Solar panel support and camping house with same

By introducing columns, tie rods, and strut structures with self-locking connections into the solar panel bracket, the problems of inconvenient installation and disassembly in the existing technology are solved, rapid installation and multiple reuse are achieved, and the efficiency of field operations is improved. Installation efficiency and bracket strength.

CN221886334UActive Publication Date: 2024-10-22XUCHANG SUPERELEVATOR ELECTRICAL & MECHANICAL EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323382202.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-12
Publication Date
2024-10-22
Estimated Expiration
2033-12-12

AI Technical Summary

Technical Problem

Existing solar photovoltaic brackets cannot be quickly installed and disassembled in field operations, and cannot meet the rapid installation requirements of camping houses. They are also inconvenient to disassemble after installation and cannot be reused.

Method used

A solar panel bracket is designed, which realizes quick butt connection through the self-locking connection mechanism of the uprights, tie rods and struts set parallel to each other without the need for additional screws or bolts, and has double-joints in the middle of the uprights, tie rods and struts. Nuts enable locking or unlocking, improving installation efficiency and reusability.

Benefits of technology

It achieves compact connection of solar brackets, simplifies the installation and disassembly process, reduces installation difficulty, improves installation efficiency, and enhances the overall strength of the frame. It is suitable for rapid construction and repeated use in field operation scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221886334U_ABST
    Figure CN221886334U_ABST
Patent Text Reader

Abstract

The solar panel support comprises a first stand column and a second stand column which are arranged in parallel, the height of the first stand column is larger than that of the second stand column, the upper end of the first stand column is connected with the upper end of the second stand column through a pull rod, and the lower end of the first stand column is connected with the lower end of the second stand column. Pull rod nuts are fixedly arranged at the two ends of a rod body of the pull rod respectively, the rotating directions of the pull rod nuts arranged at the two ends of the rod body are opposite, pull rod bolts are installed in the pull rod nuts, and rotating clamping heads matched with the pull rod bolts are arranged at the upper ends of the first stand column and the second stand column. And therefore, the upper ends of the first upright post and the second upright post are fixedly locked through the pull rod. The device is simple in structure, and can be quickly assembled through the components of the solar bracket without additional connection of screws, bolts and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of solar photovoltaic brackets, and in particular relates to a solar panel bracket and a camping house with the solar panel bracket. Background Art

[0002] Solar panel brackets are special brackets designed for placing, installing and fixing solar panels in solar photovoltaic power generation systems. Solar photovoltaic brackets in the prior art are generally made of aluminum alloy and stainless steel. Photovoltaic bracket products are divided into ground type, roof type, wall type, portable type, etc. In the prior art, in special operations such as oil exploration, mapping, mining, forestry and military, field operations are often required to cope with routine or sudden operations, so field camping is often required. In order to improve living comfort and fully improve the resting and living environment for workers, existing long-term field operations, such as bridging solar panels on the roof, can solve the electricity problem of field operations to a certain extent. Although the existing solar brackets can meet the requirements in terms of support strength and stability, the existing solar brackets cannot be perfectly overlapped and assembled with the barracks. At the same time, the existing solar direct combination installation is inconvenient and cannot meet the rapid installation requirements of field operation barracks. Even after installation, it often causes great inconvenience when disassembling and cannot be reused. Therefore, this part needs to be improved to meet the needs of rapid construction of field operations and to achieve matching installation with barracks. Utility Model Content

[0003] The purpose of the utility model is to solve the above-mentioned problems existing in the prior art and to provide a solar panel bracket and a camping house having the solar panel bracket. The device has a simple structure and can be quickly assembled through the components of the solar bracket itself, without the need for additional connections such as screws and bolts, thereby reducing the difficulty of installation and improving the installation efficiency. The device is particularly suitable for the installation needs of outdoor camping houses and can be repeatedly assembled and used as a part of the camping house after disassembly.

[0004] One of the purposes of the utility model is to provide a solar panel bracket, comprising a first column and a second column arranged parallel to each other, and the height of the first column is greater than the height of the second column, the first ends of the first and second columns are connected by a tie rod, and tie rod nuts are fixedly provided at both ends of the rod body of the tie rod, and the internal threads of the tie rod nuts arranged at both ends of the rod body are rotated in opposite directions, and tie rod bolts are installed in the tie rod nuts, and the first ends of the first and second columns are provided with rotating clamps that cooperate with the tie rod bolts, and the tie rod bolts at both ends of the tie rod are hung and fixed on the rotating clamps of the first and second columns, and the tie rod is rotated around the central axis of the tie rod so that the first ends of the first and second columns are fixed and locked by the tie rod.

[0005] As a preferred solution, the middle section of the first column and the middle section of the pull rod are connected by a strut, and strut nuts are respectively provided at both ends of the strut rod body, and the rotation directions of the internal threads of the strut nuts provided at both ends of the strut rod body are opposite. A strut bolt is installed in the strut nut, and the first column and the pull rod are both provided with a rotating clamping plate that cooperates with the strut bolt, and the strut bolt rests on the rotating clamping plate to rotate the strut around the central axis of the strut, so that the first column and the middle section of the pull rod are fixedly supported by the strut rod.

[0006] As a preferred solution, the rotating chuck is rotatably arranged at the ends of the first and second columns, and cannot jump along the axial direction of the first and second columns.

[0007] As a preferred solution, the rotating clamping plate is rotatably arranged on the first column and the pull rod, and limiting structures for limiting the movement of the rotating clamping plate in the axial direction are respectively arranged on the first column and the pull rod.

[0008] As a preferred embodiment, the pull rod bolt includes a bolt pull rod head and pull rod arms symmetrically arranged on both sides of the bolt pull rod head, the rotating clamp includes two symmetrically arranged hanging plates, a gap is formed between the two hanging plates, and a hanging groove is arranged on the hanging plate, the pull rod arm cooperates with the hanging groove, and the bolt pull rod head passes through the gap between the two hanging plates and is connected to the pull rod nut.

[0009] As a preferred solution, the support rod bolt includes a bolt support rod head and a support arm arranged on the bolt support rod head, and a strip-shaped through groove is arranged on the rotating clamping plate, and the support arm can support and lean against the strip-shaped through groove.

[0010] The second object of the present utility model is to provide a barracks with the solar panel bracket, including any of the above-mentioned solar panel brackets, wherein the solar panel brackets are arranged in parallel in two or more groups, the second ends of the first and second columns of the solar panel brackets are respectively fixed on the roof of the barracks, the second ends of the first and second columns are formed with external thread heads, and the roof of the barracks is provided with internal threaded parts that are connected and adapted to the external thread heads.

[0011] Beneficial Effects

[0012] First, through improvements, this solution makes the connection between the various components of the solar bracket more compact, including two vertically arranged columns, a pull rod and a support rod. Quick docking connection can be achieved only through the locking connection mechanism of the columns, the pull rod and the support rod, without the need to additionally set up locking connection fixing components such as screws or bolts. Double nuts with positive and negative threads are fixed at both ends of the pull rod of this solution, which can lock or unlock the pull rod and the columns at both ends when the pull rod is rotated. This solution is very convenient to disassemble and assemble, will not cause damage to the solar bracket itself or the roof, and can be reused many times.

[0013] Secondly, in this solution, taking into account the supporting stability of the overall frame, a strut is arranged between the middle section of the pull rod and the middle section of the long column. Double nuts with positive and negative threads are fixed at both ends of the strut, which can lock or unlock the strut, the pull rod and the long column when the strut is rotated. The overall strength of the frame can be effectively increased by the strut.

[0014] Third, the present solution also provides a barracks with the solar panel bracket, which is installed on the roof of the barracks through quick docking of the solar panel bracket. Since the structural module design of the solar bracket is reasonable, the disassembly and assembly speed of the solar bracket can be greatly improved. The solar panel bracket is particularly suitable for outdoor work scenes. At the same time, as a part of the barracks, the solar bracket improves the overall installation efficiency of the barracks to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 This is a structural diagram of the utility model solar bracket;

[0017] Figure 2 for Figure 1 The enlarged schematic diagram of point A in the middle;

[0018] Figure 3 for Figure 1 The enlarged schematic diagram of point B in the middle;

[0019] Figure 4 for Figure 1 The enlarged schematic diagram of the center C;

[0020] Figure 5 for Figure 1 The enlarged schematic diagram of point D in the middle;

[0021] Figure 6 Schematic diagram of the connection between the rotating clamp and the tie rod bolt Figure 1 ;

[0022] Figure 7 Schematic diagram of the connection between the rotating clamp and the tie rod bolt Figure 2 ;

[0023] Figure 8 Schematic diagram of the connection between the rotating clamp and the support bolt Figure 1 ;

[0024] Fig. 9Schematic diagram of the connection between the rotating clamp and the support bolt Figure 2 ;

[0025] Fig.10 is a cross-sectional view of a solar panel support;

[0026] Fig.11 for Fig.10 The enlarged schematic diagram of point E in the middle;

[0027] Fig.12 for Fig.10 The enlarged schematic diagram of F in the middle;

[0028] Fig.13 This is the effect diagram of the solar bracket in use;

[0029] Markings in the figure: 1. first column, 2. second column, 3. tie rod, 31. tie rod nut, 32. tie rod bolt, 321. bolt tie rod head, 322. tie rod arm, 323. section, 324. external thread, 33. rod body limiter, 4. rotating clamp, 41. connecting head, 42. clamp joint, 421. hanging plate, 422. hanging groove, 423. hanging plate gap, 5. support rod, 51. support rod nut, 52. support rod bolt, 521. bolt Strut head, 522, support arm, 523, support arm, 524, wedge block, 525, anti-slip head, 526, guide slope, 6, rotating clamping plate, 61, connecting hole plate, 611, through hole, 62, clamping hole plate, 621, strip through groove, 622, wedge groove, 7, sealing cover, 8, limit screw, 11, lever hole, 12, column limit platform, 100, solar bracket, 101, external thread head, 200, barracks, 300, solar panel. DETAILED DESCRIPTION

[0030] The present invention is described in detail below by means of exemplary embodiments. However, it should be understood that, without further description, the elements, structures and features in one embodiment may also be beneficially combined in other embodiments.

[0031] It should be noted that: unless otherwise defined, the technical terms or scientific terms used in this document shall have the usual meanings understood by people with ordinary skills in the field to which the utility model belongs. The words "one", "an" or "the" and the like used in the patent application specification and claims of the utility model do not express quantitative limitations, but indicate the existence of at least one. The words "include" or "comprise" and the like indicate that the elements or objects appearing before "include" or "comprises" include the elements or objects listed after "include" or "comprises" and their equivalents, but do not exclude other elements or objects with the same function.

[0032] Example 1

[0033] As shown in the figure, the present embodiment provides a solar panel bracket, including a first column 1 and a second column 2, the first column 1 and the second column 2 are arranged parallel to each other, and the height of the first column 1 is greater than the height of the second column 2, the lower ends of the first column 1 and the second column 2 are basically at the same installation height when in use, and the upper ends of the first column 1 and the second column 2 are connected by a tie rod 3, a rotating clamp 4 is provided at the upper ends of the first column 1 and the second column 2, and a card slot 41 is provided on the rotating clamp 4, and tie rod nuts 31 are fixedly provided at both ends of the tie rod 3, and the thread wires of the tie rod nuts 31 at both ends of the tie rod 3 are forward and reverse rotation directions. The purpose of such design is that rotating the tie rod 3 can realize the synchronous entry of the tie rod bolts 32 at both ends into the tie rod nuts 31 for locking, thereby tightening and fixing the upper ends of the two columns by the two ends of the tie rod 3, or rotating the tie rod 3 can realize the synchronous disengagement of the tie rod nuts 31 at both ends, thereby realizing the loosening of the upper ends of the two columns by the two ends of the tie rod 3 and the tie rod 3 can be disassembled.

[0034] In a typical embodiment of this solution, the first column 1, the second column 2, the pull rod 3 and the support rod 5 are all hollow tubular structures. Such a design can further increase the overall structural strength of the stent and achieve lightweight stent.

[0035] In one embodiment of the present scheme, a through lever hole 11 is formed on the tube wall of the first column 1 and the second column 2. The axial direction of the lever hole 11 is perpendicular to the axial direction of the first column 1 and the second column 2. The purpose of setting the lever hole 11 is to insert a lever rod tool into the lever hole 11 along the vertical direction of the column to make the installation of the column more labor-saving. During actual installation, only two hands are needed to rotate the lever to install it on the roof, which reduces the difficulty of installation.

[0036] In this solution, the rotating clamp 4 includes a connecting head 41 and a clamping joint 42. The connecting head 41 includes a shaft and two anti-slip limit plates 411 arranged on the shaft. A limited gap is formed between the two limit plates 411. The connecting head 41 is installed in the end cavity of the column, and the head of the limit screw 8 located on the side wall of the column cavity is extended into the limit gap between the two limit plates 411 to limit the axial position of the rotating clamp 4, thereby avoiding its axial movement relative to the column, so that the rotating joint 4 can only rotate relative to the column. The purpose of such design is: when installing on the solar panel bracket, the external threaded head 101 at the lower end of the first column 1 and the second column 2 will first be fixed on the internal threaded part on the roof of the barracks 200. At this time, after the column is fixed, the rotating clamp 4 can still rotate relative to the column to the connection position facing the pull rod 3, thereby ensuring the subsequent installation and connection of the pull rod 3.

[0037] In this solution, the clamping joint 42 includes two oppositely arranged hanging plates 421, the two hanging plates 421 are symmetrically arranged, and a hanging groove 422 is arranged on the hanging plates 421. The tie rod bolt 32 includes a bolt tie rod head 321, and two tie rod arms 322 are symmetrically arranged on both sides of one end of the bolt tie rod head 321. An external thread 324 is formed on the other end of the bolt tie rod head 321. The two tie rod arms 322 are respectively hung in the hanging groove 422, and the bolt tie rod head 321 can pass through the hanging plate gap 423 between the two hanging plates 421 and connect with the tie rod nut 31. The tie rod arms 322 are arranged on the symmetrical sections on both sides of the bolt tie rod head 321, and the tie rod bolt 32 can be matched with the gap side wall of the hanging plate 421 through the section. The purpose of setting the hanging groove 422 is to ensure that after the tie rod 3 is locked, the tie rod arm 322 is prevented from rotating through the cooperation of the hanging groove 422 and the tie rod arm 322. When the tie rod 3 of this solution is rotated and locked, the bolt tie rod head 321 gradually rotates into the tie rod nut 32. During the locking process, the tie rod arms 322 at both ends have entered the hanging groove 422. At this time, by continuing to rotate the tie rod 3 for a certain rotation angle, the bolt tie rod head 321 and the hanging groove 422 can be locked and fixed. When disassembling, it can only be disassembled by rotating the tie rod 3. Due to the cooperation of the hanging groove 422 and the tie rod arm 322, the connection between the tie rod nut 31 and the tie rod bolt 32 will not loosen due to accidental force on the tie rod arm 322. Specifically, the tie rod nuts 31 fixed at both ends of the tie rod 3 can be rotated by a wrench tool, thereby realizing the installation and disassembly of the tie rod 3.

[0038] In this embodiment, since the use environment of the solar panel support 100 is relatively complex, in order to improve the overall structural strength, the middle section of the first column 1 and the middle section of the tie rod 3 are connected by a strut 5, and a rotating clamping plate 6 is provided at the middle section of the first column 1 and the tie rod 3. Two strut nuts 51 are provided at both ends of the strut 5. The strut nuts 51 are adapted to be installed with strut bolts 52 according to the positive and negative rotation directions of the threads of the strut nuts 51, and the rotating plate 6 is respectively connected to the strut nuts 51 through the strut bolts 52. The purpose of such a design is that by rotating the strut 5, the strut bolts 52 at both ends can be synchronously disengaged from the strut nuts 51 to achieve locking, thereby achieving the tightening and fixing of one end of the strut 5 with the tie rod 3 and the tightening and fixing of the other end with the first column 1, or synchronously entering the strut nut 51 to achieve loosening, thereby achieving the loosening and disassembly of one end of the strut 5 with the tie rod 3 and the loosening and disassembly of the other end with the first column 1.

[0039] In this solution, the rotating clamping plate 6 includes a connecting hole plate 61 and a clamping hole plate 62, wherein the connecting hole plate 61 and the clamping hole plate 62 form a certain angle, the purpose is to adapt to the installation inclination angle of the support rod 5, the connecting hole plate 61 is provided with a through hole 611 passing through the pull rod 3 and the first column 1, and the clamping hole plate 62 is provided with a strip-shaped through groove 621. The support rod bolt 52 includes a support head 522 and a bolt support rod head 521 arranged at one end of the support head 522. A support arm 523 perpendicular to it is arranged at the end of the support head 522. The support arm 523 is used to support in the strip-shaped through groove 621. When the support arm 5 23 moves in the direction away from the support rod nut 51 and abuts against one end of the strip through groove 621. The purpose of setting the strip through groove 621 is that the support arms 523 of the support rod bolts 52 at both ends can be inserted into the strip through groove 621 first during installation. As the support rod 5 rotates, the support rod bolts 52 gradually move to both sides in the direction of disengaging from the support rod nut 51, so that the support rod bolts 52 abut against one end of the strip through groove 621. In order to ensure that the support rod 5 is installed more securely after being fixed, an anti-slip head 525 is provided at the head of the support arm 523, and a clamping gap is formed between the anti-slip head 525 and the bolt support rod head. Through the clamping gap and one end of the strip through groove 621, the installation firmness of the support rod 5 is improved and the support rod 5 is prevented from loosening. A guiding inclined surface 526 is provided on the side of the anti-slip head 525 close to the support gap, which is used to facilitate guiding one end of the strip through groove 621 into the clamping gap.

[0040] In this solution, a limiting structure for limiting the position of the rotating clamping plate 6 is fixedly provided on the rod body of the pull rod 3 and the column body of the first column 1. Specifically, this solution forms a limited gap between the two rod body limiting platforms 33 by setting two side rod body limiting platforms 33 on the rod bodies of the pull rod 3 on both sides of the rotating clamping plate 6, thereby limiting the axial position of the rotating clamping plate 6 along the pull rod 3. At the same time, to ensure that the rotating clamping plate 6 can rotate relative to the pull rod 3, two side column limiting platforms 12 are set on the columns of the first column 1 on both sides of the rotating clamping plate 6, thereby limiting the axial position of the rotating clamping plate 6 along the first column 1. At the same time, to ensure that the rotating clamping plate 6 can rotate relative to the first column 1, such a design is to ensure that when the support rod 5 is installed, the rotating clamping plate 6 can be rotated to the position directly opposite to the support rod 5 for connection and installation.

[0041] In this solution, in order to ensure the firmness of the abutment between the rotating clamping plate 6 and the support rod bolt 52, a pointed wedge block 524 is provided on one side of the support rod bolt 52 where the anti-stripping head 525 is provided, and a wedge groove 622 matching the shape of the wedge block 524 is provided at the end of the clamping hole plate 62 of the rotating clamping plate 6. The wedge block 524 cooperates with the wedge groove 622 to limit the support rod bolt 52 from rotating arbitrarily under external force after the support rod 5 is installed in place. In this way, the phenomenon of the support rod bolt 52 being loosened due to force can be avoided. When disassembling, it can only be disassembled by rotating the support rod 5, which greatly ensures the reliability after installation. The bolt and nut connection will not loosen due to the accidental interference of the support arm 522 by external forces. Specifically, when the support rod 5 is disassembled, the support rod nuts 51 fixed at both ends of the support rod 5 can be rotated by a wrench tool, thereby realizing the installation and disassembly of the pull rod 3.

[0042] Example 2

[0043] The present invention provides a camping house with the solar panel support, including more than two groups of solar panel supports 100 arranged side by side in sequence, the lower end of the column of the solar panel support 100 is fixed on the roof 20 of the camping house, the lower end of the first column 1 and the second column 2 are both provided with an external thread head 101, and the roof of the camping house is provided with an internal thread member adapted to the external thread head 101. During installation, a lever tool is inserted into the lever hole 11, and the external thread heads 101 of the first column 1 and the second column 2 are screwed into the internal thread member, and pressed on the roof 200 of the camping house through the sealing cover 7, so that the connection position of the external thread head 101 and the internal thread member can be pressed and fixed to achieve sealing, and a sealing ring is provided at the lower end of the sealing cover 7, and the sealing ring is pressed and fixed to prevent rainwater from entering the threaded connection from here, so that the solar support 100 and the roof of the camping house 200 are installed and fixed. The locking member of the solar panel 300 is installed and fixed by locking and fixing on the pull rod 3 of the solar panel support 100. The solar panel bracket 100 of this solution does not need to be provided with additional connectors, and can achieve rapid docking and assembly through the connectors configured by itself. The design of this solution can greatly improve the installation and assembly efficiency of the solar bracket in the wild environment.

[0044] The above description is only a preferred embodiment of the present invention and does not constitute any form of limitation to the present invention. Although the present invention has been disclosed as a preferred embodiment as above, it is not intended to limit the present invention. Any technician familiar with the profession can make some changes or modifications to equivalent embodiments of equivalent changes using the technical contents disclosed above without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. Solar panel bracket, characterized by: It includes a first column and a second column arranged parallel to each other, and the height of the first column is greater than that of the second column. The first ends of the first and second columns are connected by a tie rod, and tie rod nuts are fixedly provided at both ends of the rod body of the tie rod. The internal threads of the tie rod nuts arranged at both ends of the rod body are rotated in opposite directions. Tie rod bolts are installed in the tie rod nuts. The first ends of the first and second columns are provided with rotating clamps that cooperate with the tie rod bolts. The tie rod bolts at both ends of the tie rod are hung and fixed on the rotating clamps of the first and second columns. The tie rod is rotated around the central axis of the tie rod so that the first ends of the first and second columns are fixed and locked by the tie rod.

2. The solar panel bracket according to claim 1, characterized in that: The middle section of the first column and the middle section of the pull rod are connected by a strut, and strut nuts are respectively provided at both ends of the strut rod body. The rotation directions of the internal threads of the strut nuts provided at both ends of the strut rod body are opposite. A strut bolt is installed in the strut nut, and the first column and the pull rod are both provided with a rotating clamping plate that cooperates with the strut bolt. The strut bolt rests on the rotating clamping plate and rotates the strut around the central axis of the strut, so that the first column and the middle section of the pull rod are fixedly supported by the strut.

3. The solar panel support according to claim 1, characterized in that: The rotating clamp is rotatably arranged at the ends of the first and second columns and cannot jump along the axial direction of the first and second columns.

4. The solar panel support according to claim 2, characterized in that: The rotating clamping plate is rotatably arranged on the first column and the pull rod, and the first column and the pull rod are respectively provided with limiting structures for limiting the movement of the rotating clamping plate in the axial direction.

5. The solar panel bracket according to claim 1, characterized in that: The pull rod bolt includes a bolt pull rod head and pull rod arms symmetrically arranged on both sides of the bolt pull rod head, and the rotating clamp includes two symmetrically arranged hanging plates, a gap is formed between the two hanging plates, and hanging grooves are arranged on the hanging plates, the pull rod arms cooperate with the hanging grooves, and the bolt pull rod head passes through the gap between the two hanging plates and is connected to the pull rod nut.

6. The solar panel support according to claim 2, characterized in that: The support rod bolt comprises a bolt support rod head and a support arm arranged on the bolt support rod head. The rotating clamping plate is provided with a strip-shaped through groove, and the support arm can support and lean against the strip-shaped through groove.

7. The camping house with the solar panel bracket is characterized by: It includes the solar panel bracket as described in any one of claims 1-6, wherein the solar panel bracket is arranged in parallel in more than two groups, the second ends of the first and second columns of the solar panel bracket are respectively fixed on the roof of the barracks, the second ends of the first and second columns are formed with external thread heads, and the roof of the barracks is provided with internal threaded parts that are connected and adapted to the external thread heads.