Industrially constructed reinforced concrete column
Through the design of semi-grouted sleeve connections and concrete pouring channels, the problems of difficult control of grouting quality and high-altitude alignment of vertical holes in industrial construction of reinforced concrete columns were solved, achieving efficient and low-cost construction of reinforced concrete columns.
Patent Information
- Application Number
- CN202420256952.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-02-02
AI Technical Summary
During the industrial construction process of existing reinforced concrete columns, there are problems such as the difficulty in controlling the grouting connection quality of the steel sleeves, the difficulty of high-altitude alignment of vertical holes, the high cost of hole formation, the high cost of combined threaded sleeves, and the long occupation time of hoisting equipment.
The semi-grouting sleeve connection and concrete pouring channel design are adopted. The semi-grouting sleeve and the steel bar are threaded or squeezed to achieve the grouting connection, reducing the difficulty of alignment. The concrete pouring channel also reduces the self-weight and hoisting cost of the prefabricated columns. .
It improves the grouting connection efficiency and quality control of reinforced concrete columns, reduces grouting costs and hoisting equipment time, simplifies the construction process, and improves construction efficiency and quality.
Smart Images

Figure CN221896051U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of construction, relates to new-type building industrialization, and particularly relates to an industrially constructed reinforced concrete column. Background Art
[0002] Industrialized construction can greatly reduce the demand for labor on construction sites, and replace traditional manual labor with mechanization. It is the development direction of construction methods under the current situation of "difficulty in recruiting workers" and "labor shortage" in the construction industry. Reinforced concrete columns are low in cost and excellent in fire resistance. They are widely used structural components in non-residential buildings in my country. At present, precast concrete columns are mostly used to achieve their industrialized construction. Commonly used precast concrete columns include precast columns connected by steel sleeve grouting and precast hollow columns. Precast columns connected by steel sleeve grouting are solid columns, and the upper and lower column longitudinal reinforcements are connected by sleeve grouting; precast hollow columns are provided with one or more vertical holes along the height direction, and the upper and lower column longitudinal reinforcements are connected by straight threaded joints or combined threaded sleeves, and post-cast concrete is poured in the vertical holes to form an integral reinforced concrete column. However, the above method usually has the following technical problems:
[0003] First, the grouting operation can only be carried out after the column bottom is sealed for the steel sleeve grouting connection precast column. The grouting sleeve is embedded in the concrete of the precast column, and pressure grouting is required. The grouting quality control is difficult and it is easy to leak. The strength of the longitudinal reinforcement connection is greatly affected by the grouting quality. At the same time, the solid precast column has a large deadweight, which requires high on-site lifting equipment and has high lifting costs.
[0004] Second, when the prefabricated hollow column longitudinal reinforcement is connected by a straight threaded joint, the longitudinal reinforcement needs to be arranged in the vertical hole. It is difficult to align the vertical hole of the prefabricated hollow column with the longitudinal reinforcement at high altitude. At the same time, the prefabricated hollow column needs to reserve multiple vertical holes to penetrate the longitudinal reinforcement. The cost of hole making is high. The steel bars in the node area of the construction site are easy to block the vertical holes. In the process of pouring the post-cast concrete, the number of vertical holes that need to be vibrated is large, and the construction efficiency is low.
[0005] Third, when the prefabricated hollow column load-bearing longitudinal reinforcement is connected by a combined threaded sleeve, the allowable error of the upper and lower layers of the load-bearing longitudinal reinforcement is small, the alignment is difficult, and the cost of the combined threaded sleeve is high. The connection construction needs to be carried out on site without removing the hook, which occupies the lifting equipment for a long time. Utility Model Content
[0006] In order to overcome the shortcomings of the above-mentioned prior art, the utility model proposes an industrially constructed reinforced concrete column, which has the advantages of a large allowable error in the alignment of the load-bearing longitudinal reinforcement and the sleeve of the prefabricated column connected by the steel sleeve grouting, and easy control of the construction quality of the prefabricated hollow column. It avoids one or more of the problems of the prior art, such as the difficulty in quality control of pressure grouting, the difficulty in high-altitude alignment of vertical holes and load-bearing longitudinal reinforcement, the high cost of drilling multiple vertical holes, the easy obstruction of vertical holes by steel bars in the node area, the low construction efficiency of post-cast concrete for multiple vertical holes, the high cost of combined threaded sleeves, and the long-term occupation of lifting equipment.
[0007] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0008] An industrially constructed reinforced concrete column comprises a precast column and a connecting post-casting section, wherein the precast column is formed by combining steel bars and concrete, and the cross section of the precast column is a square or unequal-sided rectangle, and is used to realize the industrialized construction of reinforced concrete columns in buildings, wherein the precast column is provided with a concrete pouring channel, which is a vertical hole penetrating the height direction of the precast column, the concrete pouring channel is located at the center of the cross section of the precast column, the wall thickness of the concrete pouring channel side wall at the thinnest position is not less than 40 mm, and the cross-sectional area of the concrete pouring channel is not less than 20% of the cross-sectional area of the precast column; the connecting post-casting section is located below the precast column, and the top of the connecting post-casting section is connected to the concrete pouring section. The channels are connected, and the post-casting section is filled with concrete. The concrete in the post-casting section fills the post-casting section through the concrete pouring channel. The longitudinal bars and stirrups of the reinforced concrete column are arranged in the precast column. The longitudinal bars are located within the solid concrete range in the cross section of the precast column. A plurality of corner stress-bearing longitudinal bars are arranged at the four corners of the precast column. The corner stress-bearing longitudinal bars extend from both ends of the precast column in the height direction. A semi-grouting sleeve is arranged at the upper end of the corner stress-bearing longitudinal bars. The upper end of the semi-grouting sleeve is a grouting connection section. The semi-grouting sleeve at the upper end of the corner stress-bearing longitudinal bars of the lower precast column extends to the post-casting section below the upper precast column. The lower end of the corner stress-bearing longitudinal bars of the upper precast column is inserted into the semi-grouting sleeve for grouting connection.
[0009] Specifically, when the spacing between the stress-bearing longitudinal reinforcements at the adjacent corners of each side length of the precast column is greater than 400 mm, the side-center stress-bearing longitudinal reinforcement is set in the middle of the side length of the precast column; or, when the spacing between the stress-bearing longitudinal reinforcements at the adjacent corners of each side length of the precast column is not greater than 400 mm, the side-center structural longitudinal reinforcement is set in the middle of the side length of the precast column.
[0010] In some embodiments, when the cross-section of the precast column is a square, multiple corner stress-bearing longitudinal reinforcements at the four corners are assembled into a small steel cage through a small continuous spiral hoop, and the structural longitudinal reinforcements or the stress-bearing longitudinal reinforcements in the middle of the four sides are assembled into a large steel cage through a large continuous spiral hoop. The small steel cages at the four corners overlap with the large steel cage to form a steel cage of the reinforced concrete column.
[0011] In some embodiments, when the cross-section of the precast column is an unequal-sided rectangle, large stirrups are arranged on the periphery of the cross-section of the precast column to constrain multiple corner stress-bearing longitudinal reinforcements at the four corners, and polygonal stirrups are arranged in the middle of the cross-section to constrain the structural longitudinal reinforcements or the stress-bearing longitudinal reinforcements in the middle of the edge, and the polygonal stirrups are hexagonal stirrups or octagonal stirrups.
[0012] Optionally, when the diameter of the above-mentioned side-loaded longitudinal reinforcement is 14mm, 16mm or 18mm, the side-loaded longitudinal reinforcement of the lower precast column extends from the top of the precast column, bends and extends into the concrete pouring channel of the upper precast column, and is indirectly overlapped and connected with the side-loaded longitudinal reinforcement of the upper precast column.
[0013] Optionally, when the diameter of the above-mentioned side-middle stress-bearing longitudinal reinforcement is greater than 18 mm, the side-middle stress-bearing longitudinal reinforcement extends from both ends of the prefabricated column in the height direction, and a semi-grouting sleeve is arranged at the upper end of the side-middle stress-bearing longitudinal reinforcement, and the upper end of the semi-grouting sleeve is a grouting connection section. The semi-grouting sleeve at the upper end of the side-middle stress-bearing longitudinal reinforcement of the lower prefabricated column extends to the lower part of the upper prefabricated column to connect to the post-casting section, and the lower end of the side-middle stress-bearing longitudinal reinforcement of the upper prefabricated column is inserted into the semi-grouting sleeve and connected by grouting.
[0014] Particularly, the cross-section of the concrete pouring channel is circular or rectangular with rounded corners.
[0015] Furthermore, when the stirrups pass through the concrete pouring channel, the concrete pouring channel is generated in a centrifugal manner; when the stirrups do not pass through the concrete pouring channel, the concrete pouring channel is generated by occupying an air bag or a metal core mold, and the wall thickness of the thinnest position of the concrete on the side wall of the concrete pouring channel of the precast column with an unequal rectangular cross-section is not more than 200 mm.
[0016] Specifically, the outer large stirrups are continuous stirrups, or the outer large stirrups are formed by a combination of a rectangular stirrup and a plurality of tension bars.
[0017] In particular, the upper end of the corner stress-bearing longitudinal reinforcement or the side stress-bearing longitudinal reinforcement is connected to the semi-grouting sleeve by threaded fit or extrusion interference fit, and a water-proof hole is provided at the bottom of the grouting connection section of the semi-grouting sleeve. The water-proof hole runs through the side wall of the semi-grouting sleeve, and the diameter of the water-proof hole is 2 to 4 mm.
[0018] Compared with the prior art, the beneficial effects of the utility model are:
[0019] (1) The load-bearing longitudinal reinforcement of the upper and lower prefabricated columns of the utility model is connected by a semi-grouting sleeve. The allowable error of the alignment between the load-bearing longitudinal reinforcement and the semi-grouting sleeve is greater than that of the combined threaded sleeve. The alignment difficulty is low and the installation efficiency is high.
[0020] (2) The semi-grouting sleeve of the utility model is located in the post-casting section of the connection, and the upper end of the semi-grouting sleeve is the grouting connection section, which is connected to the upper steel bar by grouting, and is connected to the lower steel bar by threaded fit or extrusion interference fit. The opening of the semi-grouting sleeve faces upward, and the grouting material is directly poured into the upper opening of the semi-grouting sleeve and the steel bar is inserted to achieve the grouting connection. The sealing and pressure grouting operations of the existing steel bar sleeve grouting connection prefabricated column are not required. The grouting quality is easy to control, which greatly reduces the grouting cost. In addition, the steel bar connection can be achieved during the hoisting and falling process of the prefabricated column, avoiding the long-term occupation of the hoisting equipment by the traditional combined threaded sleeve connection construction, and greatly improving the installation efficiency.
[0021] (3) The utility model precast column is provided with a vertical hole with a larger cross-section to realize the concrete pouring of the bottom connection post-cast section. The vertical hole is not easily blocked by the steel bars in the node area at the top of the precast column. The post-cast concrete pouring is convenient, and only one vibration is required to ensure that the post-cast concrete in the vertical hole is dense. There is no need to vibrate the post-cast concrete in multiple vertical holes one by one. The post-cast concrete construction efficiency is high and the pouring quality is easy to ensure.
[0022] (4) The utility model has the advantages of large allowable error in the alignment of the longitudinal reinforcement of the precast column and the sleeve connected by the steel sleeve grouting, and at the same time has the advantages of precast column connection by pouring concrete after the hollow composite column is cast. The construction is convenient and the construction quality is easy to control.
[0023] (5) The utility model can ensure that the hollow ratio of the prefabricated column is not less than 20% by setting up the concrete pouring channel, which greatly reduces the dead weight of the prefabricated column, reduces the requirement for the hoisting capacity of the on-site hoisting equipment, and increases the hoisting cost.
[0024] (6) The semi-grouting sleeve of the utility model has a simple structure after being inverted, and the overall cost is significantly lower than that of the traditional semi-grouting sleeve and the combined threaded sleeve. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0026] Figure 1 It is a schematic diagram of the three-dimensional structure of some embodiments of the industrially constructed reinforced concrete column of the utility model, wherein the cross section of the prefabricated column is square, the cross section of the concrete pouring channel is circular, and the side and middle stress-bearing longitudinal reinforcements are connected by semi-grouting sleeves.
[0027] Figure 2 for Figure 1 Schematic diagram of the composition of the precast column reinforcement cage.
[0028] Figure 3 for Figure 1 Schematic diagram of the cross section of the precast column.
[0029] Figure 4 for Figure 1 Schematic diagram of the connection structure between the longitudinal reinforcement of the middle and lower precast columns and the upper precast columns.
[0030] Figure 5 for Figure 1 Schematic diagram of the three-dimensional structure of the middle half grouting sleeve.
[0031] Figure 6 It is a schematic structural diagram of some embodiments of the industrially constructed reinforced concrete column of the utility model, wherein the cross section of the prefabricated column is a square, the cross section of the concrete pouring channel is a rounded rectangle, and the side longitudinal reinforcement is arranged in the middle of the side length.
[0032] Figure 7 for Figure 6 An improvement of the industrially constructed reinforced concrete columns shown.
[0033] Figure 8 It is a schematic diagram of the three-dimensional structure of some embodiments of the industrially constructed reinforced concrete column of the utility model, wherein the cross section of the prefabricated column is a square, the cross section of the concrete pouring channel is a rounded rectangle, and the longitudinal reinforcement in the side is connected by indirect lap joints.
[0034] Fig. 9 It is a schematic structural diagram of some embodiments of the industrially constructed reinforced concrete column of the utility model, wherein the cross section of the prefabricated column is an unequal-sided rectangle, the cross section of the concrete pouring channel is a rounded rectangle, and the side-mid stress-bearing longitudinal reinforcement is arranged in the middle of the side length.
[0035] Fig.10 for Fig. 9 Schematic diagram of the structure of the middle and outer large stirrups.
[0036] Fig.11 for Fig. 9 Schematic diagram of the structure of the hexagonal stirrups of the longitudinal reinforcement in the middle restraint side.
[0037] Fig.12 for Fig. 9 An improvement of the industrially constructed reinforced concrete columns shown.
[0038] In the figure: 1-precast column; 11-lower precast column; 12-upper precast column; 2-connecting post-casting section; 3-concrete pouring channel; 41-corner stress-bearing longitudinal reinforcement; 42-side stress-bearing longitudinal reinforcement; 43-side structural longitudinal reinforcement; 51-small continuous spiral stirrups; 52-large continuous spiral stirrups; 53-large stirrups; 54-polygonal stirrups; 6-semi-grouting sleeves; 61-anti-water accumulation holes. DETAILED DESCRIPTION
[0039] Embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be construed as being limited to the embodiments described herein. On the contrary, the embodiments are provided to provide a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present invention are only for exemplary purposes and are not intended to limit the scope of protection of the present invention.
[0040] Unless otherwise specified, the technical and scientific terms used in this document have the same meanings as commonly understood by ordinary technicians in the technical field to which this application belongs; other experimental methods and technical means not specifically specified in this application refer to experimental methods and technical means commonly used by ordinary technicians in this field.
[0041] The utility model provides an industrially constructed reinforced concrete column, which is used to realize the industrialized construction of reinforced concrete columns in buildings. It absorbs the advantages of the steel sleeve grouting connection prefabricated column, such as large allowable error between the stress longitudinal reinforcement and the sleeve, and easy control of the construction quality of prefabricated hollow columns. It avoids the disadvantages of the existing technology, such as the difficulty of pressure grouting quality control, the difficulty of high-altitude alignment between vertical holes and stress longitudinal reinforcement, the high cost of multiple vertical holes, the steel bars in the node area easily blocking the vertical holes, the low construction efficiency of multiple vertical holes poured with concrete, the high cost of combined threaded sleeves, and the long-term occupation of lifting equipment. Figure 1 , Figure 3The reinforced concrete column of the utility model for industrial construction includes a precast column 1 and a connecting post-casting section 2. The precast column 1 is formed by a combination of steel bars and concrete. The cross section of the precast column 1 is a square or an unequal-sided rectangle. The precast column 1 is provided with a concrete pouring channel 3. The concrete pouring channel 3 is a vertical hole that runs through the height direction of the precast column 1. The concrete pouring channel 3 is located at the center of the cross section of the precast column 1. The wall thickness of the concrete pouring channel 3 at the thinnest position of the side wall concrete is not less than 40 mm. The cross-sectional area of the concrete pouring channel 3 is not less than 20% of the cross-sectional area of the precast column 1, so as to control the deadweight of the precast column 1; the connecting post-casting section 2 is located below the precast column 1, and the top of the connecting post-casting section 2 is connected to the concrete pouring channel 3. The connecting The post-casting section 2 is filled with concrete, and the concrete in the post-casting section 2 is filled with the post-casting section 2 through the concrete pouring channel 3; the longitudinal bars and stirrups of the reinforced concrete column are arranged in the precast column 1, and the longitudinal bars are located in the solid concrete range in the cross section of the precast column. A plurality of corner stress longitudinal bars 41 are arranged at the four corners of the precast column 1, and the corner stress longitudinal bars 41 extend from both ends of the precast column 1 in the height direction. A semi-grouting sleeve 6 is arranged at the upper end of the corner stress longitudinal bar 41, and the upper end of the semi-grouting sleeve 6 is a grouting connection section. The semi-grouting sleeve 6 at the upper end of the corner stress longitudinal bar 41 of the lower precast column 11 extends into the post-casting section 2 below the upper precast column 12, and the lower end of the corner stress longitudinal bar 41 of the upper precast column 12 is inserted into the semi-grouting sleeve 6 and connected by grouting.
[0042] In the description of the present invention, it should be noted that the terms "upper floor" and "lower floor" are the actual positional relationship between the upper and lower floors in the actual building structure, and the terms "top", "bottom", "above", "below", "upper end" and "lower end" are based on the orientation or positional relationship of the reinforced concrete columns industrially constructed according to the present invention when used. The above terms restrict the orientation and structure of the reinforced concrete columns industrially constructed according to the present invention.
[0043] Compared with the existing steel sleeve grouting connection prefabricated column, the semi-grouting sleeve 6 in the utility model opens upward, and the grouting material is directly poured into the upper opening of the semi-grouting sleeve 6 and the steel bar is inserted to achieve the grouting connection, thereby avoiding the sealing and pressure grouting operations of the traditional steel sleeve grouting connection prefabricated column, and the grouting quality is easy to control. Compared with the existing prefabricated hollow column connected by straight threaded joints with longitudinal reinforcement, the utility model completes the alignment of the steel bar and the semi-grouting sleeve 6 at the bottom of the prefabricated column 1, the alignment difficulty is low, there is no high-altitude operation, and only one vertical hole is set as the concrete pouring channel 3 to realize the pouring of the post-cast concrete in the post-cast section 2. Under the premise of effectively controlling the self-weight of the prefabricated column 1, the number of vibrations of the post-cast concrete is significantly reduced, and at the same time, it is avoided that the steel bars in the top node area of the prefabricated column 1 block the concrete pouring channel 3, and the construction efficiency of the post-cast concrete is high and the pouring quality is easy to ensure. Compared with the existing prefabricated hollow columns in which the load-bearing longitudinal reinforcement is connected by a combined threaded sleeve, the allowable error of the alignment between the semi-grouting sleeve 6 and the steel bar is significantly larger than the allowable error of the alignment between the combined threaded sleeve and the steel bar, and the steel bar connection can be achieved during the hoisting and falling process of the prefabricated column, avoiding the long-term occupation of the hoisting equipment by the traditional combined threaded sleeve connection construction, greatly improving the installation efficiency, and significantly reducing the cost of the load-bearing longitudinal reinforcement connection.
[0044] refer to Figure 1 to Figure 5 , showing the structural schematic diagram of some embodiments of the industrially constructed reinforced concrete column of the utility model. Figure 1 , Figure 3 As shown, the industrially constructed reinforced concrete column includes a precast column 1 and a connecting post-casting section 2. The precast column 1 is manufactured in a factory. The cross section of the precast column 1 is square, wherein a concrete pouring channel 3 is arranged at the center of the cross section of the precast column 1. The concrete pouring channel 3 is a vertical hole that runs through the height direction of the precast column 1. The wall thickness of the thinnest position of the side wall concrete of the concrete pouring channel 3 is not less than 40 mm. The cross section of the concrete pouring channel 3 is circular and the cross-sectional area is not less than 20% of the cross-sectional area of the precast column 1. After the precast column 1 is manufactured, it is transported to the construction site for hoisting. The connecting post-casting section 2 is located below the precast column 1. The top of the connecting post-casting section 2 is connected to the concrete pouring channel 3. The connection of the load-bearing longitudinal reinforcement of the reinforced concrete column is realized in the connecting post-casting section 2. The post-casting concrete is poured through the top of the concrete pouring channel 3. The efficient pouring and dense filling of the post-casting concrete in the connecting post-casting section 2 and the concrete pouring channel 3 are realized, and the construction of the connecting post-casting section 2 is completed. The precast column 1 and the connecting post-casting section 2 together form an integral reinforced concrete column.
[0045] like Figure 1 to Figure 3As shown, the longitudinal reinforcement and stirrups of the reinforced concrete column are arranged in the precast column 1, and the longitudinal reinforcement is located within the solid concrete range in the cross section of the precast column 1. A plurality of corner stress longitudinal reinforcements 41 are arranged at the four corners of the precast column 1, and the spacing between the corner stress longitudinal reinforcements of each side length of the precast column 1 is greater than 400 mm. In order to ensure the seismic performance of the reinforced concrete column, a side-middle stress longitudinal reinforcement 42 is arranged in the middle of the side length of each side of the precast column 1; the plurality of corner stress longitudinal reinforcements 41 at the four corners are assembled into an independent small steel cage through a small continuous spiral stirrup 51, and the side-middle stress longitudinal reinforcements 42 at the middle of the four sides are assembled into a large steel cage through a large continuous spiral stirrup 52. The small steel cages at the four corners overlap with the large steel cage to form a steel cage of the reinforced concrete column, and the overlapping small continuous spiral stirrups 51 and the large continuous spiral stirrups 52 form a restraining effect on the longitudinal reinforcement and concrete of the reinforced concrete column. At the same time, a large area of non-reinforced area can be formed at the center of the cross section of the precast column 1, which is convenient for setting the concrete pouring channel 3. In particular, the small continuous spiral stirrups 51 and the large continuous spiral stirrups 52 do not pass through the concrete pouring channel 3. When the prefabricated column 1 is manufactured in the factory, the concrete pouring channel 3 can be formed by directly using an air bag or a metal core mold to occupy the position.
[0046] like Figure 1 , Figure 4 As shown, the diameter of the side stress longitudinal reinforcement 42 is greater than 18mm, the corner stress longitudinal reinforcement 41 and the side stress longitudinal reinforcement 42 are extended from both ends of the precast column 1 in the height direction, and the upper ends of the corner stress longitudinal reinforcement 41 and the side stress longitudinal reinforcement 42 are provided with semi-grouting sleeves 6 one by one, and the upper ends of the corner stress longitudinal reinforcement 41 and the side stress longitudinal reinforcement 42 are connected with the semi-grouting sleeves 6 by threaded fit or extrusion interference fit; the upper end of the semi-grouting sleeve 6 is a grouting connection section, and the corner stress longitudinal reinforcement of the lower precast column 11 41. The semi-grouting sleeve 6 at the upper end of the side and middle stress-bearing longitudinal reinforcement 42 extends to the connecting post-casting section 2 below the upper prefabricated column 12. After the construction of the lower structure is completed, the upper prefabricated column 12 is hoisted, and the lower ends of the corner stress-bearing longitudinal reinforcement 41 and the side and middle stress-bearing longitudinal reinforcement 42 of the upper prefabricated column 12 are inserted into the semi-grouting sleeve 6 at the corresponding positions one by one and connected by grouting. The connection between the corner stress-bearing longitudinal reinforcement 41 and the side and middle stress-bearing longitudinal reinforcement 42 of the lower prefabricated column 11 and the upper prefabricated column 12 is realized through the semi-grouting sleeve 6.
[0047] like Figure 5 As shown, a water-prevention hole 61 is provided at the bottom of the grouting connection section of the semi-grouting sleeve 6. The water-prevention hole 61 runs through the side wall of the semi-grouting sleeve 6. The diameter of the water-prevention hole 61 is 2 to 4 mm. The water-prevention hole 61 can prevent water from accumulating in the semi-grouting sleeve 6 and prevent the influence of water on the strength of the grouting material.
[0048] like Figure 1 , Figure 4 and Figure 6As shown, the opening of the semi-grouting sleeve 6 faces upward. Before the upper prefabricated column 12 is hoisted, the anti-water accumulation hole 61 is plugged, and the grouting material is directly poured into the upper opening of the semi-grouting sleeve 6. The lower ends of the stress-bearing longitudinal reinforcements 41 at the corners and the stress-bearing longitudinal reinforcements 42 in the middle of the upper prefabricated column 12 are inserted one by one into the semi-grouting sleeve 6 at the corresponding positions to achieve grouting connection, thereby avoiding the sealing and pressure grouting operations of the traditional steel sleeve grouting connection prefabricated column, and the grouting quality is easy to control.
[0049] In some embodiments, reference Figure 6 The cross section of the precast column 1 is a square, and the cross section of the concrete pouring channel 3 is a rounded rectangle. The rounded rectangle can maximize the cross-sectional area of the concrete pouring channel 3 while ensuring that the concrete pouring channel 3 does not cross the stirrups, thereby increasing the hollow ratio of the precast column 1, reducing the deadweight of the precast column 1, and reducing the requirements for the lifting capacity; in particular, the spacing between the adjacent corner force longitudinal reinforcements 41 of each side length of the precast column 1 is not greater than 400mm, and the side middle structural longitudinal reinforcements 43 are arranged in the middle of each side length of the precast column 1. The side middle structural longitudinal reinforcements 43 of the upper and lower reinforced concrete columns are not connected and do not participate in the force calculation.
[0050] Figure 7 Shown Figure 6 The improved type of reinforced concrete column constructed by new industrialization in China, the specific improvement lies in the cross-sectional form and implementation method of the concrete pouring channel 3, in Figure 6 On the basis of the above, the cross-sectional form of the concrete pouring channel 3 is improved to a circle, and part of the small continuous spiral stirrups 51 enter the concrete pouring channel 3, which can further improve the hollow ratio of the precast column 1, reduce the deadweight of the precast column 1, and reduce the requirement for the lifting capacity; at the same time, part of the small continuous spiral stirrups 51 enter the concrete pouring channel 3, and the concrete pouring channel 3 cannot be formed by occupying a position. The concrete pouring channel 3 is generated in a centrifugal manner when the precast column 1 is manufactured.
[0051] In some embodiments, reference Figure 8 The cross section of the precast column 1 is a square, the cross section of the concrete pouring channel 3 is a rounded rectangle, the spacing between the adjacent corner stress longitudinal reinforcements of each side of the precast column 1 is greater than 400mm, in order to ensure the seismic performance of the reinforced concrete column, the side middle stress longitudinal reinforcement 42 is arranged in the middle of the side length of each side of the precast column 1, on the basis of ensuring that the stress requirements are met, by adjusting the relative diameters of the corner stress longitudinal reinforcement 41 and the side middle stress longitudinal reinforcement 42, the diameter of the side middle stress longitudinal reinforcement 42 is controlled to be 14mm, 16mm or 18mm, at this time, the side middle stress longitudinal reinforcement 42 of the lower precast column 11 extends from the top of the precast column, bends and extends into the concrete pouring channel 3 of the upper precast column 12, and is indirectly overlapped and connected with the side middle stress longitudinal reinforcement 42 of the upper precast column 12, which can reduce the number of semi-grouting sleeves 6, reduce the installation difficulty and the stress longitudinal reinforcement connection cost.
[0052] In some embodiments, reference Fig. 9 The cross section of the precast column 1 is an unequal-sided rectangle. A plurality of corner longitudinal reinforcements 41 are arranged at the four corners of the precast column 1. Large stirrups 53 are arranged on the periphery of the cross section of the precast column 1 to constrain the plurality of corner longitudinal reinforcements 41 at the four corners, forming a stirrup constraint effect on the corner longitudinal reinforcements 41 and the column concrete. The large stirrups 53 on the periphery are Fig.10 The continuous stirrup shown, or the large stirrup 53 on the periphery, uses a rectangular stirrup combined with a plurality of tension bars to constrain the diagonal longitudinal reinforcement 41. The continuous stirrup can improve the efficiency of stirrup binding and reduce the amount of steel bars used. The spacing between the adjacent corner longitudinal reinforcements of each side of the precast column 1 is greater than 400 mm. In order to ensure the seismic performance of the reinforced concrete column, at least one side longitudinal reinforcement 42 is arranged in the middle of each side of the precast column 1. A polygonal stirrup 54 is arranged in the middle of the cross section to constrain the side longitudinal reinforcement 42 while avoiding the intersection of the polygonal stirrup 54 and the concrete pouring channel 3 to affect the production of the precast column 1. The form of the polygonal stirrup 54 is determined according to the number of the side longitudinal reinforcement 42. When the total number of the side longitudinal reinforcement 42 on the four sides is six, the polygonal stirrup 54 is adopted. Fig.11 The hexagonal stirrups shown in the figure, in some cases when the total number of the load-bearing longitudinal reinforcements 42 on the four sides is eight, the polygonal stirrups 54 adopt octagonal stirrups; the cross-sectional form of the concrete pouring channel 3 is a rounded rectangle, the polygonal stirrups 54 do not pass through the concrete pouring channel 3, the concrete pouring channel 3 is generated by an air bag or a metal core mold, and the wall thickness of the thinnest position of the concrete on the side wall of the concrete pouring channel 3 is not more than 200 mm to ensure the hollow ratio.
[0053] Fig.12 Shown Fig. 9 The improved type of reinforced concrete column constructed by new industrialization in China, the specific improvement lies in the cross-sectional form and implementation method of the concrete pouring channel 3, in Fig. 9 On the basis of the above, the cross-sectional form of the concrete pouring channel 3 is improved to a circle, and part of the stirrups enter the concrete pouring channel 3, which can further increase the hollow ratio of the precast column 1, reduce the dead weight of the precast column 1, and reduce the requirements for the lifting capacity. The concrete pouring channel 3 is generated in a centrifugal manner when the precast column 1 is manufactured.
[0054] In summary, in the utility model, the arrangement of the semi-grouting sleeve is optimized and the reinforcement structure of the precast column is optimized, and the advantages of large allowable error in the alignment of the stressed longitudinal reinforcement and the sleeve of the precast column by the steel sleeve grouting connection and easy control of the construction quality of the precast hollow column are achieved. Compared with the traditional steel sleeve grouting connection of the precast column, there is no need for sealing and pressure grouting, and the precast hollow column has a light weight and low hoisting cost; compared with the precast hollow column in which the stressed longitudinal reinforcement is connected by a straight threaded joint, there is no need for high-altitude alignment and the installation efficiency is high, and the cross-sectional size of the concrete pouring channel is large and not easily blocked by the steel bars in the node area, and the post-pouring concrete construction efficiency is high; compared with the precast hollow column in which the stressed longitudinal reinforcement is connected by a combined threaded sleeve, the allowable error in the alignment of the semi-grouting sleeve and the stressed longitudinal reinforcement is significantly greater than the allowable error in the alignment of the combined threaded sleeve and the stressed longitudinal reinforcement, and the installation efficiency is high. The semi-grouting sleeve grouting connection can be realized during the hoisting and falling process of the precast hollow column, and there is no need to occupy the hoisting equipment for a long time.
[0055] The above description is only some preferred embodiments of the utility model and an explanation of the technical principles used. Those skilled in the art should understand that the disclosure scope involved in the embodiments of the utility model is not limited to the technical solutions formed by the specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in the embodiments of the utility model (but not limited to) to form a technical solution.
Claims
1. An industrially constructed reinforced concrete column, comprising a prefabricated column and a connecting post-cast section, wherein the prefabricated column is formed by combining steel bars and concrete, and the cross section of the prefabricated column is a square or unequal-sided rectangle, and is used to realize the industrialized construction of reinforced concrete columns in buildings, and is characterized by: The precast column is provided with a concrete pouring channel, which is a vertical hole that runs through the height direction of the precast column. The concrete pouring channel is located at the center of the cross section of the precast column. The wall thickness of the concrete pouring channel side wall at the thinnest position is not less than 40 mm, and the cross-sectional area of the concrete pouring channel is not less than 20% of the cross-sectional area of the precast column. The connecting post-casting section is located below the prefabricated column, the top of the connecting post-casting section is connected to the concrete pouring channel, the connecting post-casting section is filled with concrete, and the concrete in the connecting post-casting section fills the connecting post-casting section through the concrete pouring channel; The longitudinal reinforcement and stirrups of the reinforced concrete column are all arranged in the precast column, and the longitudinal reinforcement is all located within the range of solid concrete in the cross section of the precast column. A plurality of corner stress-bearing longitudinal reinforcements are arranged at the four corners of the precast column, and the corner stress-bearing longitudinal reinforcements extend from both ends of the precast column in the height direction. A semi-grouting sleeve is arranged at the upper end of the corner stress-bearing longitudinal reinforcement, and the upper end of the semi-grouting sleeve is a grouting connection section. The semi-grouting sleeve at the upper end of the corner stress-bearing longitudinal reinforcement of the lower precast column extends to the lower part of the upper precast column to connect to the post-casting section, and the lower end of the corner stress-bearing longitudinal reinforcement of the upper precast column is inserted into the semi-grouting sleeve and connected by grouting.
2. The industrially constructed reinforced concrete column according to claim 1, characterized in that: When the spacing between the stress-bearing longitudinal reinforcements at the adjacent corners of each side length of the precast column is greater than 400mm, the side-center stress-bearing longitudinal reinforcements shall be arranged in the middle of the side length of the precast column; or, when the spacing between the stress-bearing longitudinal reinforcements at the adjacent corners of each side length of the precast column is not greater than 400mm, the side-center structural longitudinal reinforcements shall be arranged in the middle of the side length of the precast column.
3. The industrially constructed reinforced concrete column according to claim 2, characterized in that: When the cross-section of the precast column is a square, multiple corner stress-bearing longitudinal reinforcements at the four corners are assembled into a small steel cage through a small continuous spiral stirrup, and the structural longitudinal reinforcements or the stress-bearing longitudinal reinforcements in the middle of the four sides are assembled into a large steel cage through a large continuous spiral stirrup. The small steel cages at the four corners overlap with the large steel cage to form a steel cage of the reinforced concrete column.
4. The industrially constructed reinforced concrete column according to claim 2, characterized in that: When the cross-section of the precast column is an unequal-sided rectangle, large stirrups are arranged on the periphery of the cross-section of the precast column to constrain multiple corner load-bearing longitudinal reinforcements at the four corners, and polygonal stirrups are arranged in the middle of the cross-section to constrain the structural longitudinal reinforcements or the load-bearing longitudinal reinforcements in the middle of the edge. The polygonal stirrups are hexagonal stirrups or octagonal stirrups.
5. The industrially constructed reinforced concrete column according to claim 2, characterized in that: When the diameter of the side-center stress-bearing longitudinal reinforcement is 14mm, 16mm or 18mm, the side-center stress-bearing longitudinal reinforcement of the lower precast column extends from the top of the precast column, bends and extends into the concrete pouring channel of the upper precast column, and is indirectly overlapped and connected with the side-center stress-bearing longitudinal reinforcement of the upper precast column.
6. The industrially constructed reinforced concrete column according to claim 2, characterized in that: When the diameter of the side-middle stress-bearing longitudinal reinforcement is greater than 18 mm, the side-middle stress-bearing longitudinal reinforcement extends from both ends of the precast column in the height direction, and a semi-grouting sleeve is arranged on the upper end of the side-middle stress-bearing longitudinal reinforcement, and the upper end of the semi-grouting sleeve is a grouting connection section. The semi-grouting sleeve at the upper end of the side-middle stress-bearing longitudinal reinforcement of the lower precast column extends to the lower part of the upper precast column to connect to the post-casting section, and the lower end of the side-middle stress-bearing longitudinal reinforcement of the upper precast column is inserted into the semi-grouting sleeve and connected by grouting.
7. The industrially constructed reinforced concrete column according to claim 1, characterized in that: The cross-section of the concrete pouring channel is circular or rounded rectangular.
8. The industrially constructed reinforced concrete column according to claim 1, characterized in that: When the stirrups pass through the concrete pouring channel, the concrete pouring channel is generated in a centrifugal manner; When the stirrups do not pass through the concrete pouring channel, the concrete pouring channel is generated by air bags or metal core molds. The wall thickness of the thinnest position of the concrete on the side wall of the concrete pouring channel of the precast column with an unequal rectangular cross-section shall not exceed 200mm.
9. The industrially constructed reinforced concrete column according to claim 4, characterized in that: The outer large stirrups are continuous stirrups, or the outer large stirrups are formed by a combination of a rectangular stirrup and a plurality of tension bars.
10. The industrially constructed reinforced concrete column according to claim 1 or 6, characterized in that: The upper end of the corner stress-bearing longitudinal reinforcement or the side stress-bearing longitudinal reinforcement is connected to the semi-grouting sleeve by threaded fit or extrusion interference fit. A water-proof hole is arranged at the bottom of the grouting connection section of the semi-grouting sleeve. The water-proof hole runs through the side wall of the semi-grouting sleeve. The diameter of the water-proof hole is 2 to 4 mm.