New energy automobile alternating current charging facility load intelligent regulation and control device
Through the combination of edge computing gateways and smart circuit breakers, the problem of high-power load management during charging of new energy electric vehicles is solved, intelligent regulation of new energy charging systems is realized, and the stable operation of the distribution network and the security of power supply are ensured. sex.
Patent Information
- Application Number
- CN202420443228.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-07
AI Technical Summary
Existing technology cannot effectively manage the high-power load when charging new energy electric vehicles, resulting in overload and power outages in the distribution network during peak power consumption periods, and lacks real-time control capabilities for new energy charging systems.
Using a combination of automatic parameter edge computing gateway, multi-loop circuit, intelligent circuit breaker and power regulator, through the control of circuit breaker and power regulator, intelligent regulation of the voltage and circuit breaker of the new energy charging line is realized, using the edge computing gateway Real-time monitoring and comparison of distribution network load data, and automatic adjustment of the operating status of charging facilities.
It realizes the adjustment and control of the new energy charging system, avoids overloading of the distribution network, ensures the stability and safety of power supply, and reduces the risk of power outages.
Smart Images

Figure CN221886118U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of new energy charging, and in particular to an intelligent load control device for AC charging facilities of new energy vehicles. Background Art
[0002] At present, the growth rate of new energy electric vehicles is very fast. The power load of new energy electric vehicles when charging is large, especially the 7kW household energy electric vehicle charging piles commonly configured by electric vehicle manufacturers, which have exceeded the total power of household appliances including air conditioners and heaters of most single-family residents in the community; the rapid increase of electric vehicle charging pile facilities has brought high pressure to the distribution network, but the current distribution network system cannot effectively control them, resulting in frequent power outages caused by overload and failure of distribution network facilities during peak hours of electricity consumption, or power outages to prevent overload. Therefore, how to timely collect the real-time load data of all new energy electric vehicle charging piles, and realize the voltage control and circuit breaker control of the new energy charging pile line according to the transformer compliance data of the distribution network system, and realize the adjustable control of the distribution network system over the new energy charging system is a problem that needs to be considered at present. Utility Model Content
[0003] The purpose of the utility model is to overcome the shortcomings of the prior art, provide an intelligent load control device for AC charging facilities of new energy vehicles, and solve the problems existing in the prior art.
[0004] The purpose of the utility model is achieved through the following technical solutions: a new energy vehicle AC charging facility load intelligent control device, which includes circuit breakers -QA1 to -QA7, a power regulator, a power adjustment indicator light and a mains indicator light; the circuit breakers -QA1 and -QA2 are both connected to the three-phase power line ABC and the neutral line N, the circuit breakers -QA3 to -QA7 are connected to the circuit breaker -QA1, the circuit breaker -QA1 is connected to the mains indicator light, the circuit breaker -QA2 is connected to the power adjustment indicator light, the circuit breaker -QA2 is also connected to the circuit breakers -QA3 to -QA7 through the power regulator, and the output ends of the circuit breakers -QA3 to -QA7 are connected to the charging pile meter;
[0005] The circuit breakers -QA1 to -QA7 communicate data with the edge computing gateway through an interface, the three-phase power line ABC is connected to the output end of the transformer, and the edge computing gateway reads and monitors the transformer load data and the voltage, current and power data of the circuit breakers -QA1 to -QA7.
[0006] The circuit breaker-QA2 is connected to the power adjustment indicator light through the switch-KF1. The edge computing gateway sends an instruction to the switch-KF1 through the communication protocol to enable the power regulator to turn on the power adjustment mode, and the power adjustment indicator light turns on.
[0007] The utility model has the following advantages: an intelligent load control device for new energy vehicle AC charging facilities, which adopts a combination of automatic parameter edge computing gateway, automatic reclosing multi-circuit circuit, power regulator and intelligent circuit breaker to realize voltage control and circuit breaker control of new energy charging lines, and realize the adjustable and controllable new energy charging system by the distribution network system. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Figure 1 It is a circuit diagram of the utility model. DETAILED DESCRIPTION
[0009] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the detailed description of the embodiments of the present application provided below in conjunction with the drawings is not intended to limit the scope of protection of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application. The utility model is further described below in conjunction with the drawings.
[0010] like Figure 1 As shown, the present invention specifically relates to an intelligent load control device for AC charging facilities of new energy vehicles, which is suitable for load control of charging distribution lines when the new energy electric vehicle is charged through a household 7kW charging pile, if the distribution network system is overloaded or needs to be regulated, and includes circuit breakers -QA1 to -QA7, a power regulator, a power regulation indicator light and a mains indicator light; the circuit breakers -QA1 and -QA2 are both connected to the three-phase power line ABC and the neutral line N, the circuit breakers -QA3 to -QA7 are connected to the circuit breaker -QA1, the circuit breaker -QA1 is connected to the mains indicator light, the circuit breaker -QA2 is connected to the power regulation indicator light, the circuit breaker -QA2 is also connected to the circuit breakers -QA3 to -QA7 through the power regulator, and the output ends of the circuit breakers -QA3 to -QA7 are connected to the electric meter of the household 7kW charging pile of the new energy vehicle.
[0011] Furthermore, the power data such as current, voltage, power factor, etc. of -QA1~-QA7 circuit breakers are sent to the edge computing gateway through the RS485 interface using the MODBUS RTU protocol. The edge computing gateway sends the transformer load data through the distribution network system for real-time comparison. When the transformer load data reaches the heavy load operation range, the edge computing gateway sends a command through the RS485 interface to close the -QA2 circuit breaker. After the -QA2 circuit breaker is started and stabilized, it sends a command to disconnect the -QA1 circuit breaker to enter the load adjustable and controllable mode, and start the SR10E-200 power regulator device to enter the working mode standby. At the same time, the power adjustment indicator -PG2 lights up and the mains indicator -PG1 goes out.
[0012] Furthermore, the edge computing gateway reads and monitors the load data of the distribution network transformer and the current, voltage, and power factor of -QA1, -QA3 to -QA7 circuit breakers; when it is detected that the load of the distribution network transformer reaches the heavy load standard, the edge computing gateway controls the closing of the -QA2 circuit breaker through the MODBUS protocol signal, and sends a command to -KF1 through the MODBUS protocol signal to enable the SR10E-200 power regulator to start the power regulation mode and start reducing the circuit voltage output, and feedback the working status and power parameters to the edge computing gateway. -QA3 to -QA7 circuit breakers continue to maintain power parameter detection and feedback the power parameters to the edge computing gateway. When it is detected that the voltage is reduced, -QA3 to -QA7 circuit breakers still have current. The edge computing gateway can automatically issue a disconnection order for -QA3 to -QA7 circuit breakers or ignore them according to the current distribution network load situation.
[0013] When the load of the distribution network returns to normal, the edge computing gateway sends a command to stop the power regulation mode of the SR10E-200 power regulator and switch back to the standby mode; then restart the -QA1 circuit breaker and disconnect the -QA2 circuit breaker to switch to the AC power mode.
[0014] The above is only a preferred embodiment of the utility model. It should be understood that the utility model is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used for various other combinations, modifications and improvements, and can be modified within the scope of the concept described herein through the above teachings or the technology or knowledge in the relevant field. The changes and modifications made by those skilled in the art do not deviate from the spirit and scope of the utility model, and should be within the scope of protection of the claims attached to the utility model.
Claims
1. An intelligent load control device for AC charging facilities of new energy vehicles, characterized in that: It includes circuit breakers -QA1 to -QA7, a power regulator, a power regulation indicator light and a mains indicator light; the circuit breakers -QA1 and -QA2 are both connected to the three-phase power line ABC and the neutral line N, the circuit breakers -QA3 to -QA7 are connected to the circuit breaker -QA1, the circuit breaker -QA1 is connected to the mains indicator light, the circuit breaker -QA2 is connected to the power regulation indicator light, the circuit breaker -QA2 is also connected to the circuit breakers -QA3 to -QA7 through the power regulator, and the output ends of the circuit breakers -QA3 to -QA7 are connected to the charging pile electric meter; The circuit breakers -QA1 to -QA7 communicate data with the edge computing gateway through an interface, the three-phase power line ABC is connected to the output end of the transformer, and the edge computing gateway reads and monitors the transformer load data and the voltage, current and power data of the circuit breakers -QA1 to -QA7.
2. According to claim 1, a new energy vehicle AC charging facility load intelligent control device is characterized by: The circuit breaker-QA2 is connected to the power adjustment indicator light through the switch-KF1. The edge computing gateway sends an instruction to the switch-KF1 through the communication protocol to enable the power regulator to turn on the power adjustment mode, and the power adjustment indicator light turns on.