Foundation settlement detector
By designing a secure connecting rope and protective structure on the foundation, the stability problem of the foundation settlement detector under the influence of wind was solved, achieving higher detection accuracy and device convenience.
Patent Information
- Application Number
- CN202420600182.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-27
AI Technical Summary
Existing ground settlement detectors are easily tilted or toppled by external wind forces during the detection process, affecting the stability and efficiency of the detection.
The device employs a base plate and protective structure, and its design, including a first ground stake and connecting rope, ensures stability on hard soil. The combination of a detachable connecting rope and a second ground stake further enhances the device's stability, while the probe structure and reinforcing ribs strengthen its wind resistance.
It improves the stability of the detector, prevents it from tipping over, extends its service life, enhances detection accuracy, facilitates device storage and replacement of connecting ropes, and improves the reliability of foundation settlement detection.
Smart Images

Figure CN221882532U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of settlement detectors, in particular to a foundation settlement detector. Background Art
[0002] Foundation settlement refers to the sinking of the foundation surface caused by the compaction of the foundation soil layer under the action of additional stress. Excessive settlement, especially uneven settlement, will cause the building to tilt, crack and become unusable. Therefore, it is often necessary to use a foundation settlement detection device to detect the settlement depth of the foundation to provide reliable settlement parameters for later design and construction.
[0003] Chinese patent CN220503977U discloses a foundation settlement detection device. The technical solution is to place the device on a hard soil layer through a base and an anti-skid pad to ensure the overall stability of the device and prevent the foundation from settling during the detection process. The contact plate is in contact with the foundation. At this time, the brush is in contact with the resistance rod. The length of the resistance rod at the lower end of the brush contact point can be detected through the control panel and recorded. After a certain detection time, the length of the resistance rod at the lower end of the brush contact point is detected again. The absolute value of the difference between the two values is the settlement distance. The solar panel can convert solar energy into electrical energy to charge the battery, saving electricity.
[0004] During use, the foundation settlement detector is in the shape of a vertical pole and a solar panel is installed on the top, which makes the device easily affected by external wind. However, the detector does not have a structure to resist external forces. During the detection process, the device needs to be placed in the same position for a long time, and is easily affected by external wind and tilted, which affects the stability of the detection process, reduces the detection efficiency, and is not conducive to the detection operation.
[0005] Therefore, it is necessary to provide a new foundation settlement detector to solve the above technical problems. Summary of the invention
[0006] The utility model provides a foundation settlement detector, which solves the technical problem that the detector does not have a structure that resists the influence of external forces, and the device is easily affected by external wind forces and tilts and falls during the detection process.
[0007] In order to solve the above technical problems, the foundation settlement detector provided by the utility model comprises a bottom plate and a protective structure, a detection component is vertically arranged on the upper surface of the bottom plate, a solar panel is arranged on the top of the detection component, and a probe rod structure capable of moving in a vertical direction is arranged on the detection component;
[0008] The bottom of the base plate is fixedly connected to a plurality of foot pads, the bottom of the foot pads are fixedly connected to a plurality of first ground spikes, a plurality of connecting ropes are detachably provided in the middle of the surface of the base plate, a plurality of the connecting ropes are evenly spaced and distributed in a ring along the surface of the detection component, and the other end of the connecting rope is fixedly connected to a second ground spike.
[0009] Preferably, the probe rod structure includes a accommodating tube, which is fixedly connected to the surface of the sliding part of the detection component, and a pull-out rod is laterally arranged inside the accommodating tube so as to be pulled out, the other end of the pull-out rod extends to the outside of the accommodating tube and is vertically fixedly connected with a reinforcing rib, and the bottom end of the reinforcing rib is fixedly connected with a cross plate.
[0010] Preferably, a plurality of reinforcing ribs are fixedly connected between the bottom end of the reinforcing rib surface and the upper surface of the transverse plate, and the plurality of reinforcing ribs are evenly spaced and distributed in a circular pattern along the surface of the transverse plate.
[0011] Preferably, a second bolt is provided at the other end of the side wall of the accommodating tube, one end of the second bolt can rotatably extend into the interior of the accommodating tube and abut against the surface of the pulling rod, and the outer end of the second bolt is fixedly connected with a turning handle.
[0012] Preferably, a battery is fixedly connected to the upper surface of the base plate, and a control panel is provided on the surface of the detection component.
[0013] Preferably, an L-shaped rod is fixedly connected to the top of the detection component, a connecting seat adapted to the L-shaped rod is fixedly connected to the surface of the solar panel, a third bolt is provided on the surface of the connecting seat, and a connecting seat adapted to the third bolt is opened at the other end of the surface of the L-shaped rod.
[0014] Preferably, a plurality of internal thread seats are fixedly connected to the middle part of the surface of the detection component, and the plurality of internal thread seats correspond one-to-one to the plurality of connecting ropes. A connecting handle is fixedly connected to one end of the connecting rope, and a first bolt that can be threadedly connected to the internal thread seat is fixedly connected to the surface of the connecting handle.
[0015] Compared with the related art, the foundation settlement detector provided by the utility model has the following beneficial effects:
[0016] The utility model provides a foundation settlement detector, which can be embedded in the ground through a first ground nail after a bottom plate is placed on hard soil, so as to improve the stability of the device during placement, and then after a plurality of connecting ropes are connected to the surface of a detection component, the connecting ropes are pulled to tighten the connecting ropes, and then a second ground nail is inserted into the ground to fasten the bottom plate to the ground, thereby improving the stability of the detection component during use, avoiding the detection component from tilting due to wind force, improving the protection of the detection component, extending the service life of the detection component, and improving the accuracy of the detection component settlement detection, which is beneficial to the use of foundation settlement detection, and can be disassembled on the surface of the detection component through a plurality of connecting ropes, so as to facilitate the storage, transportation and movement of the device, and facilitate the replacement operation of the connecting ropes at a later time. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 A schematic structural diagram of a preferred embodiment of the foundation settlement detector provided by the utility model;
[0018] Figure 2 for Figure 1 A local enlarged view of point A is shown;
[0019] Figure 3 for Figure 1 The structural schematic diagram of the L-shaped rod and the connecting seat is shown.
[0020] Numbers in the figure: 1. bottom plate; 2. foot pad; 3. first ground nail; 4. battery; 5. detection component; 6. L-shaped rod; 7. solar panel; 8. internal thread seat; 9. first bolt; 10. connecting handle; 11. connecting rope; 12. second ground nail; 13. accommodating tube; 14. pull rod; 15. second bolt; 16. cross plate; 17. reinforcing rib; 18. third bolt; 19. connecting seat; 20. card interface; 21. control panel. DETAILED DESCRIPTION
[0021] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.
[0022] Please refer to Figure 1 , Figure 2 and Figure 3 ,in, Figure 1 A schematic structural diagram of a preferred embodiment of the foundation settlement detector provided by the utility model; Figure 2 for Figure 1 A local enlarged view of point A is shown;
[0023] Figure 3 for Figure 1The foundation settlement detector includes a base plate 1 and a protective structure, a detection assembly 5 is vertically arranged on the upper surface of the base plate 1, a solar panel 7 is arranged on the top of the detection assembly 5, and a probe rod structure that can move in the vertical direction is arranged on the detection assembly 5.
[0024] A plurality of foot pads 2 are fixedly connected to the bottom of the base plate 1 , a plurality of first ground nails 3 are fixedly connected to the bottom of the foot pads 2 , and a plurality of connecting ropes 11 are detachably provided in the middle of the surface of the base plate 1 .
[0025] A plurality of connection ropes 11 are evenly spaced and distributed in a circular pattern along the surface of the detection assembly 5 , and the other end of the connection rope 11 is fixedly connected to a second ground nail 12 .
[0026] After the base plate 1 is placed on hard soil, it can be embedded into the ground through the first ground nails 3 to improve the stability of the device during placement.
[0027] After connecting multiple connecting ropes 11 to the surface of the detection component 5, pull the connecting ropes 11 to tighten the connecting ropes 11, and then insert the second ground nails 12 into the ground to lock the base plate 1 firmly to the ground, thereby improving the stability of the detection component 5 during use and preventing the detection component 5 from tilting due to wind.
[0028] The protection of the detection component 5 is improved, the service life of the detection component 5 is extended, and the accuracy of the settlement detection of the detection component 5 is improved, which is beneficial to the use of foundation settlement detection, and the detection component 5 can be disassembled on the surface through multiple connecting ropes 11, which is convenient for the storage, transportation and movement of the device, and convenient for the later replacement operation of the connecting ropes 11.
[0029] The probe rod structure includes a accommodating tube 13, which is fixedly connected to the surface of the sliding part of the detection component 5. A pull-out rod 14 is horizontally arranged inside the accommodating tube 13 so that it can be pulled out. The other end of the pull-out rod 14 extends to the outside of the accommodating tube 13 and is vertically fixedly connected with a reinforcing rib 17. The bottom end of the reinforcing rib 17 is fixedly connected with a horizontal plate 16.
[0030] The upper surface of the bottom plate 1 is fixedly connected with a storage battery 4 , and the surface of the detection component 5 is provided with a control panel 21 .
[0031] The detection component 5 and the control panel 21 are both existing technologies and will not be described in detail here. The accommodating tube 13 moves up and down, driving the cross plate 16 to contact the upper surface of the foundation. At this time, the brush on the detection component 5 contacts the resistance rod. The length of the resistance rod at the lower end of the brush contact point can be detected through the control panel 21 and recorded. After a certain detection time, the length of the resistance rod at the lower end of the brush contact point is detected again. The absolute value of the difference between the two values is the settlement distance, which can accurately detect the distance of foundation settlement during the detection period.
[0032] A plurality of reinforcing ribs 17 are fixedly connected between the bottom end of the surface of the reinforcing rib 17 and the upper surface of the transverse plate 16 , and the plurality of reinforcing ribs 17 are evenly spaced and distributed in a circular pattern along the surface of the transverse plate 16 .
[0033] A second bolt 15 is disposed at the other end of the side wall of the accommodating tube 13 . One end of the second bolt 15 can rotatably extend into the interior of the accommodating tube 13 and abut against the surface of the pulling rod 14 . The outer end of the second bolt 15 is fixedly connected to a rotating handle.
[0034] After the pull rod 14 and the interior of the accommodating tube 13 are extended and retracted, the horizontal plate 16 can be driven to move, so that the horizontal plate 16 can adjust the working position. The second bolt 15 is twisted so that the inner end of the second bolt 15 contacts the surface of the pull rod 14, and then the horizontal plate 16 can be fixed.
[0035] An L-shaped rod 6 is fixedly connected to the top of the detection component 5, a connecting seat 19 adapted to the L-shaped rod 6 is fixedly connected to the surface of the solar panel 7, a third bolt 18 is provided on the surface of the connecting seat 19, and a connecting seat 19 adapted to the third bolt 18 is opened at the other end of the surface of the L-shaped rod 6.
[0036] After the third bolt 18 is twisted and removed from the interior of the card interface 20 , the solar panel 7 can be disassembled, which facilitates replacement or disassembly maintenance operations on the solar panel 7 .
[0037] A plurality of internal thread seats 8 are fixedly connected to the middle part of the surface of the detection component 5, and the multiple internal thread seats 8 correspond one-to-one to multiple connecting ropes 11. A connecting handle 10 is fixedly connected to one end of the connecting rope 11, and a first bolt 9 that can be threadedly connected to the internal thread seat 8 is fixedly connected to the surface of the connecting handle 10.
[0038] By twisting the connecting handle 10 to drive the first bolt 9 to rotate and threadedly connect with the internal thread seat 8, the connecting rope 11 and the detection component 5 can be fixedly installed for use.
[0039] The working principle of the foundation settlement detector provided by the utility model is as follows:
[0040] After the base plate 1 is placed on the hard soil, it can be embedded in the ground through the first ground nail 3 to improve the stability of the device during placement. Then, after connecting multiple connecting ropes 11 to the surface of the detection component 5, the connecting ropes 11 are pulled to tighten the connecting ropes 11, and then the second ground nails 12 are inserted into the ground to lock the base plate 1 firmly on the ground. After the pull rod 14 and the internal extension of the accommodating tube 13, the cross plate 16 can be driven to move, which is convenient for the cross plate 16 to adjust the working position. The accommodating tube 13 moves up and down, driving the cross plate 16 to contact with the upper surface of the foundation. At this time, the brush on the detection component 5 contacts the resistance rod. The length of the resistance rod at the lower end of the brush contact point can be detected through the control panel 21 and recorded. After a certain detection time, the length of the resistance rod at the lower end of the brush contact point is detected again. The absolute value of the difference between the two values is the settlement distance, which can accurately detect the distance of foundation settlement during the detection.
[0041] Compared with the related art, the foundation settlement detector provided by the utility model has the following beneficial effects:
[0042] The utility model provides a foundation settlement detector. After a base plate 1 is placed on hard soil, the first ground nail 3 can be embedded in the ground to improve the stability of the device during placement. After a plurality of connecting ropes 11 are connected to the surface of a detection component 5, the connecting ropes 11 are pulled to tighten the connecting ropes 11, and then a second ground nail 12 is inserted into the ground to lock the base plate 1 firmly on the ground, thereby improving the stability of the detection component 5 during use, avoiding the detection component 5 from tilting due to wind force, improving the protection of the detection component 5, extending the service life of the detection component 5, and improving the accuracy of the settlement detection of the detection component 5, which is beneficial to the use of foundation settlement detection. Moreover, the plurality of connecting ropes 11 can be disassembled on the surface of the detection component 5, which is convenient for the storage, transportation and movement of the device, and convenient for the replacement operation of the connecting ropes 11 at a later time.
[0043] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A foundation settlement detector, comprising a base plate (1) and a protective structure, characterized in that: A detection assembly (5) is vertically arranged on the upper surface of the bottom plate (1), a solar panel (7) is arranged on the top of the detection assembly (5), and a probe rod structure capable of moving in a vertical direction is arranged on the detection assembly (5); The bottom of the base plate (1) is fixedly connected to a plurality of foot pads (2), the bottom of the foot pads (2) is fixedly connected to a plurality of first ground spikes (3), a plurality of connecting ropes (11) are detachably provided in the middle of the surface of the base plate (1), a plurality of the connecting ropes (11) are evenly spaced and distributed in a circular manner along the surface of the detection component (5), and the other end of the connecting rope (11) is fixedly connected to a second ground spike (12).
2. The foundation settlement detector according to claim 1, characterized in that: The probe rod structure comprises a housing tube (13), wherein the housing tube (13) is fixedly connected to the surface of the sliding part of the detection component (5), and a pull-out rod (14) is horizontally arranged inside the housing tube (13) so as to be pullable, and the other end of the pull-out rod (14) extends to the outside of the housing tube (13) and is vertically fixedly connected to a reinforcing rib (17), and the bottom end of the reinforcing rib (17) is fixedly connected to a transverse plate (16).
3. The foundation settlement detector according to claim 2, characterized in that: A plurality of reinforcing ribs (17) are fixedly connected between the bottom end of the surface of the reinforcing rib (17) and the upper surface of the transverse plate (16), and the plurality of reinforcing ribs (17) are evenly spaced and distributed in a circular pattern along the surface of the transverse plate (16).
4. The foundation settlement detector according to claim 2, characterized in that: A second bolt (15) is provided at the other end of the side wall of the accommodating tube (13), one end of the second bolt (15) can be rotatably extended into the interior of the accommodating tube (13) and abut against the surface of the pulling rod (14), and the outer end of the second bolt (15) is fixedly connected to a rotating handle.
5. The foundation settlement detector according to claim 1, characterized in that: A storage battery (4) is fixedly connected to the upper surface of the base plate (1), and a control panel (21) is provided on the surface of the detection component (5).
6. The foundation settlement detector according to claim 1, characterized in that: The top of the detection assembly (5) is fixedly connected to an L-shaped rod (6), the surface of the solar panel (7) is fixedly connected to a connection seat (19) adapted to the L-shaped rod (6), the surface of the connection seat (19) is provided with a third bolt (18), and the other end of the surface of the L-shaped rod (6) is provided with a connection seat (19) adapted to the third bolt (18).
7. The foundation settlement detector according to claim 1, characterized in that: A plurality of internal thread seats (8) are fixedly connected to the middle of the surface of the detection component (5), and the plurality of internal thread seats (8) correspond one to one with the plurality of connecting ropes (11). One end of the connecting rope (11) is fixedly connected to a connecting handle (10), and the surface of the connecting handle (10) is fixedly connected to a first bolt (9) that can be threadedly connected to the internal thread seat (8).
