Steel support auxiliary supporting device for self-adaptive excavation of tunnel section
By using steel support auxiliary support devices that adapt to the excavation of the tunnel section during tunnel construction, and using adjustable brackets and U-shaped steel components to achieve close contact between the I-beam and the surrounding rock surface, the problems caused by over-excavation of the top arch are solved. Support instability and safety hazards have been eliminated, and real-time support and safety improvements have been achieved.
Patent Information
- Application Number
- CN202420645964.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-04-01
AI Technical Summary
During tunnel construction, tunnels with large roof arch overexcavations require measurement of the excavation section and reprocessing of steel supports, which results in the inability to achieve immediate support after excavation and the problems of loose surrounding rock and potential safety hazards.
A steel support auxiliary support device that adapts to the excavation tunnel section is designed, using adjustable brackets and U-shaped steel components. The internal and external adjustable brackets achieve a close fit between the I-beam and the surrounding rock surface. Ensure force transmission and support stability, and enhance the connection firmness through U-shaped steel components to avoid re-measurement and processing and achieve immediate support.
This device solves the problem of non-contact between the steel support and the surrounding rock surface and uneven stress distribution, improves the stability and safety of the support, saves construction time, reduces costs, and prevents the risk of loosening and falling of surrounding rock. Significantly improved construction safety.
Smart Images

Figure CN221879421U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction equipment, in particular to a steel support auxiliary supporting device for adaptively excavating a tunnel section. Background Art
[0002] In tunnel design, steel supports and anchor spraying are used for initial support of tunnel bodies with poor surrounding rock. Steel supports are usually processed in a processing plant according to the designed excavation section. However, over-excavation may occur during the excavation of the tunnel. For the over-excavated part of the steel support position, the I-beam cannot directly contact the surrounding rock surface, and the force on the surrounding rock cannot be transmitted to the steel support, resulting in uneven stress distribution in some surrounding rocks or the formation of cavity block falling.
[0003] The traditional treatment method is to use concrete or block stones to fill the space between the I-beam and the surrounding rock surface, and then spray concrete support. The concrete filling treatment consumes a lot of time, and because it is difficult to control the quality of the formwork and vibration of the concrete, there is a cavity between the lining and the surrounding rock. The block stone filling has great safety hazards during the construction process.
[0004] For tunnels with large over-excavation of the crown arch, it is necessary to measure the excavation section and then reprocess the steel supports. It takes a certain amount of time to measure the section and reprocess the steel supports. It is impossible to provide support immediately after excavation. There is a great risk of loosening and falling of surrounding rock, posing a major safety hazard. Utility Model Content
[0005] The purpose of the utility model is to provide a steel support auxiliary support device that is adaptive to the excavation section of a tunnel, so as to solve the problem proposed in the above-mentioned background technology that for tunnels with large over-excavation of the top arch, it is necessary to reprocess the steel support after measuring the excavation section, and it takes a certain amount of time to measure the section and reprocess the steel support, and it is impossible to support immediately after excavation. There is a great risk of loosening and falling of surrounding rocks, and there is a great safety hazard.
[0006] To achieve the above-mentioned purpose, the utility model provides a steel support auxiliary support device for adaptively excavating a tunnel section, comprising a top arch I-beam, I-beams on both sides of the side wall and an adjustable bracket, the adjustable bracket comprising an external adjustable bracket and an internal adjustable bracket, the I-beams on both sides of the side wall are divided into an upper section and a lower section, the upper section is connected to the top arch I-beam by bolts, the upper section and the lower section are connected by an internal adjustable bracket, the outer walls of the top arch I-beam and the I-beams on both sides of the side wall are supported by the external adjustable bracket and the inner wall of the rock formation, the top arch I-beam and the I-beams on both sides of the side wall are connected and fixed to the bottom end of the external adjustable bracket through a U-shaped steel assembly.
[0007] Preferably, the top arch I-beam is an arc-shaped structure, and the side wall I-beams on both sides are vertical structures.
[0008] Preferably, the internal adjustable bracket includes a first bottom plate, a first base is welded to the top of the first bottom plate, a first screw is welded to the top of the first base, a first steel sleeve is sleeved on the outside of the first screw, a first rotating member is provided at the bottom end of the first steel sleeve, the first rotating member is threadedly connected to the first screw, the top of the first rotating member supports the first steel sleeve, and a first top plate is welded to the top end of the first steel sleeve.
[0009] Preferably, the first bottom plate is connected to the lower section via bolts, and the first top plate is connected to the upper end via bolts.
[0010] Preferably, the external adjustable bracket includes a second bottom plate, a second base is welded to the top of the second bottom plate, a second screw is welded to the top of the second base, a second steel sleeve is sleeved on the outside of the second screw, a second rotating member is provided at the bottom end of the second steel sleeve, the second rotating member is threadedly connected to the second screw, the top of the second rotating member supports the second steel sleeve, and a second top plate is welded to the top end of the second steel sleeve.
[0011] Preferably, the second steel sleeve in the external adjustable bracket located on the upper part of the top arch I-beam is inclined, the second top plate is horizontally arranged, and a wedge block is arranged at the gap between the top end of the second steel sleeve and the second top plate.
[0012] Preferably, the U-shaped steel assembly includes two groups of U-shaped steels, which are respectively located on the inner and outer sides of the I-beam. The two groups of U-shaped steels are fixed by bolts, and the inner wall of the outer U-shaped steel is pressed against the outer surface of the second bottom plate of the external adjustable bracket.
[0013] Compared with the prior art, the utility model has the following beneficial effects:
[0014] The steel support auxiliary support device for the adaptive excavation tunnel section solves the problems of the steel support not contacting the surrounding rock surface, uneven stress distribution, and cavity block falling caused by over-excavation in traditional tunnel construction through the innovative adjustable bracket design. The device uses internal and external adjustable brackets to achieve a close fit between the I-beam and the surrounding rock surface, ensuring that the force on the surrounding rock can be effectively transmitted to the steel support, improving the stability and safety of the support.
[0015] Specifically, the internal adjustable bracket realizes flexible connection and height adjustment between the upper and lower I-beams through the ingenious combination of the first bottom plate, the first base, the first screw, the first steel sleeve and the first top plate, adapting to the needs of different over-excavation situations. The external adjustable bracket realizes stable support and adjustable distance between the I-beam and the inner wall of the rock formation through the careful design of the second bottom plate, the second base, the second screw, the second steel sleeve and the second top plate, further enhancing the adaptability and stability of the support device.
[0016] In addition, the device also uses a U-shaped steel component to connect and fix the bottom end of the external adjustable bracket, which improves the firmness and reliability of the connection. For tunnels with large arch over-excavation, the device does not need to re-measure the cross-section and process the steel support, saving time and reducing construction costs. At the same time, it realizes immediate support after excavation, effectively preventing the risk of loosening and falling of surrounding rocks, and greatly improving construction safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 It is a structural schematic diagram of the internal adjustable bracket in the utility model;
[0019] Figure 3 It is a structural schematic diagram of the external adjustable bracket in the utility model.
[0020] The meaning of each number in the figure is:
[0021] 1. Arch I-beam; 2. Side wall I-beams; 21. Upper section; 22. Lower section; 3. Internal adjustable bracket; 31. First bottom plate; 32. First base; 33. First screw; 34. First rotating member; 35. First steel sleeve; 36. First top plate; 4. Rock layer; 41. Actual excavation section; 5. External adjustable bracket; 51. Second bottom plate; 52. Second base; 53. Second screw; 54. Second rotating member; 55. Second steel sleeve; 56. Second top plate; 57. Wedge block; 6. U-shaped steel assembly. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] The utility model provides a steel support auxiliary support device for adaptively excavating tunnel sections, such as Figure 1-Figure 3 As shown, it includes a top arch I-beam 1, side wall I-beams 2 on both sides and an adjustable bracket, the adjustable bracket includes an external adjustable bracket 5 and an internal adjustable bracket 3, the side wall I-beams 2 on both sides are divided into an upper section 21 and a lower section 22, the upper section 21 is connected to the top arch I-beam 1 by bolts, and the upper section 21 and the lower section 22 are connected by the internal adjustable bracket 3, so as to facilitate the adjustment of the support height, the outer walls of the top arch I-beam 1 and the side wall I-beams 2 on both sides are supported by the external adjustable bracket 5 and the inner wall of the rock formation 4, the top arch I-beam 1 and the side wall I-beams 2 on both sides are connected and fixed to the bottom end of the external adjustable bracket 5 by a U-shaped steel assembly 6, and the external adjustable bracket 5 located on the top of the top arch I-beam 1 is supported at the actual excavation section 41 of the rock formation.
[0024] In this embodiment, the top arch I-beam 1 is an arc-shaped structure, and the side wall I-beams 2 on both sides are vertical structures.
[0025] Specifically, the internal adjustable bracket 3 includes a first bottom plate 31, a first base 32 is welded on the top of the first bottom plate 31, a first screw 33 is welded on the top of the first base 32, a first steel sleeve 35 is sleeved on the outside of the first screw 33, a first rotating member 34 is provided at the bottom end of the first steel sleeve 35, the first rotating member 34 is threadedly connected to the first screw 33, the top of the first rotating member 34 supports the first steel sleeve 35, and a first top plate 36 is welded on the top of the first steel sleeve 35. The height of the internal adjustable bracket 3 can be adjusted by rotating the first rotating member 34 to achieve adjustment of different heights.
[0026] Furthermore, the first bottom plate 31 is connected to the lower section 22 by bolts, and the first top plate 36 is connected to the upper section 21 by bolts, so as to facilitate the stable connection between the internal adjustable bracket 3 and the upper section 21 and the lower section 22 .
[0027] Furthermore, the external adjustable bracket 5 includes a second bottom plate 51, a second base 52 is welded on the top of the second bottom plate 51, a second screw 53 is welded on the top of the second base 52, a second steel sleeve 55 is sleeved on the outside of the second screw 53, a second rotating member 54 is provided at the bottom end of the second steel sleeve 55, the second rotating member 54 is threadedly connected to the second screw 53, the top of the second rotating member 54 supports the second steel sleeve 55, and a second top plate 56 is welded on the top of the second steel sleeve 55. The height of the external adjustable bracket 5 can be adjusted by rotating the second rotating member 54, so as to facilitate the inner wall support of different rock formations 4.
[0028] Furthermore, the second steel sleeve 55 in the external adjustable bracket 5 located on the upper part of the top arch I-beam 1 is inclined, and the second top plate 56 is horizontally arranged. A wedge block 57 is arranged at the gap between the top end of the second steel sleeve 55 and the second top plate 56 to ensure horizontal and stable support of the second top plate 56.
[0029] Furthermore, the U-shaped steel assembly 6 includes two groups of U-shaped steels, which are respectively located on the inner and outer sides of the I-beam. The two groups of U-shaped steels are fixed by bolts. The inner wall of the outer U-shaped steel is pressed against the outer surface of the second bottom plate 51 of the external adjustable bracket 5 to ensure that the external adjustable bracket 5 is positioned so that it will not move.
[0030] When the utility model is used, the steel support auxiliary support device for adaptively excavating a tunnel section is firstly performed after a certain section of the tunnel is excavated, and then the lower section 22 of the I-beams 2 of the side walls on both sides are installed at the designed support section, and the internal adjustable bracket 3 is installed on the top of the lower section 22. After the upper sections 21 of the I-beams 2 of the side walls on both sides and the top arch I-beam 1 are assembled in the processing plant and transported to the support position, the I-beams 2 of the side walls on both sides and the top arch I-beam 1 are installed on the top of the internal adjustable bracket 3, and by adjusting the first rotating part 34 on the internal adjustable bracket 3, the upper section 21 and the top arch I-beam 1 are pushed to contact the rock layer surface.
[0031] After the top arch I-beam 1 and the side wall I-beams 2 are installed, the local over-excavation makes it possible to still have a large gap between the I-beam and the rock layer. An external adjustable bracket 5 is used to support the rock layer and the I-beam. The external adjustable bracket 5 is installed on the I-beam, and the second top plate 56 is pushed to contact the rock layer by adjusting the second rotating member 54. The second base 52 is fixed to the I-beam through two groups of U-shaped steel components 6. Before installing the second base 52, the second rotating member 54 needs to be adjusted to the bottom of the second base 52, and then the second steel sleeve 55 is installed on the second base 52. The second top plate 56 on the top of the second steel sleeve 55 can be selected according to the size of the over-excavation surface. The second rotating member 54 is adjusted according to the distance from the rock layer to the I-beam to drive the second steel sleeve 55 to move toward the rock layer, and the second top plate 56 is pushed to contact the rock layer.
[0032] For places where the over-excavation surface is large, the number of second bases 52 can be increased so that the force of the rock layer can be evenly transmitted to the I-beam. When the over-excavation surface is not parallel to the I-beam, when two or more second bases 52 are used for support, by adjusting the height of the second rotating members 54 on the two second bases 52, auxiliary support between the excavation surface and the I-beam at any angle can be achieved.
[0033] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. A steel support auxiliary support device for adaptively excavating a tunnel section, comprising a top arch I-beam (1), two side wall I-beams (2) and an adjustable bracket, Features: The adjustable bracket comprises an external adjustable bracket (5) and an internal adjustable bracket (3); the side wall I-beams (2) on both sides are divided into an upper section (21) and a lower section (22); the upper section (21) is connected to the top arch I-beam (1) by bolts; the upper section (21) and the lower section (22) are connected by the internal adjustable bracket (3); the outer walls of the top arch I-beam (1) and the side wall I-beams (2) on both sides are supported by the external adjustable bracket (5) and the inner wall of the rock layer (4); the top arch I-beam (1) and the side wall I-beams (2) on both sides are connected and fixed to the bottom end of the external adjustable bracket (5) by a U-shaped steel assembly (6).
2. The steel support auxiliary support device for adaptively excavating tunnel sections according to claim 1, Features: The top arch I-beam (1) is an arc-shaped structure, and the side wall I-beams (2) on both sides are vertical structures.
3. The steel support auxiliary support device for adaptively excavating tunnel sections according to claim 1, Features: The internal adjustable bracket (3) comprises a first bottom plate (31), a first base (32) is welded to the top of the first bottom plate (31), a first screw (33) is welded to the top of the first base (32), a first steel sleeve (35) is sleeved on the outside of the first screw (33), a first rotating member (34) is provided at the bottom end of the first steel sleeve (35), the first rotating member (34) is threadedly connected to the first screw (33), the top of the first rotating member (34) supports the first steel sleeve (35), and a first top plate (36) is welded to the top end of the first steel sleeve (35).
4. The steel support auxiliary support device for adaptively excavating tunnel sections according to claim 3, Features: The first bottom plate (31) is connected to the lower section (22) via bolts, and the first top plate (36) is connected to the upper section (21) via bolts.
5. The steel support auxiliary support device for adaptively excavating tunnel sections according to claim 1, Features: The external adjustable bracket (5) comprises a second bottom plate (51), a second base (52) is welded to the top of the second bottom plate (51), a second screw (53) is welded to the top of the second base (52), a second steel sleeve (55) is sleeved on the outside of the second screw (53), a second rotating member (54) is provided at the bottom end of the second steel sleeve (55), the second rotating member (54) is threadedly connected to the second screw (53), the top of the second rotating member (54) supports the second steel sleeve (55), and a second top plate (56) is welded to the top end of the second steel sleeve (55).
6. The steel support auxiliary support device for adaptively excavating tunnel sections according to claim 5, Features: The second steel sleeve (55) in the external adjustable bracket (5) located on the upper part of the top arch I-beam (1) is arranged obliquely, the second top plate (56) is arranged horizontally, and a wedge block (57) is arranged at the gap between the top end of the second steel sleeve (55) and the second top plate (56).
7. The steel support auxiliary support device for adaptively excavating tunnel sections according to claim 1, Features: The U-shaped steel assembly (6) includes two groups of U-shaped steels, which are respectively located on the inner side and the outer side of the I-shaped steel. The two groups of U-shaped steels are connected and fixed by bolts, and the inner wall of the outer U-shaped steel is pressed against the outer surface of the second bottom plate (51) of the external adjustable bracket (5).