Concrete curing equipment for building construction
By designing a device that includes a water tank, nozzles, water pumps and nozzles, the problem of difficulty in sprinkling and maintaining walls with existing technology is solved, effective maintenance of the ground and walls is achieved, and the labor intensity of the staff is reduced.
Patent Information
- Application Number
- CN202420012215.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-03
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-01-03
AI Technical Summary
The existing concrete curing equipment for building construction is difficult to effectively spray water on the wall and curing it, and there is a lack of solutions for pouring concrete on the wall.
A device is designed that includes a base plate, a water tank, a sprinkler head, a first water pump, a second water pump, a delivery pipe and a nozzle. The water source is stored in the water tank, and the first water pump and sprinkler heads are used to sprinkle water on the ground for maintenance. The second water pump and sprinkler are used. The pipe is used to spray water on the wall for maintenance, and the direction of the nozzle is adjusted through the rotating plate and mounting bracket to reduce the labor intensity of the staff.
It achieves effective maintenance of floor and wall concrete, is easy to use, reduces the labor intensity of staff, and improves the efficiency of equipment.
Smart Images

Figure CN221890142U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete construction, in particular to a kind of building construction concrete curing equipment. Background Art
[0002] Concrete is one of the most important civil engineering materials in contemporary times. It is an artificial stone made of cementitious materials, granular aggregates, water, and admixtures and additives added in a certain proportion when necessary, and is evenly stirred, compacted into shape, and cured and hardened. Concrete has the characteristics of abundant raw materials, low price, and simple production process.
[0003] The Chinese utility model patent with announcement number CN216341084U discloses a concrete pouring and curing device for construction, but the above patent can only perform watering and curing on the concrete poured on the ground, which is more difficult for wall curing. Therefore, we propose a concrete curing device for construction to solve the above problem. Utility Model Content
[0004] The purpose of the utility model is to provide a construction concrete curing device to solve the problems raised in the above background technology.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A concrete curing equipment for building construction comprises a base plate, the bottom surface of the base plate is fixedly connected to a nozzle, the upper surface of the base plate is fixedly connected to a water tank, the inner bottom wall of the water tank is fixedly connected to a first water pump and a second water pump, the output end of the first water pump is fixedly connected to a first delivery pipe, the end of the first delivery pipe away from the first water pump sequentially penetrates the water tank and the base plate and is fixedly connected to the input end of the nozzle, the upper surface of the water tank is rotatably connected to a rotating plate, the upper surface of the rotating plate and the upper surface of the water tank are jointly provided with a through opening, the upper surface of the rotating plate is fixedly connected to two mounting brackets, the side surfaces of the two mounting brackets close to each other are jointly hinged with a nozzle, the input end of the nozzle is fixedly connected to the second delivery pipe, the end of the second delivery pipe away from the nozzle penetrates the through opening and is fixedly connected to the output end of the second water pump.
[0007] In a further embodiment, a group of moving wheels are fixedly connected to the bottom surface of the base plate, and a push handle is fixedly connected to the right side surface of the water tank.
[0008] In a further embodiment, a drain valve and a water inlet pipe are fixedly connected on the front side of the water tank, and an observation window is fixedly embedded on the front side of the water tank.
[0009] In a further embodiment, a control panel is fixedly connected to the right side of the water tank, and a movable panel is hinged on the front side of the water tank.
[0010] In a further embodiment, a control rod is fixedly connected to the outer surface of the nozzle, and an anti-slip sleeve is fixedly connected to the outer surface of the control rod.
[0011] In a further embodiment, a sealing ring is sleeved on the outer surface of the second conveying pipe, and the bottom surface of the sealing ring is fixedly connected to the upper surface of the rotating plate.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] The device is provided with a water tank, which can be used to store water. The first water pump, the first delivery pipe and the nozzle are used to extract water and spray it outward to maintain the concrete cast on the ground. The second water pump is provided, and the second water pump, the second delivery pipe and the nozzle are used to spray water onto the wall, so that the concrete cast wall can be maintained. The device is convenient to use. The rotating plate can be used to facilitate the staff to adjust the use direction of the nozzle. The mounting bracket can be used to avoid the staff holding the nozzle for maintenance, which effectively reduces the labor intensity of the staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The present invention is a three-dimensional structural schematic diagram of concrete curing equipment for construction.
[0015] Figure 2 It is a three-dimensional structural schematic diagram of a front section view of concrete curing equipment for construction.
[0016] Figure 3 The present invention is a three-dimensional structural schematic diagram of a side view of a concrete curing equipment for construction.
[0017] Figure 4 The present invention is a three-dimensional structural schematic diagram of a bottom view of a concrete curing equipment for construction.
[0018] In the figure: 1. moving wheel; 2. bottom plate; 3. water tank; 4. push handle; 5. control panel; 6. anti-slip cover; 7. control lever; 8. nozzle; 9. nozzle; 10. drain valve; 11. observation window; 12. water inlet pipe; 13. movable plate; 14. rotating plate; 15. mounting bracket; 16. first delivery pipeline; 17. first water pump; 18. second water pump; 19. second delivery pipeline; 20. through port; 21. sealing ring. DETAILED DESCRIPTION
[0019] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.
[0020] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] See also Figure 1-4In the utility model, a construction concrete curing equipment comprises a base plate 2, a nozzle 9 is fixedly connected to the bottom surface of the base plate 2, a water tank 3 is fixedly connected to the upper surface of the base plate 2, a first water pump 17 and a second water pump 18 are fixedly connected to the inner bottom wall of the water tank 3, an output end of the first water pump 17 is fixedly connected to a first delivery pipe 16, an end of the first delivery pipe 16 away from the first water pump 17 sequentially penetrates the water tank 3 and the base plate 2 and is fixedly connected to the input end of the nozzle 9, a rotating plate 14 is rotatably connected to the upper surface of the water tank 3, a through opening 20 is commonly provided on the upper surface of the rotating plate 14, two mounting brackets 15 are fixedly connected to the upper surface of the rotating plate 14, a nozzle 8 is hingedly connected to one side of the two mounting brackets 15 close to each other, an input end of the nozzle 8 is fixedly connected to a second delivery pipe 19, an end of the second delivery pipe 19 away from the nozzle 8 penetrates the through opening 20 and is fixedly connected to the output end of the second water pump 18.
[0023] A group of moving wheels 1 are fixedly connected to the bottom surface of the base plate 2, and a push handle 4 is fixedly connected to the right side of the water tank 3. The moving wheels 1 and the push handle 4 can facilitate the staff to move and use the equipment. The front of the water tank 3 is fixedly connected to a drain valve 10 and a water inlet pipe 12. The front of the water tank 3 is fixedly inlaid with an observation window 11. The water volume inside the water tank 3 can be adjusted by the drain valve 10 and the water inlet pipe 12. The right side of the water tank 3 is fixedly connected to a control panel 5. The front of the water tank 3 is hinged with a movable plate 13. The control panel 5 can be used to operate the equipment, which is easy to use, and the inside of the water tank 3 can be cleaned through the movable plate 13.
[0024] The outer surface of the nozzle 8 is fixedly connected to a control rod 7, and the outer surface of the control rod 7 is fixedly connected to an anti-slip sleeve 6. The control rod 7 can facilitate the staff to control the use direction of the nozzle 8 for easy operation. The outer surface of the second conveying pipe 19 is sleeved with a sealing ring 21, and the bottom surface of the sealing ring 21 is fixedly connected to the upper surface of the rotating plate 14. The sealing ring 21 can be used to close the opening 20 to prevent external foreign matter from falling into the interior of the water tank 3.
[0025] The working principle of the utility model is:
[0026] When the staff uses this equipment, they can first add the used water source into the water tank 3 through the water inlet pipe 12, and then push it to the use position and connect the power supply. When maintaining, start the first water pump 17, and through the cooperation of the first delivery pipe 16 and the nozzle 9, water can be sprayed to the ground to maintain the ground concrete. When maintaining the wall, the second water pump 18 can be started, and the second water pump 18, the second delivery pipe 19 and the nozzle 8 can be used to spray water to the wall. At the same time, according to the needs, the staff can also use the control lever 7 to adjust the direction angle of the nozzle 8, which is convenient to use.
[0027] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
[0028] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A concrete curing device for construction, characterized in that: The invention comprises a bottom plate (2), the bottom surface of the bottom plate (2) being fixedly connected to a nozzle (9), the upper surface of the bottom plate (2) being fixedly connected to a water tank (3), the inner bottom wall of the water tank (3) being fixedly connected to a first water pump (17) and a second water pump (18), the output end of the first water pump (17) being fixedly connected to a first delivery pipe (16), the end of the first delivery pipe (16) away from the first water pump (17) passing through the water tank (3) and the bottom plate (2) in sequence and being fixedly connected to the input end of the nozzle (9), the upper surface of the water tank (3) being fixedly connected to a first water pump (17) and a second water pump (18) being fixedly connected to the inner bottom wall of the water tank (3), A rotating plate (14) is rotatably connected to the surface, a through opening (20) is formed on the upper surface of the rotating plate (14) and the upper surface of the water tank (3), two mounting brackets (15) are fixedly connected to the upper surface of the rotating plate (14), a nozzle (8) is hingedly connected to the side surfaces of the two mounting brackets (15) close to each other, the input end of the nozzle (8) is fixedly connected to a second delivery pipe (19), and the end of the second delivery pipe (19) away from the nozzle (8) passes through the through opening (20) and is fixedly connected to the output end of the second water pump (18).
2. A construction concrete curing equipment according to claim 1, characterized in that: A set of moving wheels (1) is fixedly connected to the bottom surface of the bottom plate (2), and a push handle (4) is fixedly connected to the right side surface of the water tank (3).
3. The construction concrete curing equipment according to claim 1, characterized in that: A drainage valve (10) and a water inlet pipe (12) are fixedly connected on the front of the water tank (3), and an observation window (11) is fixedly embedded on the front of the water tank (3).
4. The construction concrete curing equipment according to claim 1, characterized in that: A control panel (5) is fixedly connected to the right side of the water tank (3), and a movable plate (13) is hingedly connected to the front side of the water tank (3).
5. The construction concrete curing equipment according to claim 1, characterized in that: The outer surface of the nozzle (8) is fixedly connected to a control rod (7), and the outer surface of the control rod (7) is fixedly connected to an anti-slip sleeve (6).
6. The construction concrete curing equipment according to claim 1, characterized in that: The outer surface of the second conveying pipe (19) is sleeved with a sealing ring (21), and the bottom surface of the sealing ring (21) is fixedly connected to the upper surface of the rotating plate (14).