Building engineering hole filling device
By designing a construction engineering hole-filling device with multiple components working together, it solves the time-consuming, labor-intensive and fluidity problems of manual filling of cement in the existing technology, and achieves an efficient and labor-saving hole filling effect.
Patent Information
- Application Number
- CN202323502409.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-21
AI Technical Summary
Existing hole-filling devices in construction projects require manual filling of cement and other fillers into higher holes, which is time-consuming and labor-intensive, and the fillers are highly fluid, resulting in low hole-filling efficiency.
A construction engineering hole patching device including a movable base, a sliding cylinder, a sliding rod, a lifting plate, a lifting component, a blocking plate, a fixed component, a material box, a mixing component and a transport component is designed. The lifting component drives the lifting plate to move up and down. , the sliding tube and sliding rod support the blocking plate, the fixed component fixes the position of the blocking plate, the mixing component stirs the materials, and the transport component transports the materials in the material box to the hole.
It realizes simple operation and convenience of filling materials into holes of different heights, reduces the possibility of material flowing out during the filling process, and improves the hole filling efficiency.
Smart Images

Figure CN221878950U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hole-filling devices, in particular to a hole-filling device for construction engineering. Background Art
[0002] In the process of construction projects, it is often necessary to open holes, and after the construction project is completed, these holes need to be sealed. At this time, construction project hole fillers will be used.
[0003] An existing construction engineering hole patching device, China disclosed a patent publication number CN211974450U on November 20, 2020. The construction engineering hole patching device can be applied to holes of various calibers. It only needs to assemble a corresponding number of hoses to form a ring according to the circumference of the hole, and then move to the corresponding position of the hole and inflate to complete the assembly. Then, cement and other fillers can be filled in the hole. After the filler is stable, the hole patching device can be removed.
[0004] However, the above-mentioned prior art solutions require manual filling of cement and other fillers into the higher holes, which is not only time-consuming and labor-intensive, but also most of the fillers are fluid and easily flow out during the filling process, resulting in low hole filling efficiency. Utility Model Content
[0005] 1. Technical issues to be solved
[0006] In view of the shortcomings of the prior art, the utility model provides a construction engineering hole filler to solve the problem that the prior art mentioned in the background technology requires manual filling of cement and other fillers into holes at higher places, which is not only time-consuming and labor-intensive, but also most of the fillers are fluid and easily flow out during the filling process, resulting in low hole filling efficiency.
[0007] (II) Technical solution
[0008] To achieve the above-mentioned objectives, the utility model provides the following technical solutions: a construction engineering hole filler, comprising a mobile base, a slide cylinder, a slide rod, a lifting plate, a lifting assembly, a blocking plate, a fixing assembly, a material box, a stirring assembly and a transport assembly, wherein the slide cylinder is fixedly connected to the mobile base, the slide rod is slidably mounted on the slide cylinder, the lifting plate is fixedly connected to the slide rod, the lifting assembly is arranged on the mobile base for driving the lifting plate to move up and down, the blocking plate is fixedly connected to the lifting plate, the fixing assembly is arranged on the lifting plate for fixing the position of the blocking plate, the material box is fixedly connected to the mobile base, the stirring assembly is arranged on the material box for stirring the filled material, and the transport assembly is arranged on the mobile base for transporting the filler in the material box into the hole.
[0009] Preferably, the lifting assembly includes a threaded barrel, a rotating screw and a driving assembly, the rotating barrel is rotatably connected to the mobile base, the rotating screw is threadably sleeved on the threaded barrel, and the rotating screw is fixedly connected to the lifting plate, and the driving assembly is arranged on the mobile base for driving the threaded barrel to rotate.
[0010] Furthermore, the driving assembly includes a support frame, a rotating rod, a driving gear, a passive gear and a first motor. The support frame is fixedly connected to the mobile base, the rotating rod is rotatably connected between the support frame and the mobile base, the driving gear is fixedly sleeved on the rotating rod, the passive gear is fixedly sleeved on the threaded cylinder, and the driving gear is meshed with the passive gear. The first motor is fixedly mounted on the support frame, and the output end of the first motor passes through the support frame and is concentrically connected to the rotating rod.
[0011] Furthermore, the fixed component includes a vacuum pump, an exhaust pipe and a fixed air cushion, the vacuum pump is fixedly installed on the lifting plate, the exhaust pipe is connected to the vacuum pump, and the fixed air cushion is connected to the exhaust pipe.
[0012] Furthermore, the stirring assembly includes a rotating shaft, a stirring blade and a second motor, the rotating shaft is rotatably connected to the material box, the stirring blade is fixedly connected to the rotating shaft, the second motor is fixedly installed on the material box, and the output end of the second motor passes through the material box and is concentrically connected to the rotating shaft.
[0013] Wherein, the transport component includes a mounting frame, a material pump, a material extraction pipe, a telescopic tube and a transfer tube, the mounting frame is fixedly connected to the mobile base, the material pump is fixedly mounted on the mounting frame, the material extraction pipe is connected to the material pump, the material extraction pipe passes through the mounting frame and the material box and extends into the material box, the telescopic tube is connected to the material pump, the transfer tube is connected to the telescopic tube, and the transfer tube is connected to the sealing plate.
[0014] Secondly, the material box is connected with a feed channel, and the feed channel is connected with a feed hopper.
[0015] (III) Beneficial effects
[0016] In summary, the present invention includes at least one of the following beneficial technical effects:
[0017] The hole-filling device for construction engineering drives the lifting plate to move up and down through the lifting component, the sliding cylinder and the sliding rod support the lifting plate, and drive the blocking plate to move up and down to the same height as the hole opening, the position of the blocking plate is fixed by the fixing component, the material filled in the material box is stirred by the stirring component, and the filling in the material box is transported to the hole by the transport component. Therefore, the hole-filling device for construction engineering is simple to operate, and is convenient for filling materials into holes at different heights, saving time and labor, and the material is not easy to flow out during the filling process, and the hole-filling efficiency is high. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0019] Figure 2 It is a schematic diagram of the exploded structure of the threaded barrel, the rotating screw and the supporting frame of the utility model;
[0020] Figure 3 It is a schematic diagram of the structure of the partial cross section of the telescopic tube, the transfer tube and the feed channel of the utility model;
[0021] Figure 4 It is a partial cross-sectional structural diagram of the cooperation among the rotating shaft, stirring blades and the second motor of the utility model.
[0022] In the figure: 1. movable base; 2. slide cylinder; 3. slide rod; 4. lifting plate; 5. blocking plate; 6. material box; 7. threaded cylinder; 8. rotating screw; 9. support frame; 10. rotating rod; 11. driving gear; 12. passive gear; 13. first motor; 14. vacuum pump; 15. exhaust pipe; 16. fixed air cushion; 17. rotating shaft; 18. stirring blade; 19. second motor; 20. mounting frame; 21. material pump; 22. extraction pipe; 23. telescopic pipe; 24. transfer pipe; 25. feeding channel; 26. feeding hopper. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0025] Example 1
[0026] Reference Figure 1 and Figure 2A hole filler for construction engineering, comprising a mobile base 1, a slide cylinder 2, a slide rod 3, a lifting plate 4, a lifting assembly, a blocking plate 5, a fixed assembly, a material box 6, a stirring assembly and a transport assembly. The mobile base 1 is equipped with a universal wheel, which is more conducive to the movement of the mobile base 1. The slide cylinder 2 is fixedly connected to the mobile base 1, the slide rod 3 is slidably sleeved on the slide cylinder 2, the lifting plate 4 is fixedly connected to the slide rod 3, and the lifting assembly is arranged on the mobile base 1 to drive the lifting plate 4 to move up and down. The lifting assembly comprises a threaded cylinder 7, a rotating screw 8 and a driving assembly. The rotating cylinder is rotatably connected to the mobile base 1, the rotating screw 8 is threadably sleeved on the threaded cylinder 7, and the rotating screw 8 is fixedly connected to the lifting plate 4. The driving assembly is arranged on the mobile base 1 to drive the threaded cylinder 7 to rotate. The driving assembly comprises a support frame 9, a rotating rod 10, a driving gear 11, a passive gear 12 and a first motor 13, the support frame 9 is fixedly connected to the mobile base 1, the rotating rod 10 is rotatably connected between the support frame 9 and the mobile base 1, the driving gear 11 is fixedly sleeved on the rotating rod 10, the passive gear 12 is fixedly sleeved on the threaded tube 7, and the driving gear 11 is meshed with the passive gear 12, the first motor 13 is fixedly installed on the support frame 9, the output end of the first motor 13 passes through the support frame 9 and is concentrically connected to the rotating rod 10, the output end of the first motor 13 rotates to drive the rotating rod 10 to rotate, the rotating rod 10 rotates to drive the driving gear 11 to rotate, the driving gear 11 rotates to drive the passive gear 12 to rotate, the passive gear 12 rotates to drive the threaded tube 7 to rotate, the threaded tube 7 rotates to drive the rotating screw 8 to move up and down, the sliding rod 3 slides up and down in the sliding tube 2, and drives the lifting plate 4 to move up and down, so as to facilitate the adjustment of the height of the blocking plate 5 according to the position of the hole.
[0027] Reference Figure 1 The blocking plate 5 is fixedly connected to the lifting plate 4. The fixing component is arranged on the lifting plate 4 and is used to fix the position of the blocking plate 5. The fixing component includes a vacuum pump 14, an exhaust pipe 15 and a fixed air cushion 16. The vacuum pump 14 is fixedly installed on the lifting plate 4. The exhaust pipe 15 is connected to the vacuum pump 14. The fixed air cushion 16 is connected to the exhaust pipe 15. The vacuum pump 14 evacuates the gas in the fixed air cushion 16 through the exhaust pipe 15, so that the fixed air cushion 16 is adsorbed onto the wall, thereby fixing the position of the blocking plate 5 and reducing the gap between the blocking plate 5 and the wall, further reducing the possibility of the filler flowing out of the hole.
[0028] Reference Figure 1 , Figure 3 and Figure 4The material box 6 is fixedly connected to the mobile base 1, and a feed channel 25 is connected to the material box 6, and a feed hopper 26 is connected to the feed channel 25, so as to facilitate pouring the filler into the material box 6. The stirring assembly is arranged on the material box 6 for stirring the filled material, and the stirring assembly includes a rotating shaft 17, a stirring blade 18 and a second motor 19. The rotating shaft 17 is rotatably connected to the material box 6, and the stirring blade 18 is fixedly connected to the rotating shaft 17. The second motor 19 is fixedly installed on the material box 6, and the output end of the second motor 19 passes through the material box 6 and is concentrically connected to the rotating shaft 17. The output end of the second motor 19 drives the rotating shaft 17 to rotate, and the rotating shaft 17 drives the stirring blade 18 to perform a circular motion, so as to facilitate stirring the filler in the material box 6. For stirring, a transport component is arranged on the mobile base 1, and is used for transporting the filling material in the material box 6 to the hole. The transport component includes a mounting frame 20, a material pump 21, a pumping pipe 22, a telescopic pipe 23 and a transfer pipe 24. The mounting frame 20 is fixedly connected to the mobile base 1, the material pump 21 is fixedly mounted on the mounting frame 20, the pumping pipe 22 is connected to the material pump 21, the pumping pipe 22 passes through the mounting frame 20 and the material box 6 and extends into the material box 6, the telescopic pipe 23 is connected to the material pump 21, the transfer pipe 24 is connected to the telescopic pipe 23, and the transfer pipe 24 is connected to the blocking plate 5, the material pump 21 transports the filling material in the material box 6 to the telescopic pipe 23 through the pumping pipe 22, and then transports it to the hole through the transfer pipe 24.
[0029] Example 2
[0030] In summary, the working principle and working process of the hole filling device for construction engineering are as follows: when in use, firstly, the filler is poured into the material box 6 through the feed hopper 26 and the feed channel 25, the second motor 19 is turned on, and the output end of the second motor drives the rotating shaft 17 to rotate, and the rotating shaft 17 drives the stirring blade 18 to perform a circular motion to stir the filler in the material box 6, and then the mobile base 1 is moved to the hole opening, and the first motor 13 is turned on, and the output end of the first motor 13 rotates to drive the rotating rod 10 to rotate, and the rotating rod 10 rotates to drive the driving gear 11 to rotate, and the driving gear 11 rotates to drive the driven gear 12 to rotate, and the driven gear 11 rotates to drive the driven gear 12 to rotate. The rotation of the moving gear 12 drives the threaded barrel 7 to rotate, and the rotation of the threaded barrel 7 drives the rotating screw 8 to move up and down. The slide rod 3 slides up and down in the slide barrel 2, driving the lifting plate 4 to move up and down, thereby adjusting the height of the blocking plate 5 to be consistent with the position of the hole, and turning on the vacuum pump 14. The vacuum pump 14 evacuates the gas in the fixed air cushion 16 through the exhaust pipe 15, so that the fixed air cushion 16 is adsorbed onto the wall, so that the blocking plate 5 is in close contact with the wall around the hole, and the material pump 21 is turned on. The material pump 21 transports the filler in the material box 6 to the telescopic tube 23 through the extraction pipe 22, and then transports it to the hole through the transfer pipe 24.
[0031] The above-mentioned embodiments only express the specific implementation methods of the utility model, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model.
Claims
1. A hole-filling device for construction engineering, comprising a mobile base (1), characterized in that: Also includes: A slide cylinder (2), wherein the slide cylinder (2) is fixedly connected to the mobile base (1); A sliding rod (3), wherein the sliding rod (3) is slidably sleeved on the sliding cylinder (2); A lifting plate (4), wherein the lifting plate (4) is fixedly connected to the sliding rod (3); A lifting component, the lifting component is arranged on the mobile base (1) and is used to drive the lifting plate (4) to move up and down; A blocking plate (5), the blocking plate (5) being fixedly connected to the lifting plate (4); A fixing component, the fixing component being arranged on the lifting plate (4) and being used for fixing the position of the blocking plate (5); A material box (6), wherein the material box (6) is fixedly connected to the mobile base (1); A stirring component, the stirring component is arranged on the material box (6) and is used to stir the filled material; A transport component is arranged on the mobile base (1) and is used to transport the filling material in the material box (6) into the hole.
2. A construction engineering hole filler according to claim 1, characterized in that: The lifting assembly comprises: A threaded cylinder (7), the rotating cylinder being rotatably connected to the movable base (1); A rotating screw (8), wherein the rotating screw (8) is threadedly sleeved on the threaded barrel (7), and the rotating screw (8) is fixedly connected to the lifting plate (4); A driving and rotating assembly is arranged on the movable base (1) and is used for driving the threaded barrel (7) to rotate.
3. A hole-filling device for construction engineering according to claim 2, characterized in that: The driving assembly comprises: A support frame (9), wherein the support frame (9) is fixedly connected to the mobile base (1); A rotating rod (10), the rotating rod (10) being rotatably connected between the supporting frame (9) and the movable base (1); A driving gear (11), wherein the driving gear (11) is fixedly sleeved on the rotating rod (10); A passive gear (12), wherein the passive gear (12) is fixedly sleeved on the threaded barrel (7), and the active gear (11) is meshed with the passive gear (12); A first motor (13), wherein the first motor (13) is fixedly mounted on the support frame (9), and an output end of the first motor (13) passes through the support frame (9) and is coaxially connected to the rotating rod (10).
4. A hole-filling device for construction engineering according to claim 1, characterized in that: The fixing assembly comprises: a vacuum pump (14), wherein the vacuum pump (14) is fixedly mounted on the lifting plate (4); An air extraction pipe (15), the air extraction pipe (15) being connected to the vacuum pump (14); A fixed air cushion (16), wherein the fixed air cushion (16) is connected to the air extraction pipe (15).
5. A hole-filling device for construction engineering according to claim 1, characterized in that: The stirring assembly comprises: A rotating shaft (17), the rotating shaft (17) being rotatably connected to the material box (6); A stirring blade (18), wherein the stirring blade (18) is fixedly connected to the rotating shaft (17); A second motor (19), wherein the second motor (19) is fixedly mounted on the material box (6), and an output end of the second motor (19) passes through the material box (6) and is coaxially connected to the rotating shaft (17).
6. A hole-filling device for construction engineering according to claim 1, characterized in that: The transport assembly comprises: A mounting frame (20), wherein the mounting frame (20) is fixedly connected to the mobile base (1); A material pump (21), wherein the material pump (21) is fixedly mounted on the mounting frame (20); A material extraction pipe (22), the material extraction pipe (22) being connected to the material pump (21), the material extraction pipe (22) penetrating the mounting frame (20) and the material box (6) and extending into the material box (6); a telescopic tube (23), wherein the telescopic tube (23) is connected to the material pump (21); A transfer tube (24), the transfer tube (24) is connected to the telescopic tube (23), and the transfer tube (24) is connected to the blocking plate (5).
7. A hole-filling device for construction engineering according to claim 1, characterized in that: The material box (6) is connected to a feed channel (25), and the feed channel (25) is connected to a feed hopper (26).