Full-immersion electrode hot water boiler

By designing the rotating body and screw rod in the fully immersed electrode hot water boiler, the problems of clogging of the sewage pipe and low cleaning efficiency are solved, and a stable and efficient sewage discharge effect is achieved.

CN221881802UActive Publication Date: 2024-10-22JILIN GUANGSEN TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420759847.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-13
Publication Date
2024-10-22
Estimated Expiration
2034-04-13

AI Technical Summary

Technical Problem

Fully immersed electrode hot water boilers need to clean internal dirt after use. The existing sewage pipe design is easy to clog and has low cleaning efficiency, resulting in a slow sewage discharge process.

Method used

The rotating body and blowdown scraper are designed to clean the inner wall of the boiler, and a screw rod is set in the blowdown valve pipe to prevent clogging. The rotating body and screw rod are driven by the drive unit to rotate to ensure that the blowdown pipe is unobstructed.

Benefits of technology

It achieves efficient cleaning of the inner wall of the boiler and prevents blockage of the sewage pipe, ensuring the stability and efficiency of the sewage process and meeting usage needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221881802U_ABST
    Figure CN221881802U_ABST
Patent Text Reader

Abstract

The utility model discloses a full-immersion electrode hot water boiler, which relates to the field of boiler equipment and comprises a boiler main body and a blow-down valve main body arranged on the side surface of the boiler main body, a blow-down valve pipeline is arranged on the blow-down valve main body, and a stirring unit, an anti-blocking unit and a driving unit are arranged on the boiler main body. The stirring unit comprises a rotating body rotationally connected to the interior of the boiler body, a plurality of sets of blow-down scraping plates are arranged on the side face of the rotating body, and the anti-blocking unit comprises a screw rod arranged in a blow-down valve pipeline. When the full-immersion electrode hot water boiler is used for discharging sewage, the inner wall of the inner cavity of the boiler main body is scraped through the design of the rotating body and the sewage discharging scraping plate, the cleaning effect is good, the sewage discharging valve pipeline is not prone to being blocked through the rotating design of the screw rod in the sewage discharging valve pipeline, and therefore it is guaranteed that the sewage discharging process of the full-immersion electrode hot water boiler is stable; the pollution discharge effect is good, and the use requirements are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of boiler equipment, in particular to a fully submerged electrode hot water boiler. Background Art

[0002] The principle of electrode boiler is that when the electrode is electrified in water, the current flowing through the electrode generates heat through the water between the electrodes as resistance, and then heats the water to saturation and evaporates to generate steam. In this process, water itself acts as a conductive medium, and energy conversion is carried out by using the principle that the conductive medium itself resists electricity and generates heat.

[0003] Since the fully submerged electrode hot water boiler needs to be cleaned internally after being used for a period of time in order to prevent internal dirt from affecting the heating efficiency, a drain pipe for discharging the dirt is usually designed on the side of the electrode boiler to facilitate the discharge of the internal dirt. During the discharge process of the drain pipe, on the one hand, the internal dirt is easy to adhere to the inner wall, which is not convenient for discharge. On the other hand, the dirt is also easy to clog the drain pipe, resulting in a slow discharge process. In view of the deficiencies of the prior art, the utility model provides a fully submerged electrode hot water boiler to solve the above problems. Summary of the invention

[0004] In view of the deficiencies in the prior art, the utility model provides a fully submerged electrode hot water boiler. When discharging sewage, the inner wall of the inner cavity of the boiler main body is scraped through the design of a rotating body and a sewage scraper, and the cleaning effect is good. The rotation design of the spiral rod inside the sewage valve pipe makes the sewage valve pipe less likely to be blocked, thereby ensuring that the sewage discharge process of the fully submerged electrode hot water boiler is stable, the sewage discharge effect is good, and the use requirements are met.

[0005] To achieve the above purpose, the utility model is implemented through the following technical solutions: a fully submerged electrode hot water boiler comprises a boiler body and a drain valve body arranged on the side of the boiler body, the drain valve body is provided with a drain valve pipeline, and the boiler body is provided with:

[0006] The stirring unit comprises a rotating body rotatably connected to the inside of the boiler body, and a plurality of groups of sewage scrapers are arranged on the side of the rotating body;

[0007] The anti-blocking unit includes a spiral rod arranged inside the sewage valve pipeline;

[0008] The driving unit is used for driving the stirring unit and the anti-blocking unit to move.

[0009] Preferably, the driving unit comprises a support frame fixedly connected to the boiler body, the support frame is fixedly connected to the motor body, the output end of the motor body is fixedly connected to a transmission shaft, the transmission shaft passes through the boiler body and is fixedly connected to a worm;

[0010] A worm wheel is fixedly connected to the rotating body, and the worm wheel is meshed with the worm.

[0011] Preferably, a first pulley is fixedly connected to the transmission shaft, a driven shaft is provided on the spiral rod, a second pulley is fixedly connected to the driven shaft, and belts are sleeved on the second pulley and the first pulley.

[0012] Preferably, a support shaft seat for providing support for the driven shaft is fixedly connected to the support frame.

[0013] Preferably, the boiler body is provided with a first bearing for supporting the rotating body.

[0014] Preferably, a second bearing for supporting the transmission shaft is provided on the boiler body.

[0015] The utility model discloses a fully submerged electrode hot water boiler, which has the following beneficial effects:

[0016] The fully submerged electrode hot water boiler, when discharging sewage, scrapes the inner wall of the inner cavity of the boiler main body through the design of the rotating body and the sewage scraper, and has a good cleaning effect. The spiral rod is designed to rotate inside the sewage valve pipe, so that the sewage valve pipe is not easy to be blocked, thereby ensuring that the sewage discharge process of the fully submerged electrode hot water boiler is stable, the sewage discharge effect is good, and the use requirements are met. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0019] Figure 2 It is a cross-sectional view of the main body of the boiler of the utility model;

[0020] Figure 3 It is a transmission schematic diagram of the boiler main body of the utility model;

[0021] Figure 4 It is a transmission schematic diagram of the screw rod of the utility model.

[0022] In the figure: 1. boiler body; 101. drain valve body; 2. rotating body; 201. drain scraper; 3. drain valve pipe; 4. support frame; 5. motor body; 6. transmission shaft; 601. worm; 602. worm wheel; 603. first pulley; 604. second pulley; 605. belt; 7. screw rod; 701. driven shaft; 702. support shaft seat. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution in the embodiments of the utility model is described clearly and completely. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] The embodiment of the present application solves the problem that a sewage pipe for discharging waste is usually designed on the side of the electrode boiler by providing a fully submerged electrode hot water boiler. During the sewage discharge process, on the one hand, the waste inside the sewage pipe easily adheres to the inner wall, making it difficult to discharge. On the other hand, the waste easily clogs the sewage pipe, causing a slow sewage discharge process.

[0025] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0026] The utility model embodiment discloses a fully immersed electrode hot water boiler, according to the attached Figure 1-4 As shown, it includes a boiler body 1 and a drain valve body 101 arranged on the side of the boiler body 1, the drain valve body 101 is provided with a drain valve pipeline 3, and the boiler body 1 is provided with:

[0027] The stirring unit comprises a rotating body 2 rotatably connected to the inside of the boiler body 1, and a plurality of groups of sewage scrapers 201 are arranged on the side of the rotating body 2;

[0028] The anti-blocking unit comprises a spiral rod 7 arranged inside the sewage valve pipeline 3;

[0029] The driving unit is used for driving the stirring unit and the anti-blocking unit to move.

[0030] Further, the driving unit includes a support frame 4 fixedly connected to the boiler body 1, a motor body 5 is fixedly connected to the support frame 4, a transmission shaft 6 is fixedly connected to the output end of the motor body 5, and the transmission shaft 6 passes through the boiler body 1 and is fixedly connected to a worm 601;

[0031] A worm wheel 602 is fixedly connected to the rotating body 2, and the worm wheel 602 is meshed with the worm 601. The driving unit has a compact structure and stable operation. The support frame 4 is used to support the motor body 5, and the worm 601 and the worm wheel 602 are driven to rotate through the motor body 5, thereby driving the rotating body 2 and the sewage scraper 201 to rotate.

[0032] Furthermore, a first pulley 603 is fixedly connected to the transmission shaft 6, a driven shaft 701 is provided on the spiral rod 7, a second pulley 604 is fixedly connected to the driven shaft 701, a belt 605 is sleeved on the second pulley 604 and the first pulley 603, and through the design of the second pulley 604, the first pulley 603, the belt 605 and the driven shaft 701, the power of the transmission shaft 6 can be conveniently transmitted to the spiral rod 7, thereby ensuring the compact structure of the drive unit.

[0033] It is particularly disclosed that the transmission shaft 6, worm 601, worm wheel 602, rotating body 2 and sewage scraper 201 designed inside the boiler body 1 are designed as insulating material structures, thereby preventing the water inside the boiler body 1 from conducting electricity with the above structures.

[0034] Specifically, a support shaft seat 702 for supporting the driven shaft 701 is fixedly connected to the support frame 4, a first bearing for supporting the rotating body 2 is provided on the boiler body 1, and a second bearing for supporting the transmission shaft 6 is provided on the boiler body 1. The support shaft seat 702 provides support and limitation for the driven shaft 701, so that the force on the driven shaft 701 is stable, and the rotating body 2 and the transmission shaft 6 are limited on the boiler body 1 and the force is stable.

[0035] When the fully submerged electrode hot water boiler is discharging sewage, the inner wall of the inner cavity of the boiler body 1 is scraped through the design of the rotating body 2 and the sewage scraper 201, and the cleaning effect is good. The spiral rod 7 is designed to rotate inside the sewage valve pipe 3, so that the sewage valve pipe 3 is not easy to be blocked, thereby ensuring that the sewage discharge process of the fully submerged electrode hot water boiler is stable, the sewage discharge effect is good, and the use requirements are met.

[0036] The rotating body 2, the sewage scraper 201 and the spiral rod 7 are all driven by the driving unit. During the driving process, the motor body 5 provides power to drive the transmission shaft 6 to rotate;

[0037] On one hand, the transmission shaft 6 drives the worm 601 to rotate, the worm 601 drives the worm wheel 602 to rotate, and the worm wheel 602 drives the rotating body 2 and the sewage scraper 201 to rotate;

[0038] On the other hand, the transmission shaft 6 drives the first pulley 603 to rotate, the first pulley 603 drives the belt 605 to rotate, the belt 605 drives the second pulley 604 to rotate, and the second pulley 604 drives the driven shaft 701 and the screw rod 7 to rotate.

[0039] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A fully submerged electrode hot water boiler, comprising a boiler body (1) and a drain valve body (101) arranged on the side of the boiler body (1), wherein the drain valve body (101) is provided with a drain valve pipeline (3), characterized in that: The boiler body (1) is provided with: The stirring unit comprises a rotating body (2) rotatably connected to the inside of the boiler body (1), wherein a plurality of groups of sewage scrapers (201) are provided on the side of the rotating body (2); An anti-blocking unit, comprising a spiral rod (7) arranged inside the sewage valve pipeline (3); The driving unit is used for driving the stirring unit and the anti-blocking unit to move.

2. The fully submerged electrode hot water boiler according to claim 1, characterized in that: The drive unit comprises a support frame (4) fixedly connected to the boiler body (1), a motor body (5) fixedly connected to the support frame (4), a transmission shaft (6) fixedly connected to the output end of the motor body (5), and the transmission shaft (6) passing through the boiler body (1) and fixedly connected to a worm (601); A worm wheel (602) is fixedly connected to the rotating body (2), and the worm wheel (602) is meshed with the worm (601).

3. The fully submerged electrode hot water boiler according to claim 2, characterized in that: The transmission shaft (6) is fixedly connected to a first pulley (603), the spiral rod (7) is provided with a driven shaft (701), the driven shaft (701) is fixedly connected to a second pulley (604), and the second pulley (604) and the first pulley (603) are sleeved with a belt (605).

4. The fully submerged electrode hot water boiler according to claim 3, characterized in that: The support frame (4) is fixedly connected to a support shaft seat (702) for providing support for the driven shaft (701).

5. The fully submerged electrode hot water boiler according to claim 1, characterized in that: The boiler body (1) is provided with a first bearing for supporting the rotating body (2).

6. The fully submerged electrode hot water boiler according to claim 5, characterized in that: The boiler body (1) is provided with a second bearing for supporting the transmission shaft (6).