning device can easily destroy the flatness of the concrete surface when it is removed after the concrete has solidified, causing construction workers to need to re-level it, which is time-consuming and labor-intensive.

Method used

A U-shaped beam reserved and embedded positioning device is designed, including a baffle, a lifting component and a positioning component. The U-shaped beam is fixed with bolts. After the concrete is poured, the lifting component and scraper are started. The scraper drives the positioning component to rise and scrape. On the concrete surface, the spring automatically resets to avoid re-pouring of concrete.

Benefits of technology

It is possible to complete the positioning of U-shaped beams and smooth the concrete surface without destroying the flatness of the concrete, saving construction time and cost and improving work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878911U_ABST
    Figure CN221878911U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, and discloses a U-shaped beam reserving and pre-embedding positioning device which comprises a baffle, two lifting assemblies are movably connected in the baffle, the front faces of the two lifting assemblies are fixedly connected with a positioning assembly, and after a constructor puts a U-shaped beam into a reinforcement cage, the positioning assembly is fixedly connected with the U-shaped beam. When a constructor finishes pouring concrete, relieves fixation of the U-shaped beam, starts a lifting assembly to drive the whole positioning assembly to ascend, holds a grip to drive a scraper plate to move forwards, and scrapes the damaged concrete surface after the positioning assembly is lifted to be flat, the U-shaped beam is fixed through the bolt, and then the U-shaped beam is positioned. After the surface of the concrete is scraped to be flat, the positioning assembly continues to ascend, then the grip is loosened, the scraping plate automatically resets under the elastic force of the spring on the rear side of the moving block, constructors do not need to pour the concrete again, cost is saved, and working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a U-shaped beam reserved and embedded positioning device. Background Art

[0002] U-shaped beams have the characteristics of simple structure, strong bearing capacity, good bending resistance, convenient construction, high space utilization and low maintenance cost. These characteristics make U-shaped beams widely used in engineering, and in the continuous development and improvement, they provide reliable support and guarantee for projects in all walks of life. U-shaped beams are a common structural form and are widely used in engineering fields such as bridges, buildings and mechanical equipment.

[0003] After searching, the announcement number: CN203238953U discloses a pre-embedded sleeve positioning device, including: a bracket, a plurality of through holes are opened on the bracket, at least one positioning sleeve is fixedly provided on the bracket at the position of the through holes, and the positions of the through holes and the positioning sleeves correspond to the embedded positions of the pre-embedded sleeves. This application solves the problem of accurately embedding embedded parts in concrete.

[0004] However, in this application, after the embedded parts were poured with concrete and the concrete solidified slightly, the screws and brackets were removed, which damaged the flatness of the concrete surface. The staff also needed to level the damaged concrete surface again, which was very time-consuming and labor-intensive.

[0005] Therefore, we designed a U-beam pre-embedded positioning device. Utility Model Content

[0006] In view of the deficiencies of the prior art, the utility model provides a U-shaped beam pre-embedded positioning device, which solves the problem of damaging the flatness of the concrete surface.

[0007] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0008] A U-shaped beam reserved and embedded positioning device comprises a baffle, wherein two sets of lifting components are movably connected inside the baffle, and the front faces of the two sets of lifting components are fixedly connected with positioning components, and a steel cage is placed below the positioning components;

[0009] The positioning assembly includes two groups of connecting plates fixedly connected to the front faces of the two groups of lifting assemblies, the front faces of the two groups of connecting plates are fixedly connected with support plates, the tops of the support plates are threadedly connected with multiple groups of bolts, the bottoms of the two groups of connecting plates are provided with a first moving groove, the bottoms of the support plates are provided with a second moving groove, the rear inner wall of the first moving groove is fixedly connected with a spring, the front face of the spring is fixedly connected with a moving block slidably connected to the first moving groove, a scraper is fixedly connected in the middle of the two groups of moving blocks, and a handle is fixedly connected to the top of the scraper.

[0010] Furthermore, the baffle includes a plate body, and two sets of lifting grooves are opened on the front side of the plate body.

[0011] Furthermore, the lifting assembly includes two sets of stepper motors fixedly connected to the top of the plate body, the bottom of the stepper motor is fixedly connected to a screw, and the bottom of the screw is movably connected to the inner bottom wall of the lifting groove, and the surface of the screw is threadedly connected to a lifting block.

[0012] Furthermore, the second moving groove is located at the front side of the two groups of first moving grooves, and the second moving groove is communicated with the two groups of first moving grooves.

[0013] Furthermore, the scraper is located in the middle of the two groups of connecting plates, and the top of the scraper does not contact the bottom of the connecting plates.

[0014] Furthermore, the two groups of moving blocks are located inside the two groups of first moving grooves, and the bottoms of the two groups of moving blocks extend out of the two groups of first moving grooves.

[0015] The beneficial effects of the utility model are:

[0016] 1. Through the positioning assembly, the two sets of connecting plates in the positioning assembly are fixedly connected with the front of the two sets of lifting blocks. After the construction workers put the U-shaped beam into the steel cage, they turn the bolts from the top of the support plate to fix the U-shaped beam and complete the positioning of the U-shaped beam. When the construction workers finish pouring the concrete, they release the fixation of the U-shaped beam, start the lifting assembly to drive the overall positioning assembly to rise, and the construction workers hold the handle to drive the scraper to move forward to scrape the damaged concrete surface after the positioning assembly is raised. After the concrete surface is scraped flat, the positioning assembly continues to rise, and then the handle is released. The scraper automatically resets under the elastic force of the spring on the rear side of the moving block. The construction workers do not need to pour concrete again, which saves costs and improves work efficiency.

[0017] 2. By setting the second moving groove, the second moving groove is located in front of the first moving groove, and the second moving groove is connected to the first moving groove, so that the moving block can slide from the first moving groove into the second moving groove. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the lifting assembly structure of the utility model;

[0020] Figure 3 This is a schematic diagram of the positioning component structure of the utility model;

[0021] Figure 4It is a bottom view of the positioning assembly of the utility model.

[0022] In the figure: 1. baffle; 101. plate body; 102. lifting slot; 2. lifting assembly; 201. stepping motor; 202. screw; 203. lifting block; 3. positioning assembly; 301. connecting plate; 302. support plate; 303. bolt; 304. first moving slot; 305. second moving slot; 306. spring; 307. moving block; 308. scraper; 309. handle; 4. steel cage. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] See also Figure 1-4 : A U-shaped beam reserved and embedded positioning device, comprising a baffle 1, two sets of lifting components 2 are movably connected inside the baffle 1, and the front of the two sets of lifting components 2 are fixedly connected with a positioning component 3, which is convenient for positioning the U-shaped beam, and a steel cage 4 is placed under the positioning component 3;

[0025] The positioning assembly 3 includes two sets of connecting plates 301 fixedly connected to the front of the two sets of lifting assemblies 2. The front of the two sets of connecting plates 301 is fixedly connected with a supporting plate 302. The top of the supporting plate 302 is threadedly connected with multiple sets of bolts 303. When the construction personnel put the U-shaped beam into the steel cage 4, the bolts 303 are rotated from the top of the supporting plate 302 to fix the U-shaped beam, so as to complete the positioning of the U-shaped beam. The bottom of the two sets of connecting plates 301 is provided with a first moving groove 304. The supporting plate 302 is threadedly connected with multiple sets of bolts 303. A second moving groove 305 is provided at the bottom of 2, a spring 306 is fixedly connected to the inner wall of the rear side of the first moving groove 304, a moving block 307 slidably connected to the first moving groove 304 is fixedly connected to the front of the spring 306, a scraper 308 is fixedly connected in the middle of the two groups of moving blocks 307, and a handle 309 is fixedly connected to the top of the scraper 308, so that the construction workers can hold the handle 309 to drive the scraper 308 to move forward, so as to flatten the concrete surface damaged after the positioning assembly 3 is raised;

[0026] The baffle 1 includes a plate body 101, and two sets of lifting grooves 102 are opened on the front of the plate body 101. The lifting assembly 2 includes two sets of stepper motors 201 fixedly connected to the top of the plate body 101, and a screw 202 is fixedly connected to the bottom of the stepper motor 201, so that the stepper motor 201 can be started to drive the screw 202 to rotate, and the bottom of the screw 202 is movably connected to the inner bottom wall of the lifting groove 102, and the surface of the screw 202 is threadedly connected to a lifting block 203;

[0027] After the construction workers put the U-shaped beam into the steel cage 4, they rotate the bolt 303 from the top of the support plate 302 to fix the U-shaped beam and complete the positioning of the U-shaped beam. When the construction workers finish pouring concrete, they release the fixation of the U-shaped beam, start the lifting assembly 2 to drive the overall positioning assembly 3 to rise, and the construction workers hold the handle 309 to drive the scraper 308 to move forward to scrape the concrete surface damaged by the positioning assembly 3 after it is raised. After the concrete surface is scraped flat, the positioning assembly 3 continues to rise, and then the handle 309 is released. The scraper 308 automatically resets under the elastic force of the spring 306 on the rear side of the moving block 307, and the construction workers do not need to pour concrete again, which saves costs and improves work efficiency.

[0028] The second moving groove 305 is located at the front side of the two groups of first moving grooves 304, and the second moving groove 305 is connected with the two groups of first moving grooves 304. The scraper 308 is located in the middle of the two groups of connecting plates 301, and the top of the scraper 308 does not contact the bottom of the connecting plate 301.

[0029] The two groups of moving blocks 307 are located inside the two groups of first moving grooves 304 , and the bottoms of the two groups of moving blocks 307 extend out of the two groups of first moving grooves 304 .

[0030] To sum up, when the utility model is in use, after the construction personnel put the U-shaped beam into the steel cage 4, they turn the bolt 303 from the top of the support plate 302 to allow the bolt 303 to fix the U-shaped beam and complete the positioning of the U-shaped beam. When the construction personnel have finished pouring concrete, they release the fixation of the U-shaped beam, start the lifting assembly 2 to drive the overall positioning assembly 3 to rise, and the construction personnel hold the handle 309 to drive the scraper 308 to move forward to scrape the damaged concrete surface after the positioning assembly 3 is raised. After the concrete surface is scraped flat, the positioning assembly 3 continues to rise, and then the handle 309 is released. The scraper 308 automatically resets under the elastic force of the spring 306 on the rear side of the moving block 307. The construction personnel do not need to pour concrete again, which saves costs and improves work efficiency.

[0031] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A U-shaped beam pre-embedded positioning device, comprising a baffle (1), Features: Two groups of lifting assemblies (2) are movably connected inside the baffle (1), and the front faces of the two groups of lifting assemblies (2) are fixedly connected with positioning assemblies (3), and a steel cage (4) is placed below the positioning assemblies (3); The positioning assembly (3) comprises two groups of connecting plates (301) fixedly connected to the front faces of the two groups of lifting assemblies (2); the front faces of the two groups of connecting plates (301) are fixedly connected to supporting plates (302); the tops of the supporting plates (302) are threadedly connected to multiple groups of bolts (303); the bottoms of the two groups of connecting plates (301) are provided with first moving grooves (304); the bottoms of the supporting plates (302) are provided with second moving grooves (305); the inner wall of the rear side of the first moving groove (304) is fixedly connected to a spring (306); the front face of the spring (306) is fixedly connected to a moving block (307) slidably connected to the first moving groove (304); a scraper (308) is fixedly connected between the two groups of moving blocks (307); and the top of the scraper (308) is fixedly connected to a handle (309).

2. A U-beam pre-embedded positioning device according to claim 1, Features: The baffle (1) comprises a plate body (101), and two groups of lifting grooves (102) are provided on the front side of the plate body (101).

3. A U-beam pre-embedded positioning device according to claim 2, Features: The lifting assembly (2) comprises two groups of stepper motors (201) fixedly connected to the top of the plate body (101), the bottom of the stepper motor (201) is fixedly connected to a screw rod (202), and the bottom of the screw rod (202) is movably connected to the inner bottom wall of the lifting groove (102), and the surface of the screw rod (202) is threadedly connected to a lifting block (203).

4. A U-beam pre-embedded positioning device according to claim 1, Features: The second moving groove (305) is located at the front side of the two groups of first moving grooves (304), and the second moving groove (305) is connected to the two groups of first moving grooves (304).

5. A U-beam pre-embedded positioning device according to claim 1, Features: The scraper (308) is located in the middle of the two groups of connecting plates (301), and the top of the scraper (308) does not contact the bottom of the connecting plate (301).

6. A U-beam pre-embedded positioning device according to claim 1, Features: The two groups of moving blocks (307) are located inside the two groups of first moving grooves (304), and the bottoms of the two groups of moving blocks (307) extend out of the inside of the two groups of first moving grooves (304).